NASA Space Flight Program and Project Management Handbook

This handbook is a companion to NPR 7120.5E, NASA Space Flight Program and Project Management Requirements and supports the implementation of the requirements by which NASA formulates and implements space flight programs and projects. Its focus is on what the program or project manager needs to know to accomplish the mission, but it also contains guidance that enhances the understanding of the high-level procedural requirements. (See Appendix C for NPR 7120.5E requirements with rationale.) As such, it starts with the same basic concepts but provides context, rationale, guidance, and a greater depth of detail for the fundamental principles of program and project management. This handbook also explores some of the nuances and implications of applying the procedural requirements, for example, how the Agency Baseline Commitment agreement evolves over time as a program or project moves through its life cycle.

Michael P Blythe

Dryden Flight Research Center Critical Chain Project Management Implementation

In Fiscal Year 2011 Dryden Flight Research Center (DFRC) implemented a new project management system called Critical Chain Project Management (CCPM). Recent NASA audits have found that the Dryden workforce is strained under increasing project demand and that multi-tasking has been carried to a whole new level at Dryden. It is very common to have an individual work on 10 different projects during a single pay period. Employee surveys taken at Dryden have identified work/life balance as the number one issue concerning employees. Further feedback from the employees indicated that project planning is the area needing the most improvement. In addition, employees have been encouraged to become more innovative, improve job skills, and seek ways to improve overall job efficiency. In order to deal with these challenges, DFRC management decided to adopt the CCPM system that is specifically designed to operate in a resource constrained multi-project environment. This paper will discuss in detail the rationale behind the selection of CCPM and the goals that will be achieved through this implementation. The paper will show how DFRC is tailoring the CCPM system to the flight research environment as well as laying out the implementation strategy. Results of the ongoing implementation will be discussed as well as change management challenges and organizational cultural changes. Finally this paper will present some recommendations on how this system could be used by selected NASA projects or centers.

Hines, Dennis O.

Toward an expert project management system

The purpose of the research effort is to prescribe a generic reusable shell that any project office can install and customize for the purposes of advising, guiding, and supporting project managers in that office. The prescribed shell is intended to provide both: a component that generates prescriptive guidance for project planning and monitoring activities, and an analogy (intuition) component that generates descriptive insights of previous experience of successful project managers. The latter component is especially significant in that it has the potential to: retrieve insights, not just data, and provide a vehicle for expert PMs to easily transcribe their current experiences in the course of each new project managed.

Silverman, Barry G.

Enhanced project management tool

A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.

Maluf, David A.

Software engineering project management - A state-of-the-art report

The management of software engineering projects in the aerospace industry was investigated. The survey assessed such features as contract type, specification preparation techniques, software documentation required by customers, planning and cost-estimating, quality control, the use of advanced program practices, software tools and test procedures, the education levels of project managers, programmers and analysts, work assignment, automatic software monitoring capabilities, design and coding reviews, production times, success rates, and organizational structure of the projects.

Thayer, R. H.

Project management tool

A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as a monthly report, a task plan report, a budget report and a risk management report, are generated and made available for display or further analysis. An extensible database allows searching for information based upon context and upon content.

Maluf, David A.

Building a Propulsion Experiment Project Management Environment

What do you get when you cross rocket scientists with computer geeks? It is an interactive, distributed computing web of tools and services providing a more productive environment for propulsion research and development. The Rocket Engine Advancement Program 2 (REAP2) project involves researchers at several institutions collaborating on propulsion experiments and modeling. In an effort to facilitate these collaborations among researchers at different locations and with different specializations, researchers at the Information Technology and Systems Center,' University of Alabama in Huntsville, are creating a prototype web-based interactive information system in support of propulsion research. This system, to be based on experience gained in creating similar systems for NASA Earth science field experiment campaigns such as the Convection and Moisture Experiments (CAMEX), will assist in the planning and analysis of model and experiment results across REAP2 participants. The initial version of the Propulsion Experiment Project Management Environment (PExPM) consists of a controlled-access web portal facilitating the drafting and sharing of working documents and publications. Interactive tools for building and searching an annotated bibliography of publications related to REAP2 research topics have been created to help organize and maintain the results of literature searches. Also work is underway, with some initial prototypes in place, for interactive project management tools allowing project managers to schedule experiment activities, track status and report on results. This paper describes current successes, plans, and expected challenges for this project.

Keiser, Ken

Space Research Project Management Can Benefit from Engineering Technology Selection Methods

Many engineering methods have been developed to help management select technology for a system design or further research. The simplest way to compare technologies is to use a checklist containing all the more or less important selection criteria, so that nothing is overlooked. The criteria usually include cost, safety, reliability and maintainability, and potential problems such as noise generation and microgravity sensitivity. The next step typically is to weight and score all the criteria. The process of weighting and scoring is helpful in bringing out different priorities and reaching a shared point of view. Group technology selection methods are designed to highlight initial disagreements and produce a shared consensus. Often a frank discussion led by management rather than decision analysts can be more effective. The final selection depends on management and engineering judgment and may include programmatic and organizational factors that are beyond the engineering checklist. The objective of engineering technology selection methods is to provide engineering information to assist management in making sound decisions. Project management and technology selection are assumed to use rational engineering analytic methods, but they often do not. The reason is that human insight, intuition, and “gut feel,” rather than logic, more frequently determine our decisions. Project selection and management are strongly influenced by nonrational psychological influences, which can produce unjustified confidence and determination. Nevertheless, there is a strong need for space projects to do rational project analysis and selection. Demonstrating a rational spirit is necessary for a scientific and technical organization. Professional ethics at its best requires an open, honest, and fair process, without damaging politics. Rational analysis can help improve good projects and avoid selecting bad ones. A sanity check using rational analysis guided by a checklist can help avoid egregious and damaging errors.

Jones, Harry W.

The PI-Mode of Project Management

The PI-Mode is NASA's new approach to project management. It responds to the Agency's new policy to develop scientific missions that deliver the highest quality science for a fixed cost. It also attempts to provide more research opportunities by reducing project development times and increasing the number of launches per year. In order to accomplish this, the Principal Investigator is placed at the helm of the project with full responsibility over all aspects of the mission, including instrument and spacecraft development, as well as mission operations and data analysis. This paper intends to study the PI-Mode to determine the strengths and weaknesses of such a new project management technique. It also presents an analysis of its possible impact on the scientific community and its relations with industry, NASA, and other institutions.

Isaac, Dan

A project management system for the X-29A flight test program

The project-management system developed for NASA's participation in the X-29A aircraft development program is characterized from a theoretical perspective, as an example of a system appropriate to advanced, highly integrated technology projects. System-control theory is applied to the analysis of classical project-management techniques and structures, which are found to be of closed-loop multivariable type; and the effects of increasing project complexity and integration are evaluated. The importance of information flow, sampling frequency, information holding, and delays is stressed. The X-29A system is developed in four stages: establishment of overall objectives and requirements, determination of information processes (block diagrams) definition of personnel functional roles and relationships, and development of a detailed work-breakdown structure. The resulting system is shown to require a greater information flow to management than conventional methods. Sample block diagrams are provided.

Stewart, J. F.

Issues in NASA program and project management

This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

Hoban, Francis T.

Issues in NASA program and project management

This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

Hoban, Francis T.

New challenges for Life Sciences flight project management

Scientists have conducted studies involving human spaceflight crews for over three decades. These studies have progressed from simple observations before and after each flight to sophisticated experiments during flights of several weeks up to several months. The findings from these experiments are available in the scientific literature. Management of these flight experiments has grown into a system fashioned from the Apollo Program style, focusing on budgeting, scheduling and allocation of human and material resources. While these areas remain important to the future, the International Space Station (ISS) requires that the Life Sciences spaceflight experiments expand the existing project management methodology. The use of telescience with state-the-art information technology and the multi-national crews and investigators challenges the former management processes. Actually conducting experiments on board the ISS will be an enormous undertaking and International Agreements and Working Groups will be essential in giving guidance to the flight project management Teams forged in this matrix environment must be competent to make decisions and qualified to work with the array of engineers, scientists, and the spaceflight crews. In order to undertake this complex task, data systems not previously used for these purposes must be adapted so that the investigators and the project management personnel can all share in important information as soon as it is available. The utilization of telescience and distributed experiment operations will allow the investigator to remain involved in their experiment as well as to understand the numerous issues faced by other elements of the program The complexity in formation and management of project teams will be a new kind of challenge for international science programs. Meeting that challenge is essential to assure success of the International Space Station as a laboratory in space.

NASA Discipline General Space Life Sciences

Issues in NASA program and project management. Special Report: 1993 conference

This volume is the seventh in an ongoing series on aerospace project management at NASA. Articles in this volume cover the 1993 Conference: perspectives in NASA program/project management; the best job in aerospace; improvements in project management at NASA; strategic planning...mapping the way to NASA's future; new NASA procurement initiatives; international cooperation; and industry, government and university partnership. A section on resources for NASA managers rounds out the publication.

Hoffman, ED

Project Management in NASA: The system and the men

An analytical description of the NASA project management system is presented with emphasis on the human element. The NASA concept of project management, program managers, and the problems and strengths of the NASA system are discussed.

Pontious, R. H.

Was Project Management Life Really Better in Apollo?

This slide presentation discusses the question of "Was Project Management Life Really Better in Apollo?" Was money really flowing freely all through Apollo? Are we wallowing in nostalgia and comparing current circumstances to a managerial time which did not exist? This talk discusses these and other questions as background for you as today s project managers. There are slides showing the timelines from before the speech that Kennedy gave promising to land a man on the moon, to the early 60's, when the manned space center prepared the preliminary lunar landing mission design, an NASA organization chart from 1970, various photos of the rockets, and the astronauts are presented. The next slides discuss the budgets from the 1960's to the early 1970's. Also the results of a survey of 62 managers, who were asked "What problems pose the greatest obstacles to successful project performance?"

Source record

Space Program Advocacy Can Distort Project Management and Damage Systems Engineering

Over-optimistic project advocacy often causes exaggerated performance claims and underestimated costs and schedules. This can distort project management and damage systems engineering. NASA projects such as the space shuttle and Hubble are extreme examples. NASA's spectacular success in the Apollo moon landings seems to have produced overconfidence and carelessness, but also to have gained tolerance for unrealistic claims and forgiveness when they were proven wrong. Apollo risk analysis predicted many astronaut fatalities. This was believed but was potentially damaging to the Apollo program, so risk analysis was discontinued. The moon landings beat bad odds because Apollo obsessively reduced risk. Its success seemed to confirm that risk analysis was unreasonably pessimistic and that risk could be overcome by good engineering. This understanding caused risk to be increased during space shuttle engineering and led to an unnecessarily dangerous approach. The shuttle design placed a fragile spacecraft next to the fuel tanks and failed to provide crew escape or launch abort. These design decisions directly caused the Challenger and Columbia tragedies. After Challenger, risk analysis was re-established. The current rocket and capsule design does consider risk and the result strongly resembles Apollo. Apollo advocacy led NASA to abandon risk analysis and this was ultimate cause of the Shuttle tragedies. Excessive advocacy that distorts risk, cost, and schedule could be prevented in an ideal organization that used systems engineering to make rational and fair decisions. However, most real organizations accommodate human and group needs using informal methods often described as "the system." Humans have biases, use innate decision making heuristics, instinctively rely on "gut feel," and establish deviant groups through groupthink. Expecting organizations to become totally rational is impractical, but specific problems such as neglecting risk and underestimating cost and schedule can be directly challenged with some hope of success.

Jones, Harry W.

Issues in NASA program and project management. Special report: 1995 conference

This volume is the tenth in an ongoing series on aerospace project management at NASA. Articles in this volume cover the 1996 Conference as follows: international partnerships; industry/interagency collaboration; technology transfer; and project management development process. A section on resources for NASA managers rounds out the publication.

Hoffman, Edward J.