Search NASA⌕ Search

SEARCH · Search NASA

Results for “Photovoltaic systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Photovoltaic system criteria documents. Volume 2: Quality assurance criteria for photovoltaic applications

Quality assurance criteria are described for manufacturers and installers of solar photovoltaic tests and applications. Quality oriented activities are outlined to be pursued by the contractor/subcontractor to assure the physical and operational quality of equipment produced is included. In the broad sense, guidelines are provided for establishing a QA organization if none exists. Mainly, criteria is provided to be considered in any PV quality assurance plan selected as appropriate by the responsible Field Center. A framework is established for a systematic approach to ensure that photovoltaic tests and applications are constructed in a timely and cost effective manner.

Koenig, John C.↗

Common source-multiple load vs. separate source-individual load photovoltaic system

A comparison of system performance is made for two possible system setups: (1) individual loads powered by separate solar cell sources; and (2) multiple loads powered by a common solar cell source. A proof for resistive loads is given that shows the advantage of a common source over a separate source photovoltaic system for a large range of loads. For identical loads, both systems perform the same.

Appelbaum, Joseph↗

Cost and Performance of Distributed Photovoltaic Systems

Lifetime Cost and Performance (LCP) model assists in design of Photovoltaic (PV) systems. LCP simulation of performance, cost and revenue streams associated with distributed PV power systems. Provides user with substantial flexibility in specifying technical and economic environment of PV application.

Borden, C. S.↗

Photovoltaic system costs using local labor and materials in developing countries

The use of photovoltaic (PV) technology in countries that do not presently have high technology industrial capacity was investigated. The relative cost of integrating indigenous labor (and manufacturing where available) into the balance of the system industry of seven countries (Egypt, Haiti, the Ivory Coast, Kenya, Mexico, Nepal, and the Phillipines) was determined. The results were then generalized to other countries, at most levels of development. The results of the study imply several conclusions: (1) the cost of installing and maintaining comparable photovoltaic systems in developing countries is less than in the United States; (2) skills and some materials are available in the seven subject countries that may be applied to constructing and maintaining PV systems; (3) there is an interest in foreign countries in photovoltaics; and (4) conversations with foreign nationals suggest that photovoltaics must be introduced in foreign markets as an appropriate technology with high technology components rather than as a high technology system.

Jacobson, E.↗

Summary of photovoltaic system performance models

A detailed overview of photovoltaics (PV) performance modeling capabilities developed for analyzing PV system and component design and policy issues is provided. A set of 10 performance models are selected which span a representative range of capabilities from generalized first order calculations to highly specialized electrical network simulations. A set of performance modeling topics and characteristics is defined and used to examine some of the major issues associated with photovoltaic performance modeling. Each of the models is described in the context of these topics and characteristics to assess its purpose, approach, and level of detail. The issues are discussed in terms of the range of model capabilities available and summarized in tabular form for quick reference. The models are grouped into categories to illustrate their purposes and perspectives.

Smith, J. H.↗

Photovoltaic system grounding and fault protection

The grounding and fault protection aspects of large photovoltaic power systems are studied. Broadly, the overlapping functions of these two plant subsystems include providing for the safety of personnel and equipment. Grounding subsystem design is generaly governed by considerations of personnel safety and the limiting of hazardous voltages to which they are exposed during the occurrence of a fault or other misoperation of equipment. A ground system is designed to provide a safe path for fault currents. Metal portions of the modules, array structures, and array foundations are used as a part of the ground system, provided that they and their interconnection are designed to be suitably reliable over the life of the plant. Several alternative types of fault protection and detection equipment are designed into the source circuits and dc buses feeding the input terminals of the subfield power conditioner. This design process requires evaluation of plausible faults, equipment, and remedial actions planned to correct faults. The evaluation should also consider life cycle cost impacts.

Stolte, W. J.↗

Status of DOE and AID stand-alone photovoltaic system field tests

The NASA Lewis Research Center (LeRC) is managing stand-alone photovoltaic (PV) system projects sponsored by the U.S. Department of Energy (DOE) and the U.S. Agency for International Development (AID). The DOE project includes village PV power demonstration projects in Gabon (four sites) and the Marshall Islands, and PV-powered vaccine refrigerator systems in six countries. The AID project includes a large village power system, a farmhouse system and two water pumping-irrigation systems in Tunisia, a water pumping/grain grinding system in Upper Volta, five medical clinic systems in four countries, PV-powered vaccine refrigerator systems in 18 countries and a PV-powered remote earth station in Indonesia. This paper reviews these PV projects and summarizes significant findings to date.

Bifano, W. J.↗

A survey of photovoltaic systems

Results of extensive telephone survey of photovoltaic manufacturers are compiled in 220 page report. Three part report includes catalog of suppliers, data sheets on specific products, and typical operating, installation, and maintenance procedures.

Source record↗

Investigation of energy management strategies for photovoltaic systems - A predictive control algorithm

The present investigation is concerned with the formulation of energy management strategies for stand-alone photovoltaic (PV) systems, taking into account a basic control algorithm for a possible predictive, (and adaptive) controller. The control system controls the flow of energy in the system according to the amount of energy available, and predicts the appropriate control set-points based on the energy (insolation) available by using an appropriate system model. Aspects of adaptation to the conditions of the system are also considered. Attention is given to a statistical analysis technique, the analysis inputs, the analysis procedure, and details regarding the basic control algorithm.

Cull, R. C.↗

Procedure for minimizing the cost per watt of photovoltaic systems

A general analytic procedure is developed that provides a quantitative method for optimizing any element or process in the fabrication of a photovoltaic energy conversion system by minimizing its impact on the cost per watt of the complete system. By determining the effective value of any power loss associated with each element of the system, this procedure furnishes the design specifications that optimize the cost-performance tradeoffs for each element. A general equation is derived that optimizes the properties of any part of the system in terms of appropriate cost and performance functions, although the power-handling components are found to have a different character from the cell and array steps. Another principal result is that a fractional performance loss occurring at any cell- or array-fabrication step produces that same fractional increase in the cost per watt of the complete array. It also follows that no element or process step can be optimized correctly by considering only its own cost and performance

Redfield, D.↗

Distributed photovoltaic systems: Utility interface issues and their present status

Major technical issues involving the integration of distributed photovoltaics (PV) into electric utility systems are defined and their impacts are described quantitatively. An extensive literature search, interviews, and analysis yielded information about the work in progress and highlighted problem areas in which additional work and research are needed. The findings from the literature search were used to determine whether satisfactory solutions to the problems exist or whether satisfactory approaches to a solution are underway. It was discovered that very few standards, specifications, or guidelines currently exist that will aid industry in integrating PV into the utility system. Specific areas of concern identified are: (1) protection, (2) stability, (3) system unbalance, (4) voltage regulation and reactive power requirements, (5) harmonics, (6) utility operations, (7) safety, (8) metering, and (9) distribution system planning and design.

Hassan, M.↗

Solar breeder: Energy payback time for silicon photovoltaic systems

The energy expenditures of the prevailing manufacturing technology of terrestrial photovoltaic cells and panels were evaluated, including silicon reduction, silicon refinement, crystal growth, cell processing and panel building. Energy expenditures include direct energy, indirect energy, and energy in the form of equipment and overhead expenses. Payback times were development using a conventional solar cell as a test vehicle which allows for the comparison of its energy generating capability with the energies expended during the production process. It was found that the energy payback time for a typical solar panel produced by the prevailing technology is 6.4 years. Furthermore, this value drops to 3.8 years under more favorable conditions. Moreover, since the major energy use reductions in terrestrial manufacturing have occurred in cell processing, this payback time directly illustrates the areas where major future energy reductions can be made -- silicon refinement, crystal growth, and panel building.

Lindmayer, J.↗

Voltage Regulators for Photovoltaic Systems

Two simple circuits developed to provide voltage regulation for highvoltage (i.e., is greater than 75 volts) and low-voltage (i.e., is less than 36 volts) photovoltaic/battery power systems. Use of these circuits results in voltage regulator small, low-cost, and reliable, with very low power dissipation. Simple oscillator circuit controls photovoltaic-array current to regulate system voltage and control battery charging. Circuit senses battery (and system) voltage and adjusts array current to keep battery voltage from exceeding maximum voltage.

Delombard, R.↗

An in-depth review of photovoltaic system performance models

The features, strong points and shortcomings of 10 numerical models commonly applied to assessing photovoltaic performance are discussed. The models range in capabilities from first-order approximations to full circuit level descriptions. Account is taken, at times, of the cell and module characteristics, the orientation and geometry, array-level factors, the power-conditioning equipment, the overall plant performance, O and M effects, and site-specific factors. Areas of improvement and/or necessary extensions are identified for several of the models. Although the simplicity of a model was found not necessarily to affect the accuracy of the data generated, the use of any one model was dependent on the application.

Smith, J. H.↗

Historical Evidence of Importance to the Industrialization of Flat-plate Silicon Photovoltaic Systems, Volume 2

Problems which may arise as the low cost silicon solar array (LSSA) project attempts to industrialize the production technologies are defined. The charge to insure an annual production capability of 500 MW peak for the photovoltaic supply industry by 1986 was critically examined, and focused on one of the motivations behind this goal-concern over the timely development of industrial capacity to supply anticipated demand. Conclusions from the analysis are utilized in a discussion of LSSA's industrialization plans, particularly the plans for pilot, demonstration and commercial scale production plants. Specific recommendations for the implementation of an industrialization task and the disposition of the project quantity goal were derived.

Smith, J. L.↗

Historical evidence of importance to the industrialization of flat-plate silicon photovoltaic systems. Volume 1: Executive summary

An analysis is given of the Low-Cost Silicon Solar Array Project plans for the industrialization of new production technologies expected to be forthcoming as a result of the project's technology development efforts. In particular, LSSA's mandate to insure an annual production capability of 500 MW peak for the photovoltaic supply industry by 1986 is critically examined. The examination focuses on one of the concerns behind this goal -- timely development of industrial capacity to supply anticipated demand. Some of the conclusions include: (1) construction of small-scale pilot plants should be undertaken only for purposes of technology development; (2) large-scale demonstrations should be undertaken only when the technology is well in hand; (3) commercial-scale production should be left to the private sector; (4) the 500-MW annual output goal should be shifted to Program Headquarters.

Smith, J. L.↗

Photovoltaic system test facility electromagnetic interference measurements

Field strength measurements on a single row of panels indicates that the operational mode of the array as configured presents no radiated EMI problems. Only one relatively significant frequency band near 200 kHz showed any degree of intensity (9 muV/m including a background level of 5 muV/m). The level was measured very near the array (at 20 ft distance) while Federal Communications Commission (FCC) regulations limit spurious emissions to 15 muV/m at 1,000 ft. No field strength readings could be obtained even at 35 ft distant.

Johnson, J. A.↗