PV Output Variability Modeling Using Satellite Imagery and Neural Networks.
Abstract Not Provided
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract Not Provided
Abstract Not Provided
Abstract Not Provided
Current trends in the architecture of software systems focus our attention on building systems using a set of loosely coupled components, each providing a specific functionality known as service. It is not much different in control and monitoring systems, where a functionally distinct sub-system can be identified and independently designed, implemented, deployed and maintained. One functionality that renders itself perfectly to becoming a service is archiving the history of the system state. The design of such a service and our experience of using it are the topic of this article. The service is built with responsibility segregation in mind, therefore, it provides for reducing data processing on the data viewer side and separation of data access and modification operations. The service architecture and the details concerning its data store design are discussed. An implementation of a service client capable of archiving EPICS process variables (PV) and LabVIEW shared variables is presented. Data access tools, including a browser-based data viewer and a mobile viewer, are also presented.
Solar photovoltaic (PV) resources are the most common form of distributed generation in residential and commercial customer premises within electric distribution networks. A higher penetration of PV generation in distribution circuits will impose challenges on maintaining service voltages within the range of industry standards, power quality, and power flow. Buildings consume 74% of the electricity produced in the United States, and a significant portion of the building load is dispatchable, making them responsive to electrical grid needs. Oak Ridge National Laboratory—in collaboration with Southern Company; the University of Tennessee, Knoxville; and the Georgia Institute of Technology—is examining the PV integration issues in distribution-level electrical grids and developing integrated demand-side control and communication systems to enable responsive loads. The proposed responsive loads mechanism performs renewable generation following to increase the penetration of solar PV within each feeder. The specific objectives of this project are to (1) examine distribution-level PV integration scenarios to understand requirements, (2) undertake an end-to-end simulation-based design of a distributed control strategy of loads geographically near the PV generation asset to minimize the effect on the distribution feeder, (3) deploy and demonstrate the control technology developed in partnership with utilities, and (4) perform a scalability analysis at the utility scale. This 3-year integrated project aims to develop, demonstrate, and validate demand-side control technology to enable increased the penetration of renewables while mitigating challenges that arise due to their intermittency. Activities in Budget Period (BP) 1 focused on a literature review and the formal design of a control system for integrating local distribution with generation and loads. The team used modeling and simulation to evaluate the impact of varying buildings loads, variable PV generation, and power flow dynamics on the distribution circuit. The dynamic models developed in BP 1 were used in BP 2 to develop a model-based control design and a test bed. The test bed has enabled the simulation-based testing and comparison of different control designs and formulations applied to different configurations of the distribution grid, PVs, and building loads. The control approaches developed in BP 2 were implemented in BP 3 in the form of hardware deployed at the Central Baptist Church (CBC) in Knoxville, Tennessee, for testing and evaluation. The outcome of this project was the development and demonstration of open-source, low-cost, low-touch sensing and control retrofits to distributed PV generation and building loads that, in a coordinated fashion, provide the load-shaping response needed to integrate high levels of renewable penetration. This research addresses the target metrics by dynamically controlling a load with solar generation variability to minimize the extent of two-way power flow, enhance reliability, facilitate high PV penetration (>100% of peak load in a line segment), and generate scalable software and hardware solutions adaptable to any penetration levels. The research and development activities are focused and designed to be impactful within the relevant 2020 targets time frame.An accurate open-source integration simulation framework for end-to-end control design was developed and deployed at the CBC facility for testing and evaluation. This final report provides a detailed review of the technical results achieved during this 3-year integrated project. A novel spectral analysis of PV data is demonstrated to derive the requirements of the control design. A detailed simulation-based analysis of PV integration at increasing penetration levels is presented using 1 year of PV data to demonstrate the impact on the distribution circuits. Two different control strategies were developed and demonstrated via simulation to track variable PV generation with adaptive load dispatch. The report concludes with a summary of accomplishments and recommendations for a path forward.
This paper presents a novel approach to rigorously quantify power Output Variability from a fleet of photovoltaic (PV) systems, ranging from a single central station to a set of distributed PV systems. The approach demonstrates that the relative power Output Variability for a fleet of identical PV systems (same size, orientation, and spacing) can be quantified by identifying the number of PV systems and their Dispersion Factor. The Dispersion Factor is a new variable that captures the relationship between PV Fleet configuration, Cloud Transit Speed, and the Time Interval over which variability is evaluated. Results indicate that Relative Output Variability: (1) equals the inverse of the square root of the number of systems for fully dispersed PV systems; and (2) could be further minimized for optimally-spaced PV systems. (author)
This report describes in-depth analysis of photovoltaic (PV) output variability in a high-penetration residential PV installation in the Pal Town neighborhood of Ota City, Japan. Pal Town is a unique test bed of high-penetration PV deployment. A total of 553 homes (approximately 80% of the neighborhood) have grid-connected PV totaling over 2 MW, and all are on a common distribution line. Power output at each house and irradiance at several locations were measured once per second in 2006 and 2007. Analysis of the Ota City data allowed for detailed characterization of distributed PV output variability and a better understanding of how variability scales spatially and temporally. For a highly variable test day, extreme power ramp rates (defined as the 99 th percentile) were found to initially decrease with an increase in the number of houses at all timescales, but the reduction became negligible after a certain number of houses. Wavelet analysis resolved the variability reduction due to geographic diversity at various timescales, and the effect of geographic smoothing was found to be much more significant at shorter timescales.
Abstract Aim Vegetation is sensitive to mean annual precipitation (MAP), but the sensitivity of vegetation to precipitation variability (PV) is less clear. Tropical ecosystems are likely to experience increased PV in the future. Here we assessed the importance, magnitude and mechanism of PV effects on tree cover in the context of covarying environmental drivers such as fire, temperature and soil properties. Location Tropical land. Time period 2000–2010. Major taxa studied Trees. Methods We compiled climate, soil and remotely‐sensed tree cover data over tropical land. We then comprehensively assessed the contribution of PV at different time‐scales to tropical tree cover variations and estimated the sensitivity of tree cover to PV changes by conducting rolling‐window regression and variance decomposition analyses. We further adopted a mechanistic modelling approach to test whether water competition between trees and grasses can explain the observed effect of PV. Results We find that PV contributes 33–56% to the total explained spatial variation (65–79%) in tree cover. The contribution of PV depends on MAP and is highest under intermediate MAP (500–1,500 mm). Tree cover generally increases with rainy day frequency and wet season length but shows mixed responses to inter‐annual PV. Based on the estimated sensitivity, tropical tree cover can decrease by 3–5% overall and by up to 20% in Amazonia under a 20% decrease in rainy days. Mechanistic modelling analysis reproduced the continental differences in tree cover along an MAP gradient. Main conclusions Under intermediate rainfall regimes (500–1,500 mm), PV can be a more important determinant of tropical tree cover than conventionally proposed drivers such as MAP and fire. The effect of PV likely results from the sensitivity of tree–grass competition to the temporal distribution of water resources. These results show that climate variability can strongly shape the biosphere.
This report investigates the effects that increased distributed photovoltaic (PV) generation would have on the Kauai Island Utility Co-op (KIUC) system operating requirements. The study focused on determining reserve requirements needed to mitigate the impact of PV variability on system frequency, and the impact on operating costs. Scenarios of 5-MW, 10-MW, and 15-MW nameplate capacity of PV generation plants distributed across the Kauai Island were considered in this study. The analysis required synthesis of the PV solar resource data and modeling of the KIUC system inertia. Based on the results, some findings and conclusions could be drawn, including that the selection of units identified as marginal resources that are used for load following will change; PV penetration will displace energy generated by existing conventional units, thus reducing overall fuel consumption; PV penetration at any deployment level is not likely to reduce system peak load; and increasing PV penetration has little effect on load-following reserves. The study was performed by EnerNex under contract from Sandia National Laboratories with cooperation from KIUC.
Transmission and distribution (T&D) standard test systems are currently defined separately, and are critical for researchers and engineers to test new solutions. Growing installation of energy resources in distribution and sub-transmission systems is creating higher interactions between T&D systems. This paper proposes a standard test system to study T&D interactions for high penetration of solar photovoltaic (PV) generation. The proposed test system can be used to study and propose solutions to problems such as reverse power flows and voltage control affected by PV variability. The proposed test system combines the transmission IEEE 118 bus system, with the distribution IEEE 123-node feeder. The original test systems are significantly enhanced by adding high penetration of solar PV generation with corresponding full-year minute-resolution chronological data. Conventional generation chronology is achieved by adding dispatch and unit commitment data for AC optimal power flow solutions. And chronological load data is added in both aggregated and disaggregated fashions. Sample applications of the data are provided highlighting voltage control challenges, and the proposed system is made available openly online.
Electric utilities in the United States are increasingly employing demand charges and/or real-time pricing. This directive is bringing potential opportunities in deploying behindthe-meter energy storage (BMES) systems for various grid functionalities. This study quantifies techno-economic benefits of BMES in reducing demand charge and smoothing load/generation intermittencies, and determines how those benefits vary with onsite distributed photovoltaic. We proposed a two-stage control algorithm, whereby the first stage proactively determines costoptimal BMES configuration for reducing peak-demands and demand charges, and the second stage adaptively compensates intermittent generations and short load spikes that may otherwise increase the demand charges. The performance of the proposed algorithm is evaluated through a 24 hours time sweep simulation performed using data from smart microgrid testbed at Idaho National Laboratory (INL). The simulation results demonstrated that this research provides a simple but effective solution for peak shaving, demand charge reductions, and smoothing onsite PV variability.
To continue the momentum for cost reduction in solar technologies, DOE recently established 2030 cost targets for that would make solar one of the lowest-cost sources of new electricity in the United States. The potential impacts of achieving the 2030 cost targets for solar photovoltaics (PV) were recently explored in a related publication, which found significant potential for solar PV deployment and generation, particularly when coupled with low-cost storage. Building on this previous report, the present analysis evaluates the potential impacts of simultaneously achieving the 2030 cost targets for both PV and concentrating solar power with thermal energy storage (CSP-TES) systems in the contiguous United States, with a detailed evaluation of the role that CSP-TES plays in realizing those impacts. The evolution of the contiguous U.S. electricity system is evaluated with NREL's Renewable Energy Deployment System (ReEDS) model, which has been specifically designed to represent the time and locational value of renewable generation technologies in the U.S. power system. This analysis suggests achievement of the SunShot cost targets for CSP-TES might lead to dramatic growth in CSP-TES capacity, with accelerated deployment after the 2030 target is achieved. Based on our representation of the 2030 cost targets in ReEDS, economically-competitive CSP-TES could primarily be deployed in a dispatch able, high-capacity factor configuration, which allows it to provide valuable services to the power sector and results in a generation profile for CSP-TES that is complementary to that of variable PV. Aggressive cost reductions for CSP-TES could also make such a configuration economically competitive across the contiguous United States, which is a a result that warrants additional analysis in terms of potential siting, permitting, regulatory, and construction challenges in these new regions and markets. The modeled capacity expansion of both CSP-TES and PV in our scenarios that achieve the 2030 cost targets requires most growth in transmission capacity at a pace that is consistent with historical buildout rates, and could result in reduced electricity prices and power system costs, water usage, and air emissions. Finally, sensitivity analysis suggests that the cumulative capacity and geographic extent of CSP-TES deployment in our low-cost solar scenarios is highly sensitive to the post-2030 cost reductions for CSP-TES and future price of natural gas, and that significant competition exists among renewable energy and energy storage technologies, assuming aggressive cost reductions for each. For example, significant competition between CSP-TES and PV with battery storage indicates the similar role that these systems play in capacity planning and grid operations, as well as the fact that low-cost battery storage would help improve the capacity value of low-cost PV into the future.
The rapidly growing penetration levels of distributed photovoltaic (PV) systems requires more comprehensive studies to understand their impact on distribution feeders. IEEE P.1547 highlights the need for Quasi-Static Time Series (QSTS) simulation in conducting distribution impact studies for distributed resource interconnection. Unlike conventional scenario-based simulation, the time series simulation can realistically assess time-dependent impacts such as the operation of various controllable elements (e.g. voltage regulating tap changers) or impacts of power fluctuations. However, QSTS simulations are still not widely used in the industry because of the computational burden associated with running yearlong simulations at a 1-s granularity, which is needed to capture device controller effects responding to PV variability. This study presents a novel algorithm that reduces the number of times that the non-linear 3-phase unbalanced AC power flow must be solved by storing and reassigning power flow solutions as it progresses through the simulation. Each unique power flow solution is defined by a set of factors affecting the solution that can easily be queried. We demonstrate a computational time reduction of 98.9% for a yearlong simulation at 1-s resolution with minimal errors for metrics including: number of tap changes, capacitor actions, highest and lowest voltage on the feeder, line losses, and ANSI voltage violations. Finally, the key contribution of this work is the formulation of an algorithm capable of: (i) drastically reducing the computational time of QSTS simulations, (ii) accurately modeling distribution system voltage-control elements with hysteresis, and (iii) efficiently compressing result time series data for post-simulation analysis.
redis-pvxs-ioc is a standalone PVAccess service for hot-reloadable, Redis-backed EPICS process variables (PV) defined by YAML. The core runtime is PVA-only. It does not load EPICS databases, call iocInit(), or serve Channel Access.
Sandia National Laboratories performed analysis to develop conservative hazard guidelines regarding firefighters working near photovoltaic (PV) arrays. Assuming implementation of NFPA 70 system shutdown requirements, the analysis focused on DC hazards only. Several different PV variables were considered, including system grounding and DC voltage classes. The hazard scenarios considered the contact conditions, current paths through the body, and PPE. Guidelines for the hazard definitions for men and women were based on the IEC TS 60479-1 guidelines. The importance of PPE was illustrated in the results.
The Spallation Neutron Source (SNS) Project is continuing on its path towards high reliability. To help ensure that this happens, the SNS Controls Group has developed many new applications for use with Control System Studio (CSS). These applications are different in functionality and somewhat in implementation. The ELog integration, PACE, Alarm System GUI, and Data Browser updates are some of the applications that are generic in nature and designed to be implemented regardless of the institution. The Process Variable (PV) Utility, Fields Viewer, and Rack Viewer were designed specifically for use at SNS but allow for additions and use elsewhere. The use of CSS provides a common interface to the users. CSS also provides developers with the ability to build their applications and use the various CSS-data types. End users benefit because the use of the CSS-data types provides a connection between the different applications at run-time. This paper describes the recent applications that have been developed at SNS for use within CSS.
With the increasing penetration of distribution connected photovoltaic (PV) systems, more and more PV developers and utilities are interested in easing future PV interconnection concerns by mitigating some of the impacts of PV integration using advanced PV inverter controls and functions. This paper describes the testing of a 500 kW PV inverter using Power Hardware-in-Loop (PHIL) testing techniques. The test setup is described and the results from testing the inverter in advanced functionality modes, not commonly used in currently interconnected PV systems, are presented. PV inverter operation under PHIL evaluation that emulated both the DC PV array connection and the AC distribution level grid connection are shown for constant power factor (PF) and constant reactive power (VAr) control modes. The evaluation of these modes was completed under varying degrees of modeled PV variability.
The ATCA standard specifies a mandatory Shelf Manager (ShM) unit which is a key element for the system operation. It includes the Intelligent Platform Management Controller (IPMC) which monitors the system health, retrieves inventory information and controls the Field Replaceable Units (FRUs). These elements enable the intelligent health monitoring, providing high-availability and safety operation, ensuring the correct system operation. For critical systems like ones of tokamak ITER these features are mandatory to support the long pulse operation. The Nominal Device Support (NDS) was designed and developed for the ITER CODAC Core System (CCS), which will be the responsible for plant Instrumentation and Control (I and C), supervising and monitoring on ITER. It generalizes the Enhanced Physics and Industrial Control System (EPICS) device support interface for Data Acquisition (DAQ) and timing devices. However the support for health management features and ATCA ShM are not yet provided. This paper presents the implementation and test of a NDS for the ATCA ShM, using the ITER Fast Plant System Controller (FPSC) prototype environment. This prototype is fully compatible with the ITER CCS and uses the EPICS Channel Access (CA) protocol as the interface with the Plant Operation Network (PON). The implemented solution running in an EPICS Input / Output Controller (IOC) provides Process Variables (PV) to the PON network with the system information. These PVs can be used for control and monitoring by all CA clients, such as EPICS user interface clients and alarm systems. The results are presented, demonstrating the fully integration and the usability of this solution. (authors)