Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Cost”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Michigan resource inventories: Characteristics and costs of selected projects using high altitude color infrared imagery. Remote Sensing Project

The procedures and costs associated with mapping land cover/use and forest resources from high altitude color infrared (CIR) imagery are documented through an evaluation of several inventory efforts. CIR photos (1:36,000) were used to classify the forests of Mason County, Michigan into six species groups, three stocking levels, and three maturity classes at a cost of $4.58/sq. km. The forest data allow the pinpointing of marketable concentrations of selected timber types, and facilitate the establishment of new forest management cooperatives. Land cover/use maps and area tabulations were prepared from small scale CIR photography at a cost of $4.28/sq. km. and $3.03/sq. km. to support regional planning programs of two Michigan agencies. procedures were also developed to facilitate analysis of this data with other natural resource information. Eleven thematic maps were generated from Windsor Township, Michigan at a cost of $1,500 by integrating grid-geocoded land cover/use, soils, topographic, and well log data using an analytical computer program.

Enslin, W. R.↗

NASA Air Force Cost Model (NAFCOM): Capabilities and Results

NAFCOM is a parametric estimating tool for space hardware. Uses cost estimating relationships (CERs) which correlate historical costs to mission characteristics to predict new project costs. It is based on historical NASA and Air Force space projects. It is intended to be used in the very early phases of a development project. NAFCOM can be used at the subsystem or component levels and estimates development and production costs. NAFCOM is applicable to various types of missions (crewed spacecraft, uncrewed spacecraft, and launch vehicles). There are two versions of the model: a government version that is restricted and a contractor releasable version.

McAfee, Julie↗

Cost of Czochralski wafers as a function of diameter

The impact of diameter in the range of 10 to 15 cm on the cost of wafers sliced from Czochralski ingots was analyzed. Increasing silicon waste and decreasing ingot cost with increasing ingot size were estimated along with projected costs. Results indicate a small but continuous decrease in sheet cost with increasing ingot size in this size range. Sheet costs including silicon are projected to be $50 to $60/sq m (1980 $) depending upon technique used.

Leipold, M. H.↗

A System-Level Cost Modeling Framework for Design for Remanufacturing: A Case Study of an Agricultural Machine Transmission

Remanufacturing offers significant environmental and economic benefits by restoring end-of-life products to as-new conditions. Although extensive research has been conducted on the topic, the adoption of remanufacturing practices remains limited across various industries. A primary barrier to broader implementation is the substantial upfront investment required, which necessitates reliable cost modeling to justify potential future savings. Most existing models treat components independently and ignore inter-component dependencies. We develop a probabilistic, system-level cost modeling framework that integrates reliability, reusability, and a dependency matrix to capture cascading effects across components over multiple life cycles. Our model identifies those critical components that maximize remanufacturing benefits across a product's many lives. A toy example and an industry case study (John Deere PowrQuad transmission subassembly) illustrate how design alternatives affect cumulative cost. Using a Monte Carlo simulation (MCS) to perform life cycle cost analysis on the system with different design changes, we show the normalized average cost savings after three remanufacturing cycles. Accounting for dependencies meaningfully alters cost projections and ignoring them underestimates accumulated cost by up to 20% in our examples. Furthermore, the results of our study confirm that accounting for component interdependencies is necessary to produce cost estimates that meet industry standards.

Life Cycle Analysis and Design↗

Survey and Assessment of Crew Performance Evaluation Methods Applicable to Human Spacecraft Design

Space is an unforgiving environment where the actions of the crew play a critical role in their health and safety. Given the limited number of crewmembers typically onboard a spacecraft and the multitude of complex systems they must operate, the performance of each individual is of paramount importance. Spacecraft habitat layout and operations are two main drivers affecting crew performance efficiency. Having the capability to analyze and compare crew performance across various spacecraft configurations can help identify improvements early in the conceptual design process where changes are less costly to implement, ultimately reducing overall project costs and improving long-term operations of the system. Currently, there are few comprehensive methods readily available for evaluating crew integration within a spacecraft in the conceptual design phase. In order to address this shortcoming, the goal of this work was to analyze various specialized evaluation methods found in analogous industries that have potential application to human spacecraft design. A survey of more than 400 human performance evaluation methods was completed. Over twenty different attributes were identified for each method and a variety of analyses were conducted to characterize and evaluate their potential use for assessing human spacecraft design options. The analysis revealed a particular deficiency of quantitative evaluation methods that are applicable early in the systems engineering design phase. It also identified five existing methods that could be supplemented to achieve the needs of an early design evaluation method. Additional discussion describes potential issues that must be overcome when developing a method specific for use in human spacecraft evaluations.

crew performance↗

Solar thermal technology development: Estimated market size and energy cost savings. Volume 1: Executive summary

Estimated future energy cost savings associated with the development of cost-competitive solar thermal technologies (STT) are discussed. Analysis is restricted to STT in electric applications for 16 high-insolation/high-energy-price states. The fuel price scenarios and three 1990 STT system costs are considered, reflecting uncertainty over future fuel prices and STT cost projections. STT R&D is found to be unacceptably risky for private industry in the absence of federal support. Energy cost savings were projected to range from $0 to $10 billion (1990 values in 1981 dollars), dependng on the system cost and fuel price scenario. Normal R&D investment risks are accentuated because the Organization of Petroleum Exporting Countries (OPEC) cartel can artificially manipulate oil prices and undercut growth of alternative energy sources. Federal participation in STT R&D to help capture the potential benefits of developing cost-competitive STT was found to be in the national interest.

Gates, W. R.↗

Solar thermal technology development: Estimated market size and energy cost savings. Volume 2: Assumptions, methodology and results

Estimated future energy cost savings associated with the development of cost-competitive solar thermal technologies (STT) are discussed. Analysis is restricted to STT in electric applications for 16 high-insolation/high-energy-price states. Three fuel price scenarios and three 1990 STT system costs are considered, reflecting uncertainty over future fuel prices and STT cost projections. Solar thermal technology research and development (R&D) is found to be unacceptably risky for private industry in the absence of federal support. Energy cost savings were projected to range from $0 to $10 billion (1990 values in 1981 dollars), depending on the system cost and fuel price scenario. Normal R&D investment risks are accentuated because the Organization of Petroleum Exporting Countries (OPEC) cartel can artificially manipulate oil prices and undercut growth of alternative energy sources. Federal participation in STT R&D to help capture the potential benefits of developing cost-competitive STT was found to be in the national interest. Analysis is also provided regarding two federal incentives currently in use: The Federal Business Energy Tax Credit and direct R&D funding.

Gates, W. R.↗

Fast projection algorithm for unstructured meshes

Two projection operators are presented which employ a very efficient point-location algorithm. For a wide variety of practical problems, the projection cost was reduced by a substantial factor when compared with simpler procedures. Problems involving high levels of local refinement do not impede the point-location algorithm, and the extension of these concept to three dimensions has been implemented with no additional difficulty. Nodal interpolation is noted to be an excellent projection operator when cost is a criterion, while consistent-mass L2-projection furnishes the highest accuracy.

Jansen, Kenneth↗

Characterizing the Impact of Heliostat Size, Focus Method, and Optical Error on Concentrating Solar Tower Systems

Concentrating Solar Power (CSP) tower systems use heliostat fields to direct solar energy to a central receiver. The efficiency of the heliostat field is crucial for achieving thermal generation targets and is also the largest cost component, making up 30-40% of total project costs. Developers face a tradeoff: reducing heliostat costs may decrease optical performance and increase land use, while improving performance could raise manufacturing costs (through higher precision). The optimal design depends on land, labor, and manufacturing costs. Additionally, inherent performance limitations exist - optical errors result in larger solar images as heliostats move farther from the receiver, increasing spillage and attenuation losses. Ultimately, there exists a point where receiver design power can no longer be achieved at design conditions for a given solar field area. This point depends on key heliostat field design parameters including field layout, heliostats size, focus method, and heliostat optical error. In this work, we explore and characterize the performance trade-offs between heliostat size, focus method, and optical error using Monte Carlo ray-tracing simulations using NREL's high performance computing resources. The goal of this fundamental investigation is to understand practical heliostat design performance impacts that can be used to produce more cost-effective heliostat fields while still achieving plant thermal generation targets.

14 SOLAR ENERGY↗

Low cost silicon solar array project: Feasibility of low-cost, high-volume production of silane and pyrolysis of silane to semiconductor-grade silicon

Silicon epitaxy analysis of silane produced in the Process Development Unit operating in a completely integrated mode consuming only hydrogen and metallurgical silicon resulted in film resistivities of up to 120 ohms cm N type. Preliminary kinetic studies of dichlorosilane disproportionation in the liquid phase have shown that 11.59% SiH4 is formed at equilibrium after 12 minutes contact time at 56 C. The fluid-bed reactor was operated continuously for 48 hours with a mixture of one percent silane in helium as the fluidizing gas. A high silane pyrolysis efficiency was obtained without the generation of excessive fines. Gas flow conditions near the base of the reactor were unfavorable for maintaining a bubbling bed with good heat transfer characteristics. Consequently, a porous agglomerate formed in the lower portion of the reactor. Dense coherent plating was obtained on the silicon seed particles which had remained fluidizied throughout the experiment.

Breneman, W. C.↗

Low Cost Silicon Solar Array Project. Feasibility of Low-cost, High-volume Production of Silane and Pyrolysis of Silane to Semiconductor-grade Silicon

The presence of copper promotes a more rapid approach to the steady stete operating condition and results in a more consistent reactor effluent composition. The average kinetic and equilibrium yield are unchanged. Incoloy has been identified as the preferred choice of material of construction for the hydrogenation reactor although certain metallurgical changes were noted in samples exposed to the H2/HCl atmosphere at 500 C which indicate the need for more testing.

Breneman, W. C.↗

Solar power satellite

The solar power satellite (SPS) concept, under evaluation by NASA since 1974, is discussed. A typical system providing a total of 10,000 MW of electrical power to the ground receiving stations is considered. Energy conversion systems, including the photovoltaic device category using single-crystal silicon cells, are taken into account, as are the 2.45-GHz microwave power-transmission link and the ground receiver (or rectenna). Concepts involving space construction of the satellite's large structures (5 x 25 km) are described, noting that a process similar to the familiar roll-forming of light sheet metal parts has been adapted to the space environment. Transportation vehicles are discussed, including the Space Shuttle planned to reach 60 flights per year by the mid 1980's. Electrical power forecasts and advanced systems cost projections are analyzed, together with a description of costs estimates. The indirect economics of energy research and development, and the present NASA/DOE SPS program are noted.

Davis, H. P.↗

Cost reductions in nickel-hydrogen battery

Significant progress was made toward the development of a commercially marketable hydrogen nickel oxide battery. The costs projected for this battery are remarkably low when one considers where the learning curve is for commercialization of this system. Further developmental efforts on this project are warranted as the H2/NiO battery is already cost competitive with other battery systems.

Beauchamp, Richard L.↗

Low-cost solar array structure development

Early studies of flat-plate arrays have projected costs on the order of $50/square meter for installed array support structures. This report describes an optimized low-cost frame-truss structure that is estimated to cost below $25/square meter, including all markups, shipping an installation. The structure utilizes a planar frame made of members formed from light-gauge galvanized steel sheet and is supposed in the field by treated-wood trusses that are partially buried in trenches. The buried trusses use the overburden soil to carry uplift wind loads and thus to obviate reinforced-concrete foundations. Details of the concept, including design rationale, fabrication and assembly experience, structural testing and fabrication drawings are included.

Wilson, A. H.↗

Cost, capability, and risk for planetary operations

The three key factors for flight projects - cost, capability, and risk - are examined with respect to their interplay, the uplink process, cost drivers, and risk factors. Scientific objectives are translated into a computer program during the uplink process, and examples are given relating to the Voyager Interstellar Mission, Galileo, and the Comet Rendezvous Asteroid Flyby. The development of a multimission sequence system based on these uplinks is described with reference to specific subsystems such as the pointer and the sequence generator. Operational cost drivers include mission, flight-system, and ground-system complexity, uplink traffic, and work force. Operational risks are listed in terms of the mission operations, the environment, and the mission facilities. The uplink process can be analyzed in terms of software development, and spacecraft operability is shown to be an important factor from the initial stages of spacecraft development.

Mclaughlin, William I.↗

Spacecraft platform cost estimating relationships

The three main cost areas of unmanned satellite development are discussed. The areas are identified as: (1) the spacecraft platform (SCP), (2) the payload or experiments, and (3) the postlaunch ground equipment and operations. The SCP normally accounts for over half of the total project cost and accurate estimates of SCP costs are required early in project planning as a basis for determining total project budget requirements. The development of single formula SCP cost estimating relationships (CER) from readily available data by statistical linear regression analysis is described. The advantages of single formula CER are presented.

Gruhl, W. M.↗

LSA Low-cost Solar Array project

The activities of the Low-Cost Silicon Solar Array Project during the period October through December, 1977 are reported. The LSSA Project is assigned responsibility for advancing silicon solar array technology while encouraging industry to reduce the price of arrays to a level at which photovoltaic electric power systems will be competitive with more conventional power sources early in the next decade. Set forth are the goals and plans with which the Project intends to accomplish this and the progress that was made during the quarter.

Source record↗