Managers Handbook for Software Development

Methods and aids for the management of software development projects are presented. The recommendations are based on analyses and experiences with flight dynamics software development. The management aspects of organizing the project, producing a development plan, estimation costs, scheduling, staffing, preparing deliverable documents, using management tools, monitoring the project, conducting reviews, auditing, testing, and certifying are described.

Agresti, W.↗

Manager's handbook for software development, revision 1

Methods and aids for the management of software development projects are presented. The recommendations are based on analyses and experiences of the Software Engineering Laboratory (SEL) with flight dynamics software development. The management aspects of the following subjects are described: organizing the project, producing a development plan, estimating costs, scheduling, staffing, preparing deliverable documents, using management tools, monitoring the project, conducting reviews, auditing, testing, and certifying.

Source record↗

Pipeline for Integrated Projects in Energy Systems (PIPES): A Tool for Integrated System Planning [Slides]

The Pipeline for Integrated Projects in Energy Systems (PIPES) is a comprehensive project, data, and workflow management tool designed for integrated modeling teams. PIPES facilitates the management of data requirements, tasks, and progress tracking, serving as a higher-level integration layer that works across various data and modeling software. This tool integrates models, data, and tools to perform large-scale, integrated analysis work at scale. PIPES is designed to streamline integrated modeling projects, enhance collaboration, and ensure the quality and efficiency of data management and workflow processes. This presentation introduces PIPES a multi-model tool for integrated system planning; it describes the underlying architecture, deep dives into common user workflows, and outlines the upcoming development roadmap beyond its current alpha state.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Georgetown University – SYSM 5630 Systems Integration Verification and Validation : Todd Noste

At Lawrence Livermore National Laboratory in the National Ignition Facility Optics Group, we use the systems engineering approach for project management and as a design tool. Systems engineering is used in a graded approach to design and project management that is based on risk, informing how much rigor to apply. The tools and techniques from systems engineering offer a framework to organize projects with everyone speaking the same language to provide consistent and repeatable project success that satisfies the stakeholders’ needs and meets the mission. The classes have provided a framework with tools for communicating system design, requirements, verification and validation, and an operational context.

42 ENGINEERING↗

Performance Management: Should We Manage to a Single Data Point? A NASA/Goddard Space Flight Center Perspective

With today's changing environment, meeting project commitments can be challenging. The Flight Projects Directorate at NASA's Goddard Space Flight Center (GSFC) has a portfolio of over 60 missions in various stages of the space flight life cycle. Numerous methods and approaches are used to monitor and track project performance and utilization of tools can provide valuable information to help manage missions. However, challenges can arise when these approaches are viewed as the sole data point for assessing the project status. At GSFC, performance management metric-based tools have provided insightful information for evaluating the programmatic health of space projects. These tools have provided the awareness and foresight desired to effectively manage and meet commitments, which is tremendously beneficial on the road to achieving mission success.

Peters, Wanda↗

Aerospace Power Systems Design and Analysis (APSDA) Tool

The conceptual design of space and/or planetary electrical power systems has required considerable effort. Traditionally, in the early stages of the design cycle (conceptual design), the researchers have had to thoroughly study and analyze tradeoffs between system components, hardware architectures, and operating parameters (such as frequencies) to optimize system mass, efficiency, reliability, and cost. This process could take anywhere from several months to several years (as for the former Space Station Freedom), depending on the scale of the system. Although there are many sophisticated commercial software design tools for personal computers (PC's), none of them can support or provide total system design. To meet this need, researchers at the NASA Lewis Research Center cooperated with Professor George Kusic from the University of Pittsburgh to develop a new tool to help project managers and design engineers choose the best system parameters as quickly as possible in the early design stages (in days instead of months). It is called the Aerospace Power Systems Design and Analysis (APSDA) Tool. By using this tool, users can obtain desirable system design and operating parameters such as system weight, electrical distribution efficiency, bus power, and electrical load schedule. With APSDA, a large-scale specific power system was designed in a matter of days. It is an excellent tool to help designers make tradeoffs between system components, hardware architectures, and operation parameters in the early stages of the design cycle. user interface. It operates on any PC running the MS-DOS (Microsoft Corp.) operating system, version 5.0 or later. A color monitor (EGA or VGA) and two-button mouse are required. The APSDA tool was presented at the 30th Intersociety Energy Conversion Engineering Conference (IECEC) and is being beta tested at several NASA centers. Beta test packages are available for evaluation by contacting the author.

Truong, Long V.↗

Increases in Efficiency and Enhancements to the Mars Observer Non-stored Commanding Process

The Mars Observer team was, until the untimely loss of the spacecraft on August 21, 1993, performing flight operations with greater efficiency and speed than any previous JPL mission of its size. This level of through-put was made possible by a Mission Operations System which was composed of skilled personnel using sophisticated sequencing and commanding tools. During cruise flight operations, however, it was realized by the project that this commanding level was not going to be sufficient to support the activities planned for the mapping operations. The project had committed to providing the science instrument principle investigators with a much higher level of commanding during mapping. Thus, the project began taking steps to enhance the capabilities of the flight team. One mechanism used by project management was a tool available from Total Quality Management (TQM). This tool is known as a Process Action Team (PAT). The Mars Observer PAT was tasked to increase the capacity of the flight team's non-stored commanding process by fifty percent with no increase in staffing and a minimal increase in risk. The outcome of this effort was to, in fact, increase the capacity by a factor of 2.5 rather than the desired fifty percent and actually reduce risk. The majority of these improvements came from the automation of the existing command process. The results required very few changes to the existing mission operations system. Rather, the PAT was able to take advantage of automation capabilities inherent in the existing system and make changes to the existing flight team procedures. This paper will describe in detail the enhancements recommended by the PAT for the non-stored command generation process on Mars Observer. This will be contrasted with the process used by the flight team prior to implementation of these improvements. Finally, there will be a discussion of the applicability of the techniques devised by the PAT for enhancement of the non-stored command process to present and future projects.

Process↗

Application of ESE Data and Tools to Air Quality Management: Services for Helping the Air Quality Community use ESE Data (SHAirED)

The goal of this REASoN applications and technology project is to deliver and use Earth Science Enterprise (ESE) data and tools in support of air quality management. Its scope falls within the domain of air quality management and aims to develop a federated air quality information sharing network that includes data from NASA, EPA, US States and others. Project goals were achieved through a access of satellite and ground observation data, web services information technology, interoperability standards, and air quality community collaboration. In contributing to a network of NASA ESE data in support of particulate air quality management, the project will develop access to distributed data, build Web infrastructure, and create tools for data processing and analysis. The key technologies used in the project include emerging web services for developing self describing and modular data access and processing tools, and service oriented architecture for chaining web services together to assemble customized air quality management applications. The technology and tools required for this project were developed within DataFed.net, a shared infrastructure that supports collaborative atmospheric data sharing and processing web services. Much of the collaboration was facilitated through community interactions through the Federation of Earth Science Information Partners (ESIP) Air Quality Workgroup. The main activities during the project that successfully advanced DataFed, enabled air quality applications and established community-oriented infrastructures were: develop access to distributed data (surface and satellite), build Web infrastructure to support data access, processing and analysis create tools for data processing and analysis foster air quality community collaboration and interoperability.

Falke, Stefan↗

Increases in efficiency and enhancements to the Mars Observer non-stored commanding process

The Mars Observer team was, until the untimely loss of the spacecraft on August 21, 1993, performing flight operations with greater efficiency and speed than any previous JPL mission of its size. This level of through-put was made possible by a mission operations system which was composed of skilled personnel using sophisticated sequencing and commanding tools. During cruise flight operations, however, it was realized by the project that this commanding level was not going to be sufficient to support the activities planned for mapping operations. The project had committed to providing the science instrument principle investigators with a much higher level of commanding during mapping. Thus, the project began taking steps to enhance the capabilities of the flight team. One mechanism used by project management was a tool available from total quality management (TQM). This tool is known as a process action team (PAT). The Mars Observer PAT was tasked to increase the capacity of the flight team's nonstored commanding process by fifty percent with no increase in staffing and a minimal increase in risk. The outcome of this effort was, in fact, to increase the capacity by a factor of 2.5 rather than the desired fifty percent and actually reduce risk. The majority of these improvements came from the automation of the existing command process. These results required very few changes to the existing mission operations system. Rather, the PAT was able to take advantage of automation capabilities inherent in the existing system and make changes to the existing flight team procedures.

Brooks, Robert N., Jr.↗

Planning and scheduling for success

Planning and scheduling programs are excellent management tools when properly introduced to the project management team and regularly maintained. Communications, creativity, flexibility and accuracy are substantially improved by following a simple set of rules. A planning and scheduling program will work for you if you believe in it, make others in your project team realize its benefits, and make it an extension of your project cost control philosophy.

Manzanera, Ignacio↗

Demonstrating and Evaluating an Action Learning Approach to Building Project Management Competence

This paper contributes a description of an action-learning approach to building project management competence. This approach was designed, implemented, and evaluated for use with the Dynacs Engineering Development Contract at the Kennedy Space Center. The aim of the approach was to improve three levels of competence within the organization: individual project management skills, project team performance. and organizational capabilities such as the project management process and tools. The overall steps to the approach, evaluation results, and lessons learned are presented. Managers can use this paper to design a specific action-learning approach for their organization.

Kotnour, Tim↗

Performance measurement: A tool for program control

Performance measurement is a management tool for planning, monitoring, and controlling as aspects of program and project management--cost, schedule, and technical requirements. It is a means (concept and approach) to a desired end (effective program planning and control). To reach the desired end, however, performance measurement must be applied and used appropriately, with full knowledge and recognition of its power and of its limitations--what it can and cannot do for the project manager. What is the potential of this management tool? What does performance measurement do that a traditional plan vs. actual technique cannot do? Performance measurement provides an improvement over the customary comparison of how much money was spent (actual cost) vs. how much was planned to be spent based on a schedule of activities (work planned). This commonly used plan vs. actual comparison does not allow one to know from the numerical data if the actual cost incurred was for work intended to be done.

Abell, Nancy↗

AmeriFlux FLUXNET-1F US-xTL NEON Toolik (TOOL)

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-xTL NEON Toolik (TOOL). This is the FLUXNET version of the carbon flux data for the site US-xTL NEON Toolik (TOOL) produced by applying the standard ONEFlux (1F) software. Site Description - The Toolik field site is located in a remote wilderness area at the Toolik Field Station which is on land managed by the Bureau of Land Management. The area is underlain by continuous permafrost, which exerts a major influence on hydrology and the distribution, structure, and function of terrestrial and aquatic ecosystems. Because of its location between the Brooks Range and the coastal plain, the vegetation and soils at TOOL are representative of much of the Alaskan foothills tundra. This terrestrial field site is collocated with NEON’s Toolik Lake aquatic site. The closest city, Fairbanks, Alaska is 400 miles away. The Dalton Highway (also known as the Haul Road or Pipeline Road), which traverses the middle of the state from Fairbanks to Prudhoe Bay, provides access to the area.

Network), NEON (National Ecological Observatory↗

PIPES (Pipeline for Integrated Projects in Energy Systems) [SWR-24-89]

The Pipeline for Integrated Projects in Energy Systems (PIPES) is a comprehensive project, data, and workflow management tool designed for integrated modeling teams. PIPES facilitates the management of data requirements, tasks, and progress tracking, serving as a higher-level integration layer that works across various data and modeling software. This tool integrates models, data, and tools to perform large-scale, integrated analysis work at scale. PIPES is designed to streamline integrated modeling projects, enhance collaboration, and ensure the quality and efficiency of data management and workflow processes. https://github.com/nrel-pipes/pipes-api https://github.com/nrel-pipes/pipes-web https://github.com/nrel-pipes/nrel-pipes

Gu, Jianli↗

Monitoring software development through dynamic variables

Research conducted by the Software Engineering Laboratory (SEL) on the use of dynamic variables as a tool to monitor software development is described. Project independent measures which may be used in a management tool for monitoring software development are identified. Several FORTRAN projects with similar profiles are examined. The staff was experienced in developing these types of projects. The projects developed serve similar functions. Because these projects are similar some underlying relationships exist that are invariant between the projects. These relationships, once well defined, may be used to compare the development of different projects to determine whether they are evolving the same way previous projects in this environment evolved.

Doerflinger, C. W.↗

Monitoring software development through dynamic variables

Research conducted by the Software Engineering Laboratory (SEL) on the use of dynamic variables as a tool to monitor software development is described. Project independent measures which may be used in a management tool for monitoring software development are identified. Several FORTRAN projects with similar profiles are examined. The staff was experienced in developing these types of projects. The projects developed serve similar functions. Because these projects are similar some underlying relationships exist that are invariant between the projects. These relationships, once well defined, may be used to compare the development of different projects to determine whether they are evolving the same way previous projects in this environment evolved.

Doerflinger, C. W.↗

Monitoring software development through dynamic variables

Research conducted by the Software Engineering Laboratory (SEL) on the use of dynamic variables as a tool to monitor software development is described. Project independent measures which may be used in a management tool for monitoring software development are identified. Several FORTRAN projects with similar profiles are examined. The staff was experienced in developing these types of projects. The projects developed serve similar functions. Because these projects are similar some underlying relationships exist that are invariant between projects. These relationships, once well defined, may be used to compare the development of different projects to determine whether they are evolving the same way previous projects in this environment evolved.

Doerflinger, Carl W.↗

Changing the Project Execution Culture at NASA Dryden

Dryden has embarked on implementing Critical Chain Project Management (CCPM) philosophies and tools to reduce workforce stress and increase the centers work throughput. This effort has been under way for over one year and represents a fundamental state change in how various projects are planned and executed at the center. The implementation of CCPM philosophies and the required cultural changes represent the most difficult aspects of the implementation.

Horn, Thomas J.↗