Search NASA⌕ Search

SEARCH · Search NASA

Results for “PEP”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 1: Executive summary

An array deployment assembly, power regulation and control assembly, the necessary interface, and display and control equipment comprise the power extension package (PEP) which is designed to provide increased power and duration, as well as reduce fuel cell cryogen consumption during Spacelab missions. Compatible with all currently defined missions and payloads, PEP imposes minimal weight and volume penalties on sortie missions, and can be installed and removed as needed at the launch site within the normal Orbiter turnaround cycle. The technology on which it is based consists of a modified solar electric propulsion array, standard design regulator and control equipment, and a minimally modified Orbiter design. The requirements from which PEP was derived, and the system and its performance capabilities are described. Features of the recommended project are presented.

Source record↗

Parameters for the PEP-II B-Factory at SLAC in 2008

The PEP-II B-Factory at SLAC (3.1 GeV e{sup +} x 9.0 GeV e{sup -}) operated from 1999 to 2008, delivering luminosity to the BaBar experiment. The design luminosity was reached after one and a half years of operation. In the end PEP-II surpassed, by four times, its design luminosity reaching 1.21 x 10{sup 34} cm{sup -2}s{sup -1}. It also set world stored beam current records of 2.1 A e{sup -} and 3.2 A e{sup +}. Continuous injection was implemented with BaBar successfully taking data. The total delivered luminosity to the BaBar detector was 557.4 fb{sup -1} spanning five upsilon resonances. PEP-II was constructed by SLAC, LBNL, and LLNL with help from BINP, IHEP, the BaBar collaboration, and the US DOE OHEP.

43 PARTICLE ACCELERATORS↗

Simulating Large PEPs Tensor Networks on Small Quantum Devices

We systematically map low bond dimension PEPs tensor networks to quantum circuits. By measuring and reusing qubits, we are in principle able to simulate an N×M square lattice PEPs network (for arbitrary M) of bond dimension 2 using N+ 2 qubits. We then seek to determine if this mapping can yield useful values for long-range loop observables in the presence of quantum device noise in the topological Wen plaquette model by mapping a 3×3 PEPs tensor network to a 5-qubit quantum circuit and executing it on the Honeywell System Model H1-1 trapped-ion device. We find that, for this system size, the noisy observable values are indeed sufficient for diagnosing topological vs. trivial order as the Wen model is perturbed by a magnetic field term in the Hamiltonian. We provide an overview of the experimental procedure and its results. We then explain in greater detail our method for mapping 2D tensor networks to quantum circuits and its scaling properties. This serves as a proof-of-concept of the utilty of the measure-and-reuse approach for simulating large 2D quantum systems on small quantum devices.

MacCormack, Ian↗

Final Design And Manufacturing of the PEP II High Energy Ring Arc Bellows Module

A novel RF shield bellows module developed at SLAC has been successfully manufactured and installed in the PEP-II High Energy Ring (HER). Tests indicate that the module meets its performance and operational requirements. The primary function of the bellows module is to allow for thermal expansion of the chambers and for lateral, longitudinal and angular offsets due to tolerances and alignment, while providing RF continuity between adjoining chambers. An update on the Arc bellows module for the PEP-II High Energy Ring is presented. Final design, manufacturing issues, material and coating selection, and tribological and RF testing are discussed. Performance and operational requirements are also reviewed. The RF shield design has been proven during assembly to allow for large manufacturing tolerances without reducing the mechanical spring force below required values. In addition, the RF shield maintains electrical contact even with large misalignments across the module.

43 PARTICLE ACCELERATORS↗

An Orbit And Dispersion Correction Scheme for the PEP II

To achieve optimum luminosity in a storage ring it is vital to control the residual vertical dispersion. In the original PEP storage ring, a scheme to control the residual dispersion function was implemented using the ring orbit as the controlling element. The 'best' orbit not necessarily giving the lowest vertical dispersion. A similar scheme has been implemented in both the on-line control code and in the simulation code LEGO. The method involves finding the response matrices (sensitivity of orbit/dispersion at each Beam-Position-Monitor (BPM) to each orbit corrector) and solving in a least squares sense for minimum orbit, dispersion function or both. The optimum solution is usually a subset of the full least squares solution. A scheme of simultaneously correcting the orbits and dispersion has been implemented in the simulation code and on-line control system for PEP-II. The scheme is based on the eigenvector decomposition method. An important ingredient of the scheme is to choose the optimum eigenvectors that minimize the orbit, dispersion and corrector strength. Simulations indicate this to be a very effective way to control the vertical residual dispersion.

43 PARTICLE ACCELERATORS↗

Design And Verification of Controllers for Coupled Bunch Instabilities Using Optimal Control Theory And Numerical Simulation: Predictions for PEP II

We present a technique for the design and verification of efficient bunch-by-bunch controllers for damping longitudinal multibunch instabilities. The controllers attempt to optimize the use of available feedback amplifier power - one of the most expensive components of a feedback system - and define the limits of the closed loop system performance. Our design technique alternates between analytic computation of single bunch optimal controllers and verification on a multibunch numerical simulator. The simulator uses PEP-II parameters and identifies unstable coupled bunch modes, their growth rates and their damping rates with feedback. The results from the simulator are shown to be in reasonable agreement with analytical calculations based on the single bunch model. The technique is then used to evaluate the performance of a variety of controllers proposed for PEP-II.

43 PARTICLE ACCELERATORS↗

Status of PEP-X Light Source Design Study

The SLAC Beam Physics group and other SLAC collaborators continue to study options for implementing a near diffraction-limited ring-based light source in the 2.2-km PEP-II tunnel that will serve the SSRL scientific program in the future. The study team has completed the baseline design for a 4.5-GeV storage ring having 160 pm-rad emittance with stored beam current of 1.5 A, providing >10{sup 22} brightness for multi-keV photon beams from 3.5-m undulator sources. The team has also investigated possible 5-GeV ERL configurations which, similar to the Cornell and KEK ERL plans, would have {approx}30 pm-rad emittance with 100 mA current, and {approx}10 pm-rad emittance with 25 mA or less. Now a 4.5-GeV 'ultimate' storage ring having emittance similar to the ERL and operating with {approx}200 mA is under study. An overview of the progress of the PEP-X design study and SSRL's plans for defining performance parameters that will guide the choice of ring options is presented.

43 PARTICLE ACCELERATORS↗

Dynamic Aperture and Tolerances for PEP-X Ultimate Storage Ring Design

A lattice for the PEP-X ultimate storage ring light source, having 11 pm-rad natural emittance at a beam energy of 4.5 GeV at zero current, using 90 m of damping wiggler and fitting into the existing 2.2-km PEP-II tunnel, has been recently designed. Such a low emittance lattice requires very strong sextupoles for chromaticity correction, which in turn introduce strong non-linear field effects that limit the beam dynamic aperture. In order to maximize the dynamic aperture we choose the cell phases to cancel the third and fourth order geometric resonances in each 8-cell arc. Four families of chromatic sextupoles and six families of geometric (or harmonic) sextupoles are added to correct the chromatic and amplitude-dependent tunes. To find the best settings of the ten sextupole families, we use a Multi-Objective Genetic Optimizer employing elegant to optimize the beam lifetime and dynamic aperture simultaneously. Then we evaluate dynamic aperture reduction caused by magnetic field multipole errors, magnet fabrication errors and misalignments. A sufficient dynamic aperture is obtained for injection, as well as workable beam lifetime.

43 PARTICLE ACCELERATORS↗

Optimization of Dynamic Aperture of PEP-X Baseline Design

SLAC is developing a long-range plan to transfer the evolving scientific programs at SSRL from the SPEAR3 light source to a much higher performing photon source. Storage ring design is one of the possibilities that would be housed in the 2.2-km PEP-II tunnel. The design goal of PEPX storage ring is to approach an optimal light source design with horizontal emittance less than 100 pm and vertical emittance of 8 pm to reach the diffraction limit of 1-{angstrom} x-ray. The low emittance design requires a lattice with strong focusing leading to high natural chromaticity and therefore to strong sextupoles. The latter caused reduction of dynamic aperture. The dynamic aperture requirement for horizontal injection at injection point is about 10 mm. In order to achieve the desired dynamic aperture the transverse non-linearity of PEP-X is studied. The program LEGO is used to simulate the particle motion. The technique of frequency map is used to analyze the nonlinear behavior. The effect of the non-linearity is tried to minimize at the given constrains of limited space. The details and results of dynamic aperture optimization are discussed in this paper.

43 PARTICLE ACCELERATORS↗

Lessons Learned from PEP-II LLRF and Longitudinal Feedback

The PEP-II B-Factory collider ended the final phase of operation at nearly twice the design current and 4X the design luminosity. To highlight the evolution from the original conceptual design through to the 1.2E34 final machine we choose one example each from the broadband feedback and from the LLRF system. They illustrate the original design estimation missed some very significant details, and how in the course of PEP-II operation unexpected difficulties led to significant insights and new approaches which allowed higher machine performance. We present valuable 'lessons learned' which are of interest to designers of next generation feedback and impedance controlled LLRF systems.

43 PARTICLE ACCELERATORS↗

PEPS as ground states: Degeneracy and topology

We introduce a framework for characterizing Matrix Product States (MPS) and Projected Entangled Pair States (PEPS) in terms of symmetries. This allows us to understand how PEPS appear as ground states of local Hamiltonians with finitely degenerate ground states and to characterize the ground state subspace. Subsequently, we apply our framework to show how the topological properties of these ground states can be explained solely from the symmetry: We prove that ground states are locally indistinguishable and can be transformed into each other by acting on a restricted region, we explain the origin of the topological entropy, and we discuss how to renormalize these states based on their symmetries. Finally, we show how the anyonic character of excitations can be understood as a consequence of the underlying symmetries.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

PEP solar array definition study

The power extension package (PEP) is a solar array system that will be used on the space transportation system to augment the power of the Orbiter vehicle and to extend the time the vehicle may stay in orbit. The baseline configuration of the PEP is reviewed. The programmatic aspects of the design covering the development plan, the manufacturing facility plan and the estimated costs and risks are presented.

Source record↗

Implementing Ethernet Services on the Payload Executive Processor (PEP)

The Ethernet interface is more common and easier interface to implement for payload developers already familiar with Ethernet protocol in their labs. The Ethernet interface allows for a more distributed payload architecture. Connections can be placed in locations not serviced by the PEP 1553 bus. The Ethernet interface provides a new access port into the PEP so as to use the already existing services. Initial capability will include a subset of services with a plan to expand services later.

Pruett, David↗

Network Upgrade for the SLC: PEP II Network

The PEP-II control system required a new network to support the system functions. This network, called CTLnet, is an FDDI/Ethernet based network using only TCP/IP protocols. An upgrade of the SLC Control System micro communications to use TCP/IP and SLCNET would allow all PEP-II control system nodes to use TCP/IP. CTLnet is private and separate from the SLAC public network. Access to nodes and control system functions is provided by multi-homed application servers with connections to both the private CTLnet and the SLAC public network. Monitoring and diagnostics are provided using a dedicated system. Future plans and current status information is included.

43 PARTICLE ACCELERATORS↗

Beam Position Monitor System for PEP II

We describe the beam position monitor system built for PEP-II, the B-factory at SLAC. The system reports beam position for bunches of between 5 x 10{sup 8} and 8 x 10{sup 10} electron charges, either singly or as continuous streams of bunches every 4.2 ns. Resolution at full charge is to be better than 10 microns in a single turn. Higher resolution is available via on-board multi-turn averaging. The position signal is processed in a 20 MHz bandwidth around 952 MHz. This bandwidth, rather broader than that typical of RF position monitors, allows good resolution for low charge single bunches. Additional novel features include stringent control of return losses in order to minimize cross-talk between nearby bunches which may contain very different charges. The digitizing electronics is multiplexed between the two PEP-II storage rings. Design, construction, and installation experience, as well as first results with beam are presented.

43 PARTICLE ACCELERATORS↗

Single Bunch Stability in LER of PEP II

The note describes results of studies of the single bunch stability in the low energy ring (LER) of the PEP-II B-factory. Simulations describe the potential well distortion (PWD) obtained by numerical solution of the Haiisinski equation and results on the beam stability obtained with the code TRISIM. Both longitudinal and transverse wake fields are taken into account. Preliminary estimates indicate that single bunch in the LER of the PEP-II B-factory has to be stable, both longitudinally and transversely, at the maximum design bunch current 1.8 mA (beam current 3A). However, realistic wakes of the machine has been constructed only recently using results of the extensive numerical simulations of the vacuum components of the ring. Additional to that, the code TRISIM, a simulation program for single-bunch collective effects written by one of the authors (G. S.), became recently available. This allows us to study beam stability in a more reliable way than it is possible analytically.

43 PARTICLE ACCELERATORS↗

The Interaction Region of PEP-II

The PEP-II e{sup +}e{sup -} collider turned off last year after a very successful 9 years of running. The accelerator achieved a peak luminosity of 12 x 10{sup 33} cm{sup -2} s{sup -1}, 4 times over the design of 3 x 10{sup 33} cm{sup -2} s{sup -1}. The peak beam currents were quite high; over 3 A for the positron beam and over 2 A for the electron beam. The beams were stored in separate storage rings. The PEP-II design called for a head-on collision at the interaction point (IP). This was possible because of the asymmetric beam energies (9 on 3.1 GeV) and was achieved using permanent magnet (PM) dipoles. I describe the actual interaction region (IR) layout including some of the design constraints that led to the final design and discuss operation issues related to the IR design.

43 PARTICLE ACCELERATORS↗