Search NASA⌕ Search

SEARCH · Search NASA

Results for “Options”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Analysis of Shroud Options in Support of the Human Exploration of Mars

In support of the Mars Design Reference Architecture (DRA) 5.0, the NASA study team analyzed several shroud options for use on the Ares V launch vehicle.1,2 These shroud options included conventional "large encapsulation" shrouds with outer diameters ranging from 8.4 to 12.9 meters (m) and overall lengths of 22.0 to 54.3 meters, along with a "nosecone-only" shroud option used for Mars transfer vehicle component delivery. Also examined was a "multi-use" aerodynamic encapsulation shroud used for launch, Mars aerocapture, and entry, descent, and landing of the cargo and habitat landers. All conventional shroud options assessed for use on the Mars launch vehicles were the standard biconic design derived from the reference shroud utilized in the Constellation Program s lunar campaign. It is the purpose of this paper to discuss the technical details of each of these shroud options including material properties, structural mass, etc., while also discussing both the volume and mass of the various space transportation and surface system payload elements required to support a "minimum launch" Mars mission strategy, as well as the synergy, potential differences and upgrade paths that may be required between the Lunar and Mars mission shrouds.

Feldman, Stuart↗

Exploration Architecture Options - ECLSS, EVA, TCS Implications

Many options for exploration of space have been identified and evaluated since the Vision for Space Exploration (VSE) was announced in 2004. Lunar architectures have been identified and addressed in the Lunar Surface Systems team to establish options for how to get to and then inhabit and explore the moon. The Augustine Commission evaluated human space flight for the Obama administration and identified many options for how to conduct human spaceflight in the future. This paper will evaluate the options for exploration of space for the implications of architectures on the Environmental Control and Life Support (ECLSS), ExtraVehicular Activity (EVA) and Thermal Control System (TCS) Systems. The advantages and disadvantages of each architecture and options are presented.

Chambliss, Joe↗

A Decision Support Framework for Feasibility Analysis of International Space Station (ISS) Research Capability Enhancing Options

The assembly and operation of the ISS has generated significant challenges that have ultimately impacted resources available to the program's primary mission: research. To address this, program personnel routinely perform trade-off studies on alternative options to enhance research. The approach, content level of analysis and resulting outputs of these studies vary due to many factors, however, complicating the Program Manager's job of selecting the best option. To address this, the program requested a framework be developed to evaluate multiple research-enhancing options in a thorough, disciplined and repeatable manner, and to identify the best option on the basis of cost, benefit and risk. The resulting framework consisted of a systematic methodology and a decision-support toolset. The framework provides quantifiable and repeatable means for ranking research-enhancing options for the complex and multiple-constraint domain of the space research laboratory. This paper describes the development, verification and validation of this framework and provides observations on its operational use.

Ortiz, James N.↗

Manchester Coding Option for SpaceWire: Providing Choices for System Level Design

This paper proposes an optional coding scheme for SpaceWire in lieu of the current Data Strobe scheme for three reasons. First reason is to provide a straightforward method for electrical isolation of the interface; secondly to provide ability to reduce the mass and bend radius of the SpaceWire cable; and thirdly to provide a means for a common physical layer over which multiple spacecraft onboard data link protocols could operate for a wide range of data rates. The intent is to accomplish these goals without significant change to existing SpaceWire design investments. The ability to optionally use Manchester coding in place of the current Data Strobe coding provides the ability to DC balanced the signal transitions unlike the SpaceWire Data Strobe coding; and therefore the ability to isolate the electrical interface without concern. Additionally, because the Manchester code has the clock and data encoded on the same signal, the number of wires of the existing SpaceWire cable could be optionally reduced by 50. This reduction could be an important consideration for many users of SpaceWire as indicated by the already existing effort underway by the SpaceWire working group to reduce the cable mass and bend radius by elimination of shields. However, reducing the signal count by half would provide even greater gains. It is proposed to restrict the data rate for the optional Manchester coding to a fixed data rate of 10 Megabits per second (Mbps) in order to make the necessary changes simple and still able to run in current radiation tolerant Field Programmable Gate Arrays (FPGAs). Even with this constraint, 10 Mbps will meet many applications where SpaceWire is used. These include command and control applications and many instruments applications with have moderate data rate. For most NASA flight implementations, SpaceWire designs are in rad-tolerant FPGAs, and the desire to preserve the heritage design investment is important for cost and risk considerations. The Manchester coding option can be accommodated in existing designs with only changes to the FPGA.

Electrical Isolation↗

Proximity Operations for the Robotic Boulder Capture Option for the Asteroid Redirect Mission

In September of 2013, the Asteroid Robotic Redirect Mission (ARRM) Option B team was formed to expand on NASA's previous work on the robotic boulder capture option. While the original Option A concept focuses on capturing an entire smaller Near-Earth Asteroid (NEA) using an inflatable bag capture mechanism, this design seeks to land on a larger NEA and retrieve a boulder off of its surface. The Option B team has developed a detailed and feasible mission concept that preserves many aspects of Option A's vehicle design while employing a fundamentally different technique for returning a significant quantity of asteroidal material to the Earth-Moon system. As part of this effort, a point of departure proximity operations concept was developed complete with a detailed timeline, as well as DeltaV and propellant allocations. Special attention was paid to the development of the approach strategy, terminal descent to the surface, controlled ascent with the captured boulder, and control during the Enhanced Gravity Tractor planetary defense demonstration. The concept of retrieving a boulder from the surface of an asteroid and demonstrating the Enhanced Gravity Tractor planetary defense technique is found to be feasible and within the proposed capabilities of the Asteroid Redirect Vehicle (ARV). While this point of departure concept initially focuses on a mission to Itokawa, the proximity operations design is also shown to be extensible to wide range of asteroids.

Reeves, David M.↗

Lunar Cube Transfer Trajectory Options

Contingent upon the modification of an initial condition of the injected or deployed orbit. Additionally, these designs can be restricted by the selection of the Cubesat subsystem design such as propulsion or communication. Nonetheless, many trajectory options can be designed with have a wide range of transfer durations, fuel requirements, and final destinations. Our investigation of potential trajectories highlights several design options including deployment into low Earth orbit (LEO), geostationary transfer orbits (GTO), and higher energy direct lunar transfer orbits. In addition to direct transfer options from these initial orbits, we also investigate the use of longer duration Earth-Moon dynamical systems. For missions with an intended lunar orbit, much of the design process is spent optimizing a ballistic capture while other science locations such as Sun-Earth libration or heliocentric orbits may simply require a reduced Delta-V imparted at a convenient location along the trajectory. In this article we examine several design options that meet the above limited deployment and subsystem drivers. We study ways that both impulsive and low-thrust Solar Electric Propulsion (SEP) engines can be used to place the Cubesat first into a highly eccentric Earth orbit, enter the Moon's Sphere of Influence, and finally achieve a highly eccentric lunar orbit. We show that such low-thrust transfers are feasible with a realistic micro-thruster model, assuming that the Cubesat can generate sufficient power for the SEP. Two examples are shown here: (1) A Cubestat injected by Exploration Mission 1 (EM-1) then employing low thrust; and (2) a CubSat deployed in a GTO, then employing impulsive maneuvers. For the EM-1 injected initial design, we increase the EM-1 targeted lunar flyby distance to reduce the energy of the lunar flyby to match that of a typical lMoon system heteroclinic manifold. Figure 1 presents an option that encompasses the similar dynamics as that of the ARTEMIS mission design. Low-thrust maneuvers are used along the manifold trajectory to raise perigee to that of a lunar orbit, adjust the timing with respect to the Moon, rotate the line of apsides, and target a ballistic lunar encounter. In this design a second flyby decreases the orbital energy with respect to the Moon, so that C3 -0.1 km2s2. Another design, shown in Figure 2 emanates from a GTO then uses impulsive maneuvers to phase onto a local Earth-Moon manifold, which then transfers the CubeSat to a lunar encounter.

Dynamical System↗

Real Options Analysis for Valuation of Climate Adaptation Pathways With Application to Transit Infrastructure

Climate change and sea level rise (SLR) are expected to increase the frequency and intensity of coastal flood events, posing risks to coastal communities and infrastructure. While regional climate adaptation investments can provide substantive flood protection, existing plans often neglect uncertainty in future climate conditions and adaptation performance, consequently neglecting the option value of flexibly implementing proposed projects. Addressing this gap, we develop and employ a generalizable real options analysis (ROA) valuation framework that considers how uncertainty in adaptation project costs, SLR, flood severity, and flood losses inform the full range of adaptation performance outcomes. We further propose and apply a novel, computationally efficient flood loss sampling algorithm to estimate the consequences of randomly arriving coastal flood events. We apply this ROA framework to assess the option value of flexibly timing adaptation investments over time, investigating an adaptation pathway proposed by the City of Boston from the perspective of the regional transit system manager. Our results suggest that flexible implementation can provide significant option value in the near-to mid-term(>30 years), with highest option values under low-probability, high consequence scenarios. Our results also suggest adaptation pathway performance in the latter half of the 21stcenturyis most sensitive to uncertainty in sea level rise, flood loss estimates, and flood frequency, underscoring the importance of uncertainty quantification in the long-term valuation of adaptation investments.

Michael V. Martello↗

Selling Demand Response Using Options

Wholesale electricity markets in many jurisdictions use a two-settlement structure: a day-ahead market for bulk power transactions and a real-time market for fine-grain supply-demand balancing. This paper explores trading demand response assets within this two-settlement market structure. Here, we consider two approaches for trading demand response assets: (a) an intermediate spot market with contingent pricing, and (b) an over-the-counter options contract. In the first case, we characterize the competitive equilibrium of the spot market, and show that it is socially optimal. Economic orthodoxy advocates spot markets, but these require expensive infrastructure and regulatory blessing. In the second case, we characterize competitive equilibria and compare its efficiency with the idealized spot market. Options contract are private bilateral over-the-counter transactions and do not require regulatory approval. We show that the optimal social welfare is, in general, not supported. We then design optimal option prices that minimize the social welfare gap. This optimal design serves to approximate the ideal spot market for demand response using options with modest loss of efficiency. Our results are validated through numerical simulations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Building Technologies Office 03.02.02.38 Milestone Report — Technology Options for Low Environmental Impact Air-Conditioning and Refrigeration Systems

Due to increasing concerns about global warming, various environmental regulations will eventually phase out refrigerants used in air conditioning and refrigeration systems (e.g., R-410A, R-404A). Several refrigerants have been proposed as replacements, offering a variety of global warming potential (GWP), levels of energy efficiency and flammability. Some of these options are synthetic HFC/HFO mixtures such as R-454C and R-455A while other are commonly called naturals such as R-290 (Propane) and R-744 (Carbon Dioxide). This study discusses the merits of the leading options for air Conditioning and refrigeration systems. The fundamental requirements (environmental, performance, safety) are employed to fairly evaluate these options. Performance data and Life Cycle analysis results for these options are presented. Overall, this study provides information needed to judge the prospects of getting adequate replacement for R-410A and R-404A in a long-term sustainable basis.

42 ENGINEERING↗

Area-A Options Cost Estimate Report

Five options for re-establishing various configurations of beam to LANSCE Area A were considered. Bottoms up cost estimates to implement three of the options were developed. The two options not costed were considered too complex and too expensive compared with the other options based on their relative benefits to experimental programs at LANSCE.

43 PARTICLE ACCELERATORS↗

Power Supply Options for the Marpi Landfill, Saipan: Addendum to 2023 Feasibility Study

The Marpi Landfill (Marpi or the landfill), located on the northern end of the island of Saipan in the Commonwealth of the Northern Mariana Islands (CNMI), is powered by an on-site diesel generator that only operates when the landfill is open and staffed. The CNMI Office of Planning and Development (OPD) aspires to provide the Marpi Landfill with 24-hour power availability despite its remote location and to increase sustainable energy consumption within the CNMI. Pacific Northwest National Laboratory (PNNL) authored a feasibility study in 2023 that explores alternative power supply options for the landfill. This feasibility study (hereafter referred to as Phase I of this study) culminated in a report named “Power Supply Options for the Marpi Landfill, Saipan.” In Phase I, the project team investigated and prioritized seven different power supply scenarios (Table ES-1) for the landfill according to Solid Waste (SW) Taskforce priorities. The project team found that Scenario 4 (100 kW of solar photovoltaic [PV] generation, a 75 kW/300 kWh battery energy storage system [BESS], and 160 kW of diesel generation) ranked highest. Following the Phase I feasibility study, the SW Taskforce secured additional funding for PNNL to assess additional considerations regarding power supply options for Marpi. The purpose of Phase II of this study is to investigate these additional considerations, as compiled in this addendum. Some of the findings compiled here replace findings from the original report. The project team evaluated additional considerations regarding power supply options for the landfill, including modified operations to account for 24/7 power supply, electrified landfill equipment, new and replacement distribution line costs, and the social cost of carbon.

14 SOLAR ENERGY↗

Navigating Options for Transportation Electrification and Solar Charging: Steps and Lessons Learned in Montana Communities

This document is intended to assist communities who are considering investing in electric transportation. It can assist communities engage stakeholders, prioritize community goals, assess electric transportation options, and navigate complex decisions about deploying zero emission electric transportation in their community. It covers technological, economic and environmental aspects of the transition to electric vehicles (EV), and highlights the specific considerations related to the deployment of renewable energy technologies (e.g., distributed solar) in combination with EV supply equipment (EVSE, e.g., charging stations). There are many important decisions to make and questions for communities to ask themselves as they consider electric vehicle types, charging infrastructure, and electricity generation options. This guide will help communities assess: (1) Which stage in the decision-making process they are in with respect to EV deployment; (2) Questions they can explore to guide their decisions about EV deployment; (3) How to engage key stakeholders on EV deployment options; (4) Tradeoffs and benefits of various electric transportation options and; (5) Synergies of pairing electric vehicle charging and renewable energy generation technologies. The analysis and lessons learned presented in this roadmap are intended to serve as a template and guide for similarly situated communities across the country who want to prepare for and play a role in the electrified transportation future.

14 SOLAR ENERGY↗

An Assessment of Nuclear Fuel Options for Microreactors

A design options trade-off study was conducted for various nuclear fuel system options. This study developed requirements for ideal fuel system characteristics and weighted ranking criteria specifically for microreactor designs. A semiquantitative method of consensus ranking on a numeric scale was used with input from several nuclear fuel experts. The purpose of this study was to assess options and provide recommendations for further nuclear fuel technology development to better support small reactor cores. Modern microreactor designs have only recently begun emerging and have little in common except their diminutive size. The purpose of this study was not to determine which reactor type is best (e.g., coolant type and/or neutron energy spectrum), but rather to assess fuel system options within five broad categories of reactor types inspired by: 1) Very High Temperature Reactors (VHTR), 2) Sodium Fast Reactors (SFR), 3) System for Nuclear Auxiliary Power (SNAP) reactors, 4) Gas Fast Reactor (GFR), and 5) Molten Salt Reactors (MSR). The order in which these reactor types were listed generally represents the amount of current interest and technological maturity in the microreactor development community (in descending order). As such, the conclusions drawn for each reactor type category have varying levels of certainty, but there is confidence in the general conclusion that known fuel technologies can support small reactors, but that microreactors will be able to maximize their performance potential if these fuel systems were further optimized. These optimization opportunities were found to revolve around increasing uranium loading and improving behaviors/understanding for long time-at-temperature conditions. Further details about these recommendations can be found in the concluding section of this report.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Modular space station program option

The study to determine whether a viable space station experiment program of 5 to 10 years duration could be defined that would reduce the projected program cost of $6 billion is presented. The options considered are limited to a six-man capability. The identification and description of the options, impact assessment of these options on the space station design, and the costs and schedules for encompassing each option are summarized. It is concluded that viable space station programs of 5 to 10 years duration are attainable; however, the 10-year program offers a significantly greater return on the investment.

Source record↗

Mars sample-return options

Attention is given to the comparative merits of two options for the return to earth of Mars round-trip sampling probe missions. The first option makes use of an onboard propulsion system to place the returning vehicle into a highly elliptical orbit around the earth. An orbital transfer vehicle (OTV) or OTV/orbital maneuvering vehicle combination retrieves the sample from the return vehicle. The second option uses aerocapture to place the return vehicle in earth orbit; this maneuver imposes no greater weight penalty for proceeding to a low orbit than remaining at one that is high. The second option delivers the sample to a Space Station-compatible orbit for pickup.

French, J. R.↗

Design and assembly sequence analysis of option 3 for CETF reference space station

A design and assembly sequence was conducted on one option of the Dual Keel Space Station examined by a NASA Critical Evaluation Task Force to establish viability of several variations of that option. A goal of the study was to produce and analyze technical data to support Task Force decisions to either examine particular Option 3 variations in more depth or eliminate them from further consideration. An analysis of the phasing assembly showed that use of an Expendable Launch Vehicle in conjunction with the Space Transportation System (STS) can accelerate the buildup of the Station and ease the STS launch rate constraints. The study also showed that use of an Orbital Maneuvering Vehicle on the first flight can significantly benefit Station assembly and, by performing Station subsystem functions, can alleviate the need for operational control and reboost systems during the early flights. In addition to launch and assembly sequencing, the study assessed stability and control, and analyzed node-packaging options and the effects of keel removal on the structural dynamics of the Station. Results of these analyses are presented and discussed.

Garrett, L. Bernard↗

Current trajectory options for a comet nucleus sample return mission

A summary of the current trajectory options available for the ESA comet nucleus sample return mission, Rosetta, is presented. These options include direct trajectories, delta-V-EGA trajectories using a Titan IV/Centaur launch vehicle with upgraded solid rocket motors, a trajectory involving a gravity assist of the earth (VEGA) prior to comet rendezvous, and one involving an additional gravity assist of the earth (VEEGA). Other propulsion options proposed and discussed are solar electric propulsion/ballistic trajectory modes and nuclear electric propulsion trajectory modes. Tables of performance data for each of these trajectory options are given.

Sauer, Carl G., Jr.↗

Space Station redesign option A: Modular buildup concept

In early 1993, President Clinton mandated that NASA look at lower cost alternatives to Space Station Freedom. He also established an independent advisory committee - the Blue Ribbon Panel - to review the redesign work and evaluate alternatives. Daniel Goldin, NASA Administrator, established a Station Redesign Team that began operating in late March from Crystal City, Virginia. NASA intercenter teams - one each at Marshall Space Flight Center, Johnson Space Center, and Langley Research Center provided engineering and other support. The results of the Option A study done at Marshall Space Flight Center are summarized. Two configurations (A-1 and A-2) are covered. Additional data is provided in the briefing package MSFC SRT-001, Final System Review to SRT-002, Space Station Option A Modular Buildup Concept, Volumes 1-5, Revision B, June 10, 1993. In June 1993, President Clinton decided to proceed with a modular concept consistent with Option A, and asked NASA to provide an Implementation Plan by September. All data from the Option A redesign activity was provided to NASA's Transition Team for use in developing the Implementation Plan.

Source record↗