Successful Deployment of System for the Storage and Retrieval of Spent/Used Nuclear Fuel from Hanford K-West Fuel Storage Basin-13051

In 2012, a system was deployed to remove, transport, and interim store chemically reactive and highly radioactive sludge material from the Hanford Site's 105-K West Fuel Storage Basin that will be managed as spent/used nuclear fuel. The Knockout Pot (KOP) sludge in the 105-K West Basin was a legacy issue resulting from the spent nuclear fuel (SNF) washing process applied to 2200 metric tons of highly degraded fuel elements following long-term underwater storage. The washing process removed uranium metal and other non-uranium constituents that could pass through a screen with 0.25-inch openings; larger pieces are, by definition, SNF or fuel scrap. When originally retrieved, KOP sludge contained pieces of degraded uranium fuel ranging from 600 microns (μm) to 6350 μm mixed with inert material such as aluminum hydroxide, aluminum wire, and graphite in the same size range. In 2011, a system was developed, tested, successfully deployed and operated to pre-treat KOP sludge as part of 105-K West Basin cleanup. The pretreatment process successfully removed the vast majority of inert material from the KOP sludge stream and reduced the remaining volume of material by approximately 65 percent, down to approximately 50 liters of material requiring management as used fuel. The removal of inert material resulted in significant waste minimization and project cost savings because of the reduced number of transportation/storage containers and improvement in worker safety. The improvement in worker safety is a result of shorter operating times and reduced number of remote handled shipments to the site fuel storage facility. Additionally in 2011, technology development, final design, and cold testing was completed on the system to be used in processing and packaging the remaining KOP material for removal from the basin in much the same manner spent fuel was removed. This system was deployed and successfully operated from June through September 2012, to remove and package the last of the SNF fragments from the 105-K West Basin, ending the long and complex history of the KOP sludge materials. The planning and execution of this project demonstrated how the graded application of DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets[1], DOE-STD-1189-2008, Integration of Safety into the Design Process[2], and DOE G 413.3-4, U.S. Department of Energy Technology Readiness Assessment Guide[3], can positively affect the outcome of project implementation in the DOE Complex. Provided herein are relevant information, ideas, and tools for use by other projects facing similar issues in managing high risk waste streams in a complex regulatory environment. Positive aspects are also provided of appropriate time spent in detailed planning, design, and testing in non-hazardous environments to reduce project risks in both cost and safety performance, as well as improving confidence in meeting project goals through predictable and reliable performance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Industry Requirements for Geomagnetic Disturbance Models

This research project will address the most pressing uncertainties in modeling and measuring the electric power grid effects of geomagnetic disturbances (GMDs) and the E3 portion of nuclear electromagnetic pulse (EMP). The primary goal is to help decision-makers in the electric power sector have the knowledge and tools they need to most effectively mitigate GMD effects on our nation’s electric grid, with a secondary focus on EMP. Comprehensive modeling, model assessment through sensitivity analysis, and validation with field measurement data will be the primary tasks undertaken. The goal will be a more widespread adoption of these modeling approaches, namely characterizing the uncertainty associated with these models and how that uncertainty will affect decision-making by industry. This document summarizes industry requirements for better decision-making tools, informed by feedback from an industry advisory board. These requirements help guide planning and execution of the project's remaining tasks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Feedback from International Decommissioning Planning Projects - 20269

Decommissioning of Nuclear Power Plants is an increasing reality in many countries with nuclear power. Already many years before final shutdown, planning of the decommissioning work is usually started in order to understand for example the costs, waste volume capacity and licensing work needed. In many countries it is required to have a final decommissioning plan before any decommissioning work is allowed to start. Westinghouse has been involved in international decommissioning planning for more than 30 years, where the first 20 years was mostly funding and preliminary plans due to that decommissioning was many years away. However, as many more plants are now moving into decommissioning, the focus has shifted to final decommissioning plans with budgets instead of funding plans, strategic decisions instead of choices, waste volume specifications instead of estimates and a defined approach instead of what ifs. Westinghouse has developed a methodology based on the planning and execution of many decommissioning projects in Europe, America and Asia. That international experience and understanding helps the customers to adopt a systematic planning process where strategy development is done with the end state in mind, where the goals are clearly outlined and the starting point described. The process and steps to reach the desired end state need to be clearly defined and all options/alternatives evaluated from a cost/benefit point of view. This is followed by a thorough and quantitative risk analysis in order to give solid recommendations and credible conclusions. One important feedback has been that real decommissioning experience from reference projects is invaluable for an efficient and timely progress in order not to spend unnecessary time and effort on understanding the barriers and links between different activities in decommissioning. Skilled project managers or engineers can drive the project forward, but without decommissioning experience previously gained, valuable lessons learned are not used and the same mistakes can be made again. Many utilities have invested in knowledge transfer from other decommissioning projects through site visits, exchange programs and supplier meetings, which is a valuable asset and way of implementing lessons learned from performed decommissioning projects into the planning process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EGS Collab SIGMA-V Project: Stimulation Investigations for Geothermal Modeling Analysis and Validation Phase 1 Report. For the period February 2017 – March 2019

The EGS Collab project was initiated in March 2017 to enable the subsurface modelling and research community to establish validations against controlled, small-scale, in-situ experiments focused on rock fracture behavior and permeability enhancement. The EGS Collab project is to provide the opportunity for reservoir model prediction and validation, in coordination with in depth analysis of geophysical and other fracture characterization data with an ultimate goal of further elucidating the basic relationship between stress, seismicity and permeability enhancement. In addition, the project is to identify and quantify other key governing parameters that impact permeability as well as understanding how these parameters change throughout the three EGS development phases (identify/characterize site, create reservoir, operate power plant). The project is to use comprehensive instrumentation and data collection effort to inform baseline, predictive, and post stimulation reservoir modeling is essential. This report describes the activities performed in Phase 1 of the project. The work done to date is extensive, and a large number of participants have contributed significant effort to enable project success. From planning to execution, we have stayed on track to address the objectives established by the Department of Energy in the paragraph above.

15 GEOTHERMAL ENERGY↗

EGS Collab SIGMA-V Project: Stimulation Investigations for Geothermal Modeling Analysis and Validation: For the period February 2017 – March 2019 (Phase 1 Report)

The EGS Collab project was initiated in March 2017 to enable the subsurface modelling and research community to establish validations against controlled, small-scale, in-situ experiments focused on rock fracture behavior and permeability enhancement. The EGS Collab project is to provide the opportunity for reservoir model prediction and validation, in coordination with in depth analysis of geophysical and other fracture characterization data with an ultimate goal of further elucidating the basic relationship between stress, seismicity and permeability enhancement. In addition, the project is to identify and quantify other key governing parameters that impact permeability as well as understanding how these parameters change throughout the three EGS development phases (identify/characterize site, create reservoir, operate power plant). The project is to use comprehensive instrumentation and data collection effort to inform baseline, predictive, and post stimulation reservoir modeling is essential. This report describes the activities performed in Phase 1 of the project. The work done to date is extensive, and a large number of participants have contributed significant effort to enable project success. From planning to execution, we have stayed on track to address the objectives established by the Department of Energy in the paragraph above.

15 GEOTHERMAL ENERGY↗

Experimental Validation of a Spectral-Based Structural Analysis Model Implemented in the Design of the VolturnUS 6MW Floating Offshore Wind Turbine

The following work presents a spectral-based structural analysis method implemented in the design of the VolturnUS 6MW Floating Offshore Wind Turbine hull developed to increase system optimization. To begin, a description of the methodology is provided which details how transfer functions relate the hull's structural response to first order wave kinematics and wind turbine aerodynamics. Following the model definition, focus is placed on model validation using results from an experimental 1:52 scale model test of the VolturnUS system (shown in Fig. 1) conducted at the University of Maine's Alfond W2 Ocean Engineering Laboratory. Using data acquired from load cells installed at various locations in the hull the accuracy of the model is assessed through the use of power spectra and statistics. The performance of the structural model is considered over a range of environmental conditions representing design load cases prescribed by the American Bureau of Shipping for class certification of floating offshore wind turbines.

artificial intelligence, offshore projects plannin↗

Waste Management Project Success - Regulatory Assurance Systems - 20118

Waste management (WM) and remediation projects are essential within a restorative environmental culture. Despite years of experience, challenges and obstacles associated with efficient and effective WM project execution remain. Although some obstacles are project specific, a common challenge is navigating the regulatory landscape from planning through execution, particularly with first of a kind (FOAK) and first in a while (FIAW) projects. The absence of a comprehensive regulatory assurance strategy places significant hurdles in the path of project success. To clear a path for the successful execution of increasingly complex WM projects, this paper focuses on development of a comprehensive regulatory assurance strategy and implementation plan that effectively engages stakeholders, agencies, and performers to produce project plans that fully and cost effectively integrate applicable regulatory requirements. The most reliable way to align regulatory processes and decisions needed for mission success is through a regulatory assurance system. This system establishes a healthy interface with regulatory decision makers, to work in a collaborative manner, to create a common vision for regulatory decisions on an agreed upon schedule. A regulatory assurance system consists of several elements. Although the mission may vary from cleanup to site closure to nuclear component production, the elements of a regulatory assurance system remain essentially constant and must include: 1) identifying a common vision or end state, 2) developing a long-term, integrated strategy and schedule, 3) establishing a regulatory partnering team consisting of key decision-makers, 4) regular and frequent communication with decision-makers, 5) ensuring consistent surveillance for early identification of issues and changes that may impact the project, 6) quick resolution of emerging issues to prevent schedule impact, 7) identifying core compliance functions, 8) periodically assessing progress of the project as it relates to regulatory assurance and, 9) providing constructive feedback to improve the process. A regulatory assurance system provides a living, multi-faceted approach to planning, visioning, communicating and tracking to avoid surprises and ensure smooth and timely progress to the project. The overall success measures will be whether the system produces common sense regulatory decisions supporting the vision on time without appeal. Effective regulatory frameworks rarely happen on their own. Balanced, common-sense regulatory decisions stem from teams that are trained to work together to achieve shared goals. In this paper, particular attention is placed on the importance of starting with a shared vision for a regulatory assurance and execution strategy that leverages experience to establish optimal approaches. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

IDC Integrated Master Plan (V.1.0)

This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts.

Harris, James Mark↗

Preliminary Assessment of the Hanford Tank Waste Feed Acceptance and Product Qualification Programs

The U.S. Department of Energy Office of Environmental Management (EM) is engaging the national laboratories to provide the scientific and technological rigor to support EM program and project planning, technology development and deployment, project execution, and assessment of program outcomes. As an early demonstration of this new responsibility, Savannah River National Laboratory (SRNL) and Pacific Northwest National Laboratory (PNNL) have been chartered to implement a science and technology program addressing Hanford Tank waste feed acceptance and product qualification. As a first step, the laboratories examined the technical risks and uncertainties associated with the planned waste feed acceptance and qualification testing for Hanford tank wastes. Science and technology gaps were identified for work associated with 1) feed criteria development with emphasis on identifying the feed properties and the process requirements, 2) the Tank Waste Treatment and Immobilization Plant (WTP) process qualification program, and 3) the WTP HLW glass product qualification program. Opportunities for streamlining the accetpance and qualification programs were also considered in the gap assessment. Technical approaches to address the science and technology gaps and/or implement the opportunities were identified. These approaches will be further refined and developed as strong integrated teams of researchers from national laboratories, contractors, industry, and academia are brought together to provide the best science and technology solutions. Pursuing the identified approaches will have immediate and long-term benefits to DOE in reducing risks and uncertainties associated with tank waste removal and preparation, transfers from the tank farm to the WTP, processing within the WTP Pretreatment Facility, and in producing qualified HLW glass products. Additionally, implementation of the identified opportunities provides the potential for long-term cost savings given the anticipated facility life of WTP.

HLW glass product qualification↗

Decommissioning of the Reactor Pressure Vessels by Remote Controlled Thermal Cutting Segmentation Facilities of the ZION Nuclear Power Plant at ZION, USA - 16599

This paper presents the experiences for the segmentation of both reactor pressure vessels (RV) Units 1 and 2 at the ZION nuclear power plant. The Zion Station project was the first to use the large-scale application of thermal cutting (oxy-propane) technology in the USA. The elaborate planning and engineering was the basis for a quick, safe and flawless project execution without any aerosol migration or release of contamination. The used segmentation technology based on industry-tested methods with its big advantage of availability and spare parts inventory. For safeguarding Simulation (interfering edge analysis), animations and Trials with mock-ups dummies were executed prior. Also risk assessments and rescue concepts are part of the planning. Lean project organization for decommissioning and the flexibility, creativity, willingness to cooperate and willing for uninterrupted decisions of client and contractor are the essential basis for a successful project execution and a short project duration. The remote controlled segmentation of the RV of Unit 2 was performed in 3 month an in Unit 1 in less than 2 month.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) - Year 5 : Annual Report for FY 2008.

The Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) is a coordinated effort to improve the quality, consistency, and focus of fish population and habitat data to answer key monitoring and evaluation questions relevant to major decisions in the Columbia River Basin. CSMEP was initiated by the Columbia Basin Fish and Wildlife Authority (CBFWA) in October 2003. The project is funded by the Bonneville Power Administration (BPA) through the Northwest Power and Conservation Council's Fish and Wildlife Program (NPCC). CSMEP is a major effort of the federal state and Tribal fish and wildlife managers to develop regionally integrated monitoring and evaluation (M&E) across the Columbia River Basin. CSMEP has focused its work on five monitoring domains: status and trends monitoring of populations and action effectiveness monitoring of habitat, harvest, hatcheries, and the hydrosystem. CSMEP's specific goals are to: (1) interact with federal, state and tribal programmatic and technical entities responsible for M&E of fish and wildlife, to ensure that work plans developed and executed under this project are well integrated with ongoing work by these entities; (2) document, integrate, and make available existing monitoring data on listed salmon, steelhead, bull trout and other fish species of concern; (3) critically assess strengths and weaknesses of these data for answering key monitoring questions; and (4) collaboratively design, implement and evaluate improved M&E methods with other programmatic entities in the Pacific Northwest. During FY2008 CSMEP biologists continued their reviews of the strengths and weaknesses (S&W) of existing subbasin inventory data for addressing monitoring questions about population status and trends at different spatial and temporal scales. Work was focused on Lower Columbia Chinook and steelhead, Snake River fall Chinook, Upper Columbia Spring Chinook and steelhead, and Middle Columbia River Chinook and steelhead. These FY2008 data assessments and others assembled over the years of the CSMEP project can be accessed on the CBFWA public website. The CSMEP web database (http://csmep.streamnet.org/) houses metadata inventories from S&W assessments of Columbia River Basin watersheds that were completed prior to FY2008. These older S&W assessments are maintained by StreamNet, but budget cutbacks prevented us from adding the new FY2008 assessments into the database. Progress was made in FY2008 on CSMEP's goals of collaborative design of improved M&E methods. CSMEP convened two monitoring design workshops in Portland (December 5 and 6, 2007 and February 11 and 12, 2008) to continue exploration of how best to integrate the most robust features of existing M&E programs with new approaches. CSMEP continued to build on this information to develop improved designs and analytical tools for monitoring the status and trends of fish populations and the effectiveness of hatchery and hydrosystem recovery actions within the Columbia River Basin. CSMEP did not do any new work on habitat or harvest effectiveness monitoring designs in FY2008 due to budget cutbacks. CSMEP presented the results of the Snake Basin Pilot Study to the Independent Scientific Review Panel (ISRP) in Portland on December 7, 2008. This study is the finalization of CSMEP's pilot exercise of developing design alternatives across different M&E domains within the Snake River Basin spring/summer Chinook ESU. This work has been summarized in two linked reports (CSMEP 2007a and CSMEP 2007b). CSMEP participants presented many of the analyses developed for the Snake Basin Pilot work at the Western Division American Fisheries Society (AFS) conference in Portland on May 4 to 7, 2008. For the AFS conference CSMEP organized a symposium on regional monitoring and evaluation approaches. A presentation on CSMEP's Cost Integration Database Tool and Salmon Viability Monitoring Simulation Model developed for the Snake Basin Pilot Study was also given to the Pacific Northwest Aquatic monitoring Partnership (PNAMP) steering committee in Portland on August 28, 2008. Further information on CSMEP strengths and weaknesses assessments and monitoring design products for FY2008 is presented in the main text and appendices of this Annual Report as well as being available on CBFWA's public website.

13 HYDRO ENERGY↗

Preliminary Assessment of the Low-Temperature Waste Form Technology Coupled with Technetium Removal

The U.S. Department of Energy Office of Environmental Management (EM) is engaging the national laboratories to provide the scientific and technological rigor to support EM program and project planning, technology development and deployment, project execution, and assessment of program outcomes. As an early demonstration of this new responsibility, Pacific Northwest National Laboratory (PNNL) and Savannah River National Laboratory (SRNL) have been chartered to implement a science and technology program addressing low-temperature waste forms for immobilization of DOE aqueous waste streams, including technetium removal as an implementing technology. As a first step, the laboratories examined the technical risks and uncertainties associated with the Cast Stone waste immobilization projects at Hanford. Science and technology needs were identified for work associated with 1) conducting performance assessments and risk assessments of waste form and disposal system performance, and 2) technetium chemistry in tank wastes and separations of technetium from waste processing streams. Technical approaches to address the science and technology needs were identified and an initial sequencing priority was suggested. The following table summarizes the most significant science and technology needs and associated approaches to address those needs. These approaches and priorities will be further refined and developed as strong integrated teams of researchers from national laboratories, contractors, industry, and academia are brought together to provide the best science and technology solutions. Implementation of a science and technology program that addresses these needs by pursuing the identified approaches will have immediate benefits to DOE in reducing risks and uncertainties associated with near-term decisions regarding supplemental immobilization at Hanford. Longer term, the work has the potential for cost savings and for providing a strong technical foundation for future performance assessments at Hanford and across the DOE complex.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of the Cast Stone Low-Temperature Waste Form Technology Coupled with Technetium Removal - 14379

The U.S. Department of Energy Office of Environmental Management (EM) is engaging the national laboratories to provide the scientific and technological rigor to support EM program and project planning, technology development and deployment, project execution, and assessment of program outcomes. As an early demonstration of this new responsibility, Pacific Northwest National Laboratory (PNNL) and Savannah River National Laboratory (SRNL) were chartered to implement a science and technology program addressing low-temperature waste forms for immobilization of DOE aqueous waste streams, including technetium removal as an implementing technology. As a first step, the laboratories examined the technical risks and uncertainties associated with the Cast Stone waste immobilization and technetium removal projects at Hanford. Science and technology gaps were identified for work associated with 1) conducting performance assessments and risk assessments of waste form and disposal system performance, and 2) technetium chemistry in tank wastes and separation of technetium from waste processing streams. Technical approaches to address the science and technology gaps were identified and an initial sequencing priority was suggested. A subset of research was initiated in 2013 to begin addressing the most significant science and technology gaps. The purpose of this paper is to report progress made towards closing these gaps and provide notable highlights of results achieved to date.

Cast Stone Low-Temperature Waste Form Technology C↗

The DeepLynx Data Warehouse

Digital Engineering and the development of digital twins necessitate the use of highly sophisticated tools and software. These methodologies and systems bring many benefits but rely on accomplishing challenging goals such as disparate data and systems integration into a single cohesive and holistic system. Idaho National Laboratory has recently released an open-source data warehouse – DeepLynx – to help in the planning, creation, execution, and management of projects in the digital engineering space, with an emphasis on supporting digital twins in an operational space.

97 MATHEMATICS AND COMPUTING↗

FCIC Task X - Project Management and Consortium Overview

The objective of the FCIC Program Management Task is to provide scientific direction and leadership to the nine participating labs, and to provide robust project management to ensure robust operational planning and execution. The FCIC directly supports the BETO portfolio by focusing on feedstock variability across the bioenergy value chain, and the Project Management Task ensures the smooth operation of the FCIC, making sure that the 9 independent projects with different objectives have a common focus - understanding and mitigating the impacts of feedstock variability across the value chain.

bioenergy↗

University Coalition for Fossil Fuel Energy Research

Following a nationwide open competition, the University Coalition for Fossil Energy Research (UCFER) was established in October 2015 through a cooperative agreement between Penn State and the Department of Energy (DOE) National Energy Technology Laboratory (NETL). Penn State lead UCFER with the objective of advancing basic and applied research for clean and low-carbon energy based on fossil fuels in support of the DOE’s mission. UCFER focused on research that improves the efficiency of production and use of fossil energy resources, while minimizing the environmental impacts and reducing greenhouse gas emissions. Penn State lead a team of nine universities (Massachusetts Institute of Technology, The Pennsylvania State University, Princeton University, Texas A&M University, University of Kentucky, University of Southern California, The University of Tulsa, University of Wyoming, and Virginia Polytechnic and State University) during the competition stage, adding seven more universities in 2017 (Carnegie Mellon University, Louisiana State University, The Ohio State University, University of North Dakota, University of Pittsburgh, University of Utah, and West Virginia University). This Coalition exhibited a wide geographical distribution across the U.S. bringing a wide variety of fossil energy expertise. This national university alliance was a major collaborative effort with NETL to address specific topics of R&D in NETL’s mission area, which involved one or more of NETL’s five core competencies (Geologic and Environmental Systems, Materials Engineering and Manufacturing, Energy Conversion Engineering, Systems Engineering and Analysis, and Computational Science and Engineering). The first five to six months of the project was the definitization stage. During this period, Penn State worked closely with NETL to finalize the Coalition organizational structure and By- Laws, prepare a statement of substantial involvement and a statement of project objectives, and develop operations and membership plans. A major component of this stage included preparing an execution plan to solicit research, evaluate proposals, recommend selected projects to NETL, and award projects. In addition, a plan was prepared to monitor projects, review projects, disseminate knowledge from research projects and develop an online system for Coalition research portfolio management. This included developing a website and several databases. The first of six rounds of solicitations started in mid-2016. Projects from the sixth solicitation started February 1, 2021, and ended January 31, 2023. Projects that were selected represented twelve technology lines. Approximately $16.6 million in funding was available for the six solicitations. Most of the funding was provided by DOE, Office of Fossil Energy (DOEFE) with the DOE Fuel Cells Technologies Office (DOE-FCTO) providing funding for a few projects. Coalition universities submitted 259 proposals in response to the solicitations, requesting approximately $67.0 million in funding, and forty-three projects were selected. However, one project withdrew after the principal investigator left the university. The management of the Coalition projects was a major activity by Penn State. Managing the Coalition projects consisted of monitoring the projects, reviewing the projects through annual technical review meetings, disseminating knowledge from the research projects, and developing an online system for Coalition research portfolio management. Penn State’s OMT monitored projects to ensure that all milestones (technical, schedule, budget) were met, expenditures were allowable, cost share (when applicable) were reported, and all technical reports were submitted. The OMT also posted the technical reports electronically on a secure members-only website for access and review by the Coalition members. Disseminating knowledge from the research projects was done through a website, newsletters, various meetings, conferences, journal articles, publicity/press releases, and project summaries that were prepared after each project was completed. Penn State kept NETL apprised of UCFER progress through quarterly reports (thirtyone were submitted by Penn State), verbal and written communications, yearly updates at the annual technical review meetings, and cost accrual reports. The UCFER project had a significant impacty. The UCFER program established the first national university alliance in fossil energy research with a major collaboration effort with DOE NETL that addressed specific topics in NETL’s research and development mission areas. It generated inter-university collaborations, which was another program interest. Twenty-two out of 259 proposals contained collaborations (≈8.5%) and three of forty-two funded projects involved inter-university collaborations (≈7.0%). The forty-two funded projects provided support at fourteen universities involving 269 personnel. Research was conducted by 106 faculty, 115 graduate and undergraduate students, forty-six research staff and post-doctoral scholars, and two visiting scholars. Students and post-doctoral scholars were also on-site at NETL through CRADAs. In addition, non-Coalition participants included six universities and sixteen companies and national laboratories. The non-Coalition participants were involved as subcontractors, providers of cost share, performed unpaid consultation and sample analysis, served as advisory board members, or were providers of samples and materials for testing. UCFER also produced visibility in that fifty-six refereed journal articles were published, fifty-seven conference papers and twenty-three posters were prepared, 190 presentations were given, eight patent applications were filed, two books/book chapters were written, and ten software codes were developed. Collaboration between NETL and the individual projects was a major requirement for all funded projects. This included NETL staff time to support collaboration, consultation, technical guidance, sample preparation and analysis, internships at NETL, on-site testing and equipment usage by Coalition participants at NETL, co-mentoring students, and coauthoring journal articles and conference papers. Collaboration was impacted by COVID-19 in that not all on-site activities could be performed. NETL personnel were coauthors on eight of the conference papers (fourteen percent of the conference papers that were prepared) and seventeen of the journal articles (thirty percent of the journal articles that were prepared). A website was developed for an online proposal solicitation and review process and to provide exposure to UCFER. A website analysis highlighted the large amount of member and general public interest in UCFER by interpreting access statistics from March 2016 through June 2023. Visitors to the site originated from many different organizations, businesses, and countries. The website provided a means to disseminate information to both the general public and the UCFER members and was successfully used for outreach activities. In addition, NETL required that RFP release, proposal submission, and proposal reviews all be performed online. Penn State successfully developed these capabilities in a secure section of the website, which were used throughout the UCFER project. It is recognized that each project had its technical successes. In addition, highlighted successes were compiled and summarized from the research projects. Information was requested from the PIs of completed projects. In addition, Penn State’s Operations Management Team reviewed subcontract reports to identify project successes. Examples of information requested from PIs included (not all-inclusive): new projects that have been funded as a result of UCFER funding; new commercial products; establishment of a new center; new patent; new software; best paper awards; highly-cited work; and graduate student successes. A total of forty-eight highlighted successes were reported.

01 COAL, LIGNITE, AND PEAT↗

Long-Baseline Neutrino Experiment (LBNE)

The US department of energy approved the Mission Need (CD-0) for a long baseline neu trino experiment on January 8th 2010. This marked the official start of the LBNE project whose goal is to plan and execute the construction of a next generation neutrino experiment designed to measure neutrino oscillation parameters with a neutrino beam from Fermilab detected in a large detector a mile underground in the former Homestake mine in South Dakota.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Improved Performance of an Air Cooled Condenser (ACC) Using SPX Wind Guide Technology at Coal-Based Thermoelectric Power Plants

This project added a new airflow enhancement technology to an existing ACC cooling process at a selected coal power plant. Airflow parameters and efficiency improvement for the main plant cooling process using the applied technology were determined and compared with the capabilities of existing systems. The project required significant planning and pre-test execution in order to reach the required Air Cooled Condenser system configuration for evaluation. A host Power Plant ACC system had to be identified, agreement finalized, and addition of the SPX ACC Wind Guide Technology completed on that site. Design of the modification, along with procurement, fabrication, instrumentation, and installation of the new airflow enhancement technology were executed. Baseline and post-modification cooling system data was collected and evaluated. The improvement of ACC thermal performance after SPX wind guide installation was clear. Testing of the improvement indicates there is a 5% improvement in heat transfer coefficient in high wind conditions and 1% improvement at low wind speed. The benefit increased with increasing wind speed. This project was completed on schedule and within budget.

01 COAL, LIGNITE, AND PEAT↗