Sample Preparation Laboratory (SPL) Best Practices: CGD as the Primary Acceptance Method
The traditional paradigm applied to the construction of nuclear safety related systems, structures, and components (SSCs), like SPL, involves an owner/licensee hiring an EPC firm with an NQA 1 program to manage the engineering, procurement, and construction of the desired SSC. This traditional approach would have posed significant barriers to the successful completion of the SPL. As a smaller capital project, in the $\$$100–$\$$200 million range, there was concern that employing one of the larger EPC companies would escalate costs and extend the projected schedule beyond what would be feasible for the Department of Energy (DOE). The traditional acceptance method employed for nuclear facilities with credited safety functions requires the use of an EPC firm applying American Society of Mechanical Engineers (ASME) NQA 1 nuclear quality assurance (NQA) to accept safety SSCs. In lieu of this approach, INL elected to apply its own NQA 1 program to hire an EPC firm operating a commercial quality program. This method used commercial grade dedication (CGD) as outlined in NQA 1 which had not been applied at this scale. Use of the commercial supply chain was identified as a key factor to the successful completion of SPL. Favorable conditions enabling the use of CGD included: • INL serving as both the designer and the design authority • Design created by an NQA 1 qualified source • A mature CGD program • Availability of a CGD subject matter expert (SME) • A strong construction management program. This white paper elaborates on the methodology employed in the construction of the SPL, the successes achieved, and best practices implemented.