Analyses and limited evaluation of payload and legged landing system structures for the survivable soft landing of instrument payloads
Two computer programs for investigation of wide variety of legged planetary landing gear configurations
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Two computer programs for investigation of wide variety of legged planetary landing gear configurations
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The feasibility of some off-the-shelf microprocessors and state-of-art software is assessed (1) as a development system for the principle investigator (pi) in the design of the experiment model, (2) as an example of available technology application for future PI's experiments, (3) as a system capable of being interactive in the PCTC's simulation of the dedicated experiment processor (DEP), preferably by bringing the PI's DEP software directly into the simulation model, (4) as a system having bus compatibility with host VAX simulation computers, (5) as a system readily interfaced with mock-up panels and information displays, and (6) as a functional system for post mission data analysis.
Explore the source record for details and available documents.
Payload integration onto space transport vehicles and the International Space Station (ISS) is a complex process. Yet, cargo transport is the sole reason for any space mission, be it for ferrying humans, science, or hardware. As the largest such effort in history, the ISS offers a wide variety of payload experience. However, for any payload to reach the Space Station under the current process, Payload Developers face a list of daunting tasks that go well beyond just designing the payload to the constraints of the transport vehicle and its stowage topology. Payload customers are required to prove their payload s functionality, structural integrity, and safe integration - including under less than nominal situations. They must also plan for or provide training, procedures, hardware labeling, ground support, and communications. In addition, they must deal with negotiating shared consumables, integrating software, obtaining video, and coordinating the return of data and hardware. All the while, they must meet export laws, launch schedules, budget limits, and the consensus of more than 12 panel and board reviews. Despite the cost and infrastructure overhead, payload proposals have increased. Just in the span from FY08 to FY09, the NASA Payload Space Station Support Office budget rose from $78M to $96M in attempt to manage the growing manifest, but the potential number of payloads still exceeds available Payload Integration Management manpower. The growth has also increased management difficulties due to the fact that payloads are more frequently added to a flight schedule late in the flow. The current standard ISS template for payload integration from concept to payload turn-over is 36 months, or 18 months if the payload already has a preliminary design. Customers are increasingly requiring a turn-around of 3 to 6-months to meet market needs. The following paper suggests options for streamlining the current payload integration process in order to meet customer schedule needs and reduce costs for both the integration support teams and the developers, without reducing quality or compromising safety. Issues for the key integration areas of planning, training, verification, and safety are presented in a Root-Cause Analysis study, with plausible solutions provided that involve technology and tools already available to the ISS community. Although based upon the ISS process, the payload integration techniques outlined herein also offer an integration template for any space transport endeavor.
In a commercially hosted operational mode, a scientific instrument or operational device is attached to a spacecraft but operates independently from the spacecraft s primary mission. Despite the expected benefits of this arrangement, there are few examples of hosted payload programs actually being executed by government organizations. The lack of hosted payload programs is largely driven by programmatic challenges, both real and perceived, rather than by technical challenges. Partly for these reasons, NASA has not sponsored a hosted payload program, in spite of the benefits and visible community interest in doing so. In the interest of increasing the use of hosted payloads across the space community, this paper seeks to alleviate concerns about hosted payloads by identifying these programmatic challenges and presenting ways in which they can be avoided or mitigated. Despite the challenges, several recent hosted payload programs have been successfully completed or are currently in progress. This paper presents an assessment of these programs, with a focus on acquisition, costs, schedules, risks, and other programmatic aspects. The hosted payloads included in this study are the Federal Aviation Administration's Wide Area Augmentation System (WAAS) payloads, United States Coast Guard's Automatic Identification System (AIS) demonstration payload, Department of Defense's IP Router In Space (IRIS) demonstration payload, the United States Air Force's Commercially Hosted Infrared Payload (CHIRP), and the Australian Defence Force's Ultra High Frequency (UHF) payload. General descriptions of each of these programs are presented along with issues that have been encountered and lessons learned from those experiences. A set of recommended approaches for future hosted payload programs is presented, with a focus on addressing risks or potential problem areas through smart and flexible contracting up front. This set of lessons and recommendations is broadly applicable to future hosted payload programs, whether they are technology demonstrations, communications systems, or operational sensors. Additionally, we present a basic cost model for commercial access to space for hosted payloads as a function of payload mass
Payloads are secured in the orbiter payload bay by the payload retention system or are equipped with their own unique retention systems. The orbiter payload retention mechanisms provide structural attachments for each payload by using four or five attachment points to secure the payload within the orbiter payload bay during all phases of the orbiter mission. The payload retention system (PRS) is an electromechanical system that provides standarized payload carrier attachment fittings to accommodate up to five payloads for each orbiter flight. The mechanisms are able to function under either l-g or zero-g conditions. Payload berthing or deberthing on orbit is accomplished by utilizing the remote manipulator system (RMS). The retention mechanisms provide the capability for either vertical or horizontal payload installation or removal. The payload support points are selected to minimize point torsional, bending, and radial loads imparted to the payloads. In addition to the remotely controlled latching system, the passive system used for nondeployable payloads performs the same function as the RMS except it provides fixed attachments to the orbiter.
Efficient handling of payloads destined for a planetary surface, such as the moon or Mars, requires robust systems to secure the payloads during transport on the ground, in-space and on the planetary surface. In addition, mechanisms to release the payloads need to be reliable to ensure successful transfer from one vehicle to another. An efficient payload handling strategy must also consider the devices available to support payload handling. Cranes used for overhead lifting are common to all phases of payload handling on Earth. Similarly, both recent and past studies have demonstrated that devices with comparable functionality will be needed to support lunar outpost operations. A first generation test-bed of a new high performance device that provides the capabilities of both a crane and a robotic manipulator, the Lunar Surface Manipulation System (LSMS), has been designed, built and field tested and is available for use in evaluating a system to secure payloads to transportation vehicles. National Institute of Aerospace, Hampton Va 23662 A payload handling approach must address all phases of payload management including: ground transportation, launch, planetary transfer and installation in the final system. In addition, storage may be required during any phase of operations. Each of these phases requires the payload to be lifted and secured to a vehicle, transported, released and lifted in preparation for the next transportation or storage phase. A critical component of a successful payload handling approach is a latch and associated carrier system. The latch and carrier system should minimize requirements on the: payload, carrier support structure and payload handling devices as well as be able to accommodate a wide range of payload sizes. In addition, the latch should; be small and lightweight, support a method to apply preload, be reusable, integrate into a minimal set of hard-points and have manual interfaces to actuate the latch should a problem occur. A latching system which meets these requirements has been designed and fabricated and will be described in detail. This latching system works in conjunction with a payload handling device such as the LSMS, and the LSMS has been used to test first generation latch and carrier hardware. All tests have been successful during the first phase of operational evaluations. Plans for future tests of first generation latch and carrier hardware with the LSMS are also described.
Efficient handling of payloads destined for a planetary surface, such as the moon or mars, requires robust systems to secure the payloads during transport on the ground, in space and on the planetary surface. In addition, mechanisms to release the payloads need to be reliable to ensure successful transfer from one vehicle to another. An efficient payload handling strategy must also consider the devices available to support payload handling. Cranes used for overhead lifting are common to all phases of payload handling on Earth. Similarly, both recent and past studies have demonstrated that devices with comparable functionality will be needed to support lunar outpost operations. A first generation test-bed of a new high performance device that provides the capabilities of both a crane and a robotic manipulator, the Lunar Surface Manipulation System (LSMS), has been designed, built and field tested and is available for use in evaluating a system to secure payloads to transportation vehicles. A payload handling approach must address all phases of payload management including: ground transportation, launch, planetary transfer and installation in the final system. In addition, storage may be required during any phase of operations. Each of these phases requires the payload to be lifted and secured to a vehicle, transported, released and lifted in preparation for the next transportation or storage phase. A critical component of a successful payload handling approach is a latch and associated carrier system. The latch and carrier system should minimize requirements on the: payload, carrier support structure and payload handling devices as well as be able to accommodate a wide range of payload sizes. In addition, the latch should; be small and lightweight, support a method to apply preload, be reusable, integrate into a minimal set of hard-points and have manual interfaces to actuate the latch should a problem occur. A latching system which meets these requirements has been designed and fabricated and will be described in detail. This latching system works in conjunction with a payload handling device such as the LSMS, and the LSMS has been used to test first generation latch and carrier hardware. All tests have been successful during the first phase of operational evaluations. Plans for future tests of first generation latch and carrier hardware with the LSMS are also described.
For more than ten years hundreds of payloads have been, and are currently being, successfully operated onboard the ISS. These payloads are operated by a diverse set of users all over the world. Due to the current international economic environment payload operations are being streamlined, in more and more cases, by using the payload investigators and scientists to also fill the role of operators. Taking this into consideration, increasingly, we have payload operators that are new to space operations and practices, therefore ground systems training and support have become a more critical aspect in ensuring a successful payload mission. The ISS ground systems payload interface is the Payload Operations and Integration Center (POIC), located at Marshall Space Flight Center. ISS ground systems training for all remote ISS payload operators, as well as the ISS POIC CADRE, are centralized at this facility. The POIC is the starting point for a remote payload operator to learn how to integrate, and operate their payload, successfully onboard the ISS. Additionally, the CADRE that supports the payload user community are trained and operate from this facility. This paper will give an overview of the ISS ground systems at the POIC, as it relates to the payload user/operator and CADRE community. The entire training process from initial contact with the POIC to in-flight operations will be reviewed and improvements to this process will be presented. More importantly we will present current training methods and proposed methodology whereby the user community will be trained more efficiently and thoroughly. Also, we will discuss how we can more effectively support users in their operations concept to programmatically conduct certain aspects of payload operations to reduce costs.
For over 10 years, NASA has been working with U.S.-based commercial companies to support the design, development, and operations of new commercial space vehicles. The purpose of these vehicles is to provide cargo and crew transportation services to the International Space Station (ISS) and to stimulate the commercial space transportation industry to Low-Earth Orbit (LEO). Along with the ability to provide a couple tons of cargo to the ISS each mission, the commercial visiting vehicles also provide the ability to transfer NASA payloads to and from the ISS in an active, powered state. To take advantage of this capability, NASA requirements for the data services that payloads need while they are integrated into the visiting vehicles have grown with each set of commercial contracts. Today, NASA desires for payload data services encompass a variety of capabilities including payload health and status (H&S) telemetry monitoring, visiting vehicle environment data monitoring, and payload commanding. The intent of these capabilities is to provide payload developers with situational awareness and the ability to quickly diagnose any problems with payload operations prior to vehicle docking or post-landing to support immediate troubleshooting response. As new requirements for payload data services have emerged over the years, the ISS Payload Operations Integration Center (POIC) at the NASA Marshall Space Flight Center (MSFC) has established ground segment interfaces to the visiting vehicle control centers to enable payload developers to use these services. Many technical and programmatic challenges have been faced while establishing these interfaces. The most significant challenge faced has been in finding the right balance amongst providing interfaces to payloads that are compatible with the ISS so that payload hardware or software changes are not necessary to ensure compatibility with the visiting vehicles; keeping POIC ground system development costs low by standardizing implementation approaches across commercial vehicle partners; and fostering commercialization through supporting vendor-unique implementations that are commercially economical. This paper will first detail the data services that will be available to payload users under each commercial visiting vehicle contract. Secondly, this paper will offer discussion of the most significant technical and programmatic challenges faced to-date in offering these new data services to payload developers.
There are many steps involved in preparing a payload for a mission into space on the Space Shuttle. Operations at the John F. Kennedy Space Center (KSC) are the last of those steps for the hardware before the payload is launched. To assure a successful and efficient KSC processing flow, a great deal of planning between the Robert H. Goddard Space Flight Center (GSFC) and KSC personnel is required before the payload arrives at KSC. After arrival, pre-flight operations occur between payload personnel, GSFC personnel, and KSC personnel for integration of the payload into its carrier (if required), in preparation for installation into a Orbiter. Once installed into an Orbiter, final test(s), checkout, and close-out of the payload is performed by GSFC and KSC personnel before launch. Mission support varies depending on the payload flying, but once the mission is complete and the Orbiter has returned to KSC, post-flight operations begin. This usually involves a reverse flow of the pre-flight operations. KSC operations conclude when the payload, its ground support equipment (GSE), and personnel depart KSC. A list of lessons learned is generated at the end of each payload flow, to avoid repeating the same mistakes (if any) for the next payload or for multiple repeat flights of the same payload. Always monitored are planned changes that may affect the payloads, GSE, KSC facilities, payload personnel, GSFC personnel, and/or KSC personnel.
The EXpedite the processing of Experiments to Space Station or EXPRESS Rack System was developed to provide Space Station accommodations for subrack payloads. The EXPRESS Rack accepts Space Shuttle middeck locker type payloads and International Subrack Interface Standard (ISIS) Drawer payloads, allowing previously flown payloads an opportunity to transition to the International Space Station. The EXPRESS Rack provides power, data command and control, video, water cooling, air cooling, vacuum exhaust, and Nitrogen supply to payloads. The EXPRESS Rack system also includes transportation racks to transport payloads to and from the Space Station, Suitcase Simulators to allow a payload developer to verify data interfaces at the development site, Functional Checkout Units to allow payload checkout at KSC prior to launch, and trainer racks for the astronauts to learn how to operate the EXPRESS Racks prior to flight. Standard hardware and software interfaces provided by the EXPRESS Rack simplify the integration processes, and facilitate simpler ISS payload development. Whereas most ISS Payload facilities are designed to accommodate one specific type of science, the EXPRESS Rack is designed to accommodate multi-discipline research within the same rack allowing for the independent operation of each subrack payload. On-orbit operations began with the EXPRESS Rack Project on April 24, 2001, with one rack operating continuously to support long-running payloads. The other on-orbit EXPRESS Racks operate based on payload need and resource availability. Sustaining Engineering and Logistics and Maintenance functions are in place to maintain operations and to provide software upgrades.