Search NASA⌕ Search

SEARCH · Search NASA

Results for “Prelaunch”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Astro-D Prelaunch Mission Operation Report (MOR)

The Prelaunch Mission Operation Report for the Astro-D mission is enclosed for your information. Astro-D is a Japanese-led program involving the United States as a participating partner. The Japanese Institute of Space and Astronautical Science (ISAS) provides overall program management, the launch vehicle, the spacecraft, and two Gas Scintillation Imaging System detectors. NASA is providing four nested, thin-foil, grazing-incidence telescope mirrors and two X-ray charged-coupled device solid-state detectors. NASA also provides telemetry tracking support using Deep Space Network ground stations. In return for its scientific instrument contribution, the U.S. will receive 15 percent of the observing time and will share an additional 25 percent for collaborative U.S./Japan scientific investigations. Launch is scheduled for mid- February 1993 from the ISAS launch center near Kagoshima in southern Japan. This MOR: (a) describes the NASA objectives for the Astro-D mission; (b) provides brief descriptions of the spacecraft and its scientific instruments; (c) provides a chronology of launch and deployment; and (d) describes the ground operation elements that support the mission. .

Source record↗

Comparison of VIIRS Prelaunch RVS Among Independent Studies

The Visible Infrared Imaging Radiometer Suite (VIIRS) is a key sensor carried on the NPOESS (National Polar-orbiting Operational Environmental Satellite System), upgraded and developed recently from heritage instruments including AVHRR, OLS, MODIS, and SeaWiFS. It has on-board calibration components including a solar diffuser (SD) and a solar diffuser stability monitor (SDSM) for the reflective solar bands (RSB), a V-groove blackbody for the thermal emissive bands (TEB), and a space view (SV) port for background subtraction. These on-board calibrators are located at fixed scan angles. The VIIRS response versus scan angle (RVS) was characterized prelaunch in lab ambient conditions and will be used on-orbit to characterize the response for the all scan angles relative to the calibrator scan angle (SD for RSB and blackbody for TEB). Since the RVS is vitally important to the quality of calibrated radiance products, several independent studies were performed and their results were compared and validated. This document provides RVS results from three groups: the NPP Instrument Calibration Support Team (NICST), Raytheon, and the Aerospace Corporation. A comparison of the RVS results obtained using a 2nd order polynomial fit to measurement data is conducted for each band, detector, and half angle mirror (HAM) side. The associated RVS fitting residuals are examined and compared with the relative differences in RVS found between independent studies. Results show that the agreement is within 0.1% and comparable with fitting residuals for all bands except for RSB band M9, where a difference of 0.2% results from the application of the atmospheric water vapor correction for laboratory conditions during the test by Raytheon. NICST has slightly larger RSB RVS uncertainties but still well within the 0.3% total uncertainty allowed for the RVS characterization defined in the Performance Verification Plan.

Wu, Aisheng↗

Prelaunch Radiometric Calibration and Uncertainty Analysis of Landsat Thermal Infrared Sensor 2

The Thermal Infrared Sensor-2 (TIRS-2) that will be onboard Landsat 9 has undergone a prelaunch testing campaign to characterize its radiometric, spectral, and spatial performances and demonstrate compliance to its requirements. This work reviews the key elements of the instrument-level radiometric testing using an SI-traceable source to derive its uncertainties. Those arising from on-orbit calibration using the TIRS-2 onboard blackbody are also discussed. We use a Monte Carlo approach to propagate the uncertainties through a nonlinear calibration equation and address both random and systematic uncertainty terms. Achieving the required performance demonstrates the instrument's potential for enhancing our understanding of the Earth's environment.

Aaron Pearlman↗

Initial Look at the Results From the Prelaunch Characterization Campaign of OCI on the Pace Mission

Scheduled for launch in January 2024, the Phytoplankton, Aerosol, Cloud, and ocean Ecosystem (PACE) mission represents NASA’s next investment in ocean biology, clouds, and aerosol data records [1]. A key feature of PACE is the inclusion of an advanced satellite radiometer known as the Ocean Color Instrument (OCI), a global mapping radiometer that combines multispectral and hyperspectral remote sensing. This paper describes the results of the prelaunch test campaign of the OCI Flight Unit. The measured OCI flight unit performance exceeded requirement thresholds in all critical areas. Overall, the performance of the OCI is excellent, and will allow the PACE science team to meet its science objectives.

Calibration↗

SSS-A attitude control prelaunch analysis and operations plan

A description of the attitude control support being supplied by the Mission and Data Operations Directorate is presented. Descriptions of the computer programs being used to support the mission for attitude determination, prediction, control, and definitive attitude processing are included. In addition, descriptions of the operating procedures which will be used to accomplish mission objectives are provided.

Werking, R. D.↗

Tracking and data system support for the Pioneer project. Volume 1: Pioneer 10-prelaunch planning through second trajectory correction, 4 December 1969 - 1 April 1972

The tracking and data system support of the launch, near-earth, and deep space phases of the Pioneer 10 mission, which sent a Pioneer spacecraft into a flyby of Jupiter that would eventually allow the spacecraft to escape the solar system is discussed. The support through the spacecraft's second trajectory correction is reported. During this period, scientific instruments aboard the spacecraft registered information relative to interplanetary particles and fields, and radiometric data generated by the network continued to improve knowledge of the celestial mechanics of the solar system. In addition to network support activity detail, network performance and special support activities are covered.

Siegmeth, A. J.↗

IMP-J attitude control prelaunch analysis and operations plan

A description of the attitude control support being supplied for the Explorer 50 mission is given. Included in the document are descriptions of the computer programs being used to support attitude determination, prediction, and control for the mission and descriptions of the operating procedures that will be used to accomplish mission objectives.

Hooper, H. L.↗

AE-C attitude determination and control prelaunch analysis and operations plan

A description of attitude control support being supplied by the Mission and Data Operations Directorate is presented. Included are descriptions of the computer programs being used to support the missions for attitude determination, prediction, and control. In addition, descriptions of the operating procedures which will be used to accomplish mission objectives are provided.

Werking, R. D.↗

Tracking and data system support for the Pioneer project. Volume 2: Pioneer 11 prelaunch planning through second trajectory correction, to 1 May 1973

The tracking and data system support of the planning, testing, launch, near-earth, and deep space phases of the Pioneer 11 Jupiter Mission are described, including critical phases of spacecraft flight and guidance. Scientific instruments aboard the spacecraft registered information relative to interplanetary particles and fields. Knowledge of the celestial mechanics of the solar system was improved through radiometric data gathering. Network performance, details of network support activity, and special support activities are discussed.

Barton, W. R.↗

GEOS-C C-band transponder prelaunch calibration and test data

The delay characteristics and spacecraft telemetry housekeeping data for the GEOS-C C-Band transponders are presented. The data are presented in graphical form to provide a convenient method for computing radar range measurement corrections as a function of signal strength at the transponder and spacecraft environment. The data are also presented in tabular form along with the mathematical models used to derive the curves. Also included are a list of the operating characteristics of each transponder and a description of the calibration test equipment set-up.

Selser, A. R.↗

User guide to a command and control system; a part of a prelaunch wind monitoring program

A set of programs called Command and Control System (CCS), intended as a user manual, is described for the operation of CCS by the personnel supporting the wind monitoring portion of the launch mission. Wind data obtained by tracking balloons is sent by electronic means using telephone lines to other locations. Steering commands are computed from a system called ADDJUST for the on-board computer and relays this data. Data are received and automatically stored in a microprocessor, then via a real time program transferred to the UNIVAC 1100/40 computer. At this point the data is available to be used by the Command and Control system.

Cowgill, G. R.↗

Tracking and data system support for the Viking 1975 mission to Mars. Volume 1: Prelaunch planning, implementation, and testing

The tracking and data acquisition support for the 1975 Viking Missions to Mars is described. The history of the effort from its inception in late 1968 through the launches of Vikings 1 and 2 from Cape Kennedy in August and September 1975 is given. The Viking mission requirements for tracking and data acquisition support in both the near earth and deep space phases involved multiple radar tracking and telemetry stations, and communications networks together with the global network of tracking stations, communications, and control center. The planning, implementation, testing and management of the program are presented.

Mudgway, D. J.↗