Search NASA⌕ Search

SEARCH · Search NASA

Results for “Optimized Plant Dispatch”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

HOPP - Hybrid Optimization and Performance Platform

The Hybrid Optimization and Performance Platform, HOPP, is a wind + solar + battery + X design software for optimizing co-located, utility-scale hybrid plants down to the component level for different markets and technoeconomic objectives. Key technology and financial inputs to the HOPP model that inform the objective to be optimized are presented. The layout and performance integration is combined with optimal dispatch and full financial modeling within an optimization framework. With an example scenario, optimal sizing and layout results are shown in a sensitivity analysis of prices for two hybrid configurations.

batteries↗

Estimating the Performance and Economic Value of Multiple Concentrating Solar Power Technologies in a Production Cost Model

Concentrating solar power with thermal energy storage (CSP-TES) is a unique source of renewable energy in that the solar thermal energy can be dispatched similarly to conventional thermal generation. However, CSP-TES plants are energy-limited, meaning that their response might be restricted by solar availability. Therefore, the use of this limited solar energy must be optimally scheduled toprovide the greatest value to the system. The timing of CSP-TES dispatch depends on a variety of factors, including electricity demand patterns, the penetration of variable generation sources, and the configuration of the CSP-TES plant itself. We use an established CSP-TES modeling framework in a commercially available production cost model to compare the dispatch and value of two CSP-TEStechnologies (molten salt towers and parabolic troughs) in a Colorado test system. In addition, we consider a range of configuration parameters, such as the solar multiple and thermal energy storage limit, to evaluate how the operational and capacity value varies with plant configuration.

14 SOLAR ENERGY↗

Report on the Economic Optimization of a Demonstration Case for a Static N-R HES Configuration using RAVEN

The synthetic time history generation algorithm in RAVEN has been extensively tested and used to perform qualitative assessments of the statistical characteristics of the net demand vs. demand for different values of the penetration of wind generation. Reported results highlight the need to consider the impact of variable renewable on the electricity net demand profile, due to the increase in its volatility with increased wind penetration. This analysis provides a strong foundation for the modeling and simulation needs expressed under the "Nuclear-Renewable Hybrid Energy Systems" (NRHES) project. Following this confirmative analysis the entire stochastic optimization framework has been tested in a demo case. The case chosen is an optimization driven by profitability for a system composed by a nuclear plant and a hydrogen production industrial process. This type of economical analysis is aimed to assess the capability of a hybrid system to penetrate the current energy market. In this sense it differs from the approach suggested under NRHES, where a cost minimization approach is suggested. This analysis is instead aimed to show the flexibility of the developed framework, e.g. for the evaluation of retrofitting projects of already existing plants. The system considered is subject to variable prices of electricity, which are simulated using the algorithm for the production of synthetic time histories. The physical system is considered without inertia so that it can be replaced by dispatching rules based on the highest marginal profit. Two optimization problems have been considered, for the first the size of the nuclear power plant is fixed and the optimization variable is the capacity of the hydrogen production plant. For the second, both plant sizes are optimization parameters while the overall capital expenditure is caped. The economical figures of merits considered are the Internal Rate of Return (IRR) and/or Profitability Index (PI) for the first one (since no cap is placed on the investment size) and Net Present Value (NPV) and/or IRR for the second one where the capital expenditure is constrained. Economic input data concerning capital costs, size-scaling factors, and operational costs for both plants have been collected from literature in order to achieve a simulation as realistic as possible. More work will be needed to obtain even more realistic numbers, possibly from industrial partners, and considering market elasticity for the hydrogen market. In order to perform the optimization of the cases described above, the economical external RAVEN module (CashFlow) for financial analysis has been improved in flexibility and generality. Some improvements have also been made to the optimization algorithm for a more efficient treatment of the boundary constrains. In conclusion three major results have been obtained: a) collection of the economical parameters characterizing the nuclear power plants and hydrogen production plants, b) extension of the financial analysis module (CashFlow) to drive the calculation of all needed cash flow streams and c) the testing of the full framework in a nearly final configuration.

97 MATHEMATICS AND COMPUTING↗

Influence of Business Models on PV-Battery Dispatch Decisions and Market Value

PV-battery hybrid projects dominate interconnection queues in some regions in the United States, but few projects have been operational long enough to assess how the hybrid capabilities may be used in practice. We interview plant operators and analyze empirical dispatch data for eleven large-scale PV-battery hybrids in three organized wholesale markets in the United States. We use the dispatch data and wholesale market prices to estimate the market value of our sample hybrids in 2020. The empirical increase in market value of a PV-battery hybrid relative to a standalone PV plant varies by project and ranges from $\$$1 to $\$$48/MWhsolar. The premium is driven by market, location, technical characteristics of the PV and battery asset, and battery dispatch strategies. In contrast to the widespread assumptions in the PV-battery hybrid modeling literature, only three of the eleven project operators optimize battery usage for wholesale market revenue as merchant plants. Instead, the majority of operators in the sample have alternate objectives. For example, load-serving entities target peak load reductions, incentive program participants focus on compliance with program requirements, and large energy consumers prioritize resiliency and utility bill minimization. Understanding prevalent dispatch signals and the degree of alignment with system-wide grid needs can increase the market value of PV-battery hybrids.

14 SOLAR ENERGY↗

A Technical and Economic Assessment of LWR Flexible Operation for Generation and Demand Balancing to Optimize Plant Revenue

With increased penetration of subsidized variable renewable energy (VRE) resources and competition from low natural gas prices, existing light water reactor (LWR) nuclear power plants (NPPs) are struggling to remain economically competitive. This work examines the potential economic competitiveness of various thermal energy storage (TES) technologies when coupled directly or indirectly with a NPP. To highlight their relative economic competitiveness, we contrast several energy storage solutions in stochastic dispatch optimization. We leverage data from recent work analyzing a range of TES technologies with varying capital costs, performance, and technology readiness level (TRL) to establish our case. We explore inserting these technologies into an electricity market with existing nuclear generation and large projected variable renewable energy (VRE) penetration. Although these technologies' projected capital costs may make them unlikely candidates in their current state, this analysis demonstrates a high-fidelity techno-economic analysis of energy storage. Furthermore, as the projected cost of energy storage technologies evolves, this analysis sets a precedent for similar future investigations. One region with projected trends that may be unfavorable for existing nuclear capacity is the New York Independent System Operator (NYISO) market. New York state’s baseload generation has been historically provided by fossil-fired and nuclear assets. However, amid economic pressures from subsidized VREs and low natural gas prices, the state has recently deactivated Indian Point nuclear power plant units 2 and 3. Furthermore, the state plans to meet its zero-emission generation target by 2040 by replacing fossil-fired capacity with significant investments in VRE resources like wind and solar photovoltaic (PV) and battery storage. Increased intermittent resource penetration lowers the baseload power requirement, adding further economic pressure to the state’s three remaining NPPs still in operation. With three NPPs still in operation in New York, this work analyzes potential economic benefits to NPPs on the New York grid when directly or indirectly coupled with various TES technologies. This work requires two modeling steps to analyze the potential economic benefits of various system configurations of the TES directly or indirectly coupled with nuclear. First, this analysis leverages capacity expansion modeling by experts at the Electric Power Research Institute (EPRI). Using their deterministic capacity expansion model, U.S. Regional Economy, Greenhouse Gas, and Energy (US-REGEN), EPRI analysts evaluated the capacity and generation evolution of the New York state energy market under four projection scenarios. These four projection scenarios were developed to represent the potential evolution of the capacity and generation in NYISO from 2015 to 2050 under various economic, technology, and policy constraints. The results from these capacity expansion models are then used as boundary conditions in the second modeling step. The second modeling step uses the Holistic Energy Resource Optimization Network (HERON) for a set of stochastic techno-economic analyses (STEAs) to investigate the potential increase in the economic viability of various configurations of the TES. With no current capacity expansion capabilities, HERON takes the data generated from US-REGEN for 2050 to generate synthetic load, solar, and wind data. Then HERON economically optimizes the capacity and dispatch of the various TES configurations. The potential economic benefit is the differential net present value (NPV) of the TES configurations from the no-TES baseline. As a stochastic techno-economic analysis package, HERON introduces uncertainty into the economic metrics, while US-REGEN trades resolution for reduced computational complexity. Using HERON also allows the modeling of direct thermal coupling, a feature not common in capacity and dispatch models. As expected, with high capital costs, the costs of introducing energy storage for all the technologies considered outweighed the potential economic benefit of this strategy for flexible plant operation. The benefit of this analysis is primarily in demonstrating a workflow that examines innovative solutions to increase NPP revenue via TES coupling. HERON’s stochastic capacity and dispatch optimization process used in this work has proven an effective tool in observing and evaluating the impact of introducing storage technologies in a grid energy system.

25 ENERGY STORAGE↗

Market-Integrated Optimization of Wind-Battery-Hydrogen Hybrids for Peaking Capacity via Storage

As Integrated Energy Systems (IES) combine multiple energy and storage technologies to provide potentially more value and less risk via resource diversification, complementary overbuild, increased flexibility, and revenue-stacking, IES value is dependent on electricity market dispatch and grid interactions should play an important role in IES design and operation. This study hybridizes and retrofits wind and combustion turbine plants to study the impacts of replacing gas generation capacity with wind, battery, PEM electrolysis, hydrogen tanks and hydrogen turbines. The optimized design is co-simulated in a production cost model with different bidding strategies in order to compare performance and highlight the importance of grid-interactions. We analyze the revenue and dispatch changes as well as the price and cost implications of wind-battery-hydrogen IESs.

electrolysis↗

Comprehensive assessment of deep reinforcement learning approaches for economic dispatch in nuclear-driven microgrids

As the electrical grid integrates more variable renewable energy sources such as wind and solar, the demand for distributed and flexible systems to address this increased variability becomes critical. Nuclear-driven microgrids provide a promising solution by offering stable generation to complement intermittent renewables, ensuring grid reliability and operating efficiency. This paper proposes a recurrent deep reinforcement learning framework for optimal economic dispatch in a nuclear-powered microgrid integrating renewable energy sources, small modular reactors, battery storage systems, and balance-of-plant dynamics. A three-agent control architecture is developed, where demand and renewable energy agents act as forecasters, and a reinforcement learning-based dispatch agent performs real-time energy allocation. A nonlinear programming formulation is first used to generate an optimal baseline for benchmarking. The proposed dispatch controller, based on Proximal Policy Optimization enhanced with Long Short-Term Memory networks, exploits temporal correlations in system dynamics by taking advantage of the time series used as inputs to improve policy robustness under uncertainty. Comparative analysis against established deep reinforcement learning methods, including Proximal Policy Optimization with a feedforward architecture, Soft Actor-Critic, and Twin Delayed Deep Deterministic Policy Gradient, demonstrates superior performance. Numerical results indicate that the proposed controller achieves a 0.39% cost reduction relative to the nonlinear programming benchmark and outperforms other learning-based methods by generating additional revenue of up to 0.35%. All reinforcement learning controllers compute dispatch actions in less than 0.3 s, resulting in a computational speedup of more than three orders of magnitude over the nonlinear programming baseline. The findings of this paper highlight their applicability for real-time operation and control in nuclear-integrated microgrids under volatile operating conditions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Efficient prediction of concentrating solar power plant productivity using data clustering

Concentrating solar power (CSP) plants convert solar energy to electricity and can be deployed with a thermal storage capability to shift electricity generation from time periods with available solar resource to those with high electricity demand or electricity price. Rigorous optimization of plant design and operational strategies can improve the market-competitiveness and commercial viability; however, such optimization may require hundreds of annual performance simulations, each of which can be computationally expensive when including considerations such as optimization of dispatch scheduling, sub-hourly time resolution, and stochastic effects due to uncertain weather or electricity price forecasts. This paper proposes a methodology to reduce the computational burden associated with simulation of electricity yield and revenue for CSP plants over a single- or multi-year period. Data-clustering techniques are employed to select a small number of limited-duration time blocks for simulation that, when appropriately weighted, can reproduce generation and revenue over a single year or within each year of a multi-year period. After selection of appropriate data features and weighting factors defining similarity between time-series profiles, the methodology captured annual revenue within 2.3%, 1.7%, or 1.2% using simulation of 10, 30, or 50 three-day exemplar time blocks, respectively, for each of three single-year location/weather/market scenarios and five plant configurations ranging from low to high solar multiple and storage capacity. When applied to multi-year datasets, the proposed methodology can capture inter-year variability that is unavailable from typical meteorological year (TMY) datasets while simultaneously requiring simulation of less than a single year of data.

14 SOLAR ENERGY↗

Modelling Concentrating Solar Power with Thermal Energy Storage for Integration Studies (Presentation)

Concentrating solar power with thermal energy storage (CSP-TES) can provide multiple benefits to the grid, including low marginal cost energy and the ability to levelize load, provide operating reserves, and provide firm capacity. It is challenging to properly value the integration of CSP because of the complicated nature of this technology. Unlike completely dispatchable fossil sources, CSP is a limited energy resource, depending on the hourly and daily supply of solar energy. To optimize the use of this limited energy, CSP-TES must be implemented in a production cost model with multiple decision variables for the operation of the CSP-TES plant. We develop and implement a CSP-TES plant in a production cost model that accurately characterizes the three main components of the plant: solar field, storage tank, and power block. We show the effect of various modelling simplifications on the value of CSP, including: scheduled versus optimized dispatch from the storage tank and energy-only operation versus co-optimization with ancillary services.

14 SOLAR ENERGY↗

Modelling Concentrating Solar Power with Thermal Energy Storage for Integration Studies: Preprint

Concentrating solar power with thermal energy storage (CSP-TES) can provide multiple benefits to the grid, including low marginal cost energy and the ability to levelize load, provide operating reserves, and provide firm capacity. It is challenging to properly value the integration of CSP because of the complicated nature of this technology. Unlike completely dispatchable fossil sources, CSP is a limited energy resource, depending on the hourly and daily supply of solar energy. To optimize the use of this limited energy, CSP-TES must be implemented in a production cost model with multiple decision variables for the operation of the CSP-TES plant. We develop and implement a CSP-TES plant in a production cost model that accurately characterizes the three main components of the plant: solar field, storage tank, and power block. We show the effect of various modelling simplifications on the value of CSP, including: scheduled versus optimized dispatch from the storage tank and energy-only operation versus co-optimization with ancillary services.

14 SOLAR ENERGY↗

Economic dispatch for electricity merchant with energy storage and wind plant: State of charge based decision making considering market impact and uncertainties

Here this paper investigates how the market impact of electricity merchants and uncertainty of wind generation affect their co-optimized scheduling policy, specifically for merchants who have both energy storage and wind plants. In the existing literature, merchants' trading actions are usually assumed not to affect market prices; however, a large-scale energy storage merchant's actions can affect market prices. To this end, we approximate the electricity price by a linear function of the quantity of power traded by the merchant in the reward function to achieve decision-making incorporating the market impact. This paper utilizes the dynamic programming approach to analyze merchants' optimal multi-period decision-making incorporating market impact, uncertain wind generation, and energy storage constraints. First, our results demonstrate that for a merchant with co-located energy storage facilities and wind power plants, the energy storage's feasible state of charge (SOC) range can be segmented into four possible sub-ranges by three analytically developed SOC reference points. The unique optimal trading decision can be achieved by comparing the current energy inventory and the SOC references of the next period. Second, our results show that market impact and uncertainties substantially change the optimal storage scheduling policy by impacting the values of the reference points. To mitigate the negative effect of the merchant's market impact on buying and selling actions, the merchant may reduce the amount of generating or pumping electricity each period to maximize profit. Moreover, we identify and investigate the trade-off between market price and transaction quantity. Our findings provide co-optimized scheduling guidance for electricity merchants with co-located energy storage and renewable power plants systems.

17 WIND ENERGY↗

Integrating an Ensemble Reward System into an Off-Policy Reinforcement Learning Algorithm for the Economic Dispatch of Small Modular Reactor-Based Energy Systems

Nuclear Integrated Energy Systems (NIES) have emerged as a comprehensive solution for navigating the changing energy landscape. They combine nuclear power plants with renewable energy sources, storage systems, and smart grid technologies to optimize energy production, distribution, and consumption across sectors, improving efficiency, reliability, and sustainability while addressing challenges associated with variability. The integration of Small Modular Reactors (SMRs) in NIES offers significant benefits over traditional nuclear facilities, although transferring involves overcoming legal and operational barriers, particularly in economic dispatch. This study proposes a novel off-policy Reinforcement Learning (RL) approach with an ensemble reward system to optimize economic dispatch for nuclear-powered generation companies equipped with an SMR, demonstrating superior accuracy and efficiency when compared to conventional methods and emphasizing RL’s potential to improve NIES profitability and sustainability. Finally, the research attempts to demonstrate the viability of implementing the proposed integrated RL approach in spot energy markets to maximize profits for nuclear-driven generation companies, establishing NIES’ profitability over competitors that rely on fossil fuel-based generation units to meet baseload requirements.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Analysis of Differential Financial Impacts of LWR Load-Following Operations. Revision 1

This document reports the application of HERON (Holistic Energy Resource Optimization Network), a newly-developed RAVEN (Risk Analysis Virtual ENvironment) plugin for grid and capacity optimization, to a case study conducted in collaboration with Arizona Public Service (APS). The study is a work in progress; this report presents a description of current models and corresponding results for a particular consideration. APS is anticipating several operational challenges. The first is rapid growth of Variable Renewable Energy (VRE) sources such as wind and solar power providing energy to the grid in the APS service region. This creates challenges for baseload operation of the Palo Verde Generating Station (PVGS), a nuclear power plant co-owned and operated by APS. The second challenge for APS is a change in the cooling water acquisition contract with the Sub Regional Operating Group (SROG). The existing contract is expiring soon, and a renewal is only available for a significantly higher price of water. These two challenges represent a difficulty in maintaining profitability for PVGS as local area demand is highly fluctuant and water prices may increase. Furthermore, excess production at PVGS is currently traded on the Palo Verde energy Hub (PVH), which occasionally offers very low or negative locational marginal prices (LMP) for electricity. This analysis considers the potential benefits of occasional curtailment of PVGS as a method to mitigate unprofitable production hours. Similar to load following, optional daily curtailment would allow APS to elect curtailment of PVGS as low as 70% of its nominal operating level between the hours of 08:00 and 16:00 provided local area demand is met and it is profitable to do so. This document reports a stochastic differential analysis of the Net Present Value (NPV) of PVGS as operated by NPS as a result of optional curtailment operation. To model this differential case, HERON has been designed from previous efforts in this study as a generic tool to accelerate the design and execution of RAVEN workflows for technoeconomic analysis of grid energy systems. HERON leverages both RAVEN and the CashFlow plugin for RAVEN to stochastically explore or optimize a response surface with energy grid system production capacities as inputs and mean NPV as a goal function. HERON performs these evaluations by stochastically sampling market, weather, and demand events using RAVEN’s ARMA reduced-order model capability to generate boundary conditions for dispatch optimization. The algorithm performs the dispatch optimization for each of the synthetic scenarios. For this case, HERON designs workflows to simulate behavior of the PVH, wind, solar, and APS local area demand, and use these synthetic scenarios to stochastically evaluate the differential benefit of optional curtailment for each scenario. While this study finds optional curtailment to be a potential source of revenue, the magnitude of the differential NPV is sufficiently small that it is unlikely a priority for increasing the profitability of PVGS. Further, the differential NPV shrinks throughout the simulated years, suggesting the long-term benefit of such operation given current assumptions is negligible.

14 SOLAR ENERGY↗

Modular Undersea Compressed Air Energy Storage (UCAES) System

This project has been devoted to the design, optimization, and cost analysis of a unique power plant with integral energy storage. The proposed facility combines a novel underwater compressed air energy storage (UCAES) system with a customized gas turbine generator, providing exceptional power management and overall efficiency. Unlike conventional CAES, opportunities for underwater storage are plentiful and proximal to the power grid. The UCAES system provides coastal and island communities a practical means for managing the volatility of large-scale wind and solar power resources. The result is higher renewable energy absorption and improved electrical reliability with reduced fossil fuel consumption. The UCAES power plant is composed of three major subsystems: The underwater air containment system (ACS), the air transport pipe (ATP), and the land-based power conversion system (PCS). The underwater ACS is made up of modular concrete shell units, structurally optimized for minimal material usage while employing conventional production methods and equipment. Each shell is designed to receive and control loose fill or gravel, serving as the ballast. The static nature of the final structures make them an asset to marine habitats and includes features intended to permit safe and cost-effective deployment. The ATP Connects the ACS modules to each other and to the on-land power conversion system and utilizes high density polyethylene (HDPE) pipe for low cost and long life. The PCS Houses the turbine-generator ‘expander modules’, with peak capacity of 12.3 MWe each, engineered from existing gas turbine equipment and includes electrically driven commercial 3-stage intercooled centrifugal compressors, each nominally drawing 6.6 MWe when matching the turbine flow requirements. The subsystems listed above are designed with the intent to serve as building-blocks to achieve a peak power output rating in the 40 to 120 MWe range, with 0.25 to 4 hours of energy storage capacity. The modular facility with integral energy storage provides some remarkable transient maneuvers and load-following features unachievable by competing technologies. The system can operate as a dispatchable power plant with a fuel-to-electric efficiency over 41%; substantially better that the average existing Hawaiian peak power generation assets. Optimal efficiency can be maintained while load-following due to modular PCS design and is operable with a range of liquid or gaseous fuels while meeting the most stringent California (CARB) emission standards. The system can operate as a peaking energy plant in discharge mode. Power ramp-up equivalent to 215% of continuous load rating within 1 second accomplished by simply turning off the electric compressor(s). Contrarily, the system can offer energy absorption during periods of grid surplus generation. The electric compressors may be sequenced on to absorb power within seconds. More moderate transitions are easily achieved with standard compressor control functions. The system offers unique features as compared to energy storage systems. ‘Round-trip efficiency’, as calculated by industry standard methods, is in the 90% range. The PCS equipment has a mean-time between overhauls of 80,000 hours, with maintenance costs of less than $0.005/kW-hr of electricity delivered. The underwater ACS structures and piping employ materials and designs specified to achieve a 75 year life. With the underwater containment modules qualified as a marine habitat, there would be no decommissioning costs. In conjunction with the engineering work invested in the design of the UCAES power plant, Brayton Energy has employed a team of manufacturing specialists, marine construction engineers, and power industry experts to create a comprehensive economic model that captures the many site-related variables and configuration options. The cost results and methodology have been validated by suppliers, engineers, and deployment specialists through a detailed case study on Hawaii. While creation of the parametric cost model was based on inputs specific to Hawaii, the proposed construction and deployment steps were chosen to be general enough to allow extrapolation across locations world-wide. Analysis of the proposed system shows it to be a viable option and addresses the principal challenges described by the Department of Energy by offering competitive costs, validated safety and reliability, consideration of the regulatory environment, and utilization of industry accepted practices and equipment. The UCAES system is recommended for immediate consideration in Hawaii. Estimation of time to complete planning, design, and construction of the facility is anticipated to take 3 to 5 years. Other coastal and island communities world-wide should realize similar benefits; as the results presented in this report are considered generally transferable to other locations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design, Integration and Synthesis Platform to Advance Tightly Coupled Hybrid Energy Systems (DISPATCHES) v0.1.0

The DISPATCHES software will enable the design and optimization of Integrated Energy Systems (IES). The platform will support hybridizing existing generation facilities (such as nuclear and coal plants) as well as greenfield hybrid designs that incorporate advanced technologies (such as Advanced Modular Reactors and Coal FIRST), and it will enable the consideration of multiple technology options with different time constants. The design of the IES will be optimized for operation within the bulk power system via energy market signals (day ahead, real-time, and ancillary services) obtained from a production cost model. The goal of DISPATCHES is to identify flexible, dynamic designs that are responsive to grid market signals resulting in highly efficient, cost effective tightly coupled hybrid energy systems that can act as a "black box" to the grid to provide increased flexibility and resiliency.

Gunter, Daniel↗

Optimization of a Virtual Power Plant to Provide Frequency Support.

Increasing the penetration of distributed renewable sources, including photovoltaic (PV) sources, poses technical challenges for grid management. The grid has been optimized over decades to rely upon large centralized power plants with well-established feedback controls, but now non-dispatchable, renewable sources are displacing these controllable generators. This one-year study was funded by the Department of Energy (DOE) SunShot program and is intended to better utilize those variable resources by providing electric utilities with the tools to implement frequency regulation and primary frequency reserves using aggregated renewable resources, known as a virtual power plant. The goal is to eventually enable the integration of 100s of Gigawatts into US power systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Concentrating Solar Power (CSP) Plant Optimization Study for the California Power Market (CalCSP)

In the United States, many states are implementing goals to achieve 100% carbon free power generation by 2050 or sooner. California has one of the more aggressive goals to achieve 100% carbon free generation of its retail power sales by 2045. California has excellent solar resources, but to accomplish this goal, California’s power utilities will need new zero carbon resources that can replace the natural gas units that they currently rely on for suppling power at night. Appropriately configured concentrating solar power plants with thermal energy storage are an option to serve this nighttime load. These plants would be designed to take advantage of CSP’s low-cost thermal energy storage and collect and store energy during the day and then be dispatched to produce power at night. The U.S. Department of Energy has funded a study to identify the design of a CSP plant that optimally meets the evolving CA grid needs. This will be done by taking a fresh look at how CSP technologies can best be designed to meet the emerging nighttime market for carbon free power generation or zero-carbon firm resources. The paper provides an overview of the study and present preliminary findings on the California power market requirements, CSP configurations, technoeconomic analysis, siting opportunities, and key issues for CSP deployment in this market.

Price, Hank (ORCID:0000000267049197)↗