Search NASA⌕ Search

SEARCH · Search NASA

Results for “Office practice.”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Occupancy data analytics and prediction: A case study

Occupants are a critical impact factor of building energy consumption. Numerous previous studies emphasized the role of occupants and investigated the interactions between occupants and buildings. However, a fundamental problem, how to learn occupancy patterns and predict occupancy schedule, has not been well addressed due to highly stochastic activities of occupants and insufficient data. This study proposes a data mining based approach for occupancy schedule learning and prediction in office buildings. The proposed approach first recognizes the patterns of occupant presence by cluster analysis, then learns the schedule rules by decision tree, and finally predicts the occupancy schedules based on the inducted rules. A case study was conducted in an office building in Philadelphia, U.S. Based on one-year observed data, the validation results indicate that the proposed approach significantly improves the accuracy of occupancy schedule prediction. The proposed approach only requires simple input data (i.e., the time series data of occupant number entering and exiting a building), which is available in most office buildings. Furthermore, this approach is practical to facilitate occupancy schedule prediction, building energy simulation and facility operation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Turning Semiconductors into Clean Energy Technologies

Semiconductor technology is what has powered the IT revolution, providing ever smaller, less expensive chips. Less well known are newer semiconductor technologies that are transforming the lighting industry and creating super-efficient solar cells to power smart watches, smart buildings, and smart highways. This second semiconductor revolution is based on several decades of fundamental research supported by the DOE Basic Energy Sciences office into the properties of semiconductor materials and applied research by the DOE Energy Efficiency and Renewable Energy office into novel processes for manufacturing practical devices.

14 SOLAR ENERGY↗

Risk Management Techniques and Practice Workshop Workshop Report

At the request of the Department of Energy (DOE) Office of Science (SC), Lawrence Livermore National Laboratory (LLNL) hosted a two-day Risk Management Techniques and Practice (RMTAP) workshop held September 18-19 at the Hotel Nikko in San Francisco. The purpose of the workshop, which was sponsored by the SC/Advanced Scientific Computing Research (ASCR) program and the National Nuclear Security Administration (NNSA)/Advanced Simulation and Computing (ASC) program, was to assess current and emerging techniques, practices, and lessons learned for effectively identifying, understanding, managing, and mitigating the risks associated with acquiring leading-edge computing systems at high-performance computing centers (HPCCs). Representatives from fifteen high-performance computing (HPC) organizations, four HPC vendor partners, and three government agencies attended the workshop. The overall workshop findings were: (1) Standard risk management techniques and tools are in the aggregate applicable to projects at HPCCs and are commonly employed by the HPC community; (2) HPC projects have characteristics that necessitate a tailoring of the standard risk management practices; (3) All HPCC acquisition projects can benefit by employing risk management, but the specific choice of risk management processes and tools is less important to the success of the project; (4) The special relationship between the HPCCs and HPC vendors must be reflected in the risk management strategy; (5) Best practices findings include developing a prioritized risk register with special attention to the top risks, establishing a practice of regular meetings and status updates with the platform partner, supporting regular and open reviews that engage the interests and expertise of a wide range of staff and stakeholders, and documenting and sharing the acquisition/build/deployment experience; and (6) Top risk categories include system scaling issues, request for proposal/contract and acceptance testing, and vendor technical or business problems. HPC, by its very nature, is an exercise in multi-level risk management. Every aspect of stewarding HPCCs into the petascale era, from identification of the program drivers to the details of procurement actions and simulation environment component deployments, represents unprecedented challenges and requires effective risk management. The fundamental purpose of this workshop was to go beyond risk management processes as such and learn how to weave effective risk management practices, techniques, and methods into all aspects of migrating HPCCs into the next generation of leadership computing systems. This workshop was a follow-on to the Petascale System Integration Workshop hosted by Lawrence Berkeley National Laboratory (LBNL)/NERSC last year. It was intended to leverage and extend the risk management experience of the participants by looking for common best practices and unique processes that have been especially successful. This workshop assessed the effectiveness of tools and techniques that are or could be helpful in HPCC risk management, with a special emphasis on how practice meets process. As the saying goes: 'In theory, there is no difference between theory and practice. In practice there is'. Finally, the workshop brought together a network of experts who shared information as technology moves into the petascale era and beyond.

99 GENERAL AND MISCELLANEOUS↗

INFORMATION: Special Report on "Selected Department of Energy Program Efforts to Implement the American Recovery and Reinvestment Act"

The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted on February 17, 2009, to jumpstart the economy by creating or saving millions of jobs, spurring technological advances in health and science, and investing in the Nation's energy future. The Department of Energy received over $32.7 billion in Recovery Act funding for various science, energy, and environmental programs and initiatives. As of November 2009, the Department had obligated $18.3 billion of the Recovery Act funding, but only $1.4 billion had been spent. The Department's Offices of Energy Efficiency and Renewable Energy, Fossil Energy, Environmental Management, Science, and Electricity Delivery and Energy Reliability received the majority of funding allocated to the Department, about $32.3 billion. Obligating these funds by the end of Fiscal Year 2010, as required by the Recovery Act, and overseeing their effective use in succeeding years, represents a massive workload increase for the Department's programs. The effort to date has strained existing resources. As has been widely acknowledged, any effort to disburse massive additional funding and to expeditiously initiate and complete projects increases the risk of fraud, waste and abuse. It is, therefore, important for the Department's program offices to assess and mitigate these risks to the maximum extent practicable. In this light, we initiated this review as an initial step in the Office of Inspector General's charge to determine whether the Department's major program offices had developed an effective approach for identifying and mitigating risks related to achieving the goals and objectives of the Recovery Act. The Department's program offices included in our review identified risks and planned mitigation strategies that, if successfully implemented and executed, should help achieve the goals and objectives of the Recovery Act. While each office identified risks unique to its respective areas of responsibility, there were a number of risks shared in common. These included the mechanical and substantive requirements related to the award and distribution of funds; program and project performance monitoring; and, program and project execution activities. In particular, the offices self-identified common risks such as: (1) The inability to award and distribute funds in a timely manner to achieve the goals of the Recovery Act; (2) The sufficiency of monitoring procedures and resources to, among other things, prevent and detect fraud, waste and abuse throughout the performance period of financial assistance awards and contracts; and (3) The inherent cost, schedule and performance risks associated with first-of-a-kind, innovative research and demonstration projects. Our review confirmed that the Department had begun to implement a number of strategies designed to mitigate these and other program-specific risks. Our testing, however, identified challenges to the effective implementation of these mitigation strategies that need to be addressed if the Department is to meet the goals and objectives established by the Recovery Act. At the time of our review: (1) Program staffing resources, critical to the success of all other mitigation strategies, remained inadequate both in numbers and qualifications (certifications and training) for positions in procurement and acquisition, project management, and monitoring and oversight functions; (2) Performance measures for achieving Recovery Act goals such as distributing funds in an expeditious manner had not always been established and included in performance plans, and, in financial assistance and contract documents; and (3) Programs had not consistently demonstrated that previously reported deficiencies, identified through audits, inspections, investigations and other oversight activities, had been considered in designing mitigation strategies for the Recovery Act related risks. As we noted in our Special Report on the American Recovery and Reinvestment Act at the Department of Energy (OAS-RA-09-01, March 2009) these sorts of deficiencies, which were described in the March 2009 report, had adversely impacted the success of earlier Departmental projects. We concluded that consideration of these previously encountered internal control weaknesses was essential if the Department was to avoid the same or similar problems in executing the Recovery Act programs/projects. During the course of our audit we identified other internal control weakness indicators. When brought to their attention by the Office of Inspector General audit staff, program officials acted promptly to address these problems by modifying or improving their risk mitigation strategies. For instance, we found that the Office of Energy Efficiency and Renewable Energy, responsible for $16.8 billion in Recovery Act program activities, took steps to strengthen its merit review process to avoid potential conflict of interest concerns.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy management study: A proposed case of government building

Align with the current needs of the sustainable and green technology in Malaysian construction industry, this research is conducted to seek and identify opportunities to better manage energy use including the process of understand when, where, and how energy is used in a building. The purpose of this research is to provide a best practice guideline as a practical tool to assist construction industry in Malaysia to improve the energy efficiency of the office building during the post-production by reviewing the current practice of the building operation and maintenance in order to optimum the usage and reduce the amount of energy input into the building. Therefore, this paper will review the concept of maintenance management, current issue in energy management, and on how the research process will be conducted. There are several process involves and focuses on technical and management techniques such as energy metering, tracing, harvesting, and auditing based on the case study that will be accomplish soon. Accordingly, a case study is appropriate to be selected as a strategic research approach in which involves an empirical investigation of a particular contemporary phenomenon within its real life context using multiple sources of evidence for the data collection process. A Government office building will be selected as an appropriate case study for this research. In the end of this research, it will recommend a strategic approach or model in a specific guideline for enabling energy-efficient operation and maintenance in the office building.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Equitable Resilience: Opportunities to Advance Solar Paired with Battery Storage in Historically Marginalized Communities

This report was produced as part of the Equitable Solar Communities of Practice program through the U.S. Department of Energy (DOE) Solar Energy Technologies Office (SETO). Clean Energy Group (CEG) managed the Resilience, Storage, and Grid Benefits Community of Practice, which aimed to research, evaluate, and identify opportunities to scale the meaningful benefits of solar paired with battery storage in historically marginalized communities. The report is designed to 1) educate a broad audience on the benefits of solar paired with battery storage, 2) identify barriers to deploying solar paired with battery storage in historically marginalized communities, 3) amplify early-adopters and innovative programs that support battery storage access across the nation, and 4) recommend best practices for programs and policies to adopt in advancing equitable access to solar and battery storage technologies.

14 SOLAR ENERGY↗

Enabling the Capture and Sharing of NASA Technical Expertise Through Communities of Practice

Historically, engineers at the National Aeronautics and Space Administration (NASA) had few opportunities or incentives to share their technical expertise across the Agency. Its center- and project- focused culture often meant that knowledge never left organizational and geographic boundaries. With increasingly complex missions, the closeout of the Shuttle Program, and a new generation entering the workforce, developing a knowledge sharing culture became critical. To address this need, the Office of the Chief Engineer established communities of practice on the NASA Engineering Network. These communities were strategically aligned with NASA's core competencies in such disciplines as avionics, flight mechanics, life support, propulsion, structures, loads and dynamics, human factors, and guidance, navigation, and control. This paper describes the process used to identify and develop communities, from establishing simple websites that compiled discipline-specific resources to fostering a knowledge-sharing environment through collaborative and interactive technologies. It includes qualitative evidence of improved availability and transfer of knowledge. It focuses on pivotal capabilities that increased knowledge exchange such as a custom-made Ask An Expert system, community contact lists, publication of key resources, and submission forms that allowed any user to propose content for the sites. It discusses the peer relationships that developed through the communities and the leadership and infrastructure that made them possible.

Topousis, Daria E.↗

An optimization model for collection, haul, transfer, treatment and disposal of infectious medical waste: Application to a Greek region

Highlights: • We developed an optimization model to minimize cost of infectious waste management. •Two different software were used for model solution. • Model optimizes locations and capacities of treatment plants and transfer stations. • The higher percentage of total cost was due to construction of the treatment plant. • Sensitivity analysis with respect to fuel cost and waste production was conducted. - Abstract: The objective of this work was to develop an optimization model to minimize the cost of a collection, haul, transfer, treatment and disposal system for infectious medical waste (IMW). The model calculates the optimum locations of the treatment facilities and transfer stations, their design capacities (t/d), the number and capacities of all waste collection, transport and transfer vehicles and their optimum transport path and the minimum IMW management system cost. Waste production nodes (hospitals, healthcare centers, peripheral health offices, private clinics and physicians in private practice) and their IMW production rates were specified and used as model inputs. The candidate locations of the treatment facilities, transfer stations and sanitary landfills were designated, using a GIS-based methodology. Specifically, Mapinfo software with exclusion criteria for non-appropriate areas was used for siting candidate locations for the construction of the treatment plant and calculating the distance and travel time of all possible vehicle routes. The objective function was a non-linear equation, which minimized the total collection, transport, treatment and disposal cost. Total cost comprised capital and operation costs for: (1) treatment plant, (2) waste transfer stations, (3) waste transport and transfer vehicles and (4) waste collection bins and hospital boxes. Binary variables were used to decide whether a treatment plant and/or a transfer station should be constructed and whether a collection route between two or more nodes should be followed. Microsoft excel software was used as installation platform of the optimization model. For the execution of the optimization routine, two completely different software were used and the results were compared, thus, resulting in higher reliability and validity of the results. The first software was Evolver, which is based on the use of genetic algorithms. The second one was Crystal Ball, which is based on Monte Carlo simulation. The model was applied to the Region of East Macedonia – Thrace in Greece. The optimum solution resulted in one treatment plant located in the sanitary landfill area of Chrysoupolis, required no transfer stations and had a total management cost of 38,800 €/month or 809 €/t. If a treatment plant is sited in the most eastern part of the Region, i.e., the industrial area of Alexandroupolis, the optimum solution would result in a transfer station of 23 m{sup 3}, located near Kavala General Hospital, and a total cost of 39,800 €/month or 831 €/t. A sensitivity analysis was conducted and two alternative scenarios were optimized. In the first scenario, a 15% rise in fuel cost and in the second scenario a 25% rise in IMW production were considered. At the end, a cost calculation in €/t/km for every type of vehicle used for haul and transfer was conducted. Also, the cost of the whole system was itemized and calculated in €/t/km and €/t. The results showed that the higher percentage of the total cost was due to the construction of the treatment plant.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Novel Infiltration Diagnostics based on Laser-line Scanning and Infrared Temperature Field Imaging

This project targets the building energy efficiency problems induced by building infiltration/leaks. The current infiltration inspection techniques often require extensive visual inspection and/or whole building pressure test. These current techniques cannot meet more than three of the below five criteria of ideal infiltration diagnostics: 1. location and extent diagnostics, 2. building-level application, 3. least surface preparation, 4. weather-proof, and 5. non-disruption to building occupants. These techniques are either too expensive or time consuming, and often lack accuracy and repeatability. They are hardly applicable to facades/facades section. The goal of the project was to develop a novel infiltration diagnostics technology based on laser line-scanning and simultaneous infrared temperature imaging. A laboratory scale experimental setup was designed to mimic a model house of well-defined pressure difference below or above the outside pressure. Algorithms and Matlab-based programs had been developed for recognition of the hole location in infrared images. Our experiment based on laser wavelengths of 450 and 1550 nm and laser beam diameters of 4-25 mm showed that the location of the holes could be identified using laser heating; the diagnostic approach however could not readily distinguish between infiltration and non-infiltration points. To significantly improve the scanning throughput and recognition accuracy, a second approach was explored, developed, and extensively tested. It incorporates a liquid spray on the surface to induce extra phase change cooling effect. In this spray method, we termed it as PECIT (Phase-change Enhanced Cooling Infrared Thermography), phase-change enhanced cooling was used, which significantly amplifies the effect of air flow (infiltration and exfiltration). This heat transfer method worked extremely well to identify infiltration and exfiltration locations with high accuracy and increased throughput. The PECIT technique was systematically developed and tested for through holes with diameters 1 mm to 2 mm, and diagonal lines of 0.5 mm width at different camera-wall distances of 46 cm to 200 cm, under different pressure differences from 5 Pa to 20 Pa, and under different wind conditions. The PECIT technique had either met or exceeded the goals proposed in the project. For exfiltration, we achieved 100% accuracy under a much lower pressure difference of 10 Pa (proposed one: 50 Pa with stretch goal of 15 Pa). For infiltration, we achieved >90% accuracy under a much lower pressure difference of 10 Pa (proposed one: 50 Pa with stretch goal of 15Pa). For exfiltration, we achieved 100% accuracy under a much lower pressure difference of 10 Pa. For infiltration, we achieved 100% accuracy under a much lower pressure difference of 10 Pa. The PECIT technique can reach a throughput of 120 m2/h, which is 4 times the proposed goal for the laser line-scanning and simultaneous infrared temperature imaging approach. For commercialization and market penetration, we had meetings with two companies for feedback collection and further improvement for practical use. Also, we have interacted with Office of Intellectual Property and Technology Transfer of Iowa State University for idea disclosure and patent application.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

National Childhood Cancer Foundation

The initiative will enable the COG Biopathology Center (Biospecimen Repository), the Molecular Genetics Laboratory and other participating reference laboratories to upload large data sets to the eRDES. The capability streamlines data currency and accuracy allowing the centers to export data from local systems and import the defined data to the eRDES. The process will aid in the best practices which have been defined by the Office of Biorepository and Biospecimen Research (OBBR) and the Group Banking Committee (GBC). The initiative allows for batch import and export, a data validation process and reporting mechanism, and a model for other labs to incorporate. All objectives are complete. The solutions provided and the defined process eliminates dual data entry resulting in data consistency. The audit trail capabilities allow for complete tracking of the data exchange between laboratories and the Statistical Data Center (SDC). The impact is directly on time and efforts. In return, the process will save money and improve the data utilized by the COG. Ongoing efforts include implementing new technologies to further enhance the current solutions and process currently in place. Web Services and Reporting Services are technologies that have become industry standards and will allow for further harmonization with caBIG (cancer Biolnforrnatics Grid). Additional testing and implementation of the model for other laboratories is in process.

59 BASIC BIOLOGICAL SCIENCES↗

Upgrades and Enclosure of Building 15 at Technical Area 40: Los Alamos National Laboratory

The U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Field Office (Field Office) proposes to upgrade and enclose Building 15 at Technical Area (TA) 40, Los Alamos National Laboratory. Building TA-40-15, a Cold War-era firing site, was determined eligible for listing in the National Register of Historic Places (Register) in DX Division’s Facility Strategic Plan: Consolidation and Revitalization at Technical Areas 6, 8, 9, 14, 15, 22, 36, 39, 40, 60, and 69 (McGehee et al. 2005). Building TA-40-15 was constructed in 1950 to support detonator testing. The firing site will be enclosed by a steel building to create a new indoor facility that will allow for year-round mission capability. Enclosing TA-40-15 will adversely affect the building by altering the characteristics that make it eligible for the Register. In compliance with Section 106 of the National Historic Preservation Act of 1966, as amended, the Field Office is initiating consultation for this proposed undertaking. The Field Office is also requesting concurrence with the use of standard practices to resolve adverse effects as defined in the Programmatic Agreement among the U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Field Office, the New Mexico State Historic Preservation Office and the Advisory Council on Historic Preservation Concerning Management of the Historic Properties at Los Alamos National Laboratory, Los Alamos, New Mexico.

42 ENGINEERING↗

Achieving 50% Energy Savings in Office Buildings, Advanced Energy Design Guides: Office Buildings (Brochure)

This fact sheet summarizes recommendations for designing new office buildings that result in 50% less energy use than conventional designs meeting minimum code requirements. The recommendations are drawn from the Advanced Energy Design Guide for Small to Medium Office Buildings, an ASHRAE publication that provides comprehensive recommendations for designing low-energy-use office buildings with gross floor areas up to 100,000 ft2 (see sidebar). Designed as a stand-alone document, this fact sheet provides key principles and a set of prescriptive design recommendations appropriate for smaller office buildings with insufficient budgets to fully implement best practices for integrated design and optimized performance. The recommendations have undergone a thorough analysis and review process through ASHRAE, and have been deemed the best combination of measures to achieve 50% savings in the greatest number of office buildings.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Participatory health impact assessment for the development of local government regulation on hazard control

The Thai Public Health Act 1992 required the Thai local governments to issue respective regulations to take control of any possible health-hazard related activities, both from commercial and noncommercial sources. Since 1999, there has been centrally decentralized of power to a new form of local government establishment, namely Sub-district Administrative Organization (SAO). The SAO is asmall-scale local governing structure while its legitimate function is for community services, including control of health impact related activities. Most elected SAO administrators and officers are new and less experience with any of public health code of practice, particularly on health-hazard control. This action research attempted to introduce and apply a participatory health impact assessment (HIA) tool for the development of SAO health-hazard control regulation. The study sites were at Ban Meang and Kok See SAOs, Khon Kaen Province, Thailand, while all intervention activities conducted during May 2005-April 2006. A set of cooperative activities between researchers and community representatives were planned and organized by; surveying and identifying place and service base locally causing local environmental health problems, organizing community participatory workshops for drafting and proposing the health-hazard control regulation, and appropriate practices for health-hazard controlling measures. This action research eventually could successfully enable the SAO administrators and officers understanding of local environmental-related health problem, as well as development of imposed health-hazard control regulation for local community.

54 ENVIRONMENTAL SCIENCES↗

Ares Launch Vehicles Lean Practices Case Study

The Ares launch vehicles team, managed by the Ares Projects Office (APO) at NASA Marshall Space Flight Center, has completed the Ares I Crew Launch Vehicle System Requirements Review and System Definition Review and early design work for the Ares V Cargo Launch Vehicle. This paper provides examples of how Lean Manufacturing, Kaizen events, and Six Sigma practices are helping APO deliver a new space transportation capability on time and within budget, while still meeting stringent technical requirements. For example, Lean philosophies have been applied to numerous process definition efforts and existing process improvement activities, including the Ares I-X test flight Certificate of Flight Readiness (CoFR) process, risk management process, and review board organization and processes. Ares executives learned Lean practices firsthand, making the team "smart buyers" during proposal reviews and instilling the team with a sense of what is meant by "value-added" activities. Since the goal of the APO is to field launch vehicles at a reasonable cost and on an ambitious schedule, adopting Lean philosophies and practices will be crucial to the Ares Project's long-term SUCCESS.

Doreswamy, Rajiv↗

Model Based Mission Assurance: NASA's Assurance Future

Model Based Systems Engineering (MBSE) is seeing increased application in planning and design of NASA’s missions. This suggests the question: what will be the corresponding practice of Model Based Mission Assurance (MBMA)? Contemporaneously, NASA’s Office of Safety and Mission Assurance (OSMA) is evaluating a new objectives based approach to standards to ensure that the Safety and Mission Assurance disciplines and programs are addressing the challenges of NASA’s changing missions, acquisition and engineering practices, and technology. MBSE is a prominent example of a changing engineering practice. We use NASA’s objectives-based strategy for Reliability and Maintainability as a means to examine how MBSE will affect assurance. We surveyed MBSE literature to look specifically for these affects, and find a variety of them discussed (some are anticipated, some are reported from applications to date). Predominantly these apply to the early stages of design, although there are also extrapolations of how MBSE practices will have benefits for testing phases. As the effort to develop MBMA continues, it will need to clearly and unambiguously establish the roles of uncertainty and risk in the system model. This will enable a variety of uncertainty-based analyses to be performed much more rapidly than ever before and has the promise to increase the integration of CRM (Continuous Risk Management) and PRA (Probabilistic Risk Analyses) even more fully into the project development life cycle. Various views and viewpoints will be required for assurance disciplines, and an over-arching viewpoint will then be able to more completely characterize the state of the project/program as well as (possibly) enabling the safety case approach for overall risk awareness and communication.

Evans, John↗

Management of immunization solid wastes in Kano State, Nigeria

Inadequate management of waste generated from injection activities can have a negative impact on the community and environment. In this paper, a report on immunization wastes management in Kano State (Nigeria) is presented. Eight local governments were selected randomly and surveyed by the author. Solid wastes generated during the Expanded Programme on Immunization were characterised using two different methods: one by weighing the waste and the other by estimating the volume. Empirical data was obtained on immunization waste generation, segregation, storage, collection, transportation, and disposal; and waste management practices were assessed. The study revealed that immunization offices were accommodated in either in local government buildings, primary health centres or community health care centres. All of the stations demonstrated a high priority for segregation of the infectious wastes. It can be deduced from the data obtained that infectious waste ranged from 67.6% to 76.7% with an average of 70.1% by weight, and 36.0% to 46.1% with an average of 40.1% by volume. Non-infectious waste generated ranged from 23.3% to 32.5% with an average of 29.9% by weight and 53.9% to 64.0% with an average of 59.9% by volume. Out of non-infectious waste (NIFW) and infectious waste (IFW), 66.3% and 62.4% by weight were combustible and 33.7% and 37.6% were non-combustible respectively. An assessment of the treatment revealed that open pit burning and burial and small scale incineration were the common methods of disposal for immunization waste, and some immunization centres employed the services of the state or local government owned solid waste disposal board for final collection and disposal of their immunization waste at government approved sites.

54 ENVIRONMENTAL SCIENCES↗