Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

BETO 2021 Peer Review - Task X- Project Management

This presentation serves as the peer review requirement for FCIC Task X. It covers structure, approach, impact, and accomplishments. The project will be scored by a peer review panel based on the presentation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Job Life Cycle Management Libraries for CMS Workflow Management Projects

Scientific analysis and simulation requires the processing and generation of millions of data samples. These tasks are often comprised of multiple smaller tasks divided over multiple (computing) sites. This paper discusses the Compact Muon Solenoi d (CMS) workflow infrastructure, and specifically the Python based workflow library which is used for so called task lifecycle management. The CMS workflow infrastructure consists of three layers: high level specification of the various tasks based on inp ut/output data sets, life cycle management of task instances derived from the high level specification and execution management. The workflow library is the result of a convergence of three CMS sub projects that respectively deal with scientific analysis, simulation and real time data aggregation from the experiment. This will reduce duplication and hence development and maintenance costs.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Project Management Plan/Progress Report: UT/GTKS Training Program Development for Commercial Building Operators (Final Report)

Universidad del Turabo (UT), in a collaborative effort with Global Turn Key Services, Inc. (GTKS), proposed to develop a training program and a commercialization plan for the development of Commercial Building Operators (CBOs). The CBOs will operate energy efficient buildings to help maintain existing buildings up to their optimal energy performance level, and ensure that net-zero-energy buildings continuously operate at design specifications, thus helping achieve progress towards meeting BTP Strategic Goals of creating technologies and design approaches that enable net-zero-energy buildings at low incremental costs by 2025. The proposed objectives were then: (1) Develop a Commercial Building Operator (CBO) training program and accreditation that will in turn provide a certification to participants recognized by Accreditation Boards such as the North American Board of Certified Energy Practitioners (NABCEP) and Leadership in Energy & Environmental Designs (LEED). (2) Develop and implement a commercialization and sustainability plan that details marketing, deployment, financial characterization, job placement, and other goals required for long-term sustainability of the project after the funding period. (3) After program development and deployment, provide potential candidates with the knowledge and skill sets to obtain employment in the commercial building green energy (net-zero-energy building) job market. The developed CBO training program will focus on providing skills for participants, such as displaced and unemployed workers, to enter the commercial building green energy (net-zeroenergy building) job market. This course was designed to allow a participant with minimal to no experience in commercial building green technology to obtain the required skill sets to enter the job market in as little as 12 weeks of intensive multi-faceted learning. After completion of the course, the CBO staff concluded the participant will meet minimum established accreditation standards established by UT and will complete the contact hours required of training to apply to the Certification on Energy Management (CEM) offered by the Association of Energy Engineers (AEE). The CBO training program consists of a combination of theory (classroom), online & computer simulation, laboratory & hands on (onsite) training lessons. The training is addressed four basic learning elements: (1) Learn the Technology; (2) Practice Skills with hands-on the Energy Simulation Builder program; (3) Final Project and Presentation; and, (4) Accreditation and Certifications.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Lightweight Agile Process for Project Management

This document provides examples of a complete ”scrum” process for two different kinds of teams. No matter which team type you are, it is the scrum master’s job to make sure the team is functioning well. The scrum master must be flexible and able to handle a range of situations, adapting the meeting process to the situation at hand. This handout is meant to give teams a starting place to develop their own process and is based off of two teams I am currently working with as scrum master. Names have been changed to protect the not so innocent.

99 GENERAL AND MISCELLANEOUS↗

Agile Project Management for Research Software [Slides]

Scrum is an agile process that allows us to focus on delivering the highest business value in the shortest time. It allows us to rapidly and repeatedly inspect actual working software (every two weeks to one month). The business sets the priorities. Teams self-organize to determine the best way to deliver the highest priority features. Every two weeks to a month anyone can see real working software and decide to release it as is or continue to enhance it for another sprint.

97 MATHEMATICS AND COMPUTING↗

NEAMS Reactor Physics Project Management and Coordination Activities

The following report summarizes the coordination activities and collaboration efforts by research staff at Oak Ridge National Laboratory, Idaho National Laboratory, and Argonne National Laboratory for the development of Shift and Griffin computer codes under the US Department of Energy’s Nuclear Energy Advanced Modeling and Simulation program.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

CASL Enterprise Project Management (EPM) Tool, a Unified PM Platform

The Consortium for Advanced Simulation of Light Water Reactors (CASL) applies existing modeling and simulation (M&S) capabilities and develops advanced capabilities to create a usable environment for predictive simulation of light water reactors (LWRs). This environment, designated the Virtual Environment for Reactor Applications (VERA), incorporates science based models, state of the art numerical methods, multi physics integrated solutions, modern computational science and engineering practices, and uncertainty quantification (UQ). Ongoing validation of VERA relies upon data from operating pressurized water reactors (PWRs), single effect experiments, and integral tests. VERA will be designed for implementation on current desktop computers, capacity platforms (e.g., clusters), and the engineering workstations of the future. Selected components will also be capable of executing on current U.S. Department of Energy (DOE) capability and leadership class high performance computer (HPC) systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗