Techno-Economic Analysis of Photovoltaics and Battery Storage for Maine [Slides]

Maine GEO was interested in a small-scale pilot using REopt to expand on previous resilience efforts and better understand the most useful information to gather from facilities to maximize the efficacy of the analysis. The pilot began with identification of three pilot facilities from the existing Maine Community Resilience Partnership (MCRP) cohort, selection of the facilities prioritizing: social vulnerability, community led planning work and commitment to ongoing work. The technical assistance focused on working with identified facilities to help scope the project and identify their goals and then provide technical specifications on optimal energy generation and storage strategies for each community. At the conclusion of the project, participating facilities received a REopt analysis report, including optimal generation and storage strategies to address identified goals and next steps and considerations for implementation.

24 POWER TRANSMISSION AND DISTRIBUTION

Resilience Project Implementation Memo for the Town of Stowe, Vermont

This Resilience Project Implementation Process Memo was developed with and for the Town of Stowe Electric Department (SED) under the DOE C2C Expert Match Program. It is intended to outline the steps of a process, albeit nonlinear and iterative, to plan, design, and implement community resilience hubs.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Revitalizing Canton City Schools: A Sustainable and Cost-Effective Energy Efficiency Plan

The primary objective of this project was to focus on conducting the American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) Level 2 Energy Audits of all the schools/school facilities in the portfolio, and on developing a comprehensive Strategic Plan for implementing energy improvements. The overall aim of budget period 1 (BP1) was to implement Energy Audits and the Strategic Plan to provide a clear pathway to prioritize energy improvements as well as allow the district to access private sector funding (if needed) and/or tax credits and realize high-impact health and safety benefits for Budget Period 2.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

A Recipe for ABC Multifamily Retrofits: Technologies, Financing, and Project Delivery

This report documents the final technical accomplishments and outcomes of Rocky Mountain Institute’s project under the U.S. Department of Energy (DOE) Award DE-EE0009064. The project aimed to develop, validate, and scale whole building retrofit solutions for multifamily buildings, including two configurations of Integrated Mechanical System Pods (IMSP-C and IMSP-U), in alignment with DOE Advanced Building Construction (ABC) initiative's decarbonization and energy efficiency goals. While the project made significant progress in Budget Period 1 (Phase 1) and throughout Budget Period 2 (Phase 2), activities were discontinued as of March 26, 2025, following a Stop Work Order issued by DOE. As such, this report reflects all completed work through that date. The project did not enter Budget Periods 3 and 4 (Phase 2), and demonstration site implementation, field M&V, and final commercialization execution were not conducted.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Advanced-Research-on-Integrated-Energy-Systems-Based Analysis to Support Resilient System Upgrades: Energy to Communities Energyshed In-Depth Partnership with Molokai, Hawaii

The Molokai, Hawaii, Energy to Communities (E2C) Energyshed project represents a collaborative effort between the National Laboratory of the Rockies, Shake Energy Collaborative, the Molokai Clean Energy Hui, Sustainable Molokai, and Ho'ahu Energy Cooperative Molokai to advance Molokai's Community Energy Resilience Action Plan (CERAP). Supported by Hawaiian Electric Company and the Hawaii State Energy Office, the initiative aims to develop a community-defined portfolio of renewable energy solutions that enhance energy resilience while aligning with the Hawaiian Electric Integrated Grid Plan (IGP) and Molokai's energy goals. Phase 1 focused on technical analyses and community engagement to co-design feasible energy scenarios. Challenges such as grid upgrades, storage sizing, and inverter ride-through standards were addressed to align technical and operational requirements with community preferences. The project equips Molokai with actionable data and insights to implement energy initiatives while ensuring resilient and culturally informed solutions. Future efforts aim to finalize project designs, secure interconnection agreements, and deploy energy projects that reflect community priorities and technical feasibility.

24 POWER TRANSMISSION AND DISTRIBUTION

Performance Assurance Planning Guide for Utility Energy Service Contracts: 2025 Edition

Administered by the U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP), the Utility Program has fostered collaboration among federal agencies and their serving utilities for more than 25 years. The Utility Program supports agencies using Utility Energy Service Contracts (UESCs), a well-developed, effective contracting vehicle that enable the latest approaches to cost-effective energy management at federal sites. Federal agencies have successfully used UESCs to award over 2,000 energy and water efficiency and renewable energy projects, investing approximately $\$$2.8 billion in furthering the Federal Government's efforts to reduce energy intensity. Authorized by 42 U.S. Code section 8256 (10 U.S. Code section 2913 for the Department of Defense), a UESC is a limited-source acquisition between a federal agency and an eligible serving utility for energy management services that generate savings from the implementation of energy- and water -conservation measures (collectively referred to as ECMs), with 42 U.S. Code section 8287 (Defense Federal Acquisition Regulation Supplement, Part 241), providing the term of a UESC, which may extend up to 25 years. Through a UESC, the utility partner assesses designs, and implements the desired ECMs - which can range from lighting retrofits and renewable energy systems, to combined heat and power plants or other technologies and strategies, and may provide financing for the project. The agency may use any combination of appropriations and third-party financing to pay for the project, providing useful flexibility. There is no limit to the project size, big or small, that can be implemented using a UESC. To assist agencies implementing a UESC, FEMP has developed a Utility Energy Service Contract Guide and this companion guidance document to help agencies and their utility partners better understand the best practices for to ensure UESCs continue to perform and generate savings throughout their performance period. These best practices utilize a combination of effective project management, communication, documentation, and a detailed Performance Assurance Plan. This plan is a project specific set of actionable protocols that define important tasks and responsibilities throughout the contract term and reflects the site conditions, complexities, agency capabilities, and operating and maintaining planned ECMs.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Discrete versus continuous: Enhancing battery optimization in capacity expansion models

This study compares two battery modeling approaches for capacity expansion models: discrete-duration and continuous-duration formulations. In the discrete approach, battery duration is fixed, and power capacity is optimized. In the continuous approach, both power and energy capacities are decision variables, allowing storage duration to be optimized endogenously. Although both discrete-duration and continuous-duration battery formulations are used in long-term power system planning models, the literature has provided limited direct, systematic comparisons of their implications within a common modeling framework. To address this gap, this study implements both approaches in the Regional Energy Deployment System (ReEDS TM ) capacity expansion model using two resource adequacy methods, across a range of future system conditions, and with varying battery cost projections. Results show continuous-duration and high-resolution discrete approaches produce similar capacity expansion outcomes. The continuous formulation achieves faster runtimes compared to discrete-duration runs with many discrete-duration options. However, the discrete-duration approach allows users to choose to have limited fidelity for storage duration options, which in some cases can outperform the continuous formulation. The continuous formulation has the lowest overall system costs, indicating its ability to fine-tune storage duration to better meet specific system needs. This study's findings provide a side-by-side evaluation of discrete and continuous battery modeling approaches and offer guidance for improving the representation of real-world systems, flexibility, and computational efficiency for representing energy storage in long-term power system planning models.

25 ENERGY STORAGE

Financial Analysis of the Smallmouth Bass Flows implemented at the Glen Canyon Dam during 2025

The Glen Canyon Dam (GCD) is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The 2016 record of decision (ROD) for the GCD long-term experimental and management plan (LTEMP) final Environmental Impact Statement (EIS) specifies criteria for GCD monthly water releases, daily and hourly operating limits, and experimental releases.

Ploussard, Quentin [Argonne National Laboratory (A

CO2 Storage Economic Analysis: CarbonSAFE Use Case

Poster on “CO2 Storage Economic Analysis: CarbonSAFE Use Case” for the CCUS 2025 conference held in Houston, Texas March 3-5, 2025. The cost of designing, permitting, constructing, operating, and closing a CO2 storage project is of vital importance to project developers. The National Energy Technology Laboratory has developed the NRAP/SMART Technoeconomic and Liability Evaluation for Storage (TALES) Model to provide quantitative cost-based insights to support developers planning CO2 injection and storage projects. This study presents a collaborative economic analysis applying TALES with data from the San Juan Basin CarbonSAFE Phase III project led by the New Mexico Institute of Mining and Technology to estimate potential costs incurred during the implementation of a real-world commercial-scale carbon storage project. Scenario analysis was implemented in which different operational and cost attributes were varied and the associated cost implications observed. Key results data and project cost summary metrics, first-year breakeven price of CO2 ($/tonne) and net present value (NPV), are presented for base and alternative cases. Output provides a unique perspective for project stakeholders towards evaluating the influence of different operational strategies and financing approaches on overall project cost and financial viability.

carbon storage

WRPS Hanford Update [Slides]

The purpose of this report is to coordinate with the staff from WRPS, the current contract holder for operations at the Hanford site to better inform design decisions for the Autonomous systems for Hanford waste tank handling project. The project goals are to support risk reduction associated with monitoring, inspection and mapping of Hanford tank underground pits and includes: 1. A pit mock-up demonstration of Idaho National Laboratory’s (INL) Autonomous Pit Exploration System (APES) technology, which has two configurations: A. The Autonomous Robotic Arm, which is a proposed collaboration with Florida International University (FIU) and has capabilities to visually inspect, monitor, map and conduct simple tool manipulation tasks in the tank pits, and B. The robotic crawler configuration, which has capabilities to deploy to the bottom of the pits and conduct closer and bottom-up visual inspections. 2. An Implementation Plan that identifies Hanford site-wide application of the INL remote robotics technologies to enhance the performance of the tank farm systems and the characterization of the waste they contain to mitigate risk and optimize the overall waste mission. 3. A first-of-a-kind environmental digital twin will be produced. Digital twins to date require permanently installed sensors in order to produce asset specific predictions. This project will use the intermittent signals during inspections from deployed sensors on robotic systems to produce the data sets used by AI/ML to enable predictions of issues on tanks.

42 - ENGINEERING

Analysis of US Industrial Assessment Centers (IACs) implementation

Industrial energy assessments are a fundamental action toward developing a decarbonization strategy at any level. They provide an understanding of where energy efficiency opportunities exist and help to make informed business decisions about the costs and benefits of implementing sustainable policies and practices. This paper examines the effectiveness of the Department of Energy's Industrial Assessment Centers Program at providing useful energy-efficiency audits as well as the barriers faced by the program and plans for future growth and improvement. This paper presents an analysis of the program between 1981 and 2022, covering 20,290 industrial assessments and 151,198 recommendations, with $2.6 billion of recommended savings. The analysis includes a breakdown of the IAC recommendations and implemented projects based on both the industrial subsectors according to the Standard Industrial Classification code, energy type, and systems evaluated. The results include a 47 % implementation rate, a gap analysis to understand the missed opportunities, and a discussion about reasons for recommendation rejection. A comparison of the IAC Program with other country-level energy auditing or assessment programs was conducted, and suggestions for improving implementation rates were mentioned.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Physics-Based Limiter Redesign and Bit Performance Analysis at The Geysers

As part of a U.S. DOE Geothermal Technologies Office funding opportunity, Geysers Power Company, LLC (GPC), an indirect subsidiary of Calpine Corporation, partnered with Sandia National Labs, EGI at the University of Utah, and Texas A&M University to demonstrate increased drilling performance at The Geysers Geothermal Field. The performance target in the drilling demonstrations is at least a 25% improvement in rates of penetration, with increased footage on bottom for each bit coupled with increased bit life and time drilling. The project leverages advances in oil and gas drilling technologies including PDC bits, along with the physics-based limiter redesign techniques championed in drilling demonstrations conducted at the Utah FORGE geothermal site. The planned drilling demonstrations are being conducted as part of an existing drilling campaign intended to enhance reservoir utilization. The wells are typically drilled to the top of the reservoir with mud and then air-drilled to total depth (TD) through fractured zones at temperatures ≥ 450°F. A major goal of the project is to assess the effectiveness of implementing mechanical specific energy (MSE) and drilling dysfunction diagnosis and remediation in these challenging environments, as well as alternate rock reduction technologies. The first demonstration well has been completed, with 15 PDC bit runs in the 17.5”, 12.25” and 8.5” sections. Initial analysis shows ROP gains in all three sections, especially in the 17.5” and 12.25” sections, compared with conventional roller cone bit runs in the demonstration well and offset wells. However, in the 8.5” hole, wear and damage to the PDC bits resulted in relatively short bit runs. Analysis is underway to take advantage of the positive results and remediate the challenges. This paper provides updates on drilling activities conducted since the Phase 1 demonstration well at GDC-36 which was drilled from November 2023-January 2024. Additional analysis of the bit performance has been conducted. Furthermore, in subsequent wells drilled by GPC, PDC bits have been used extensively, building on the gains realized at GDC-36. GPC has continued to work with bit vendors to identify designs that last longer in the harsh, air-drilled 8.5” portions of the wells. Planning for the Phase 2 demonstration at Prati-44 is ongoing.

15 GEOTHERMAL ENERGY

DUNE Phase II: scientific opportunities, detector concepts, technological solutions

The international collaboration designing and constructing the Deep Underground Neutrino Experiment (DUNE) at the Long-Baseline Neutrino Facility (LBNF) has developed a two-phase strategy toward the implementation of this leading-edge, large-scale science project. The 2023 report of the US Particle Physics Project Prioritization Panel (P5) reaffirmed this vision and strongly endorsed DUNE Phase I and Phase II, as did the European Strategy for Particle Physics. While the construction of the DUNE Phase I is well underway, this White Paper focuses on DUNE Phase II planning. DUNE Phase-II consists of a third and fourth far detector (FD) module, an upgraded near detector complex, and an enhanced 2.1 MW beam. The fourth FD module is conceived as a “Module of Opportunity”, aimed at expanding the physics opportunities, in addition to supporting the core DUNE science program, with more advanced technologies. This document highlights the increased science opportunities offered by the DUNE Phase II near and far detectors, including long-baseline neutrino oscillation physics, neutrino astrophysics, and physics beyond the standard model. It describes the DUNE Phase II near and far detector technologies and detector design concepts that are currently under consideration. A summary of key R&D goals and prototyping phases needed to realize the Phase II detector technical designs is also provided. DUNE's Phase II detectors, along with the increased beam power, will complete the full scope of DUNE, enabling a multi-decadal program of groundbreaking science with neutrinos.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS

High-Resolution ESM Projections for Energy Applications Over the CONUS

Assessing energy resources under future scenarios requires high-resolution meteorological information that is physically consistent and suitable for regional-scale analysis. While Earth system model (ESM) projections provide valuable large-scale information, their coarse resolution and systematic biases limit direct applicability for energy system modeling and planning. In this study, we develop a high-resolution dynamical downscaling framework based on the Weather Research and Forecasting (WRF) model to translate global-scale ESM data into energy-relevant regional projections over the contiguous United States (CONUS). The framework identifies an optimized WRF configuration through numerical experiments and evaluates raw and bias-corrected ESM initial and boundary conditions, with soil moisture (SM) and soil temperature (ST) bias correction implemented as an integral part of the bias-corrected ESM forcing to improve land-atmosphere coupling prior to WRF dynamical downscaling. Using an optimized WRF configuration at 4-km resolution, we show that raw ESM forcing introduces systematic dry and cold soil biases that propagate into pronounced warm biases in near-surface air temperature and positive biases in solar irradiance, particularly during summer. Applying bias-corrected atmospheric forcing together with bias-corrected SM and ST substantially reduces these downstream biases and improves the surface energy balance and near-surface atmospheric fields. These results demonstrate that bias-aware treatment of initial conditions is critical for producing high-resolution downscaled projections suitable for energy system modeling and planning applications.

24 POWER TRANSMISSION AND DISTRIBUTION

Staying Current: A Community Readiness Framework for Marine Energy Applied to River Current Energy in Alaska

Marine energy-including wave, tidal, and river current energy-can provide a local energy source for rural and remote communities. Marine energy has the potential to bolster self-sufficiency and create economic opportunities while preserving ecological integrity. Communities may be interested in deploying, testing, and advancing these early-stage technologies to meet their needs. However, limited capacity, workforce constraints, and other barriers can challenge development. To better understand a community's interest in and preparedness for marine energy, we developed a suite of 150 'metrics of readiness.' Organized across seven categories-technical, social, environmental, strategic, governance, economic, financial-and 29 subcategories, the metrics provide a holistic perspective beyond the technical aspects of an energy device. We conducted a desktop application of the metrics of readiness for Igiugig, Alaska. The metrics were applied retrospectively for two points in time: before (2009) and after (2018) in-stream testing of a river current energy device. By documenting changes among categories and subcategories of the metrics, our results show the evolving nature of community readiness for river current energy. They also illustrate how our interdisciplinary framework captures the investment in environmental effects research and commitment to strategic planning that occurred in Igiugig. In future applications, we envision the framework could be used to foster public engagement in marine energy, collaborate with communities in project development, shape capacity building activities, prioritize investments, and inform research needs. While our study focuses on enabling river current energy in Alaska, the metrics of readiness have the potential to inform implementation of other renewable technologies with communities in new geographies.

13 HYDRO ENERGY

Solar Panel Installation at Goucher College

As part of our multi-phased sustainability initiative, Goucher College is implementing a series of necessary changes to become a model “green” campus. This comprehensive approach includes implementing systems designed to reduce energy consumption, water usage, and waste production by 2030. The first phase of this holistic endeavor is to develop two independent solar projects. One will be on the Facility Management Services building (FMS) and the other will be on the Central Utility Plan (CUP). The anticipated duration of this project is expected to be 24 months. When completed, the new photovoltaic panels (PVPs) and resulting solar array system will help offset campus energy consumption. The projects will also help the College achieve its goal of working towards operating primarily on renewable energy. During initial review of the project, it was revealed replacing the roofs prior to installing new PVPs would not only provide a sound structural foundation for the projects, but the new roofing systems will also aid de-carbonization. The project’s scope is divided between two buildings. Building A: FMS is the first building and Building B: CUP is the second building.

14 SOLAR ENERGY

Long-Term Evaluation of Remedial Technology Performance in the Laboratory: Multi-year Experimental Test Plan

An understanding of the long-term effectiveness of remediation technologies is central to sustainable environmental cleanup. Long-term experiments are valuable for reducing uncertainty and predicting remediation outcomes at scales required for regulatory compliance. However, these types of tests can be costly and challenging to interpret. Therefore, contaminated sites often rely on short-term laboratory experiments that may not account for the potentially significant effects of gradual, time- dependent processes governing contaminant retention, release, and species transformation. For example, short-term lab experiments (from months to a year) conducted with sediments from the unsaturated and saturated zones at the Hanford Site play an important role in initial evaluations of remediation technologies but cannot capture the full extent of time-dependent reactions, leaving uncertainties in field-scale deployment. Here, long-term testing will be conducted on select technologies based on their performance in short-term testing. The overall objective is to directly address the challenges described above by generating and analyzing data on long-term (2–10 years) efficacy of selected remediation technologies, integrating this understanding into models, and providing critical input for remediation planning, monitoring, and 5-year review cycles for field-implemented remedies. Specific objectives include: 1. Evaluating long-term efficiency of promising remedies under site-specific conditions. 2. Generating robust parameters for modeling, reducing uncertainty in predictive simulations. 3. Advancing integrated monitoring by combining geochemical and geophysical observations. 4. Informing field-scale implementation by incrementally advancing technologies, identifying failure mechanisms early, and prioritizing robust, cost-effective remedies. Through systematic evaluation of technologies in laboratory-scale column experiments, integrated monitoring, and modeling support, this project is designed to bolster confidence in the long-term robustness of selected technologies. The ultimate outcome is the identification and deployment of more reliable, cost-effective remedies that safeguard human health and the environment while reducing the uncertainties that have historically hindered cleanup progress at Hanford Site. An experimental approach was developed and initiated for long-term testing potentially up to 10 years. The table below summarizes the experimental approach developed for testing select technologies and presented in this multi-year experimental test plan.

54 ENVIRONMENTAL SCIENCES