Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Cost”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Solar thermal technology development: Estimated market size and energy cost savings. Volume 2: Assumptions, methodology and results

Estimated future energy cost savings associated with the development of cost-competitive solar thermal technologies (STT) are discussed. Analysis is restricted to STT in electric applications for 16 high-insolation/high-energy-price states. Three fuel price scenarios and three 1990 STT system costs are considered, reflecting uncertainty over future fuel prices and STT cost projections. Solar thermal technology research and development (R&D) is found to be unacceptably risky for private industry in the absence of federal support. Energy cost savings were projected to range from $0 to $10 billion (1990 values in 1981 dollars), depending on the system cost and fuel price scenario. Normal R&D investment risks are accentuated because the Organization of Petroleum Exporting Countries (OPEC) cartel can artificially manipulate oil prices and undercut growth of alternative energy sources. Federal participation in STT R&D to help capture the potential benefits of developing cost-competitive STT was found to be in the national interest. Analysis is also provided regarding two federal incentives currently in use: The Federal Business Energy Tax Credit and direct R&D funding.

Gates, W. R.↗

Fast projection algorithm for unstructured meshes

Two projection operators are presented which employ a very efficient point-location algorithm. For a wide variety of practical problems, the projection cost was reduced by a substantial factor when compared with simpler procedures. Problems involving high levels of local refinement do not impede the point-location algorithm, and the extension of these concept to three dimensions has been implemented with no additional difficulty. Nodal interpolation is noted to be an excellent projection operator when cost is a criterion, while consistent-mass L2-projection furnishes the highest accuracy.

Jansen, Kenneth↗

Low cost silicon solar array project: Feasibility of low-cost, high-volume production of silane and pyrolysis of silane to semiconductor-grade silicon

Silicon epitaxy analysis of silane produced in the Process Development Unit operating in a completely integrated mode consuming only hydrogen and metallurgical silicon resulted in film resistivities of up to 120 ohms cm N type. Preliminary kinetic studies of dichlorosilane disproportionation in the liquid phase have shown that 11.59% SiH4 is formed at equilibrium after 12 minutes contact time at 56 C. The fluid-bed reactor was operated continuously for 48 hours with a mixture of one percent silane in helium as the fluidizing gas. A high silane pyrolysis efficiency was obtained without the generation of excessive fines. Gas flow conditions near the base of the reactor were unfavorable for maintaining a bubbling bed with good heat transfer characteristics. Consequently, a porous agglomerate formed in the lower portion of the reactor. Dense coherent plating was obtained on the silicon seed particles which had remained fluidizied throughout the experiment.

Breneman, W. C.↗

Low Cost Silicon Solar Array Project. Feasibility of Low-cost, High-volume Production of Silane and Pyrolysis of Silane to Semiconductor-grade Silicon

The presence of copper promotes a more rapid approach to the steady stete operating condition and results in a more consistent reactor effluent composition. The average kinetic and equilibrium yield are unchanged. Incoloy has been identified as the preferred choice of material of construction for the hydrogenation reactor although certain metallurgical changes were noted in samples exposed to the H2/HCl atmosphere at 500 C which indicate the need for more testing.

Breneman, W. C.↗

Solar power satellite

The solar power satellite (SPS) concept, under evaluation by NASA since 1974, is discussed. A typical system providing a total of 10,000 MW of electrical power to the ground receiving stations is considered. Energy conversion systems, including the photovoltaic device category using single-crystal silicon cells, are taken into account, as are the 2.45-GHz microwave power-transmission link and the ground receiver (or rectenna). Concepts involving space construction of the satellite's large structures (5 x 25 km) are described, noting that a process similar to the familiar roll-forming of light sheet metal parts has been adapted to the space environment. Transportation vehicles are discussed, including the Space Shuttle planned to reach 60 flights per year by the mid 1980's. Electrical power forecasts and advanced systems cost projections are analyzed, together with a description of costs estimates. The indirect economics of energy research and development, and the present NASA/DOE SPS program are noted.

Davis, H. P.↗

Cost reductions in nickel-hydrogen battery

Significant progress was made toward the development of a commercially marketable hydrogen nickel oxide battery. The costs projected for this battery are remarkably low when one considers where the learning curve is for commercialization of this system. Further developmental efforts on this project are warranted as the H2/NiO battery is already cost competitive with other battery systems.

Beauchamp, Richard L.↗

Low-cost solar array structure development

Early studies of flat-plate arrays have projected costs on the order of $50/square meter for installed array support structures. This report describes an optimized low-cost frame-truss structure that is estimated to cost below $25/square meter, including all markups, shipping an installation. The structure utilizes a planar frame made of members formed from light-gauge galvanized steel sheet and is supposed in the field by treated-wood trusses that are partially buried in trenches. The buried trusses use the overburden soil to carry uplift wind loads and thus to obviate reinforced-concrete foundations. Details of the concept, including design rationale, fabrication and assembly experience, structural testing and fabrication drawings are included.

Wilson, A. H.↗

Cost, capability, and risk for planetary operations

The three key factors for flight projects - cost, capability, and risk - are examined with respect to their interplay, the uplink process, cost drivers, and risk factors. Scientific objectives are translated into a computer program during the uplink process, and examples are given relating to the Voyager Interstellar Mission, Galileo, and the Comet Rendezvous Asteroid Flyby. The development of a multimission sequence system based on these uplinks is described with reference to specific subsystems such as the pointer and the sequence generator. Operational cost drivers include mission, flight-system, and ground-system complexity, uplink traffic, and work force. Operational risks are listed in terms of the mission operations, the environment, and the mission facilities. The uplink process can be analyzed in terms of software development, and spacecraft operability is shown to be an important factor from the initial stages of spacecraft development.

Mclaughlin, William I.↗

Spacecraft platform cost estimating relationships

The three main cost areas of unmanned satellite development are discussed. The areas are identified as: (1) the spacecraft platform (SCP), (2) the payload or experiments, and (3) the postlaunch ground equipment and operations. The SCP normally accounts for over half of the total project cost and accurate estimates of SCP costs are required early in project planning as a basis for determining total project budget requirements. The development of single formula SCP cost estimating relationships (CER) from readily available data by statistical linear regression analysis is described. The advantages of single formula CER are presented.

Gruhl, W. M.↗

LSA Low-cost Solar Array project

The activities of the Low-Cost Silicon Solar Array Project during the period October through December, 1977 are reported. The LSSA Project is assigned responsibility for advancing silicon solar array technology while encouraging industry to reduce the price of arrays to a level at which photovoltaic electric power systems will be competitive with more conventional power sources early in the next decade. Set forth are the goals and plans with which the Project intends to accomplish this and the progress that was made during the quarter.

Source record↗

The influence of various test plans on mission reliability

Methods have been developed for the evaluation of cost effective vibroacoustic test plans for Shuttle Spacelab payloads. The shock and vibration environments of components have been statistically represented, and statistical decision theory has been used to evaluate the cost effectiveness of five basic test plans with structural test options for two of the plans. Component, subassembly, and payload testing have been performed for each plan along with calculations of optimum test levels and expected costs. The tests have been ranked according to both minimizing expected project costs and vibroacoustic reliability. It was found that optimum costs may vary up to $6 million with the lowest plan eliminating component testing and maintaining flight vibration reliability via subassembly tests at high acoustic levels.

Stahle, C. V.↗

FBI fingerprint identification automation study. AIDS 3 evaluation report. Volume 2: Technical feasibility

The results of this effort are presented in a manner for use by both the AIDS 3 Operational and Economic Feasibility subtasks as well as the Development of Alternative subtask. The approach taken was to identify the major functions that appear in AIDS 3 and then to determine which technologies would be needed for support. The technologies were then examined from the point of view of reliability, throughput, security, availability, cost and possible future trends. Whenever possible graphs are given to indicate projected costs of rapidly changing technologies.

Mulhall, B. D. L.↗

The 18/30 GHz fixed communications system service demand assessment. Volume 2: Main text

The total demand for communications services, and satellite transmission services at the 4/6 GHz, 12/14 GHz, and 18/30 GHz frequencies is assessed. The services are voice, video, and data services. Traffic demand, by service, is distributed by geographical regions, population density, and distance between serving points. Further distribution of traffic is made among four major end user groups: business, government, institutions and private individuals. A traffic demand analysis is performed on a typical metropolitan city to examine service distribution trends. The projected cost of C and Ku band satellite systems are compared on an individual service basis to projected terrestrial rates. Separation of traffic between transmission systems, including 18/30 GHz systems, is based on cost, user, and technical considerations.

Gabriszeski, T.↗

Ocean Thermal Energy Conversion (OTEC)

Energy Research and Development Administration research progress in Ocean Thermal Energy Conversion (OTEC) is outlined. The development program is being focused on cost effective heat exchangers; ammonia is generally used as the heat exchange fluid. Projected costs for energy production by OTEC vary between $1000 to $1700 per kW.

Lavi, A.↗

Shuttle payload vibroacoustic test plan evaluation

Statistical decision theory is used to evaluate seven alternate vibro-acoustic test plans for Space Shuttle payloads; test plans include component, subassembly and payload testing and combinations of component and assembly testing. The optimum test levels and the expected cost are determined for each test plan. By including all of the direct cost associated with each test plan and the probabilistic costs due to ground test and flight failures, the test plans which minimize project cost are determined. The lowest cost approach eliminates component testing and maintains flight vibration reliability by performing subassembly tests at a relatively high acoustic level.

Stahle, C. V.↗

Low cost solar array project 1: Silicon material

The low cost production of silicon by deposition of silicon from a hydrogen/chlorosilane mixture is described. Reactor design, reaction vessel support systems (physical support, power control and heaters, and temperature monitoring systems) and operation of the system are reviewed. Testing of four silicon deposition reactors is described, and test data and consequently derived data are given. An 18% conversion of trichlorosilane to silicon was achieved, but average conversion rates were lower than predicted due to incomplete removal of byproduct gases for recycling and silicon oxide/silicon polymer plugging of the gas outlet. Increasing the number of baffles inside the reaction vessel improved the conversion rate. Plans for further design and process improvements to correct the problems encountered are outlined.

Jewett, D. N.↗

Development of a high capacity bubble domain memory element and related epitaxial garnet materials for application in spacecraft data recorders. Item 1: Development of a high capacity memory element

Several versions of the 100K bit chip, which is configured as a single serial loop, were designed, fabricated and evaluated. Design and process modifications were introduced into each succeeding version to increase device performance and yield. At an intrinsic field rate of 150 KHz the final design operates from -10 C to +60 C with typical bias margins of 12 and 8 percent, respectively, for continuous operation. Asynchronous operation with first bit detection on start-up produces essentially the same margins over the temperature range. Cost projections made from fabrication yield runs on the 100K bit devices indicate that the memory element cost will be less than 10 millicents/bit in volume production.

Besser, P. J.↗