Search NASA⌕ Search

SEARCH · Search NASA

Results for “Qualification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Preliminary Assessment of the Hanford Tank Waste Feed Acceptance and Product Qualification Programs

The U.S. Department of Energy Office of Environmental Management (EM) is engaging the national laboratories to provide the scientific and technological rigor to support EM program and project planning, technology development and deployment, project execution, and assessment of program outcomes. As an early demonstration of this new responsibility, Savannah River National Laboratory (SRNL) and Pacific Northwest National Laboratory (PNNL) have been chartered to implement a science and technology program addressing Hanford Tank waste feed acceptance and product qualification. As a first step, the laboratories examined the technical risks and uncertainties associated with the planned waste feed acceptance and qualification testing for Hanford tank wastes. Science and technology gaps were identified for work associated with 1) feed criteria development with emphasis on identifying the feed properties and the process requirements, 2) the Tank Waste Treatment and Immobilization Plant (WTP) process qualification program, and 3) the WTP HLW glass product qualification program. Opportunities for streamlining the accetpance and qualification programs were also considered in the gap assessment. Technical approaches to address the science and technology gaps and/or implement the opportunities were identified. These approaches will be further refined and developed as strong integrated teams of researchers from national laboratories, contractors, industry, and academia are brought together to provide the best science and technology solutions. Pursuing the identified approaches will have immediate and long-term benefits to DOE in reducing risks and uncertainties associated with tank waste removal and preparation, transfers from the tank farm to the WTP, processing within the WTP Pretreatment Facility, and in producing qualified HLW glass products. Additionally, implementation of the identified opportunities provides the potential for long-term cost savings given the anticipated facility life of WTP.

HLW glass product qualification↗

Open-Source RTOS Space Qualification: An RTEMS Case Study

NASA space-qualification of reusable off-the-shelf real-time operating systems (RTOSs) remains elusive due to several factors notably (1) The diverse nature of RTOSs utilized across NASA, (2) No single NASA space-qualification criteria, lack of verification and validation (V&V) analysis, or test beds, and (3) different RTOS heritages, specifically open-source RTOSs and closed vendor-provided RTOSs. As a leader in simulation test beds, the NASA IV&V Program is poised to help jump-start and lead the space-qualification effort of the open source Real-Time Executive for Multiprocessor Systems (RTEMS) RTOS. RTEMS, as a case-study, can be utilized as an example of how to qualify all RTOSs, particularly the reusable non-commercial (open-source) ones that are gaining usage and popularity across NASA. Qualification will improve the overall safety and mission assurance of RTOSs for NASA-agency wide usage. NASA's involvement in space-qualification of an open-source RTOS such as RTEMS will drive the RTOS industry toward a more qualified and mature open-source RTOS product.

Real-time operating system↗

Development and Qualification of the Primary Structure of the Orion European Service Module

This paper presents an overview of the development and qualification test campaign for the primary structure of the European Service Module of ORION, the NASA spacecraft which will serve the future human exploration missions to the Moon, Mars and beyond. Under an agreement between NASA and ESA, the ORION will be powered by a European Service Module (ESM), providing also water and oxygen for astronauts' life sustainability. The development and qualification of the European Service Module (ESM) is under ESA responsibility with Airbus Defense and Space as the prime contractor. Thales Alenia Space Italia is responsible for design development, manufacturing, assembly and qualification of the Structure subsystem. The European Service Module, installed onto the launch adapter, shall support the crew module with its adapter and a launch abort system. It shall sustain: - A combination of global and local launch loads during lift off and ascent phases, - On orbit loads induced by engine firing for orbital transfers and attitude control. The ESM structure is based on a core made of Composite Fiber Reinforced Polymer (CFRP) sandwich panels complemented by aluminum alloy platforms, longerons and secondary structures. A development campaign has been implemented in order to define and validate composite parts' strength allowable values for design: coupon tests at material level, test at component level up to breadboards tests performed on main structural components (composite to metallic joints, and at panels' discontinuities). An incremental approach as defined in [1] has been followed. A qualification static test campaign at primary structure assembly level has been implemented in order to validate the design against static stiffness and ultimate strength as well as to correlate the structural Finite Element Model (FEM) used for sizing and confirm the margins of safety. The tests have been performed successfully by Thales Alenia Space Italia (TAS-I) on two flight representative structural models (STA1, STA2), in Turin facilities (Italy) between August 2015 and March 2017, with engineering support of technical representatives from Airbus, ESA, NASA and LMCO. The main development and qualification test activities and associated results are presented and discussed in the paper

Structural Testing↗

Liquid Fuel Qualification for Molten Salt Reactors: Identification of Gaps and Challenges

This report identifies and describes challenges in implementing the MSR fuel qualification process described in NUREG/CR-7299 Fuel Qualification for Molten Salt Reactors. This report provides additional information including examples and additional use case descriptions to assist applicants in understanding the content and structure of the information necessary to develop a fuel qualification report. In particular, the current report emphasizes the relationship of fuel salt qualification to the contents of the plant safety analysis report. This report is limited to the safety functions relevant to the reactor aspects of the nuclear power plant. MSRs that include significant fuel salt processing would also need to address the safety aspects of the processing facility. No significant gaps were found in NUREG/CR-7299. However, NUREG/CR-7299 focuses on generic descriptions of how the fuel salt supports achievement of plant fundamental safety functions. A fuel salt qualification report will need explicitly address the role of the fuel salt in meeting regulatory requirements for a particular plant. NUREG/CR-7299 also provides a regulatory mapping between NRC rules and the safety functions. However, by remaining at a fundamental level, NUREG/CR-7299 does not address plant specific safety analysis. Some aspects of the safety analysis may require additional emphasis for designs that incorporate particular features (such as additional confirmation of decay heat rejection performance for higher power reactors). This report provides additional structure to enable an applicant to develop their plant-specific safety analysis.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Resolution of Qualification Issues for Existing Structural Materials

This report gives a detailed assessment of several key technical issues that needs resolution for the existing structural materials with emphasis on application in liquid metal reactors (LMRs), in particular, sodium cooled fast reactors. The work is a combined effort between Argonne National Laboratory (ANL) and Oak Ridge National Laboratory (ORNL) with ANL as the technical lead, as part of Advanced Structural Materials Program for the Advanced Fuel Cycle Initiative (AFCI) Reactor Campaign. The report is the second deliverable in FY09 (M2505050201) under the work package “Advanced Materials Code Qualification”. The overall objective of the Advanced Materials Code Qualification project is to evaluate the key technical requirements for the qualification of currently available and future advanced materials for application in sodium reactor systems and the resolution of issues that the U.S. Nuclear Regulatory Commission (NRC) has raised in the past on structural materials in support of the design and licensing of the LMR. Advanced materials are a critical element in the development of sodium reactor technologies. Enhanced materials performance not only improves safety margins and provides design flexibility, but also is essential for the economics of future advanced sodium reactors. Qualification and licensing of advanced materials are prominent needs for developing and implementing advanced sodium reactor technologies. However, the development of sufficient database and qualification of these materials for application in LMRs require considerable amount of time and resources. In the meantime, the currently available materials will be used in the early development of fast reactors. Nuclear structural component designs in the U.S. comply with the ASME Boiler and Pressure Vessel Code Section III (Rules for Construction of Nuclear Facility Components) and the NRC grants licensing. As the LMR will operate at higher temperatures than the current light water reactors (LWRs), the design of elevated-temperature components must comply with ASME Section III Subsection NH (Class 1 Components in Elevated Temperature Service). Assessment of materials performance issues and high temperature design methodology issues pertinent to the LMR were presented in an earlier report (Natesan et al. 2008). In a subsequent report (Majumdar et al. 2009), we addressed the needs in high temperature methodologies for design of various high temperature components in sodium cooled fast reactor. The present report addresses several key technical issues for the currently available structural materials such as Type 304 and 316 austenitic stainless steels and ferritic steels such as 2.25Cr-1Mo and modified 9Cr-1Mo. The 60-year design life for the LMR presents a significant challenge to the development of database, extrapolation/prediction of long-term performance, and high temperature structural design methodology. The current Subsection NH is applicable to the design life only up to 34 years. No experimental data contain test durations of 525,000 hours, and it is impractical to conduct such long-term tests in any types of testing. So far the longest creep tests for Grade 91 and Grade 92 steels have run up to 100,000 hours. It has been noted that there is a large drop in creep rupture strength in long-term tests for these high-Cr creep-resistant steels, which may result in overestimation of the long-term creep strength and allowable stress. The report addresses in detail the need for a mechanistic understanding of the structural materials, from the standpoint of the effects of thermal aging, creep deformation, creep fracture, fatigue and creep-fatigue, creep-fatigue predictive models, fatigue and creep crack growth, and fracture toughness. Based on an in-depth assessment of the available data and mechanistic understanding, key technical issues are identified and discussed for each of the property areas. Furthermore, we have proposed viable approaches to resolve the issues and prioritized our recommendations.

Natesan, K.↗

AGR-3/4 Data Qualification Report for ATR Cycles 151A, 151B, 152A, 152B, 154A, and 154B

This data report provides the qualification status of Advanced Gas Reactor-3/4 (AGR-3/4) fuel irradiation experimental data from Advanced Test Reactor (ATR) Cycles 151A, 151B, 152A, 152B, 154A, and 154B, as recorded in the Nuclear Data Management and Analysis System (NDMAS). Of these cycles, ATR Cycle 152A is a low power cycle that occurred when the ATR core was briefly at low power. The irradiation data are not used for physics and thermal calculation, but the qualification status of these cycle data is still covered in this report. On the other hand, during ATR Cycles 153A (unplanned Outage cycle) and 153B (Power Axial Locator Mechanism [PALM] cycle), the AGR-3/4 was pulled out from the ATR core and stored in the canal to avoid being overheated. Therefore, qualification of the AGR-3/4 irradiation data from these 2 cycles was excluded in this report. By the end of ATR Cycle 154B, AGR-3/4 was irradiated for a total of 264.1 effective full power days. The AGR-3/4 data streams addressed in this report include thermocouple (TC) temperatures, sweep gas data (flow rates, pressure, and moisture content), and Fission Product Monitoring System (FPMS) data (release rates and release-to-birth rate ratios [R/Bs]) for each of the twelve capsules in the AGR-3/4 experiment. The final data qualification status for these data streams is determined by a Data Review Committee (DRC) composed of AGR technical leads, Sitewide Quality Assurance (QA), and NDMAS analysts. The DRC convened on February 12, 2014, reviewed the data acquisition process, and considered whether the data met the requirements for data collection as specified in QA-approved Very High Temperature Reactor (VHTR) Technology Development Office (TDO) data collection plans. The DRC also examined the results of NDMAS data testing and statistical analyses, and confirmed the qualification status of the data as given in this report.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Qualification of Daiichi Units 1, 2, and 3 Data for Severe Accident Evaluations - Process and Illustrative Examples from Prior TMI-2 Evaluations

The accidents at the Three Mile Island Unit 2 (TMI-2) Pressurized Water Reactor (PWR) and the Daiichi Units 1, 2, and 3 Boiling Water Reactors (BWRs) provide unique opportunities to evaluate instrumentation exposed to severe accident conditions. Conditions associated with the release of coolant and the hydrogen burn that occurred during the TMI-2 accident exposed instrumentation to harsh conditions, including direct radiation, radioactive contamination, and high humidity with elevated temperatures and pressures. As part of a program initiated in 2012 by the Department of Energy Office of Nuclear Energy (DOE-NE), a review was completed to gain insights from prior TMI-2 sensor survivability and data qualification efforts. This initial review focused on the set of sensors deemed most important by post-TMI-2 instrumentation evaluation programs. Instrumentation evaluation programs focused on data required by TMI-2 operators to assess the condition of the reactor and containment and the effect of mitigating actions taken by these operators. In addition, prior efforts focused on sensors providing data required for subsequent forensic evaluations and accident simulations. To encourage the potential for similar activities to be completed for qualifying data from Daiichi Units 1, 2, and 3, this report provides additional details related to the formal process used to develop a qualified TMI-2 data base and presents data qualification details for three parameters: primary system pressure; containment building temperature; and containment pressure. As described within this report, sensor evaluations and data qualification required implementation of various processes, including comparisons with data from other sensors, analytical calculations, laboratory testing, and comparisons with sensors subjected to similar conditions in large-scale integral tests and with sensors that were similar in design to instruments easily removed from the TMI-2 plant for evaluations. As documented in this report, results from qualifying data for these parameters led to key insights related to TMI-2 accident progression. Hence, these selected examples illustrate the types of activities completed in the TMI-2 data qualification process and the importance of such a qualification effort. These details are documented in this report to facilitate implementation of similar process using data and examinations at the Daiichi Units 1, 2, and 3 reactors so that BWR-specific benefits can be obtained.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Establish Fuel Qualification Expectations

The objective of this white paper is to provide an overview of the state of knowledge regarding issues associated with fuel qualification for a liquid-fueled molten salt reactor. The overview consists of fuel qualification expectations for heterogeneous reactors—conventional light water reactors, plus advanced reactors such as sodium fast reactors and modular high-temperature gas-cooled reactors—which consider the mechanical behavior of the fuel itself, interaction between fuel and its cladding, behavior of the cladding, and structural behavior of fuel assemblies. Fuel qualification expectations for molten salt reactors are viewed in contrast to the fuel qualification for heterogeneous reactors in that the fuel is liquid (molten) and there is no accumulation of mechanical effects such as stress, creep, or swelling. However, the liquid fuel salts do accumulate fission products, corrosion byproducts, and buildup of actinides which impact the chemistry of the fuel salt and thermal-physical properties that may impact the ability to remove heat from the core and retain radioactive materials in the fuel salt. Finally, the role of the US Department of Energy in research on tri-structural-isotropic and metal fuel for advanced reactors for fuel qualification purposes is briefly discussed as a potential model for the Department’s research to gather quality chemical and thermal-physical property data necessary to qualify MSR fuel performance under normal and accident conditions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Strategy for Safety-Related Digital I&C Qualification

Digital I&C qualification continues to be a major impediment to addressing the reliability and obsolescence issues of the legacy analog I&C systems of the operating LWR fleet. In particular, the issue of digital common cause failure (CCF) has been difficult to address and has been the reason that some nuclear plant licensees have deferred upgrades of these critical plant systems and have rather opted to maintain them with considerable engineering and maintenance efforts. This is getting more and more difficult in the face of declining analog technology suppliers and dwindling supplies of spare parts and support for many critical components. To remain a viable energy source for the nation, the nuclear fleet must reduce its operating costs to a competitive level. Digital technology is the foremost means of implementing performance improvements and cost reductions for this purpose. This has been demonstrated over and over again in other industry sectors, as well as in conventional generation facilities. However, due to the special nature of nuclear energy, these digital I&C qualification barriers remain and must be resolved in order to modernize these plants and transform the business model to one that is competitive. The purpose of this report is to present an assessment of digital I&C qualification issues and address gaps in qualification methods and processes that would potentially benefit from Department of Energy (DOE)-sponsored research and development. Two new qualification methods are described that are recommended for further Department of Energy-sponsored research and development. They are 1) Testability – the exhaustive (100%) testing of certain digital devices addressing all combinations of inputs and internal states, and 2) Elimination of CCF triggers – ensuring that any latent digital defects are not concurrently triggered in redundant and back-up safety systems. In addition this report presents a strategy for full nuclear plant modernization based on four interrelated elements that together address the remaining barriers to prudent implementation. These four elements are 1) End-State Architecture, 2) Cost-Benefit Analysis, 3) Regulatory Approval, and 4) Implementation Sequence Plan.

42 ENGINEERING↗

MSR Fuel Salt Qualification Methodology

This report documents the continuing activities at Oak Ridge National Laboratory (ORNL) in support of the US Nuclear Regulatory Commission (NRC) efforts to develop an efficient, appropriate process for liquid fuel salt system qualification. Fuel qualification for salt-cooled molten salt reactors (MSRs) is part of the ongoing coated particle fuel qualification effort. Fuel qualification is a process which provides high confidence that physical and chemical behavior of fuel is sufficiently understood so that it can be adequately modeled for both normal and accident conditions, reflecting the role of the fuel design in the overall safety of the facility. Uncertainties are defined so that calculated fission product releases include the appropriate margins to ensure conservative calculation of radiological dose consequences. The initial phase of ORNL’s activities is documented in ORNL/LTR-2018/1045 Molten Salt Reactor Fuel Qualification Considerations and Challenges.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ASME Code Qualification Plan for LPBF 316 SS

This report describes a plan to qualify laser powder bed fusion (LPBF) 316 stainless steel for use with the American Society of Mechanical Engineers (ASME) Boiler & Pressure Vessel Code Section III, Division 5 rules for metallic components in high temperature nuclear reactors. Accomplishing this goal would make the material and manufacturing process available to vendors for inclusion in the next generation of advanced, high temperature reactors. The general approach adopted here is to treat LPBF 316 as if it was a completely new material and to develop a plan to qualify the material according to the current ASME practices. One key goal of this work is to explore and develop accelerated qualification approaches that might reduce the time required to qualify new materials by reducing the need for long term testing. However, the qualification plan here does not employ any accelerated qualification approaches to provide a limiting, bounding description of the number, duration, and types of testing required to qualify LPBF 316 without such techniques and to describe a comprehensive dataset that could be used to explore and validate accelerated qualification approaches in the future. The report addresses the fundamental challenges to qualifying Advanced Manufacturing (AM) materials for high temperature applications and summarizes the ASME Section III qualification process as well as current efforts to qualify LBPF and DED 316 for low temperature applications. The report then discusses specific issues, both material and logistical, related to qualifying PBF 316 steel. The final chapters of the report describe a complete test plan designed to generate sufficient data to qualify the material as well as a data management plan for how to store and manage the data to eventually provide the test data packaged needed to qualify the material with ASME.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Summary of Savannah River Site FY24 Salt Waste Qualification Data

Savannah River Mission Completion (SRMC), the Liquid Waste Operations subcontractor at SRS, and Savannah River National Laboratory (SRNL) analyzed samples from Savannah River Site (SRS) Waste Tanks 21H, 41H, and 42H to support qualification of Salt Waste Processing Facility (SWPF) Waste Batches 10, 11, 12, and 13 for processing (the FY24 Salt Batch Qualification samples). These Tanks (i.e. 21H, 41H and 42H) are blend tanks for feed to SWPF. This report focuses on the characterization of the Salt Batch Qualification sub-samples (i.e., any adjustments after qualification or as a part of processing are documented elsewhere). None of the samples displayed any unusual or unexpected characteristics such as large amounts of solids, floating solids, or unusual color. Characterization of these samples confirmed similar chemical composition and characteristics to previous salt waste batches. The analytical results (both rapid, typically 4 weeks, and long-term, typically 8 weeks) for Salt Batches 10, 11, 12, and 13 are now summarized and discussed in this technical report. SRMC-Analytical Laboratory (SRMC-AL), for the first time, provided all the short-term analyses data used in the qualification evaluations of SWPF Salt Batches 10, 11, 12, and 13. These SRMC short-term results are presented along with the results for the long-term analyses provided by SRNL.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Electroplating Zr on U-Mo Foils: Process Qualification Report

Fuel Fabrication identified electroplating of zirconium onto the U-Mo fuel low enriched fuel for high performance reactors as an alternative technology. The Process Qualification was performed under the Process Qualification Plan for Fabrication of MP-1 Zirconium Electroplated Foils, Pacific Northwest National Laboratory (PNNL), 67075-PQP-0001. On December 14, 2016 PNNL was authorized to begin qualification plating runs effective January 2017 by the Fuel Fabrication Pillar. PNNL began electroplating of the BWX Technologies Nuclear Operation Group provided qualification bare foils. Receipt inspection of foils identified numerous issues with the surface quality of the foils. Zirconium Electroplating of the 12 thick and 12 thin foils was completed in March 2017. This report summarizes the results of qualification plating runs and provides the documentation necessary to qualify the electroplating process and authorize PNNL to begin plating of the MP-1 foils. Prior to plating of the MP-1 foils, PNNL will be plating demonstration low enriched uranium (LEU).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Acceptance and qualification test results of the 20 km electromechanical tether for TSS-1

Acceptance and qualification tests have been performed on the TSS-1 flight tether and its associated qualification tether. Acceptance testing during production included periodic measurement of conductor resistance, off-line breakstrength tests on strength member samples, continuous measurement of the insulation layer voltage withstand capability, and a continuous mechanical proof-loading procedure during the tether jacketing operation. The qualification test sequence consisted of thermal vacuum, voltage withstand and breakstrength tests on samples taken from the production runs for both the qualification and flight tethers. This paper will analyze the acceptance and qualification test data, respectively. Results indicate that the completed flight tether exceeds the design requirements for the TSS-1 mission.

Marshall, L. S.↗

RL10A-3-3B high mixture ratio qualification program

The results of the high mixture ratio qualification testing of the RL10 engine for the Shuttle/Centaur program are presented. The objective of the engine qualification test was to demonstrate the suitability of the RL10A-3-3B engine for space vehicle flight by subjecting it to the testing specified in RL10A-3-3B Model Specification Number 2295 dated February 1986. The applicable section of the specification is presented. Due to payload volume advantages which can be achieved by increasing the operating mixture ratio of the RL10, a decision was made to qualify the engine to run at a higher mixture ratio. A program was created to qualify the RL10 engine for operation at 15,000 pounds thrust and a nominal 6.0 to 1 mixture ratio. This model of the engine was designated the RL10A-3-3B. The qualification program included three test series as follows: (1) hardware durability and limits test in which the engine completed 23 firings and 4605.7 seconds with 1588.7 seconds at less than 6.6 mixture ratio; (2) preliminary qualification test in which the engine completed 26 firings and 5750 seconds; and (3) qualification test in which the engine completed 26 hot firings and 5693.4 seconds with 905.9 seconds at 6.7 mixture ratio. Several changes in engine hardware were required for operation of the RL10A-3-3B engine in the Space Shuttle which include a duel pressure switch ignition, an oxidizer flow control, and helium plumbing changes.

Vogel, T.↗

Structural Qualification Testing of the WindSat Payload Using Sine Bursts Near Structural Resonance

Sine burst tests are often used for structural qualification of space flight hardware. In most instances, the driving frequency of the shaker is specified far below the structure's first resonant mode, such that the entire test article sees uniform acceleration. For large structures, this limits qualification testing to lower parts of the structure, or else it over-tests the lower structure to achieve qualification of the upper structure. The WindSat payload, a 10.5 foot tall graphite/epoxy, titanium, and aluminum radiometer, experiences accelerations at the six foot diameter reflector nearly four times that at the spacecraft interface. Due to size of the payload, the number of bonded joints, and the lightweight reflector support structure design and construction, using static pull testing to qualify all of the bonded joints in the upper structure would result in large, expensive, and extensive test fixturing. Sine burst testing near the first two structural resonant modes was performed on the WindSat payload to achieve the correct load factor distribution up the stack for structural qualification. In this presentation, how finite element method (FEM) sine burst predictions were used in conjunction with low level random and sine burst tests to achieve correct qualification test load factor distribution on the WindSat payload is discussed. Also presented is the risk mitigation approach for using the uncorrelated FEM in this procedure.

Pontius, Jim↗

Synergistic Development, Test, and Qualification Approaches for the Ares I and V Launch Vehicles

The U.S. National Aeronautics and Space Administration is designing and developing the Ares I and Ares V launch vehicles for access to the International Space Station (ISS) and human exploration of the Moon. The Ares I consists of a first stage reusable five-segment solid rocket booster, a upper stage using a J-2X engine derived from heritage experience (Saturn and Space Shuttle External Tank programs), and the Orion crew exploration vehicle (CEV). The Ares V is designed to minimize the development and overall life-cycle costs by leveraging off of the Ares I design. The Ares V consists of two boosters, a core stage, an earth departure stage (EDS), and a shroud. The core stage and EDS use LH2/LO2 propellants, metallic propellant tanks, and composite dry structures. The core stage has six RS-68B upgraded Delta IV engines while the EDS uses a J-2X engine for second stage ascent and trans-lunar injection (TLI) burn. System and propulsion tests and qualification approaches for Ares V elements are being considered as follow-on extensions of the Ares I development program. Following Ares I IOC, testing will be conducted to verify the J-2X engine's orbital restart and TLI burn capability. The Ares I upper stage operation will be demonstrated through integrated stage development and acceptance testing. The EDS will undergo similar development and acceptance testing with additional testing to verify aspects of cryogenic propellant management, operation of sub-systems in a space simulation environment, and orbital re-start of the main propulsion system. RS-68B certification testing will be conducted along with integrated core stage development and acceptance testing. Structural testing of the Ares V EDS and core stage propellant tanks will be conducted similar to the Ares I upper stage. The structural qualification testing may be accomplished with separate propellant tank test articles. Structural development and qualification testing of the dry structure will be pursued as part of the design and development process. Especially critical is the development test program for the composite structures. The Ares V payload shroud will undergo acoustic, vibration, structural qualification, and deployment testing in a space simulation environment. Similar to Ares I, requirements for full-scale structural dynamic testing are being studied. Both Ares I and Ares V include validation flight testing as part of the qualification programs.

Cockrell, Charles E.↗

Unintended Consequences: How Qualification Constrains Innovation

The development and implementation of new materials and manufacturing processes for aerospace application is often hindered by the high cost and long time span associated with current qualification procedures. The data requirements necessary for material and process qualification are extensive and often require millions of dollars and multiple years to complete. Furthermore, these qualification data can become obsolete for even minor changes to the processing route. This burden is a serious impediment to the pursuit of revolutionary new materials and more affordable processing methods for air vehicle structures. The application of integrated computational materials engineering methods to this problem can help to reduce the barriers to rapid insertion of new materials and processes. By establishing predictive capability for the development of microstructural features in relation to processing and relating this to critical property characteristics, a streamlined approach to qualification is possible. This paper critically examines the advantages and challenges to a modeling-assisted qualification approach for aerospace structural materials. An example of how this approach might apply towards the emerging field of additive manufacturing is discussed in detail.

Brice, Craig A.↗