Search NASA⌕ Search

SEARCH · Search NASA

Results for “PV software”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

PRECISE: Cutting Costs and Delays for Rooftop PV

Learn about the NREL-developed software Preconfiguring & Controlling Inverter Set-Points (PRECISE), which helps utilities identify optimal inverter modes and settings for distributed PV. PRECISE is a standalone system that allows utility engineers to seamlessly interconnect PV generation, significantly cutting the wait time and costs for customers.

14 SOLAR ENERGY↗

Foundational Open Source Solar System Modeling Through Improvement and Validation of the System Advisor Model and PVWatts (FY19-FY21 Final Technical Report)

Accelerating intelligent deployment of solar energy technologies demands accurate system modeling every step of the way. From project development to policy research, grid integration studies to development of novel technologies, industry and researchers alike need validated, transparent, easy-to-use, extensible, cutting-edge, and accurate models of both the performance and financing of solar systems. The System Advisor Model (SAM) and PVWatts tools provide a platform to fill that need. The overarching goal of this set of software tools is to enable accurate PV system modeling across the industry, and our usage metrics indicate that we continue to succeed in that endeavor, with a user starting SAM every 2 minutes globally, and over 17 million PVWatts hits per month. This project leveraged DOEs past investment in the SAM and PVWatts platforms to continue to provide valuable and extensible PV, battery, and financial modeling resources to the larger solar community. We pursued multiple avenues in parallel: software maintenance and technical support that are foundational to the continued usability of the SAM and PVWatts platforms; platform and PV model improvements and stakeholder engagement activities that are core to the continued relevance of the platforms; and open source activities to foster the continued creation of a vibrant open-source community around the SAM and PVWatts tools, which opens up exciting new opportunities for industry interaction.

14 SOLAR ENERGY↗

Accelerating the Gauss-Seidel Power Flow Solver on a High Performance Reconfigurable Computer

The computationally intensive power flow problem determines the voltage magnitude and phase angle at each bus in a power system for hundreds of thousands of buses under balanced three-phase steady-state conditions. We report an FPGA acceleration of the Gauss-Seidel based power flow solver employed in the transmission module of the GridLAB-D power distribution simulator and analysis tool. The prototype hardware is implemented on an SGI Altix-RASC system equipped with a Xilinx Virtex II 6000 FPGA. Due to capacity limitations of the FPGA, only the bus voltage calculations of the power network are implemented on hardware while the branch current calculations are implemented in software. For a 200,000 bus system, the bus voltage calculation on the FPGA achieves a 48x speed-up with PQ buses and a 62 times for PV over an equivalent sequential software implementation. The average overall speed up of the FPGA-CPU implementation with 100 iterations of the Gauss-Seidel power solver is 2.6x over a software implementation, with the branch calculations on the CPU accounting for 85% of the total execution time. The FPGA-CPU implementation also shows linear scaling with increase in the size of the input power network.

24 POWER TRANSMISSION AND DISTRIBUTION↗

DEReliction: A Cybersecurity Vulnerability Assessment Methodology for Distributed Energy Resources

With the increasing integration of Distributed Energy Resources (DER) into the electric grid, maintaining grid reliability and resilience requires that these devices remain secure. This paper discusses a cybersecurity vulnerability assessment methodology that incorporates best practices from Sandia National Laboratories, SANS Institute, OWASP Foundation, and other web and Internet of Things (IoT) penetration testing (“pen testing”) programs, courses, and frameworks for assessing the security posture of devices. The methodology involves five sequential steps: (1) Collect Public Information, (2) Extract Hardware Details, (3) Inventory Software Components, (4) Identify Vulnerabilities, and (5) Test Vulnerabilities. Each step uncovers potential weaknesses in both hardware and software components of DER devices, considering adversary tactics, techniques, and procedures (TTPs), and potential attack vectors along the way. The results from the execution of this method on multiple residential- and small commercial-scale photovoltaic (PV) inverters reveled hardware and software vulnerabilities, which highlight the benefit of taking a methodical approach to discover vulnerabilities. While the specific vulnerability details are not shared here, a generalized overview of findings underscore the importance of robust security assessments for DER devices. Adoption of an assessment framework of this kind will identify and mitigate cybersecurity threats and bolster the resilience of DER-integrated electric grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Plug and Play PV Systems for American Homes

The core objectives of the Plug & Play PV Systems Project were to develop a PV system that can be installed on a residential rooftop for less than $1.50/W in 2020, and in less than 10 hours (from point of purchase to commissioning). The Fraunhofer CSE team’s approach to this challenge involved a holistic approach to system design – hardware and software – that make Plug & Play PV systems: • Quick, easy, and safe to install • Easy to demonstrate as code compliant • Permitted, inspected, and interconnected via an electronic process Throughout the three years of work during this Department of Energy SunShot funded project, the team engaged in a substantive way with inspectional services departments and utilities, manufacturers, installers, and distributors. We received iterative feedback on the system design and on ideas for how such systems can be commercialized. This ultimately led us to conceiving of Plug & Play PV Systems as a framework, with a variety of components compatible with the Plug & Play PV approach, including string or microinverters, conventional modules or emerging lightweight modules. The framework enables a broad group of manufacturers to participate in taking Plug & Play PV Systems to market, and increases the market size for such systems. Key aspects of the development effort centered on the system hardware and associated engineering work, the development of a Plug & Play PV Server to enable the electronic permitting, inspection and interconnection process, understanding the details of code compliance and, on occasion, supporting applications for modifications to the code to allow lightweight modules, for example. We have published a number of papers on our testing and assessment of novel technologies (e.g., adhered lightweight modules) and on the electronic architecture.

14 SOLAR ENERGY↗

Bifacial PV System Mismatch Loss Estimation

Nonuniform rear-irradiance on bifacial PV systems can cause additional mismatch loss, which may not be appropriately captured in PV energy production estimates and software. A simplified empirical relationship is presented that links the spatial variation of irradiance (to the resulting mismatch loss factor).

14 SOLAR ENERGY↗

Bifacial PV System Mismatch Loss Estimation & Parameterization

Non-uniform irradiance on the rear-side of bifacial PV systems can cause additional mismatch loss which may not be appropriately captured in PV energy production estimates and software. We have evaluated several rooftop mounted systems over high albedo reflective roofs. Mismatch losses of up to 2% annual loss for very close-mounted (0.15 m) rooftop systems were found, but losses for high ground-clearance rooftop systems were lower (<0.5%). A simplified empirical relationship was found that links the spatial variation of irradiance (specifically the mean absolute difference of irradiance) to the resulting mismatch loss factor, with a R2 fit better than 0.985. This approximate relationship has been validated by experiments on mismatched PV modules, and provides a basis for fast estimation of bifacial mismatch loss factors for use in hourly PV performance simulations such as PVSyst or SAM.

14 SOLAR ENERGY↗

Bifacial PV System Mismatch Loss Estimation and Parameterization: Preprint

Non-uniform irradiance on the rear-side of bifacial PV systems can cause additional mismatch loss which may not be appropriately captured in PV energy production estimates and software. We have evaluated several scenarios including horizontal single-axis tracking (HSAT) and rooftop mounted systems over high albedo reflective roofs. Mismatch losses of up to 2% annual loss for very close-mounted (0.15 m) rooftop systems were found, but losses for HSAT systems and high ground-clearance rooftop systems were lower (<0.5%). A simplified empirical relationship was found that links the spatial variation of irradiance (specifically the mean absolute difference of irradiance) to the resulting mismatch loss factor, with a R2 fit better than 0.985. This approximate relationship has been validated by experiments on mismatched PV modules, and provides a basis for fast estimation of bifacial mismatch loss factors for use in hourly PV performance simulations such as PVSyst or SAM.

14 SOLAR ENERGY↗

Estimating and parameterizing mismatch power loss in bifacial photovoltaic systems

Nonuniform irradiance on the rear side of bifacial photovoltaic (PV) systems can cause additional mismatch loss, which may not be appropriately captured in PV energy production estimates and software. We evaluated several scenarios including horizontal single-axis tracking (HSAT) over natural ground-cover and rooftop-mounted systems over high albedo reflective roofs. We found mismatch losses of up to 1.5% annual loss for very close-mounted (0.15 m) rooftop systems, but losses for HSAT systems and high-ground-clearance rooftop systems were lower (<0.5%). A simplified empirical relationship was found that links the spatial variation of irradiance (specifically, the mean absolute difference of irradiance) to the resulting mismatch loss factor, with an R 2 better than .99. Furthermore, this approximate relationship was experimentally validated on mismatched PV modules, and it provides a basis for rapidly estimating bifacial mismatch loss factors for use in hourly PV performance simulations such as PVSyst or SAM. Additional parameters investigated include (a) climate dependence and module orientation, which were not found to have a strong impact on bifacial mismatch losses and (b) PV module fill factor and bifaciality ratio, which did have a strong linear impact on mismatch losses.

14 SOLAR ENERGY↗

Performance Evaluation of an Advanced Distributed Energy Resource Management Algorithm

This paper presents performance evaluation of a new distributed energy resource management system (DERMS) algorithm via an advanced hardware-in-the-loop (HIL) platform. The HIL platform provides realistic testing in a laboratory environment, including the accurate modeling of sub-transmission and distribution networks, the DERMS software controller, and 84 power hardware solar photovoltaic (PV) inverters, standard communication protocols, and a capacitor bank controller. The DERMS algorithm is also called, Grid-Optimization of Solar (GO-Solar) platform which includes predictive state estimation (PSE) and online multiple objective optimization (OMOO) to dispatch the legacy devices and distributed energy resources (e.g., PV). The voltage regulation performance is evaluated under three scenarios, volt-var smart inverter (baseline), and DERMS control for 100% and 30% of PV. The results show that controlling 30% of PV systems with the GO-Solar platform may provide the best balance of control performance and implementation cost.

distributed energy resource management system (DER↗

Modelica Buildings Library Extension for AC and DC Building Comparison (Modelica DC Buildings) v1

This software simulates and compares the losses in AC and DC buildings. It uses formatted load profile data from EnergyPlus, PV generation data from PVWatts, realistic converter efficiency curves based on product data, a battery controller based on excess PV, and a realistic wire model. The software includes Modelica code, which is an extension of the Buildings Library Electrical models. It also includes Python code, which manages the Modelica parametric simulations and plots results.

Gerber, Daniel↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

Design of energy storage system to improve inertial response for large scale PV generation

With high-penetration levels of renewable generating sources being integrated into the existing electric power grid, conventional generators are being replaced and grid inertial response is deteriorating. This technical challenge is more severe with photovoltaic (PV) generation than with wind generation because PV generation systems cannot provide inertial response unless special countermeasures are adopted. To enhance the inertial response, this paper proposes to use battery energy storage systems (BESS) as the remediation approach to accommodate the degrading inertial response when high penetrations of PV generation are integrated into the existing power grid. A sample power system was adopted and simulated using PSS/E software. Here, impacts of different penetration levels of PV generation on the system inertial response were investigated and then BESS was incorporated to improve the frequency dynamics.

25 ENERGY STORAGE↗

Automated Shift Detection in Sensor-Based PV Power and Irradiance Time Series: Preprint

PV power and irradiance sensor-based measurements are prone to error, resulting in issues such as abrupt time series data shifts. These shifts, which are usually unintentional, may be caused by software or hardware configuration changes on a PV system, and do not reflect an actual change in overall system performance. Locating these shifts and segmenting the associated time series aids in more accurate future PV analysis. In this research, an offline changepoint detection (CPD) algorithm that automatically detects these abrupt data shifts in sensor-based time series is introduced. Data shift periods in 101 daily PV power and irradiance time series were labeled manually by two solar experts. These data streams represent sensor-based measurements, and display a variety of data shift behaviors. A changepoint detection algorithm was tuned using the 101 labeled data streams, with each model configuration's ability to detect labeled changepoints benchmarked using metrics such as F1-score, recall, and Rand Index. Best performing models on seasonality-corrected data streams include the Pruned Exact Linear (PELT) method, the Binary Segmentation method, and the Bottom-Up method, all scoring an average F1-score of 0.76 or greater at detecting labeled changepoints within a 30-day window for the labeled data sets. To promote further research in this space, we are releasing the labeled data shift sets on U.S. Department of Energy's (DOE) DuraMAT Data Hub, and the associated algorithm in the Python PVAnalytics package.

changepoint detection↗

Automated Shift Detection in Sensor-Based PV Power and Irradiance Time Series

PV power and irradiance sensor-based measurements are prone to error, resulting in issues such as abrupt time series data shifts. These shifts, which are usually unintentional, may be caused by software or hardware configuration changes on a PV system, and do not reflect an actual change in overall system performance. Locating these shifts and segmenting the associated time series aids in more accurate future PV analysis. In this research, an offline changepoint detection (CPD) algorithm that automatically detects these abrupt data shifts in sensor-based time series is introduced. Data shift periods in 101 daily PV power and irradiance time series were labeled manually by two solar experts. These data streams represent sensor-based measurements, and display a variety of data shift behaviors. A changepoint detection algorithm was tuned using the 101 labeled data streams, with each model configuration's ability to detect labeled changepoints benchmarked using metrics such as F1-score, recall, and Rand Index. Best performing models on seasonality-corrected data streams include the Pruned Exact Linear (PELT) method, the Binary Segmentation method, and the Bottom-Up method, all scoring an average F1-score of 0.76 or greater at detecting labeled changepoints within a 30-day window for the labeled data sets. To promote further research in this space, we are releasing the labeled data shift sets on U.S. Department of Energy's (DOE) DuraMAT Data Hub, and the associated algorithm in the Python PVAnalytics package.

changepoint detection↗

CyDER: A Cyber Physical Co-simulation Platform for Distributed Energy Resources in Smartgrids

The CyDER project aimed at developing an open-source, modular and scalable co-simulation platform for power grids with large shares of Distributed Energy Resources (DERs). The project partners are the Lawrence Berkeley National Lab (LBNL), Lawrence Livermore National Lab (LLNL), PG&E, SolarCity, and ChargePoint. The prime recipient is LBNL; SolarCity and ChargePoint were partners for the project’s first two years. Increased DER integration introduces a number of challenges in power grid operation including a more dynamic interaction between the transmission grid and distribution grids, and increased modeling complexity. Although specialized software exists to precisely model different components of the power system, it is far from trivial to integrate all various models and perform a holistic simulation. Instead of replicating all models in a common simulation program, a commonly accepted approach to tackle this model diversity is to couple third-party simulators and models through a co-simulation platform that coordinates information exchange among the various components. Following this line of research, this project’s objective was to develop a co-simulation platform based on a widely accepted industrial standard called Functional Mockup Interface (FMI). Within this process, the project developed models compliant with the FMI standard, called Functional Mockup Units (FMUs), and used them to perform various operational and planning power system analyses. Relying and building upon an industrial standard is the main differentiation of this project compared with previous or parallel efforts in the co-simulation area. Particular emphasis was put on delivering software utilities to facilitate setting up and running co-simulations by end-users. Furthermore, a strong aspect of this project is demonstrating that co-simulation techniques can be used to perform Hardware-in-the-Loop (HIL) simulations that couple software components (e.g., simulated models) with hardware components (e.g., real devices such PV systems and batteries). The long-term goal of CyDER project is to help establish FMI as a powerful standard for co-simulation and promote adoption by electric utilities and other interested stakeholders. The main accomplishments of the project include the development of several FMUs including distribution and transmission grid models, PV inverters with Volt/Var/Watt controllers, batteries, and predictive optimal controllers. Additionally, a unique software package was developed, called SimulatorToFMU, which is capable of exporting any Python-driven simulator or Python script as an FMU. This is an important contribution towards establishing FMI as one of the main co-simulation standards, because more and more third-party programs for sub-system modeling and simulation are delivered with Python APIs. The CyDER platform was used to perform PV hosting capacity analyses in real utility feeders with and without smart inverter controls, battery storage, and EV charging. Smart inverter controls include conventional Volt/Var/Watt controls for reactive power support and active power curtailment, but also predictive controls that optimize the charging and discharging profile of the battery connected on the DC side in order to minimize the customer’s economic benefit. Finally, an important result of this project is delivering an experimental setup that consists of residential-scale PV inverters with battery storage, a real-time grid simulator with an ideal voltage source as grid emulator, and micro Phasor Measurement Units (PMUs). All these components and additional software modules are coupled to one another using the FMI standard and can be co-simulated with the CyDER platform.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SolarAPP+ Performance Review: Final Technical Report

The National Renewable Energy Laboratory (NREL) and its project partners have developed the novel Solar Automated Permit Processing plus (SolarAPP+) software platform that provides a flexible, web-based PV-permitting tool for residential systems that can be integrated with existing and complementary software platforms. The main objective of this research is to analyze the implementation of SolarAPP+. Analysis was conducted by identifying the benefits, tradeoffs, and overall performance of SolarAPP+, including achieving its goals of delivering automated, code compliant systems, influencing permitting cycle times, and improving application submittals and/or inspection performance. The NREL team published the results of this analysis in annual SolarAPP+ Performance Review technical reports.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Hardware-in-the-Loop Evaluation of an Advanced Distributed Energy Resource Management Algorithm

This paper presents the laboratory performance evaluation of voltage regulation under a new distributed energy resource management system (DERMS) algorithm via an advanced hardware-in-tbe-loop (HIL) platform. The HIL platform provides realistic testing in a laboratory environment, including the accurate modeling of a full-scale real-world distribution system from a utility partner, the DERMS software controller, and power hardware photovoltaic (PV) inverters. The new DERMS algorithm is developed based on online multiobjective optimization (OMOO) algorithms that perform fast dispatch of distributed solar PV simulated in a real-time digital simulator and real physical hardware devices. Experimental tests confirm the correct functioning of the HIL platform for evaluating controller algorithms and satisfactory voltage regulation performance of the developed OMOO algorithms.

41 EE - Solar Energy Technologies Office (EE-4S)↗