Search NASA⌕ Search

SEARCH · Search NASA

Results for “Ops concept”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

38 records · Page 3

From Modular ADMS to Plug-and-Play Ops: Distribution Grid Operations with Platform-Level Orchestration to Enable Ambitious App Hosting

The core function of the distribution grid is to provide electricity to consumers affordably, reliably, and securely. In pursuing these core objectives, distribution utilities are accountable to customers, regulators, and in some cases, shareholders. Other third parties such as aggregators and microgrids can also have a stake in the smooth operation of the grid. Each of these stakeholders has economic, business, and/or governance objectives that inform their expectations of the distribution grid. This multi-objective, multi-stakeholder environment creates tension that must be reconciled to successfully design and operate the distribution grid. Innovative companies are competing to bring high-tech solutions to electric utilities and their customers that address each of these objectives. Many developers of advanced distribution management systems (ADMS) and distributed energy resource management systems (DERMS) have adopted a modular architecture that allows grid operators to select functions and features according to their individual system needs. A modular platform also allows the solution provider to develop and integrate specific new product modules; however, the need to pursue multiple objectives with a fixed set of controllable devices makes integration expensive whether it is done at the product development stage or the deployment stage. This cost creates a significant barrier to adoption and can lengthen the product to market time of new solutions. To fundamentally address the complexity of system integration for distribution grid operations, the U.S. Department of Energy Office of Electricity has funded the GridAPPS-D project at PNNL, which streamlines integration by contributing to standards development, defining system architecture, applying advanced mathematics, and developing open-source software to demonstrate the concept of an open data-integration platform for distribution operations. The open data-integration platform concept enables system operators and solution providers to deploy ambitious, best-of-breed applications (or apps) without continually reengineering for integration. Ambitious apps developed by different solution providers will inevitably attempt to achieve different control objectives with the same set of controllable devices. If the open platform itself can resolve these conflicts in a way that achieves the best available outcomes for all apps, doesn’t restrict the ambitious design of apps, and ensures safe and secure operations, apps will be able to plug-and-play with the platform at the same time as other ambitious apps. In this paper, we describe a framework called App Deconfliction that empowers a platform to assign setpoints to controllable devices based on the values preferred by different apps (and even external stakeholder entities like customers or aggregators). The App Deconfliction framework is compatible with several methods for determining setpoint values. We present two methods based on game theory that provide a subtle built-in incentive structure for developers to adapt their apps to the fact that they will be operating in a moderated multi-app environment and to favor device setpoints that have the most effect on their objectives over those that have the least effect. Our simulation-based demonstrations have shown that game-theory-based deconfliction can lead to a 7% improvement in control space utilization compared to design-based methods.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NASA's Ares I and Ares V Launch Vehicles -- Effective Space Operations Through Efficient Ground Operations

The United States (U.S.) plans to return to the Moon by 2020, with the development of a new human-rated space transportation system to replace the Space Shuttle, which is due for retirement in 2010 after it completes its missions of building the International Space Station and servicing the Hubble Space Telescope. Powering the future of space-based scientific exploration will be the Ares I Crew Launch Vehicle, which will transport the Orion Crew Exploration Vehicle to orbit where it will rendezvous with the Lunar Lander. which will be delivered by the Ares V Cargo Launch Vehicle. This new transportation infrastructure, developed by the National Aeronautics and Space Administration (NASA), will allow astronauts to leave low-Earth orbit for extended lunar exploration and preparation for the first footprint on Mars. All space-based operations begin and are controlled from Earth. NASA's philosophy is to deliver safe, reliable, and cost-effective solutions to sustain a multi-billion-dollar program across several decades. Leveraging 50 years of lessons learned, NASA is partnering with private industry, while building on proven hardware experience. This paper will discuss how the Engineering Directorate at NASA's Marshall Space Flight Center is working with the Ares Projects Office to streamline ground operations concepts and reduce costs. Currently, NASA's budget is around $17 billion, which is less than 1 percent of the U.S. Federal budget. Of this amount, NASA invests approximately $4.5 billion each year in Space Shuttle operations, regardless of whether the spacecraft is flying or not. The affordability requirement is for the Ares I to reduce this expense by 50 percent, in order to allow NASA to invest more in space-based scientific operations. Focusing on this metric, the Engineering Directorate provides several solutions-oriented approaches, including Lean/Six Sigma practices and streamlined hardware testing and integration, such as assembling major hardware elements before shipping to the Kennedy Space Center for launch operations. This paper provides top-level details for several cost saving initiatives, including both process and product improvements that will result in space transportation systems that are designed with operations efficiencies in mind. The Engineering Directorate provides both the intellectual capital embodied in an experienced workforce and unique facilities in which to validate the information technology tools that allow a nationwide team to collaboratively connect across miles that separate them and the engineering disciplines that integrate various piece parts into a whole system. As NASA transforms ground-based operations, it also is transitioning its workforce from an era of intense hands-on labor to a new one of mechanized conveniences and robust hardware with simpler interfaces. Ensuring that space exploration is on sound footing requires that operations efficiencies be designed into the transportation system and implemented in the development stage. Applying experience gained through decades of ground and space op'erations, while using value-added processes and modern business and engineering tools, is the philosophy upon which a new era of exploration will be built to solve some of the most pressing exploration challenges today -- namely, safety, reliability, and affordability.

Dumbacher, Daniel L.↗