Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Resource Management in the Microgravity Science Division

In the Microgravity Science Division, the primary responsibilities of the Business Management Office are resource management and data collection. Resource management involves working with a budget to do a number of specific projects, while data collection involves collecting information such as the status of projects and workforce hours. This summer in the Business Management Office I assisted Margie Allen with resource planning and the implementation of specific microgravity projects. One of the main duties of a Project Control Specialists, such as my mentor, is to monitor and analyze project manager s financial plans. Project managers work from the bottom up to determine how much money their project will cost. They then set up a twelve month operating plan which shows when money will be spent. I assisted my mentor in checking for variances in her data against those of the project managers. In order to successfully check for those variances, we had to understand: where the project is including plans vs. actual performance, why it is in its present condition, and what the future impact will be based on known budgetary parameters. Our objective was to make sure that the plan, or estimated resources input, are a valid reflection of the actual cost. To help with my understanding of the process, over the course of my tenure I had to obtain skills in Microsoft Excel and Microsoft Access.

Casselle, Justine↗

Implementing Effective Mission Systems Engineering Practices During Early Project Formulation Phases

Developing and implementing a plan for a NASA space mission can be a complicated process. The needs, goals, and objectives of any proposed mission or technology must be assessed early in the Project Life Cycle. The key to successful development of a space mission or flight project is the inclusion of systems engineering in early project formulation, namely during Pre-phase A, Phase A, and Phase B of the NASA Project Life Cycle. When a space mission or new technology is in pre-development, or "pre-Formulation", feasibility must be determined based on cost, schedule, and risk. Inclusion of system engineering during project formulation is key because in addition to assessing feasibility, design concepts are developed and alternatives to design concepts are evaluated. Lack of systems engineering involvement early in the project formulation can result in increased risks later in the implementation and operations phases of the project. One proven method for effective systems engineering practice during the pre-Formulation Phase is the use of a mission conceptual design or technology development laboratory, such as the Mission Design Lab (MDL) at NASA's Goddard Space Flight Center (GSFC). This paper will review the engineering process practiced routinely in the MDL for successful mission or project development during the pre-Formulation Phase.

Processes↗

Status of the LCLS-II-HE Project at Jefferson Lab

The Linac Coherent Light Source II High Energy (LCLS-II-HE) upgrade at the SLAC National Accelerator Laboratory is being constructed in partnership with the Thomas Jefferson National Accelerator Facility (JLab) and the Fermi National Accelerator Laboratory (FNAL). The cryomodule production scope consists of the design, procurement, construction, and acceptance testing of 24 eight-cavity, 1.3 GHz cryomodules, as well as R&D activities necessary to develop the required technology. To achieve this, JLab and FNAL are also contributing to SLAC’s effort to develop the cavity recipe and production processes necessary to meet the LCLS-II-HE goal of 20.8 MV/m and average Q₀ of 2.7·10¹⁰. This paper details the JLab scope, focusing on the project initiation phase, in particular technology development and prototyping, project development and planning, and implementation of lessons learned from LCLS-II.

Wilson, K. M.↗

Status of ERDA-DOD applications plans

A demonstration program is reported that defines solar terrestrial photovoltaic systems as power sources for DOD applications by developing requirements and implementation plans for each demonstration project. Evaluation criteria emphasize military market potential and military advantages.

Dinger, D. B.↗

Planetary Protection at Marshall Space Flight Center

Planetary Protection (PP) at NASA aims to 1) protect solar system bodies from contamination by Earth life and 2) protect Earth from possible life forms that may be returned from other solar system bodies. It is particularly relevant for missions focused on life detection. PP specialists at MSFC act as subject matter experts to interpret PP requirements and communicate with other NASA centers and/or vendors to ensure compliance. This includes insight and oversight to help projects consider and plan PP implementation during design phases. It also includes physical implementation during build, assembly, and test operations, (i.e. microbial sampling of environments and spacecraft) to help maintain cleanliness. MSFC has also expanded to include PP research which included standing up a fully functional BSL2 microbiology laboratory.

Planetary Protection↗

Bridgeport Urban Development: Leveraging NASA Earth Observations and Sociodemographic Data to Assess Urban Heat Vulnerability and Inform Cool Corridors in Bridgeport, Connecticut

Urban environments face hotter temperatures than suburban and rural areas due to higher concentrations of impervious surfaces, heat-retaining buildings, and lack of green space. Bridgeport, Connecticut, which was formerly a national manufacturing hub, is now the densest and most populous city in the state. Bridgeport experiences hotter temperatures, exposing its residents to more extreme temperatures than the surrounding affluent suburbs. Extreme heat affects the health of those exposed to it and intensifies energy demands. Understanding temperature differences is the first step in effectively directing mitigation efforts. Our partner, Groundwork Bridgeport, along with the Yale Urban Design Workshop, are planning a “cool corridors” project, implementing cooling infrastructure to combat urban heat. We used Landsat 8 Thermal Infrared Sensor and Landsat 9 Thermal Infrared Sensor-2 data to conduct a Land Surface Temperature analysis in Google Earth Engine for the county of Fairfield. A Principal Component Analysis was performed to identify indicators of social vulnerability in Bridgeport. We used the SOlar and LongWave Environmental Irradiance Geometry model to identify felt heat on the block level to inform where the partner should locate their cooling interventions to ensure they are most effective and equitable. We focused on the East Side of Bridgeport, which we found was 10 degrees hotter than other areas of Bridgeport and the neighboring town of Fairfield. We integrated our findings using Earth observations and additional sociodemographic and climate data into final communication products for our partners which will facilitate their selection of candidate locations for their Cool Corridors project.

Silas Kirsch↗

Illinois Storage Corridor CarbonSAFE Phase III: Stakeholder Engagement and Outreach Plan

The Stakeholder Engagement and Outreach Plan provides a comprehensive framework for engaging stakeholders of the Illinois Storage Corridor (ISC) project. The ISC project is a CarbonSAFE Phase III project designed to facilitate commercial deployment of carbon capture, utilization, and storage (CCUS) in Illinois. The project aims to establish a multi-industry carbon storage corridor through development of storage sites near the One Earth Energy (OEE) ethanol production facility in north-central Illinois and the Prairie State Generating Company (PSGC) coal-fired power plant in south-central Illinois, with combined annual CO 2 capture ultimately exceeding 8.6 million tons per year. Stakeholder engagement is recognized as a critical component for successful CCUS deployment, alongside technical and economic considerations. As an emerging technology, CCUS may not be well understood by the general population, and lack of public awareness can lead to opposition that poses significant barriers to project development. This plan addresses this challenge through systematic stakeholder identification, analysis, planning, and implementation of engagement actions. The plan is structured around four main sections: Communication, Stakeholder Analysis, Stakeholder Engagement, and Environmental Justice. Activities will be conducted under Tasks 1 and 4 of the project's Statement of Project Objectives, with two key subtasks: (1) developing a stakeholder analysis and engagement plan through face-to-face meetings, facilitated discussions, and surveys; and (2) implementing stakeholder engagement and public outreach activities including meetings, open houses, and permit hearings. The Illinois State Geological Survey (ISGS) will manage engagement activities following DOE-NETL best practices, focusing on providing objective, fact-based information about CCUS and the ISC project. A comprehensive Communication Plan establishes protocols for media contacts, site visits, and crisis communications. The stakeholder analysis follows a structured workflow process divided into Pre-feasibility and Feasibility phases, incorporating contextual understanding, assessment, data collection, and analysis. Key stakeholder groups include government bodies, educational organizations, conservation and environmental groups, agricultural communities, and religious organizations. The plan addresses common stakeholder questions regarding project risks, benefits, safety, property values, liability, and environmental impacts. Recommendations emphasize developing clear messaging, creating informational materials, and preparing to address both project-specific and broader environmental concerns to ensure transparent communication and build stakeholder support throughout project implementation.

25 ENERGY STORAGE↗

Development and Implementation of A Small Satellite Systems Engineering Webinar Series: A Collaboration Between the United Nations Office for Outer Space Affairs and the National Aeronautics and Space Administration

The United Nations Office for Outer Space Affairs (UNOOSA) in collaboration with the National Aeronautics and Space Administration (NASA) established a webinar series on NASA systems engineering standards and practices for the purpose of sharing knowledge in this area. UNOOSA’s “Access to Space for All” initiative provides capacity-building opportunities in space science, technology, and space applications for United Nations member states. Due to the cooperation among established space actors, the United Nations, and emerging space entities, the initiative enables students from developing countries from all over the world to carry out projects using technologies and space applications. Through NASA’s Small Spacecraft Systems Virtual Institute (S3VI), the four-part webinar series was designed to cover basic systems engineering and project management skills that are fundamental to planning, developing, and implementing an experiment or a space project and that serve as critical knowledge for those engaged in space activities, whether as a designer, builder, or manager of space infrastructure and services. The first series of webinars was convened over the course of November 2023 through February 2024.

Systems Engineering↗

Improving Reliability and Maintainability (R&M) in Space Life Support

This paper considers how to improve the reliability and maintainability (R&M) of future NASA space life support systems. If these systems are procured under an industry contract, defining the R&M requirements would take precedence over providing technical guidance on designing the system. Imposing a specific R&M design could be over constraining. However, the mission may define the overall R&M approach, as the International Space Station (ISS) did by requiring Orbital Replacement Units (ORUs). Before defining the R&M requirements for the next mission, the life support research program should understand and plan the R&M approach. The recent NASA technical standard on R&M has moved away from requiring specific R&M activities during each of the traditional project phases to instead developing and planning to implement the R&M requirements to meet the top level project R&M objectives. The emphasis is on providing the evidence to show that the R&M requirements are met, rather than on conducting specific prescribed R&M activities. The technical standard on R&M defines a comprehensive hierarchy of specific R&M objectives and identifies particular strategies to implement them at each level. That is, the top level R&M objective is defined and then one or more design strategies to implement it are developed immediately, before the next lower objectives are defined and the strategies to achieve those are designed. This step-by-step, top-down approach is similar to the axiomatic design method. The objectives are the R&M requirements, and the strategies are the hardware designs or operations plans developed to meet these requirements. The new R&M process is aligned with the systems design process and helps ensure that the methods to meet the R&M requirements are built into the design.

Jones, Harry W.↗

The Galileo Delta-VEGA mission to Jupiter

Project Galileo is to perform a more comprehensive investigation of the Jupiter system than was possible with Voyager. The Galileo spacecraft consists of both a planetary Orbiter and an atmospheric entry Probe. In connection with budgetary considerations and schedule problems, plans concerning the implementation of the project were changed a number of times. For the first seven months of 1982, the project Galileo was baselined as a Delta-VEGA transfer to be launched in 1985 by the Space Shuttle using the U.S. Air Force two-stage IUS as the upper stage augmented by a spacecraft Injection Module. The new mission and systems aspects of this 1985 Galileo Delta-VEGA baseline are compared to the prior 1985 Centaur direct transfer baseline. The techniques developed to virtually restore all the mission science in spite of greatly reduced launch vehicle performance are discussed. In July 1982, the U.S. Government reinstated the Centaur development and stipulated that Galileo be launched by Shuttle/Centaur in 1986.

Oneil, W. J.↗

Upper Atmospheric Research Satellite (UARS) ground data system - The first operational data system for the Mission to Planet Earth

The initiation of the National Aeronautics and Space Administration (NASA) Mission to Planet Earth was realized with the activation of the Upper Atmosphere Research Satellite (LIARS) in mid-September 1991 following deployment from the Shuttle Transport System (STS) - 48. The UARS provides the first comprehensive study of the chemistry and dynamics of the upper atmosphere. The UARS ground data system provides the capabilities required to support upper atmospheric studies in a timely and flexible manner. The UARS ground data system policy and implementation plan incorporated by the UARS Project team provided the flexibility necessary to be able to respond to changing priorities and requirements and to permit the ground data system to evolve far beyond initial expectations. This paper describes the policies and plans in place during the initial design and implementation phases and provides an overview of the UARS ground data system. The paper then addresses the changing UARS ground data system design and implementation priorities, the early mission experiences instrumental in the achievement of higher than expected goals, and a brief look at the future for UARS, the first Mission to Planet Earth.

Herring, Ellen L.↗

Candidate functions for advanced technology implementation in the Columbus mission planning environment

The Columbus Project is the European Space Agency's contribution to the International Space Station program. Columbus is planned to consist of three elements (a laboratory module attached to the Space Station base, a man-tended freeflyer orbiting with the Space Station base, and a platform in polar orbit). System definition and requirements analysis for Columbus are underway, scheduled for completion in mid-1990. An overview of the Columbus mission planning environment and operations concept as currently defined is given, and some of the challenges presented to software maintainers and ground segment personnel during mission operators are identified. The use of advanced technologies in system implementation is being explored. Both advantages of such solutions and potential problems they present are discussed, and the next steps to be taken by Columbus before targeting any functions for advanced technology implementation are summarized. Several functions in the mission planning process were identified as candidates for advanced technology implementation. These range from expert interaction with Columbus' data bases through activity scheduling and near-real-time response to departures from the planned timeline. Each function is described, and its potential for advanced technology implementation briefly assessed.

Loomis, Audrey↗

Technology for the future - Long range planning for space technology development

NASA's Office of Aeronautics and Space Technology (OAST) has begun the definition of an Integrated Technology Plan for the civilian space program which guides long-term technology development for space platforms, in light of continuing marker research and other planning data. OAST has conferred particular responsibility for future candidate space mission evaluations and platform performance requirement projections to NASA-Langley. An implementation plan is devised which is amenable to periodic space-platform technology updates.

Collier, Lisa D.↗

Waste Management Project Success - Regulatory Assurance Systems - 20118

Waste management (WM) and remediation projects are essential within a restorative environmental culture. Despite years of experience, challenges and obstacles associated with efficient and effective WM project execution remain. Although some obstacles are project specific, a common challenge is navigating the regulatory landscape from planning through execution, particularly with first of a kind (FOAK) and first in a while (FIAW) projects. The absence of a comprehensive regulatory assurance strategy places significant hurdles in the path of project success. To clear a path for the successful execution of increasingly complex WM projects, this paper focuses on development of a comprehensive regulatory assurance strategy and implementation plan that effectively engages stakeholders, agencies, and performers to produce project plans that fully and cost effectively integrate applicable regulatory requirements. The most reliable way to align regulatory processes and decisions needed for mission success is through a regulatory assurance system. This system establishes a healthy interface with regulatory decision makers, to work in a collaborative manner, to create a common vision for regulatory decisions on an agreed upon schedule. A regulatory assurance system consists of several elements. Although the mission may vary from cleanup to site closure to nuclear component production, the elements of a regulatory assurance system remain essentially constant and must include: 1) identifying a common vision or end state, 2) developing a long-term, integrated strategy and schedule, 3) establishing a regulatory partnering team consisting of key decision-makers, 4) regular and frequent communication with decision-makers, 5) ensuring consistent surveillance for early identification of issues and changes that may impact the project, 6) quick resolution of emerging issues to prevent schedule impact, 7) identifying core compliance functions, 8) periodically assessing progress of the project as it relates to regulatory assurance and, 9) providing constructive feedback to improve the process. A regulatory assurance system provides a living, multi-faceted approach to planning, visioning, communicating and tracking to avoid surprises and ensure smooth and timely progress to the project. The overall success measures will be whether the system produces common sense regulatory decisions supporting the vision on time without appeal. Effective regulatory frameworks rarely happen on their own. Balanced, common-sense regulatory decisions stem from teams that are trained to work together to achieve shared goals. In this paper, particular attention is placed on the importance of starting with a shared vision for a regulatory assurance and execution strategy that leverages experience to establish optimal approaches. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Directions for NASA's Advanced Life Support Program

Advanced Life Support (ALS), an element of Human Systems Research and Technology s (HSRT) Life Support and Habitation Program (LSH), has been NASA s primary sponsor of life support research and technology development for the agency. Over its history, ALS sponsored tasks across a diverse set of institutions, including field centers, colleges and universities, industry, and governmental laboratories, resulting in numerous publications and scientific articles, patents and new technologies, as well as education and training for primary, secondary and graduate students, including minority serving institutions. Prior to the Vision for Space Exploration (VSE) announced on January 14th, 2004 by the President, ALS had been focused on research and technology development for long duration exploration missions, emphasizing closed-loop regenerative systems, including both biological and physicochemical. Taking a robust and flexible approach, ALS focused on capabilities to enable visits to multiple potential destinations beyond low Earth orbit. ALS developed requirements, reference missions, and assumptions upon which to structure and focus its development program. The VSE gave NASA a plan for steady human and robotic space exploration based on specific, achievable goals. Recently, the Exploration Systems Architecture Study (ESAS) was chartered by NASA s Administrator to determine the best exploration architecture and strategy to implement the Vision. The study identified key technologies required to enable and significantly enhance the reference exploration missions and to prioritize near-term and far-term technology investments. This technology assessment resulted in a revised Exploration Systems Mission Directorate (ESMD) technology investment plan. A set of new technology development projects were initiated as part of the plan s implementation, replacing tasks previously initiated under HSRT and its sister program, Exploration Systems Research and Technology (ESRT). The Exploration Life Support (ELS) Project, under the Exploration Technology Development Program, has recently been initiated to perform directed life support technology development in support of Constellation and the Crew Exploration Vehicle (CEV). ELS) has replaced ALS, with several major differences. Thermal Control Systems have been separated into a new stand alone project (Thermal Systems for Exploration Missions). Tasks in Advanced Food Technology have been relocated to the Human Research Program. Tasks in a new discipline area, Habitation Engineering, have been added. Research and technology development for capabilities required for longer duration stays on the Moon and Mars, including bioregenerative system, have been deferred.

Barta, Daniel J.↗

Enhanced Recovery Opportunities in the Appalachian Basin

The Midwest Regional Carbon Sequestration Partnership (MRCSP) has incorporated the work of geologic research teams (Geoteams) in its regional characterization, project planning and carbon dioxide (CO2) injection implementation work since the partnership was established by the U.S. Department of Energy (DOE) in 2003. Over this 16-year period, the cohort of Geoteams has grown from five to ten states and has contributed to the characterization of geologic sequestration opportunities, refinement of reservoir and seal data, and supported injection efforts through both predictive and post-injection assessments. The regional characterization work conducted by the Geoteams during the MRCSP Phase III project period (2010 – 2019) focused on the following tasks: (1) refinement of geologic seals/reservoir systems; (2) assessment of Atlantic Coastal Plain and offshore opportunities; (3) expanded assessments of oil and gas fields, particularly as they relate to enhanced recovery opportunities; (4) regional support for implementation of carbon capture utilization and storage (CCUS) in the partnership area; and (5) communication and data sharing. The findings of this work are summarized in the final report entitled Final Report of Geologic Carbon Capture Utilization and Storage Opportunities in the form of a state-by-state presentation for the MRCSP Region. In addition to the capstone deliverable mentioned above, the Geoteams have also prepared a series of topical reports to elaborate on specific geologic intervals and/or geographic areas of study completed during the Phase III project period. Specifically, these topical reports address: (1) the Atlantic Coastal Plain and adjacent offshore; (2) Cambro-Ordovician reservoirs/seals in the region; (3) enhanced oil and gas recovery opportunities in the Appalachian Basin; and (4) enhanced oil recovery (EOR) in the Michigan Basin. The remainder of this topical report presents our findings relative to enhanced recovery opportunities in the Appalachian Basin.

54 ENVIRONMENTAL SCIENCES↗

Technical Report Series on Global Modeling and Data Assimilation, Volume 41 : GDIS Workshop Report

The workshop "An International Global Drought Information System Workshop: Next Steps" was held on 10-13 December 2014 in Pasadena, California. The more than 60 participants from 15 countries spanned the drought research community and included select representatives from applications communities as well as providers of regional and global drought information products. The workshop was sponsored and supported by the US National Integrated Drought Information System (NIDIS) program, the World Climate Research Program (WCRP: GEWEX, CLIVAR), the World Meteorological Organization (WMO), the Group on Earth Observations (GEO), the European Commission Joint Research Centre (JRC), the US Climate Variability and Predictability (CLIVAR) program, and the US National Oceanic and Atmospheric Administration (NOAA) programs on Modeling, Analysis, Predictions and Projections (MAPP) and Climate Variability & Predictability (CVP). NASA/JPL hosted the workshop with logistical support provided by the GEWEX program office. The goal of the workshop was to build on past Global Drought Information System (GDIS) progress toward developing an experimental global drought information system. Specific goals were threefold: (i) to review recent research results focused on understanding drought mechanisms and their predictability on a wide range of time scales and to identify gaps in understanding that could be addressed by coordinated research; (ii) to help ensure that WRCP research priorities mesh with efforts to build capacity to address drought at the regional level; and (iii) to produce an implementation plan for a short duration pilot project to demonstrate current GDIS capabilities. See http://www.wcrp-climate.org/gdis-wkshp-2014-objectives for more information.

GEO↗