Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Schedule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Simulation of the Infrared Astronomical Satellite /IRAS/ telescope system

The Infrared Astronomical Satellite (IRAS), a joint Dutch-British-U.S. project scheduled for launch in February 1981, will conduct the first all-sky infrared survey between 8 and 120 microns using a 60-cm aperture, cryogenically-cooled telescope. A computer simulation program has been developed at Ames Research Center to aid in the design of this complex telescope. The development and implementation of the IRAS Telescope Simulator (IRTS), its input data sources, and its output data products are described.

Henderson, E.↗

DBMS as a Tool for Project Management

Scientific objectives of crustal dynamics are listed as well as the contents of the centralized data information system for the crustal dynamics project. The system provides for project observation schedules, gives project configuration control information and project site information.

Linder, H.↗

Designing a configuration control mechanism for a flight software validation facility

Embedded computer systems and supporting operating systems have recently enabled the automation of many time-critical flight functions. This automation requires the integration of computer hardware and software, aircraft hardware, and the flight application. To properly integrate and control these critical functions requires a real-time environment that is provided by the onboard flight computer, a real-time operating system, and a real-time flight application that supplies the input commands to the aircraft and responds to the resulting actions. The increased complexity of developing and testing such real-time applications can best be supported by a separate test facility that provides the processing visibility and control which is virtually impossible in the actual real-time operating environment. Such a flight software validation facility has been developed at the NASA Langley Research Center to support applications using the Shuttle real-time language HAL/S. The development and control of this facility are described. Some of the management techniques used were project schedules, status monitoring, code walk-throughs, configuration control, phased releases, validation suites, and modern programming techniques.

Smith-Taylor, R.↗

Conceptual design for a food production, water and waste processing, and gas regeneration module

During the first six month period, the RECON (Regenerative Concepts Group) team collected reference material, made visits to consult with other researchers, and invited distinguished visitors to speak on the status of closed life support activities. A decision was made to develop the data base and modeling such that artificial intelligence (AI) methods could be used to manipulate data and examine concept alternatives. Six discrete tasks and a project schedule were outlined for the first year. The first two tasks have been essentially completed and have resulted in a sample set of assumptions for general use in defining candidate systems and for the specification of closed system characteristics. To model a closed environment, decisions were necessary to establish the amounts of food, air, water and waste products. Although recognized that data would eventually be normalized on the basis of a single human, the amount of data in existence for four person crews led to the decision to use this as a baseline. Information on existing concepts was collected from NASA sources, from industry, and libraries. Concept modeling was begun, hardware and software obtained, technical tasks identified and experimental work initiated.

Nicks, O. W.↗

The Mars Observer mission

Attention is given to the establishment of the Planetary Observer program and the initiation of the Mars Observer project (scheduled for 1990), its scientific objectives, and plans for operations. The Mars Observer mission will provide a spacecraft platform about Mars from which the entire Martian surface and atmosphere may be mapped for at least one Martian year. This first Planetary Observer mission will reveal how a series of low-cost missions can be planned and implemented to fit within constrained NASA budget for planetary operation.

Purdy, W. I., Jr.↗

Aeroassist Flight Experiment (AFE)

Information is given in viewgraph form on the Aeroassist Flight Experiment (AFE), an experiment with the objective of investigating critical vehicle design and environmental technologies applicable to the design of aeroassisted space transfer vehicles. Information is given on design, simulation, flight regime, mission requirements and objectives, instrumentation, and the project schedule.

Siemers, Paul M., III↗

Ada (R) assessment: An important issue within European Columbus Support Technology Programme

Software will be more important and more critical for Columbus than for any ESA previous project. As a simple comparison, overall software size has been in the range of 100 K source statements for EXOSAT, 500 K for Spacelab, and will probably reach several million lines of code for Columbus (all element together). Based on past experience, the total development cost of software can account for about 10 pct to 15 pct of the total space project development cost. The Ada technology may support the strong software engineering principles needed for Columbus, provided that technology is sufficiently mature and industry plans are meeting the Columbus project schedule. Over the past 3 years, Informatique Internationale has conducted a coherent program based on Ada technology assessment studies and experiments, for ESA and CNES. This specific research and development program benefits from 15 years experience in the field of space software development and is supported by the overall software engineering expertise of the company. The assessment and experiments of Ada software engineering by Informatique Internationale are detailed.

Vielcanet, P.↗

Get-Away tether experiment - Experimental plans

The experimental capabilities of the Get-Away Tether Experiment (GATE) are presented and a series of demonstration mission are proposed. The GATE is a free-flying tether system that will develop or demonstrate technology in the areas of tether dynamics (deployment and stabilization, retrieval, stationkeeping, and severance), tether electrodynamics, micrometeor hazards to tethers, and disturbance rejection. The system consists of two subsatellites connected by 1 km of tether. The free-flying system is ejected from the Orbiter via a Getaway Special (GAS) canister. Two dynamics missions are profiled along with a description of electrodynamic mission capabilities. The dynamic interactions of the end body and tether may be observed from the Orbiter or from an on-board video tracking system. Hence, GATE provides a unique, low cost capability to demonstrate various tether technologies, and address critical design and safety issues associated with future tether applications. An assessment of the significant measurable parameters and associated instrumentation is given. Future work and system development projection schedules are also outlined.

Greene, Michael↗

Developing integrated parametric planning models for budgeting and managing complex projects

The applicability of integrated parametric models for the budgeting and management of complex projects is investigated. Methods for building a very flexible, interactive prototype for a project planning system, and software resources available for this purpose, are discussed and evaluated. The prototype is required to be sensitive to changing objectives, changing target dates, changing costs relationships, and changing budget constraints. To achieve the integration of costs and project and task durations, parametric cost functions are defined by a process of trapezoidal segmentation, where the total cost for the project is the sum of the various project cost segments, and each project cost segment is the integral of a linearly segmented cost loading function over a specific interval. The cost can thus be expressed algebraically. The prototype was designed using Lotus-123 as the primary software tool. This prototype implements a methodology for interactive project scheduling that provides a model of a system that meets most of the goals for the first phase of the study and some of the goals for the second phase.

Etnyre, Vance A.↗

A geometric comparison of video camera-captured raster data to vector-parented raster data generated by the X-Y digitizing table

The relative accuracy of a georeferenced raster data set captured by the Megavision 1024XM system using the Videk Megaplus CCD cameras is compared to a georeferenced raster data set generated from vector lines manually digitized through the ELAS software package on a Summagraphics X-Y digitizer table. The study also investigates the amount of time necessary to fully complete the rasterization of the two data sets, evaluating individual areas such as time necessary to generate raw data, time necessary to edit raw data, time necessary to georeference raw data, and accuracy of georeferencing against a norm. Preliminary results exhibit a high level of agreement between areas of the vector-parented data and areas of the captured file data where sufficient control points were chosen. Maps of 1:20,000 scale were digitized into raster files of 5 meter resolution per pixel and overall error in RMS was estimated at less than eight meters. Such approaches offer time and labor-saving advantages as well as increasing the efficiency of project scheduling and enabling the digitization of new types of data.

Swalm, C.↗

X-ray calibration of a virtual phase 1024 x 1024 CCD

Results are presented on a calibration with X-rays of a front-illuminated virtual phase CCD with a 1024 x 1024 pixel array, performed as a part of the Solar-A preparation, which is a joint Japanese-U.S.-UK space project scheduled for a launch in August 1991. In the experiment, absolute quantum efficiency (QE) of a virtual CCD was measured at 14 wavelengths between 5.4 and 67.7 A, and its flat field responses to the illumination by C-K and Al-K X-rays were investigated together with its imaging properties in visible light. Higher than expected QE measurements were obtained at soft X-ray and EUV wavelengths; these are considered to be caused by fluorescence occurring in the absorbing layers on the CCD-entrance aperture.

Catura, R. C.↗

The JOVE initiative - A NASA/university Joint Venture in space science

The JOVE (NASA/university Joint Venture in space science) initiative is a point program between NASA and institutions of higher education whose aim is to bring about an extensive merger between these two communities. The project is discussed with emphasis on suggested contributions of partnership members, JOVE process timeline, and project schedules and costs. It is suggested that NASA provide a summer resident research associateship (one ten week stipend); scientific on-line data from space missions; an electronic network and work station, providing a link to the data base and to other scientists; matching student support, both undergraduate and graduate; matching summer salary for up to three faculty participants; and travel funds. The universities will be asked to provide research time for faculty participants, matching student support, matching summer salary for faculty participants, an instructional unit in space science, and an outreach program to pre-college students.

Six, F.↗

SETI prototype system for NASA's Sky Survey microwave observing project - A progress report

Two complementary search strategies, a Targeted Search and a Sky Survey, are part of NASA's SETI microwave observing project scheduled to begin in October of 1992. The current progress in the development of hardware and software elements of the JPL Sky Survey data processing system are presented. While the Targeted Search stresses sensitivity allowing the detection of either continuous or pulsed signals over the 1-3 GHz frequency range, the Sky Survey gives up sensitivity to survey the 99 percent of the sky that is not covered by the Targeted Search. The Sky Survey spans a larger frequency range from 1-10 GHz. The two searches will deploy special-purpose digital signal processing equipment designed and built to automate the observing and data processing activities. A two-million channel digital wideband spectrum analyzer and a signal processor system will serve as a prototype for the SETI Sky Survey processor. The design will permit future expansion to meet the SETI requirement that the processor concurrently search for left and right circularly polarized signals.

Klein, M. J.↗

Contamination control program results from three years of ground operations on the Extreme Ultraviolet Explorer instruments

A stringent contamination-control plan has been developed for the optical components of the Extreme Ultraviolet Explorer instruments, whose performance in the 80-900 A wavelength range is highly sensitive to particulate and molecular contamination. The contamination-control program has been implemented over the last three years during assembly, test and calibration phases of the instrument. These phases have now been completed and the optics cavities of the instruments have been sealed until deployment in space. Various approaches are discussed which have been used during ground operations to meet optics' contamination goals within the project schedule and budget. The measured optical properties of EUV witness mirrors are also presented which remained with the flight mirrors during ground operations. These were used to track optical degradation due to contamination from the cleanroom and high-vacuum test-chamber environments.

Ray, David C.↗

National Aeronautics and Space Administration (NASA)/american Society for Engineering Education (ASEE) Summer Faculty Fellowship Program, 1991, Volume 2

The objectives of the program are: (1) to further the professional knowledge of qualified engineering and science faculty members; (2) to stimulate an exchange of ideas between participants and NASA; (3) to enrich and refresh the research and teaching activities of participant's institutions; and (4) to contribute to the research objectives of the NASA Centers. A compilation of the final reports on the research projects done by the faculty fellows during the summer of 1991 are presented. Some of the topics covered include: collision avoidance for rover vehicles, bioinstrumentation, neural nets, total quality management of flexible space structures, project scheduling, nondestructive tests, orthostatic intolerance to bedrest, hypersonic reentry simulation, measuring human energy expenditure, tribological models, trace element movement in Anarctic ice, gastrointestinal function, and computer assisted instruction.

Hyman, William A.↗

AWT Project Status

The NASA Altitude Wind Tunnel program status is presented as of March 21, 1984. Topics covered by viewgraphs include: management flowchart, projected schedules, cost estimates, manpower summary, and modeling/design/construction interfaces.

Allen, Robert L.↗

Large Deployable Reflector (LDR) system concept and technology definition study. Volume 2: Technology assessment and technology development plan

A study was conducted to define reasonable and representative LDR system concepts for the purpose of defining a technology development program aimed at providing the requisite technological capability necessary to start LDR development by the end of 1991. This volume presents thirteen technology assessments and technology development plans, as well as an overview and summary of the LDR concepts. Twenty-two proposed augmentation projects are described (selected from more than 30 candidates). The five LDR technology areas most in need of supplementary support are: cryogenic cooling; astronaut assembly of the optically precise LDR in space; active segmented primary mirror; dynamic structural control; and primary mirror contamination control. Three broad, time-phased, five-year programs were synthesized from the 22 projects, scheduled, and funding requirements estimated.

Agnew, Donald L.↗