Determining Hazard Severity via Probabilistic Risk Assessment in the Commercial Trucking Industry to Inform Design and Qualification.
Abstract not provided.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Slides for an invited seminar for a safety/risk class at MIT.
Powerpoint slides for meeting with KAERI, organized by YungJoon Choi
Explore the source record for details and available documents.
Poster for ECRA poster session.
The U.S. Department of Defense (DoD) Strategic Capabilities Office (SCO) has tasked PNNL to address the regulatory challenges associated with confirming the safe transport of Transportable Nuclear Power Plants (TNPPs) containing irradiated nuclear fuel. A previous report—Proposed Risk-Informed Regulatory Framework for Approval of Microreactor Transportation Packages (PNNL-31867)—determined that the expected radioactive inventory in the irradiated fuel of a TNPP would likely require shipment in an NRC-approved Type B package (or spent nuclear fuel cask) but that a TNPP “package” is unlikely to meet the entire suite of NRC requirements set forth in Part 71 of Title 10 of the Code of Federal Regulations (CFR) for a Type B package. It was therefore concluded that shipment of this initial TNPP transportation package, as well as possibly others, under existing regulations would likely require NRC approval using the 10 CFR 71.12 (“Specific exemptions”) process that relies on risk-informed decision making supported by quantitative risk assessment (i.e., Probabilistic Risk Assessment).
Pacific Northwest National Laboratory (PNNL) is addressing the challenges associated with safe transport of microreactors including the development and evaluation of regulatory options. PNNL developed a risk-informed regulatory framework for the licensing of the transportation of microreactors in which irradiated nuclear fuel is part microreactor transportation package. The framework lays out a viable regulatory pathway, including decision points for regulatory options and the supporting technical evaluations for those options in phases from near to long term. A microreactor and its contents will likely not be able to meet all the federal regulatory requirements as a Type B or fissile material transportation package under 10 CFR Part 71 (“Packaging and Transportation of Radioactive Material”). However, the regulatory framework developed by PNNL lays out a viable risk-informed licensing options that are safe and feasible. Risk assessment such as probabilistic risk assessment (PRA) can be used to show comparable safety to that provided by a Type B or fissile material package for surface transport. The framework includes guidance on applicable regulations and discusses historical precedence in using risk information for transportation licensing. The framework includes guidance for performing a microreactor transportation PRA, use and development of risk evaluation criteria, and factors such of defense-in-depth and safety margin concepts. Key advantages of using the approach are (1) increasing the likelihood of successfully obtaining regulatory transportation package approval, (2) informing the design on the relative risk significance of microreactor containment and shielding, and (3) informing the need for transportation compensatory measures. This paper focuses on two primary elements of the framework which are development of a transportation PRA for microreactor packages and development of the risk acceptance guidelines to assess the results of the PRA for regulatory decision-making.
Modeling of Fourier amplitude spectra (FAS) of seismic motions has gained much attention in engineering seismology. In the past few years, several ground motion prediction equations (GMPEs) and inter-frequency correlation structure of FAS have been established. Due to many preferable characteristics of FAS, probabilistic seismic hazard/risk analysis is rapidly changing from ergodic, spectrum acceleration Sa(T 0 )-based approach to non-ergodic, site-specific, FAS-based approach. This paper presents time domain intrusive framework for probabilistic seismic risk analysis using GMPE of FAS. Herein, methodology for time domain stochastic ground motion modeling based on GMPEs of FAS is presented in some detail. The simulated uncertain motions are modeled as a random process and represented by polynomial chaos Karhunen-Loève expansion. The random process excitations are further propagated into the uncertain structural system using Galerkin stochastic finite element method (SFEM). Probabilistic evolution of structural response is solved, and such solution is used to develop seismic risk for any damage state. The presented framework is illustrated through seismic risk analysis of a four-story building subjected to possible earthquakes from two strike slip faults. The influences of the epistemic uncertainties in source stress drop Δσ and site attenuation κ0 on seismic risk are investigated. The need for non-ergodic seismic risk analysis with source-specific and site specific characterizations is emphasized.
Regulatory oversight of a geologic carbon sequestration (GCS) project relies on iterative estimations, throughout the project lifetime, of the area where increased risks to underground sources of drinking water (USDWs) may occur due to injection of CO2. This area, referred to as Area of Review (AoR), is typically delineated by predicting the migration of fluid between the reservoir and the lowermost USDW via an open wellbore using predictions from physics-based reservoir simulators. The inherent uncertainty in input parameters used in reservoir modeling therefore affects the accuracy of determining the AoR for a project. Furthermore, the standard analytical approaches for calculating a critical pressure to delineate the risk area yield an infinite AoR for cases where the injection reservoir is overpressured relative to the USDW. A methodology is presented in this paper to better characterize the risk to USDWs while accounting for the uncertainty in reservoir modeling, with an application to a permitted GCS project with an overpressured injection formation, FutureGen 2.0. The methodology is demonstrated using the National Risk Assessment Partnership’s open-source integrated assessment model (NRAP-Open-IAM) to develop a probabilistic estimate of impact risk to USDW quality. CO2 and pressure predictions from the reservoir modeling conducted using the STOMP-CO2 simulator for the FutureGen 2.0 site are used in a NRAP-Open-IAM model with reservoir, wellbore, and aquifer components to: (1) assess the extent of potential leakage into the USDW for the predicted reservoir pressure conditions; (2) evaluate the extent of potential impact using “no-net-degradation” thresholds; and (3) account for uncertainty in reservoir permeabilities.
Advancements in nuclear system designs with automated control features provide many benefits, but can lead to complex coupled systems and dynamic failure scenarios. This is especially true for microreactor designs where components are not expected to be replaced during the reactor’s lifetime. Hence, the life of the system, in addition to the safety, needs to be evaluated. Modeling these sequences of time-dependent events requires addressing cyclical processes and changing failure rates in ways that represent the actual system dynamics in contrast to a single sampling for a component’s time to failure. This research presents two distinct analytical methods for several failure distributions that evaluate a final time to failure used for different scenarios where the time to failure must be sampled multiple times. The first method is used when evaluating a component whose failure rate increases due to an outside event after the initial sampling but before the initially sampled time to failure. The second method is used when evaluating multiple identical components or a component that has been replaced with a new identical version before the second sampling. The two methods were implemented in a few representative case studies developed in the dynamic probabilistic risk assessment tool Event Modeling Risk Assessment using Linked Diagrams. Overall, this paper provides guidelines on how these approaches give a more realistic and accurate dynamic probabilistic risk assessment of complex systems.
Here, it is found from actual data that due to generation dispatch and uncertain renewable generations and loads with complicated correlations, inferring the probabilistic distributions for uncertain inputs is challenging. Many probabilistic power flow approaches have been developed in the literature but their validations using realistic systems and data are lacking. This paper proposes a data-driven probabilistic analysis approach for system risk assessment of the miniWECC system using actual data. The sparse Gaussian process (SGP) is advocated to quantify the impacts of uncertain inputs on voltage security. SGP does not need the probability distribution function of uncertain inputs, can handle correlations and is highly computationally efficient. Results on the miniWECC system using realistic data show that SGP outperforms existing approaches and is able to quantify the voltage violation risks.
Idaho National Laboratory (INL) has provided technical assistance to the U.S. Nuclear Regulatory Commission (NRC) in reliability and risk analysis including the operating experience (OpE) program since the 1980s. The U.S. nuclear OpE program provides input parameters to the NRC Standardized Plant Analysis Risk models and the industry probabilistic risk assessment (PRA) models. While earlier PRA focuses were on at-power, internal event analysis, the risks from external hazards and during low power shutdown (LPSD) operation could be significant and the needs to develop LPSD PRA and external hazards PRA are on the rise. One issue in developing LPSD PRA is the reasonable estimation of shutdown initiative event (SDIE) frequencies. INL has developed and is maintaining an SDIE database for the NRC. However, this database is based on the reviewing of Licensee Event Reports (LERs), which is believed to be only a subset of “actual” shutdown initiating events occurred in the industry. This paper investigates a new approach to identify and characterize shutdown initiating events from the Institute of Nuclear Power Operations (INPO) industry database using machine learning techniques. The main process in this approach is to find out the relationship between key words in event descriptions and the SDIE categories as in the NRC SDIE database. The relationship can then be applied to the INPO database and search for SDIEs.
A fire hazard analysis, required for many U.S. Department of Energy (DOE) facilities, is a complex, cumbersome, and costly process. Fire hazard analyses may be viewed as a checkbox, but ideally and in spirit with the DOE-STD-1066, the fire hazard analysis (FHA) should be a part of the workflow and used to help in modifications, maintenance, and improving operational safety. With current FHA development processes, it is both time and cost prohibitive for true integration. A tool called Fire Risk Investigation in 3D or FRI3D was developed under the DOE Light Water Reactor Sustainability program to simplify and automate many aspects of a fire probabilistic risk analysis for existing nuclear power plants. The FRI3D tool automates fire scenarios by combining approved fire simulation codes, U.S. Nuclear Regulatory Commission fire calculations methods, 3D modeling and visualization, and probabilistic risk analysis models into a single workflow supported with a user interface. FRI3D was initially designed for used in combination with a PRA, this case study, evaluated using FRI3D for a plant modification, determined the benefits that detailed fire modeling can have for U.S. Department of Energy facilities with or without a PRA model. It also looked at what tasks from DOE requirements could be reduced using the tool and what is needed to integrate fire hazard analysis into site workflow.
This paper describes ongoing work within the Light Water Reactor Sustainability (LWRS) Program at Idaho National Laboratory (INL) to optimize security and cost of nuclear power plants (NPPs). It reviews the conservatisms in conventional physical security posture and regulations. It introduces the dynamic risk assessment tool developed at INL, Event Modeling Risk Assessment using Linked Diagrams (EMRALD). The dynamic assessment methodology leverages EMRALD to process results of force-on-force (FOF) simulations and crediting safety mitigation actions from probabilistic risk assessment (PRA) models as well as diverse and flexible coping strategies (FLEX) mitigation strategies. Timing information from these simulations are compared against the available time to perform mitigations obtained from Reactor Excursion and Leak Analysis Program (RELAP5) simulations. To illustrate the methodology, a station blackout (SBO) attack scenario was modeled in commercially available FOF simulation tools. The simulation results provide valuable insights into possible attack outcomes and as the probabilistic risk of a core damage event given these outcomes. Safety mitigation procedures were modeled in EMRALD, and were dependent on the attack outcomes by considering human operator uncertainties. RELAP5 simulations incorporating human and hardware uncertainties were performed to estimate the distribution of time-to-core damage. The results demonstrate that, even in the extreme case of a successful adversarial attack, plant mitigation strategies provide significantly high-likelihood of preventing radiological release. The proposed modeling and simulation framework of integrating FLEX equipment with FOF models enables the NPPs to credit FLEX portable equipment in the plant security posture, resulting in an efficient and optimized physical security.
This plan proposes a strategy for licensing a transportable nuclear power plant, containing its unirradiated and irradiated fuel, as a transportation package for maritime transport using a probabilistic risk assessment framework in order to meet the regulatory requirements of 10 CFR Part 71. It is anticipated that initially, the deterministic transportation package licensing approach will be challenging due to the functional requirements of the transportable nuclear power plant. As such, a partial exemption request from the U.S. Nuclear Regulatory Commission coupled with applied compensatory measures are anticipated in support of providing equivalent safety to the public, worker, and environment. A plan is outlined as to how this would be demonstrated and a pathway is primarily outlined using the accompanying low accident rates which in turn support very low probabilities of release for a maritime application. Wherever possible, the proposed plan is supported by actual accident (casualty) data. Additional supporting information regarding a highway transportation probabilistic risk assessment in support of the Project Pele demonstration reactor that is currently under development is also referenced and discussed.
In the past few decades, the increasing complexity of modern engineering systems has been driven by the integration of a large number of components whose operations may involve many disciplines (e.g., thermal hydraulics, plant operations, cybersecurity). Most computational tools used by industry and regulators for system safety and reliability assessments are still based on the traditional fault tree (FT) and event tree (ET) approach, which may not be able to capture complex interactions among system constituents. The use of simulation tools has widely increased in the past few decades to improve the fidelity of the reliability and safety analyses. However, the direct use of simulation tools as part of dynamic probabilistic risk assessment (DPRA) methods is not getting traction since (1) modeling the whole system under consideration with DPRA methods may be computationally expensive and unnecessary, and (2) the manual integration of DPRA models into existing state-of-practice probabilistic risk assessment models (i.e., based on FTs and ETs) can be time consuming and prone to errors. Here, in this paper we propose a procedure to overcome this limitation by presenting several algorithms designed to automatically construct subsystem ETs and FTs from DPRA methods for integration into an existing ET/FT system model.