Search NASA⌕ Search

SEARCH · Search NASA

Results for “New Millennium Program Space Flight Technology”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Success Criteria and Risk Management for the New Millennium Program

The NASA New Millennium Program (NMP) is a technology development and validation program that will flight-validate advanced, new technologies with space flight applications. NMP's purpose is twofold. First, it will develop technologies that will enable future spacecraft to be smaller, more capable and reliable, and to be launched more frequently. Second, it will validate the technologies in flight to reduce the risks to future science missions in flying these technologies for the first time. To measure the program's success, NMP has devised a set of criteria that stresses the relevance of technologies selected for flight validation to NASA's 21st-century science mission needs. Also, NMP has instituted a 'risk management' policy, where, through a combination of adequate resources and early risk assessment and risk mitigation plans for the technologies, the overall risk of the NMP flights can be rendered acceptable.

New↗

Bridging the Technology Readiness "Valley of Death" Utilizing Nanosats

Incorporating new technology is a hallmark of space missions. Missions demand ever-improving tools and techniques to allow them to meet the mission science requirements. In Earth Science, these technologies are normally expressed in new instrument capabilities that can enable new measurement concepts, extended capabilities of existing measurement techniques, or totally new detection capabilities, and also, information systems technologies that can enhance data analysis or enable new data analyses to advance modeling and prediction capabilities. Incorporating new technologies has never been easy. There is a large development step beyond demonstration in a laboratory or on an airborne platform to the eventual space environment that is sometimes referred to as the "technology valley of death." Studies have shown that non-validated technology is a primary cause of NASA and DoD mission delays and cost overruns. With the demise of the New Millennium Program within NASA, opportunities for demonstrating technologies in space have been rare. Many technologies are suitable for a flight project after only ground testing. However, some require validation in a relevant or a space flight environment, which cannot be fully tested on the ground or in airborne systems. NASA's Earth Science Technology Program has initiated a nimble program to provide a fairly rapid turn-around of space validated technologies, and thereby reducing future mission risk in incorporating new technologies. The program, called In-Space Validation of Earth Science Technology (InVEST), now has five tasks in development. Each are 3U CubeSats and they are targeted for launch opportunities in the 2016 time period. Prior to formalizing an InVEST program, the technology program office was asked to demonstrate how the program would work and what sort of technologies could benefit from space validation. Three projects were developed and launched, and have demonstrated the technologies that they set out to validate. This paper will provide a brief status of the pre-InVEST CubeSats, and discuss the development and status of the InVEST program. Figure

Earth Science↗

SCARLET Photovoltaic Concentrator Array Selected for Flight Under NASA's New Millennium Program

The NASA Lewis Research Center continues to demonstrate its expertise in the development and implementation of advanced space power systems. For example, during the past year, the NASA New Millennium Program selected the Solar Concentrator Array with Refractive Linear Element Technology (SCARLET) photovoltaic array as the power system for its Deep Space-1 (DS-1) mission. This Jet Propulsion Laboratory (JPL) managed DS-1 mission, which represents the first operational flight of a photovoltaic concentrator array, will provide a baseline for the use of this technology in a variety of future government and commercial applications. SCARLET is a joint NASA Lewis/Ballistic Missile Defense Organization program to develop advanced photovoltaic array technology that uses a unique refractive concentrator design to focus sunlight onto a line of photovoltaic cells located below the optical element. The general concept is based on previous work conducted at Lewis under a Small Business Innovation Research (SBIR) contract with AEC-Able Engineering, Inc., for the Multiple Experiments to Earth Orbit and Return (METEOR) spacecraft. The SCARLET II design selected by the New Millennium Program is a direct adaptation of the smaller SCARLET I array built for METEOR. Even though SCARLET I was lost during a launch failure in October 1995, the hardware (designed, built, and flight qualified within 6 months) provided invaluable information and experience that led to the selection of this technology as the primary power source for DS-1.

Piszczor, Michael F., Jr.↗

The New Millenium Program: Serving Earth and Space Sciences

NASA has exciting plans for space science and Earth observations during the next decade. A broad range of advanced spacecraft and measurement technologies will be needed to support these plans within the existing budget and schedule constraints. Many of these technology needs are common to both NASA's Office of Earth Science (OES) and Office of Space Sciences (OSS). Even though some breakthrough technologies have been identified to address these needs, project managers have traditionally been reluctant to incorporate them into flight programs because their inherent development risk. To accelerate the infusion of new technologies into its OES and OSS missions, NASA established the New Millennium Program (NMP). This program analyzes the capability needs of these enterprises, identifies candidate technologies to address these needs, incorporates advanced technology suites into validation flights, validates them in the relevant space environment, and then proactively infuses the validated technologies into future missions to enhance their capabilities while reducing their life cycle cost. The NMP employs a cross-enterprise Science Working Group, the NASA Enterprise science and technology roadmaps to define the capabilities needed by future Earth and Space science missions. Additional input from the science community is gathered through open workshops and peer-reviewed NASA Research Announcement (NRAs) for advanced measurement concepts. Technology development inputs from the technology organizations within NASA, other government agencies, federally funded research and development centers (FFRDC's), U.S. industry, and academia are sought to identify breakthrough technologies that might address these needs. This approach significantly extends NASA's technology infrastructure. To complement other flight test programs that develop or validate of individual components, the NMP places its highest priority on system-level validations of technology suites in the relevant space environment. This approach is not needed for all technologies, but it is usually essential to validate advanced system architectures or new measurement concepts. The NMP has recently revised its processes for defining candidate validation flights, and selecting technologies for these flights. The NMP now employs integrated project formulation teams, 'Which include scientists, technologists, and mission planners, to incorporate technology suites into candidate validation flights. These teams develop competing concepts, which can be rigorously evaluated prior to selection for flight. The technology providers for each concept are selected through an open, competitive, process during the project formulation phase. If their concept is selected for flight, they are incorporated into the Project Implementation Team, which develops, integrates, tests, launches, and operates the technology validation flight. Throughout the project implementation phase, the Implementation Team will document and disseminate their validation results to facilitate the infusion of their validated technologies into future OSS and OES science missions. The NMP has successfully launched its first two Deep Space flights for the OSS, and is currently implementing its first two Earth Orbiting flights for the OES. The next OSS and OES flights are currently being defined. Even though these flights are focused on specific Space Science and Earth Science themes, they are designed to validate a range of technologies that could benefit both enterprises, including advanced propulsion, communications, autonomous operations and navigation, multifunctional structures, microelectronics, and advanced instruments. Specific examples of these technologies will be provided in our presentation. The processes developed by the NMP also provide benefits across the Space and Earth Science enterprises. In particular, the extensive, nation-wide technology infrastructure developed by the NMP enhances the access to breakthrough technologies for both enterprises.

Li, Fuk K.↗

Deep Space 2: The Mars Microprobe Project and Beyond

The Mars Microprobe Project, or Deep Space 2 (DS2), is the second of the New Millennium Program planetary missions and is designed to enable future space science network missions through flight validation of new technologies. A secondary goal is the collection of meaningful science data. Two micropenetrators will be deployed to carry out surface and subsurface science. The penetrators are being carried as a piggyback payload on the Mars Polar Lander cruise ring and will be launched in January 1999. The microprobe has no active control, attitude determination, or propulsive systems. It is a single stage from separation until landing and will passively orient itself due to its aerodynamic design. The aeroshell will be made of a nonerosive heat shield material, Silicon impregnated Reusable Ceramic Ablator(SIRCA), developed at Ames Research Center. The aeroshell shatters on impact, at which time the probe separates into an aftbody that remains at the surface and a forebody that penetrates into the subsurface. Each probe has a total mass of up to 3 kg, including the aeroshell. The impact velocity will be about 180 meters per second. The forebody will experience up to 30,000 g's and penetrate between 0.3 and 2 meters, depending on the ice content of the soil. The aftbody deceleration will be up to 80,000 g. The penetrators arrive in December 1999. The landing ellipse latitude range is 73 deg-77 deg S. The longitude will be selected by the Mars Surveyor Project to place the lander on the polar layered deposits in the range of 180 deg -230 deg W. The two micropenetrators are likely to land within 100 km of the Mars Surveyor Lander, on the polar deposits. The likely arrival date is L(sub s) = 256, late southern spring. The nominal mission lasts 2 days. A science team was selected in April 1998.

Smrekar, S. E.↗

Low Cost Environmental Sensors for Spaceflight: NMP Space Environmental Monitor (SEM) Requirements

An outstanding problem in spaceflight is the lack of adequate sensors for monitoring the space environment and its effects on engineering systems. By adequate, we mean low cost in terms of mission impact (e.g., low price, low mass/size, low power, low data rate, and low design impact). The New Millennium Program (NMP) is investigating the development of such a low-cost Space Environmental Monitor (SEM) package for inclusion on its technology validation flights. This effort follows from the need by NMP to characterize the space environment during testing so that potential users can extrapolate the test results to end-use conditions. The immediate objective of this effort is to develop a small diagnostic sensor package that could be obtained from commercial sources. Environments being considered are: contamination, atomic oxygen, ionizing radiation, cosmic radiation, EMI, and temperature. This talk describes the requirements and rational for selecting these environments and reviews a preliminary design that includes a micro-controller data logger with data storage and interfaces to the sensors and spacecraft. If successful, such a sensor package could be the basis of a unique, long term program for monitoring the effects of the space environment on spacecraft systems.

New Millennium Program (NMP)↗

Lessons Learned on Operating and Preparing Operations for a Technology Mission from the Perspective of the Earth Observing-1 Mission

The New Millennium Program's first Earth-observing mission (EO-1) is a technology validation mission. It is managed by the NASA Goddard Space Flight Center in Greenbelt, Maryland and is scheduled for launch in the summer of 2000. The purpose of this mission is to flight-validate revolutionary technologies that will contribute to the reduction of cost and increase of capabilities for future land imaging missions. In the EO-1 mission, there are five instrument, five spacecraft, and three supporting technologies to flight-validate during a year of operations. EO-1 operations and the accompanying ground system were intended to be simple in order to maintain low operational costs. For purposes of formulating operations, it was initially modeled as a small science mission. However, it quickly evolved into a more complex mission due to the difficulties in effectively integrating all of the validation plans of the individual technologies. As a consequence, more operational support was required to confidently complete the on-orbit validation of the new technologies. This paper will outline the issues and lessons learned applicable to future technology validation missions. Examples of some of these include the following: (1) operational complexity encountered in integrating all of the validation plans into a coherent operational plan, (2) initial desire to run single shift operations subsequently growing to 6 "around-the-clock" operations, (3) managing changes in the technologies that ultimately affected operations, (4) necessity for better team communications within the project to offset the effects of change on the Ground System Developers, Operations Engineers, Integration and Test Engineers, S/C Subsystem Engineers, and Scientists, and (5) the need for a more experienced Flight Operations Team to achieve the necessary operational flexibility. The discussion will conclude by providing several cost comparisons for developing operations from previous missions to EO-1 and discuss some details that might be done differently for future technology validation missions.

Mandl, Dan↗

Lessons Learned During Implementation and Early Operations of the DS1 Beacon Monitor Experiment

A new approach to mission operations will be flight validated on NASA's New Millennium Program Deep Space One (DS1) mission which launched in October 1998. The Beacon Monitor Operations Technology is aimed at decreasing the total volume of downlinked engineering telemetry by reducing the frequency of downlink and the volume of data received per pass. Cost savings are achieved by reducing the amount of routine telemetry processing and analysis performed by ground staff. The technology is required for upcoming NASA missions to Pluto, Europa, and possibly some other missions. With beacon monitoring, the spacecraft will assess its own health and will transmit one of four beacon messages each representing a unique frequency tone to inform the ground how urgent it is to track the spacecraft for telemetry. If all conditions are nominal, the tone provides periodic assurance to ground personnel that the mission is proceeding as planned without having to receive and analyze downlinked telemetry. If there is a problem, the tone will indicate that tracking is required and the resulting telemetry will contain a concise summary of what has occurred since the last telemetry pass. The primary components of the technology are a tone monitoring technology, AI-based software for onboard engineering data summarization, and a ground response system. In addition, there is a ground visualization system for telemetry summaries. This paper includes a description of the Beacon monitor concept, the trade-offs with adapting that concept as a technology experiment, the current state of the resulting implementation on DS1, and our lessons learned during the initial checkout phase of the mission. Applicability to future missions is also included.

Sherwood, Rob↗

Solar Sail Roadmap Mission GN and C Challenges

The NASA In-Space Propulsion program is funding development work for solar sails to enhance future scientific opportunities. Key to this effort are scientific solar sail roadmap missions identified by peer review. The two near-term missions of interest are L1 Diamond and Solar Polar Imager. Additionally, the New Millennium Program is sponsoring the Space Technology 9 (ST9) demonstration mission. Solar sails are one of five technologies competing for the ST9 flight demonstration. Two candidate solar sail missions have been identified for a potential ST9 flight. All the roadmap missions and candidate flight demonstration missions face various GN&C challenges. A variety of efforts are underway to address these challenges. These include control actuator design and testing, low thrust optimization studies, attitude control system design and modeling, control-structure interaction studies, trajectory control design, and solar radiation pressure model development. Here we survey the various efforts underway and identify a few of specific recent interest and focus.

Heaton, Andrew F.↗

Low cost environmental sensors for Spaceflight : NMP Space Environmental Monitor (SEM) requirements

An outstanding problem in spaceflight is the lack of adequate sensors for monitoring the space environment and its effects on engineering systems. By adequate, we mean low cost in terms of mission impact (e.g., low price, low mass/size, low power, low data rate, and low design impact). The New Millennium Program (NMP) is investigating the development of such a low-cost Space Environmental Monitor (SEM) package for inclusion on its technology validation flights. This effort follows from the need by NMP to characterize the space environment during testing so that potential users can extrapolate the test results to end-use conditions. The immediate objective of this effort is to develop a small diagnostic sensor package that could be obtained from commercial sources. Environments being considered are: contamination, atomic oxygen, ionizing radiation, cosmic radiation, EMI, and temperature. This talk describes the requirements and rational for selecting these environments and reviews a preliminary design that includes a micro-controller data logger with data storage and interfaces to the sensors and spacecraft. If successful, such a sensor package could be the basis of a unique, long term program for monitoring the effects of the space environment on spacecraft systems.

Galileo↗

Results Of NASA's First Autonomous Formation Flying Experiment: Earth Observing-1 (EO-1)

NASA's first autonomous formation flying mission completed its primary goal of demonstrating an advanced technology called Enhanced Formation Flying. To enable this technology, a team at the Goddard Space Flight Center implemented a universal 3-axis formation flying algorithm in an autonomous executive flight code onboard the New Millennium Program's (NMP) Earth Observing-1 (EO-1) spacecraft. This paper describes the mathematical background of the autonomous formation flying algorithm, the onboard flight design and the validation results of this unique system. Results from fully autonomous maneuver control are presented as comparisons between the onboard EO-1 operational autonomous control system called AutoCon(trademark), its ground-based predecessor used in operations, and the original standalone algorithm. Maneuvers discussed encompass reactionary, routine formation maintenance, and inclination control. Orbital data is also examined to verify that all formation flying requirements were met.

Folta, David↗

A Study of Learning Curve Impact on Three Identical Small Spacecraft

With an eye to the future strategic needs of NASA, the New Millennium Program is funding the Space Technology 5 (ST-5) project to address the future needs in the area of small satellites in constellation missions. The ST-5 project, being developed at Goddard Space Flight Center, involves the development and simultaneous launch of three small, 20-kilogram-class spacecraft. ST-5 is only a test drive and future NASA science missions may call for fleets of spacecraft containing tens of smart and capable satellites in an intelligent constellation. The objective of ST-5 project is to develop three such pioneering small spacecraft for flight validation of several critical new technologies. The ST-5 project team at Goddard Space Flight Center has completed the spacecraft design, is now building and testing the three flight units. The launch readiness date (LRD) is in December 2005. A critical part of ST-5 mission is to prove that it is possible to build these small but capable spacecraft with recurring cost low enough to make future NASA s multi- spacecraft constellation missions viable from a cost standpoint.

Chen, Guangming↗

Results of NASA's First Autonomous Formation Flying Experiment: Earth Observing-1 (EO-1)

NASA's first autonomous formation flying mission completed its primary goal of demonstrating an advanced technology called enhanced formation flying. To enable this technology, the Flight Dynamics Analysis Branch at the Goddard Space Flight Center implemented a universal 3-axis formation flying algorithm in an autonomous executive flight code onboard the New Millennium Program's (NMP) Earth Observing-1 (EO-1) spacecraft. This paper describes the mathematical background of the autonomous formation flying algorithm, the onboard flight design and the validation results of this unique system. Results from fully autonomous maneuver control are presented as comparisons between the onboard EO-1 operational autonomous control system called AutoCon, its ground-based predecessor used in operations, and the original standalone algorithm. Maneuvers discussed encompass reactionary, routine formation maintenance, and inclination control. Orbital data is also examined to verify that all formation flying requirements were met.

Folta, David↗

Preliminary Results of NASA's First Autonomous Formation Flying Experiment: Earth Observing-1 (EO-1)

NASA's first autonomous formation flying mission is completing a primary goal of demonstrating an advanced technology called enhanced formation flying. To enable this technology, the Guidance, Navigation, and Control center at the Goddard Space Flight Center has implemented an autonomous universal three-axis formation flying algorithm in executive flight code onboard the New Millennium Program's (NMP) Earth Observing-1 (EO-1) spacecraft. This paper describes the mathematical background of the autonomous formation flying algorithm and the onboard design and presents the preliminary validation results of this unique system. Results from functionality assessment and autonomous maneuver control are presented as comparisons between the onboard EO-1 operational autonomous control system called AutoCon(tm), its ground-based predecessor, and a stand-alone algorithm.

Folta, David↗

Results of NASA's First Autonomous Formation Flying Experiment: Earth Observing-1 (EO-1)

NASA's first autonomous formation flying mission completed its primary goal of demonstrating an advanced technology called enhanced formation flying. To enable this technology, the Guidance, Navigation, and Control center at the Goddard Space Flight Center (GSFC) implemented a universal 3-axis formation flying algorithm in an autonomous executive flight code onboard the New Millennium Program's (NMP) Earth Observing-1 (EO-1) spacecraft. This paper describes the mathematical background of the autonomous formation flying algorithm and the onboard flight design and presents the validation results of this unique system. Results from functionality assessment through fully autonomous maneuver control are presented as comparisons between the onboard EO-1 operational autonomous control system called AutoCon(tm), its ground-based predecessor, and a standalone algorithm.

Folta, David C.↗