Search NASA⌕ Search

SEARCH · Search NASA

Results for “Pilot performance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

An Assessment of the Error Due to Computing Waste Isolation Pilot Plant Porosity Using the Porosity Response Surface Approach

The Waste Isolation Pilot Plant Performance Assessment (WIPP PA) must predict the likelihood that radionuclides will escape into the biosphere via mechanisms that depend on geohydraulic flow. Ideally, one would predict the geohydraulic flow using coupled geohydraulic and geomechanical simulations, but such coupled simulations are not computationally tractable. Instead, Sandia has historically used a look-up table of porosities for a given fluid pressure and time, called the porosity response surface, but this approach can introduce porosity errors because it largely ignores the porosity’s dependence on the past fluid pressure history. This report discusses efforts to quantify these porosity errors for both the legacy and new porosity response surfaces. Six hundred different fluid pressure histories were fed through the legacy/new geomechanical model and the legacy/new porosity response surface to generate six hundred porosity error histories. The error associated with the legacy porosity surface was substantial, while the error associated with the new porosity surface was typically small, except when fluid pressures exceeded the lithostatic pressure at the repository. In response to the errors at high pressures, a preliminary study of the WIPP PA’s sensitivity to these porosity errors was conducted. The study found that reducing the porosity errors at high pressures negligibly affected predictions of radionuclide releases. Finally, an initial machine-learned model for porosity was developed. This ML model significantly reduced the porosity error at high pressures, but sizable errors remained, so more development is necessary before coupling an ML model to the geohydraulic model.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Engineering-Scale Demonstration of Transformational Solvent on NGCC Flue Gas ("Project Enterprise")

This final report presents the results of the NGCC pilot testing performed during ION’s engineering‑scale demonstration project funded by the U.S. Department of Energy’s National Energy Technology Laboratory (DOE/NETL): “Engineering-Scale Demonstration of Transformational Solvent on NGCC Flue Gas,” referred to as “Project Enterprise” (DE-FE0031950).

20 FOSSIL-FUELED POWER PLANTS↗

Oak Ridge Computing Academy: An HPC cluster deployment and management pilot

The High Performance Computing Technologies (HPCT) course is a hands-on High Performance Computing (HPC) cluster deployment and management training program offered as part of the International School for Advanced Studies (SISSA) and the International Center for Theoretical Physics (ICTP) Master in High Performance Computing (MHPC) specialization. Here, this training program introduces students to key concepts in cluster configuration. which include networking, software stack provisioning, job scheduling, and monitoring. The publicly available course materials feature several examples and underlying methods that are broadly applicable to cluster deployment and management. This paper discusses the design of a new workforce development program at the Oak Ridge National Laboratory that is based on HPCT, the Oak Ridge Computing Academy (ORCA). The ORCA pilot program was hosted by the Oak Ridge Leadership Computing Facility (OLCF) in Summer 2025. As a part of this discussion, HPCT and ORCA course contents and infrastructure are outlined, ORCA participant experiences are detailed, and potential opportunities for improvement are discussed.

Education↗

Temporal performance indicators for an integrated pilot-scale membrane distillation-concentrated solar power/photovoltaic system

Management of concentrate streams in inland applications has uncertain long-term environmental impacts. This study investigates an intensified solar-energy capture desalination system that integrates membrane distillation (MD) with a hybrid concentrated solar power (CSP)/photovoltaic (PV) collector to realize self-sustained zero-waste discharge for effective management of concentrate streams in inland and off-grid applications. The demonstration-scale CSP/PV system can produce up to 178 kWh of thermal energy and 4 kWh of electrical energy per day. The thermal and electrical energy from the CSP/PV system is directly supplied to the air gap MD (AGMD) pilot-scale system producing up to 288 L of distilled water per day. Experiments were performed on the hybrid AGMD-CSP/PV system to evaluate system performance under various operating conditions including AGMD and CSP flow rates, CSP system pre-heating, and AGMD vacuum pressure. Experimental results indicate that doubling the AGMD flow rate results in a 119% increase in thermal energy utilization and a 71% increase in distillate production. Compared to the winter months, operating the system in summer months when direct normal irradiance (DNI) is highest results in nearly double the distillate production (88 L in winter and 168 L in summer) and nearly three times the amount of thermal energy consumption (15 kWh in winter and 43 kWh in summer). Operating with vacuum resulted in a 34% increase in distillate production and allowing the thermal storage reservoir to preheat in the winter resulted in a 61% increase in distillate production. Altogether, experimental results highlight the tradeoff between distillate production and thermal and electrical energy production and consumption under various environmental conditions and the potential for AGMD-CSP/PV to be a stand-alone desalination system.

14 SOLAR ENERGY↗

Vitrification of Inactive Incineration Ash in a Full Industrial Scale In Can Melter - 20502

In the framework of the H2020 THERAMIN project funded by the European Commission, CEA performed a pilot-scale trial consisting of the vitrification of inactive ash (Al, Ca, Si, Zn, Bi, K, Mg, etc.) using the In- Can Melter technology. These ashes were coming from incineration of simulated technological wastes such as cotton, latex, neoprene, polyethylene. The borosilicate glass feasibility was first evaluated at a laboratory scale (10-100 g of glass). The volatile behavior of fly ash was controlled by pelletizing to avoid pipes clogging when performing the pilot scale test. A 10 wt.% inorganic binder was added to obtain cohesive pellets. The glass frit composition was selected and its ratio was fixed at 50 wt.%. After this step, a bench test (1 kg of glass) was done to verify the absence of container corrosion. Finally, it was followed by a pilot scale test (50 kg of glass) with 75,000 ash pellets used. The same glass microstructure and chemical composition were observed at each scale. Typical crystals of apatites (Ca, P), zincochromites (Zn, Cr, Al) and bismuth alloys (Bi, Sb) dispersed into a borosilicate glass matrix were observed. The chemical durability of the wasteform was measured during 28 days in a 90 deg. C water. Although there were durable crystalline phases, the hydrolysis rate of the vitreous part is relatively high because of the B and Na contents. However, leach rate profiles suggest that an alteration layer will form, leading to an alteration rate decrease. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Distributed fiber sensing systems for 3D combustion temperature field monitoring in coal-fired boilers using optically generated acoustic waves (Final Report)

In this project, we have developed and tested three kinds of fiber optic sensing systems for real time monitoring of temperature variations within an industrial scale boiler furnace. The fiber optic sensing systems target spatial and temporal distributions of high temperature profiles in a boiler furnace in fossil power plants. The reconstructed temperature profile will provide critical input for the control mechanisms to optimize the combustion process. This temperature profile will address the essential problem for fossil power plants in achieving higher efficiency and fewer pollutant emissions. Acoustic pyrometer systems have been used to reconstruct temperature field of power plant boilers based on measuring TOF (times-of-flight) of sound waves along some straight paths in a 2D cross-section of the boiler. In this project, optically generated acoustic signals from a fiber optic sensing system have replaced the acoustic signals generated from an electrical transducer. A 3D reconstruction algorithm replaced the previous 2D model. In this project, three kinds of fiber optic sensing systems have been developed and tested. They are fiber optic sensing system I, fiber optic sensing system II (Distributed Sensing System I) and fiber optic sensing system III (Distributed Sensing System II). For fiber optic sensing system I, the fiber optic ultrasound generator acts as a signal generator. A microphone, hydrophone or other electronic devices serve as a signal receiver. In this system, there are one generator and one receiver. Distance test, water temperature test, air temperature test, air temperature reconstruction, and GE ISBF pilot test were performed by Fiber optic sensing system I. The fiber optic sensing system I successfully detected temperature in all these tests. We got 2D temperature reconstruction results by using the fiber optic sensing system I and it matched the reference data. The fiber optic sensing system I successfully survived in GE ISBF boiler environment (480 °F). For fiber optic sensing system II (Distributed Sensing System I), it is an all optical ultrasound system. The fiber optic ultrasound generator acts as a signal generator. Fiber Bragg Grating (FBG) and Fabry-Perot (FP) sensor act as a signal receiver. In this system, there is one generator and one receiver. Aluminum plate temperature test, furnace high temperature test, and GE ISBF pilot test were performed by the fiber optic sensing system II. Fiber optic sensing system II successfully detected the temperature in all these tests. The fiber optic sensing system II successfully survived at up to 700 °C furnace environment and 320 °C GE ISBF boiler environment. For fiber optic sensing system III (Distributed Sensing System II), it is also an all optical ultrasound system. The fiber optic ultrasound generator acts as a signal generator. Multiple FP fiber sensors act as signal receivers. In this system, there is one generator and three receivers. Three GE ISBF pilot tests were performed by fiber optic sensing system III. The fiber optic sensing system III survived in the cold flow tests in GE’s ISBF pilot test facility. However, we didn’t get high temperature data by using this system since the nanosecond laser issues. During the period of the project, test trials, data simulation and algorithm optimization was performed successfully. For real time temperature field construction, the sampling rate must be fast enough to capture the field variations. The technology of Code-division multiple access (CDMA) is well studied which could allow parallel multiplexing, even if signals overlap in time or frequencies. Moreover, it has been known that extending the length of signal significantly improves SNR. For acoustic signals, these multiplexing techniques have also been widely used, mainly for sonar and acoustic communications. The CDMA modulation technique has been proposed and studied to guarantee high network throughput, low channel access delay and low energy consumption. We have studied the temperature field reconstruction using Gaussian Radial Basis Functions (GRBF)-based approximation approach. Reconstruction of 3D temperature field using Neural Networks with measured TOF and known propagation paths is feasible. 2D and 3D temperature field reconstruction simulation results are achieved. The milestone status is shown in Table 1. We finished milestone 1-8 and milestone 10. For milestone 9, we did three pilot tests by using the fiber optic sensing system III (Distributed Sensing System II) at GE Power. However, due to the failure of the ns laser, we did not get the temperature results. We conducted some additional tasks that were not originally proposed: 1) We fabricated a fiber optic sensing system I and did a pilot test based on this system. 2) In the proposal, we proposed two pilot tests at GE Power. In reality, we finished at least seven pilot tests at GE Power. GE Power has made a lot of efforts for supporting the pilot tests. 3) We got a simulation results based on CDMA. In summary, most of the tasks have been accomplished. The outcome of this project removed a few barriers that hinder the achievement of the final product of the distributed sensing systems. With the successful accomplishment of this project, a prototype of the fiber optic sensing system can be fabricated to attract more interests from companies and other funding agencies.

47 OTHER INSTRUMENTATION↗

Scale Up of High-Performance REBCO Tapes in a Pilot-Scale Advanced MOCVD Tool With In-Line 2D-XRD System

We have reported the development of an Advanced Metal-Organic Chemical Vapor Deposition (AMOCVD) method featuring ohmic heating of the substrate for REBCO film growth, direct tape temperature monitoring, and laminar precursor flow. This A-MOCVD method has been used to fabricate 4 – 5 m thick film REBCO tapes with record high performance: critical currents exceeding 8700 A/12 mm at 30 K, 3 T; and engineering current density of 5200 A/mm 2 at 4.2 K, 15 T. Recently, we constructed a pilot-scale reel-to-reel A-MOCVD system to scale up the technology to long tapes. Preliminary batches of tapes exhibit consistent performance and good uniformity along the length. An in-line 2D X-ray Diffraction (XRD) system has been integrated into the pilot A-MOCVD tool to monitor the REBCO texture and composition, RE 2 O 3 content, and the dimensions of BaMO 3 (BMO, M=Zr,Hf) nanorods that act as artificial pinning centers. Specifically, the streaking angle between REBCO (103) and BZO (101) has been found to correlate well with (Ba+M)/Cu of the film, lift factor in critical current over a range of temperatures and magnetic fields, and the size of the BMO nanorods. Furthermore, the in-line 2D-XRD is expected to serve as a valuable quality measuring tool supporting realtime feedback control for the process to yield uniform and consistent manufacturing of high performance REBCO tapes by Advanced MOCVD.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Standard Analysis Report INV-SAR-81, Revision 0 Chemical and Cement Components 2023 Inventory Estimates for the Interim State Performance Assessment of the Waste Isolation Pilot Plant

This standard analysis report provides the estimates for the chemical (oxyanions and complexing agents) and cement components with a data collection cut-off date of December 31, 2023. These estimates will be included in a Performance Assessment Inventory Report developed for the U.S. Department of Energy (DOE) interim state repository configuration performance assessment (PA) for the 2026 Compliance Recertification Application (CRA).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Novel High‐Performance Electrolyte for Extreme Fast Charging in Pilot Scale Lithium‐Ion Pouch Cells

Realizing extreme fast charging (XFC) in lithium-ion batteries for electric vehicles is still challenging due to the insufficient lithium-ion transport kinetics, especially in the electrolyte. Herein, a novel high-performance electrolyte (HPE) consisting of lithium bis(fluorosulfonyl)imide (LiFSI), lithium hexafluorophosphate (LiPF 6 ) and carbonates is proposed and tested in pilot-scale, 2-Ah pouch cells. Moreover, the origin of improved electrochemical performance is comprehensively studied via various characterizations, suggesting that the proposed HPE exhibits high ionic conductivity and excellent electrochemical stability at high charging rate of 6-C. Furthermore, the HPE-based pouch cells deliver improved discharge specific capacity and excellent long-term cyclability up to 1500 cycles under XFC conditions, which is superior to the conventional state-of-the-art baseline electrolyte.

25 ENERGY STORAGE↗

FINAL TECHNICAL AND ECONOMIC FEASIBILITY STUDY ON THE APPLICATION OF A HEAT INTEGRATED POST-COMBUSTION CO2 CAPTURE SYSTEM WITH HITACHI ADVANCED SOLVENT INTO EXISTING COAL-FIRED POWER PLANT

This report contains the results of a techno-economic assessment (TEA) conducted of a heat integrated post-combustion CO2 capture process with Hitachi advanced solvent for retrofit into an existing coal-fired power plant (but treated as greenfield plant on cost analysis). The process has been developed by the University of Kentucky Center for Applied Energy (UK CAER). EPRI was chiefly responsible for this analysis, with significant input from WorleyParsons, Hitachi Power Systems America (Hitachi) and UK CAER. The project also involves the design, fabrication, installation, testing, and analyses of a slipstream facility located at L&GE-KU’s E.W. Brown Generating Station to demonstrate the UK CAER carbon capture system that could utilize heat integration with the main power plant. The design, start-up, and baseline of the pilot system was performed with a generic 30 wt% MEA solvent to obtain data for direct comparison with the DOE/NETL Reference Case followed by testing Hitachi’s proprietary solvent H3-1. In this techno-economic analysis, two cases utilizing the UK CAER process are compared, using different approach temperatures and solvent, against the DOE/NETL Reference Case (Case 10). The results are shown comparing the energy demand for post-combustion CO2 capture and the net higher heating value (HHV) efficiency of the power plant integrated with the post-combustion capture (PCC) plant. A levelized cost of electricity (LCOE) assessment was performed showing the costs of the options presented in the study. The key factors contributing to the reduction of LCOE were identified as CO2 partial pressure increase at the flue gas inlet, thermal integration of the process, and performance of the Hitachi H3-1 solvent. Recent UK CAER process pilot-scale testing data and process simualtion data showed that the packing heights of absorber and stripper columns were significantly oversized in the prelimanary TEA (Task 2 of this project) and thus updated in this final TEA for the H3-1 case only. In addition, the solvent make-up cost for H3-1 was updated based on lattest test results. Finally, a heat integration with the main power plant was applied in this final TEA to increase overall energy effciency for both the MEA and H3-1 cases. Additonal reductions in capital and operational costs are expected but not taken into account here. Shorter columns result in reduced pressure drops, smaller blower head and pump hydraulic head requirements. An increase in overall energy efficiency resuls in a decreased size of the power plant, the CCS and a reduced parasitic steam requirement to the CCS. The net efficiency of the UK CAER integrated PC power plant with CO2 capture changes from 26.2% for the Reference Case 10 plant in 2010 revised DOE/NETL baseline report to 27.6% for the MEA options considered, and 29.1% for the options utilizing the Hitachi advanced solvent. The UK CAER Process + Hitachi case also produces an extra 30.9 MW of generation compared to the UK CAER Process + MEA case and total 60.9 MW more than DOE Case 10. LCOE ($/MWh) values are $172.08/MWh for the MEA option and $157.65/MWh for the Hitachi H3-1 solvent cases considered in comparison to $189.59/MWh in January 2012 dollar for the Reference Case 10. The UK CAER CCS process with MEA case lowers energy consumption for CO2 capture to 1340 Btu/lb-CO2 captured as compared to 1540 Btu/lb-CO2 in the Reference Case 10. The UK CAER CCS process with H3-1 case further lowers energy consumption for CO2 capture to 973 Btu/lb-CO2 captured, for an advantage of 36.8% less energy consumption than Case 10. The study also shows 38.1% less heat rejection associated with the carbon capture system from 3398 MBtu/hr (Case 10) to 2104 MBtu/hr for the UK CAER + MEA system. Heat rejection is reduced to 2464 MBtu/hr in the UK CAER + H3-1 case, for a 27.5 % decrease compared to Case 10. Modeling outputs show that in the UK CAER process, the cooling water that is 2-5°C cooler than conventional cooling tower water can be achieved for ambient conditions common to the midwest and other regions. The results from the techno-economic assessment show that the proposed technology can be investigated further as a viable alternative to conventional CO2 capture technology. The evaluation also shows the effect of the critical parameters on the LCOE, with the main variables being the approach temperature and CO2 partial pressure increase at the flue gas inlet. A summary of the key advantages of the UK CAER Process + H3-1 case for LCOE and other economic factors compared to the DOE Case 10 is as follows: • A lower variable operating cost by $1.56/MWh ($1.08MWh less than the UK CAER Process + MEA Case), a 11.7% reduction compared to the DOE Case 10 • A lower COE by $25.32MWh ($13.94/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower LCOE by $31.94/MWh ($17.51/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower cost of CO2 captured by $18.65/tonne CO2 ($9.44/tonne CO2 lower than the UK CAER Process + MEA Case), a 30.4% reduction compared to the DOE Case 10 • A lower cost of CO2 avoided by $34.95/tonne CO2 ($18.53 tonne CO2 lower than the UK CAER Process + MEA Case), a 38.7% reduction compared to the DOE Case 10

Bhown, Abhoyjit S.↗

Concrete Thermal Energy Storage Enabling Flexible Operation without Coal Plant Cycling

The work described in this report is responsive to the Office of Fossil Energy program “Energy Storage for Fossil Power Generation.” The pilot plant built as a result of this project demonstrated the feasibility and performance of a concrete thermal energy storage (CTES) system integrated with a supercritical coal power plant. The 10 MWh electrical (>25 MWh thermal) CTES unit, developed by Storworks Power, was designed to enable flexible operation of coal plants without cycling damage. The project's key technical achievements showcase a significant advancement in energy storage technology. A modular CTES system using 42 “Bolderblocs” units was successfully designed and constructed at Alabama Power’s Plant Gaston Unit 5, with each block containing embedded stainless-steel coils in specialized, cost-effective high-temperature concrete. The system interfaced seamlessly with the plant's 3500 psig (241 barg), 1000°F (538°C) supercritical steam, demonstrating operational flexibility. Over 86 full cycles, the CTES exhibited rapid charging and discharging capabilities, effectively mimicking steam turbine feed conditions and handling varying load profiles and storage durations. Performance validation confirmed the system's ability to consistently meet design target steam conditions of 75 bar-a and ~400°C for nominal baseline discharge. The concrete material withstood repeated thermal cycling without degradation, validating earlier lab-scale tests. Integration of balance of plant components, including a condensate management system with storage tank and air-cooled condenser, minimized plant interfaces and water consumption. A robust control scheme ensured safe, automated operation across various scenarios. Key learnings from the project were invaluable: 1. Initial concrete drying and commissioning procedures were refined for future deployments, enhancing efficiency in subsequent installations. 2. System flexibility exceeded expectations, with rapid response to changing conditions. 3. Design improvements were identified including optimized insulation and piping that will enhance overall system efficiency in future deployments 4. Full cycle thermal roundtrip efficiencies exceeded 88%. While the roundtrip electrical efficiency was somewhat limited by known challenges using input steam, such constraints may be mitigated by swapping steam for hot air as thermal input. 5. A summary of key performance parameters for the pilot test and predicted performance of a full scale commercial system with specified improvements determined from the pilot are shown in Section 8. The project faced challenges, including COVID-19 delays and host plant availability constraints. However, these were overcome through adaptive planning and execution. The successful management of these obstacles demonstrated the resilience and adaptability of the project team and the robustness of the CTES technology. This successful pilot demonstrates the potential for CTES to enhance coal plant flexibility, supporting grid stability as renewable penetration increases. The validated design and operational data provide a solid foundation for scaling up to utility-scale implementations, potentially transforming how thermal plants operate in evolving energy landscapes. The system's ability to rapidly respond to changing grid conditions while maintaining high efficiency makes it a promising solution for balancing intermittent renewable energy sources. Furthermore, the project highlighted the potential for even greater efficiencies in future iterations. The use of air as an input medium could potentially eliminate the limitations observed with steam input, opening new possibilities for energy storage applications beyond coal plant integration. In conclusion, this pilot project not only achieved its primary goals but also uncovered additional benefits and potential applications of the CTES technology. It represents a significant step forward in addressing the challenges of grid stability and flexibility in an increasingly renewable-driven energy landscape.

01 COAL, LIGNITE, AND PEAT↗

Robust constrained tension control for high-precision roll-to-roll processes

Tension control is critical for maintaining good product quality in most roll-to-roll (R2R) production systems. Previous work has primarily focused on improving the disturbance rejection performance of tension controllers. Here, a robust linear parameter-varying model predictive control (LPV-MPC) scheme is designed to enhance the tension tracking performance of a pilot R2R system for deposition of materials used in flexible thin film applications. The performance of a tension controller may degrade due to disturbances associated with model uncertainties and the slowly-changing dynamics in R2R systems. We introduce a method that separately treats these two sources of disturbance. The controller utilizes an incremental model to eliminate the errors caused by the mismatch between the nominal model and the actual system. A tube-based MPC formulation combined with scheduled parameters adequately updates models and corrects for the time-varying dynamics. Constraints on the rated motor torque are incorporated in the MPC to maintain the controller reliability and avoid machine failures. We illustrate the operation of our control algorithm through simulation of an actual R2R system. The controller outperforms the benchmarks in terms of fast transient response and offset-free tension tracking. Furthermore, it also demonstrates immunity from variations due to parametric uncertainties.

42 ENGINEERING↗

First Ever Polymer Flood Field Pilot to Enhance the Recovery of Heavy Oils on Alaska North Slope – Producer Responses and Operational Lessons Learned

The US Department of Energy and Hilcorp Alaska, LLC are jointly cosponsoring a field pilot project entitled “First Ever Field Pilot on Alaska’s North Slope to Validate the Use of Polymer Floods for Heavy Oil Enhanced Oil Recovery (EOR).” The objective of this pilot is to perform a field experiment to validate the use of an advanced polymer flooding technology to unlock the vast heavy oil resources on Alaska North Slope (ANS). Two pairs of horizontal injection and production wells have been deployed in an isolated fault block of the Schrader Bluff heavy oil reservoir at the Milne Point Field to conduct a polymer flood pilot which was designed to acquire field performance data to optimize polymer flood design in the Schrader Bluff heavy oil reservoirs on ANS. Hydrolyzed polyacrylamide (HPAM) polymer injection started on August 28, 2018 using a custom made polymer mixing and pumping unit. Polymer solution properties such as concentration, viscosity, and filter ratio, have been closely monitored and adjusted as necessary. Operational procedures have been improved to ensure adequate injectivity and polymer propagation through the formation. Oil and water production is tested frequently to monitor water cut performance, and produced water is sampled and analyzed for polymer content. Tracers were pumped pre and post polymer injection startup to compare polymer flood breakthrough timing and sweep efficiency. Polymer injectivity of the horizontal wells drilled in the Schrader Bluff NB sand is found to be sufficient to replace the reservoir production voidage although there were some declines as high viscosity polymer swept the near wellbore region. Production data show significant reduction in water cut and the oil production rate has stabilized. No polymer production has been confirmed from the two horizontal producers after 22 months of polymer injection into the two supporting horizontal injectors. Tracer data show very low sweep efficiencies with waterflood alone, whereas significant improvement has been achieved with polymer flood. Many operational lessons have been learned and improvements have been made regarding polymer mixing, pumping, and onsite quality control, particularly in a challenging Arctic environment. Adequate polymer injection rate can be achieved with diligent monitoring and quality assurance of the properties of the injected polymer solution.

Ning, Samson↗

Low-Cost Sulfur Thermal Storage for Solar Industrial Process Heat Applications

Industrial process heat (IPH) is one of the largest energy demands in U.S., representing about 10% of all domestic energy consumption. Fuel costs to generate this industrial process heat are generally a top three cost for industry, a major component in American manufacturing competitiveness. Roughly 60% of US IPH demand (about 6,500 TBtu annually) falls in the medium-temperature range of 100–250 °C. While concentrated solar thermal (CST) technologies can provide a cost-effective source of heat in this temperature range, solar intermittency limits their adoption in industries that operate 24/7. Element 16 Technologies, Inc. developed a low-cost sulfur thermal energy storage (TES) technology to bridge this gap by capturing excess solar heat during the day and dispatching it reliably during non-solar hours. The core innovation is the use of sulfur, an abundant, industrial waste byproduct that costs ten times less than molten salt used in commercial TES systems. The overall goal of the project was to advance the design and development of molten sulfur TES to a manufacturing-relevant prototype stage for solar industrial process heat applications, while establishing and validating a realistic pathway to commercial success. Key tasks included corrosion and mechanical durability testing to identify cost-effective materials, design investigations using physics-based simulation tools, techno-economic evaluations of system lifetime costs, and pilot-scale testing for performance verification. Corrosion testing of steel alloys under cyclic molten sulfur conditions showed that austenitic stainless steels in the 300 series performed particularly well, with no structural degradation of welds or joints. Thermal cyclic testing of pilot sulfur TES units up to 1.5 MWh quantified charge/discharge rates, heat losses, round-trip efficiency and validated the system's capability to operate effectively under intermittent charging conditions. A techno-economic model, informed by sulfur TES performance model validated using pilot test data, showed that hybrid solar+sulfur TES+NG boiler systems are economically competitive with incumbent natural gas boilers for multiple locations in the southwest US. In summary, this project established molten sulfur TES as a technically viable pathway to improve economic competitiveness of American manufacturing by lowering the cost of solar industrial process heat.

14 SOLAR ENERGY↗