Search NASA⌕ Search

SEARCH · Search NASA

Results for “Quarter Two”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Two bonded half planes with a crack going through the interface

The plane problem of two bonded elastic half planes containing a finite crack perpendicular to and going through the interface is considered. The problem is formulated as a system of singular integral equations with generalized Cauchy kernels. Even though the system has three irregular points, it is shown that the unknown functions are algebraically related at the irregular point on the interface and the integral equations can be solved by a method developed previously. The system of integral equations is shown to yield the same characteristic equation as that for two bonded quarter planes in the general case of the through crack, and the characteristic equation for a crack tip terminating at the interface in the special case. The numerical results given in the paper include the stress intensity factors at the crack tips, the normal and shear components of the stress intensity factors at the singular point on the interface, and the crack surface displacements.

Erdogan, F.↗

Improved optical filter

Filter includes partial polarizer between birefrigent elements. Plastic film on partial polarizer compensates for any polarization rotation by partial polarizer. Two quarter-wave plates change incident, linearly polarized light into elliptically polarized light.

Title, A. M.↗

Vegetation analysis for arid lands geobotany

Three primary study sites were selected for measurement of plant phenological properties and spectral analysis. The sites selected represented typical sagebrush, creosote bush, and saltbush communities in Owens Valley, CA. Community composition was studied at these three sites plus five burned sites. Ten 50 m transects at each locality were measured for percent cover (over 10 cm) by a given species. On each transect two point quarter and five nearest neighbor analyses were conducted. These data provided percent cover, cover by area, plant size, tendency for association, and recolonization patterns after a disturbance. Plots representing percentage plant cover for six sites are included.

Barbour, M. G.↗

High-Fidelity Measurements for Flattop-HEU Benchmark Reevaluation

Flattop was first built in the 1950’s at Los Alamos National Laboratory. Flattop-HEU is composed of a sphere of highly enriched uranium (HEU) surrounded by a thick spherical natural uranium (NU) reflector. The reflector is composed of three parts: a stationary hemisphere and two movable quarter spheres. For fine control of the reactivity of the system, there are three control rods of natural uranium located in voids in the stationary hemisphere. The final components that make Flattop a useful critical assembly are the glory hole and mass adjustment pieces. These pieces can be loaded in various configurations into the glory hole and the core pedestal to control the known worth of the system. The glory hole and mass adjustment pieces are mostly small pieces of HEU with some mass adjustment pieces fabricated from NU. This allows for the irradiation of samples to a specified level. To better document the system, Flattop was evaluated and included in the International Criticality Safety Benchmark Evaluation Project (ICSBEP) handbook. The original benchmark evaluation of Flattop-HEU was written in 1999 based on an experiment completed in the 1960’s. This original evaluation was written to provide a single diameter that defined critical mass; however, as computational capabilities have increased, the focus for benchmark evaluations has shifted to include detailed modelswith all physical dimensions. Thus, as Flattop is a lynchpin in critical experiment work, the benchmark is being reevaluated at current standards. This summary discusses some of the largest known uncertainties from the evaluation and the high-fidelity measurements taken to reduce these uncertainties.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Flattop-HEU Benchmark Reevaluation Summary

The Flattop critical assembly was first constructed in the 1950’s at Los Alamos National Laboratory as a follow-on to the Topsy experiment. Flattop is composed of a sphere of special nuclear material (SNM) surrounded by a thick spherical reflector made of natural uranium (NU). Two SNM cores currently exist: a highly-enriched-uranium (HEU) core and a plutonium core. The reflector is composed of three parts: a stationary hemisphere and two movable quarter spheres. For fine reactivity control, there are three control rods of NU that are inserted into the stationary hemisphere from underneath the assembly. The final components that allow for reactivity adjustment are the glory hole pieces, mass adjustment buttons, and hemispherical caps. These pieces can be loaded in various configurations to change the available reactivity loaded in the system.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

International Space Station USOS Crew Quarters Development

The International Space Station (ISS) United States Operational Segment (USOS) currently provides a Temporary Sleep Station (TeSS) as crew quarters for one crewmember in the Laboratory Module. The Russian Segment provides permanent crew quarters (Kayutas) for two crewmembers in the Service Module. The TeSS provides limited electrical, communication, and ventilation functionality. A new permanent rack sized USOS ISS Crew Quarters (CQ) is being developed. Up to four CQs can be installed into the Node 2 element to increase the ISS crewmember size to six. The new CQs will provide private crewmember space with enhanced acoustic noise mitigation, integrated radiation reduction material, controllable airflow, communication equipment, redundant electrical systems, and redundant caution and warning systems. The rack sized CQ is a system with multiple crewmember restraints, adjustable lighting, controllable ventilation, and interfaces that allow each crewmember to personalize their CQ workspace. Providing an acoustically quiet and visually isolated environment, while ensuring crewmember safety, is critical for obtaining crewmember rest and comfort to enable long term crewmember performance. The numerous human factor, engineering, and program considerations during the concept, design, and prototyping are outlined in the paper.

Broyan, James Lee, Jr.↗

Hund Physics Landscape of Two-Orbital Systems

Motivated by the recent discovery of superconductivity in infinite-layer nickelates RE 1–δ Sr δ NiO 2 (RE = Nd, Pr), we study the role of Hund coupling J in a quarter-filled two-orbital Hubbard model, which has been on the periphery of the attention. Here, a region of negative effective Coulomb interaction of this model is revealed to be differentiated from three- and five-orbital models in their typical Hund metal active fillings. We identify distinctive regimes including four different correlated metals, one of which stems from the proximity to a Mott insulator, while the other three, which we call “intermediate” metal, weak Hund metal, and valence-skipping metal, from the effect of J being away from Mottness. Defining criteria characterizing these metals is suggested, establishing the existence of Hund metallicity in two-orbital systems.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 SWMU #041 Year 3 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 3 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 3 PMR extends from September 2021 through October 2022. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 3 reporting period was approximately 91%, with the majority of downtime attributed to system maintenance and repair. This is generally consistent with Year 1 and Year 2 runtimes of 85% and 92%, respectively. To help reduce downtime, an anti-scaling amendment, Redux 390, has been used to reduce scaling and help maintain system design parameters. Over nine million gallons of groundwater were treated during Year 3 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 97%. This PMR describes the activities that were performed during Year 3 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 3 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 3 plume conditions. Therefore, it can be assumed that the projected path remains valid for transition to MNA in one to two years of continuous HCS operation. The contents of this Year 3 PMR were presented during the February 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Replacement of MW0019 and VMP04 was also recommended, as well as additional direct-push technology sampling to further delineate the downgradient plume and confirm overall site-wide low-concentration plume boundaries. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 Solid Waste Management Unit #041 Year 4 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 4 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 4 PMR extends from November 2022 through September 2023. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 4 reporting period was approximately 94%, with the majority of downtime attributed to associated groundwater sampling events, maintenance, and Hurricane Nicole. Almost five million gallons of groundwater were treated during Year 4 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 99%. This PMR describes the activities that were performed during Year 4 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 4 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 4 plume conditions. A supplemental DPT study conducted in 2022 and 2023. This study indicated that low-concentration plume conditions, where concentrations exceed State of Florida Groundwater Cleanup Target Levels, expanded westward to Kennedy Parkway North and northward to the vicinity of the railroad tracks. Based on these results, recommendations were made to install 14 wells to monitor the downgradient and boundary conditions of the expanded LCP. The contents of this Year 4 PMR were presented during the November 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

International Space Station USOS Crew Quarters On-orbit vs Design Performance Comparison

The International Space Station (ISS) United States Operational Segment (USOS) received the first two permanent ISS Crew Quarters (CQ) on Utility Logistics Flight Two (ULF2) in November 2008. Up to four CQs can be installed into the Node 2 element to increase the ISS crewmember size to six. The CQs provide private crewmember space with enhanced acoustic noise mitigation, integrated radiation reduction material, communication equipment, redundant electrical systems, and redundant caution and warning systems. The racksized CQ is a system with multiple crewmember restraints, adjustable lighting, controllable ventilation, and interfaces that allow each crewmember to personalize their CQ workspace. The deployment and initial operational checkout during integration of the ISS CQ to the Node is described. Additionally, the comparison of on-orbit to original design performance is outlined for the following key operational parameters: interior acoustic performance, air flow rate, temperature rise, and crewmember feedback on provisioning and restraint layout.

Broyan, James Lee, Jr.↗

Influence of overhead HVAC and aerosol control strategies on coarse mode particle dispersion and exposure in a full-scale room experiment

Coarse mode respiratory aerosols can carry viral loads over long distances and have very different dynamics than submicron particles, but experimental studies under realistic conditions remain limited. Here, to study the differential impacts on exposure under different mixing conditions, we co-released 7–10 µm particles and carbon dioxide (CO 2 )—which served as an indicator of gas and submicron particle dynamics—in a 158 m 3 room at LBNL's FLEXLAB facility with an overhead heating, ventilation, and air conditioning (HVAC) system. The room was arranged as a distanced meeting then a classroom with eight heated manikins and a researcher. Spatial variability was measured using 16 particle counters and 22–26 CO 2 sensors throughout the space. Conditions included: HVAC off or supply air at 1000-1060 m 3 h -1 at neutral, cooling, or heating temperatures; with and without 20% outdoor air; and added HVAC filtration, portable air cleaners (PACs), or a physical barrier between the speaker and occupants. We found that good mixing via neutral or cooling supply air or use of PACs under heating lowered coarse particle exposure at some locations, but increased exposure for one-quarter to two-thirds of manikins compared to poor mixing under heating. A physical barrier reduced direct transfer of coarse particles during heating, but less during cooling. High spatial variability shows that a single measurement cannot represent occupant exposure. Instantaneous air mixing assumptions overstate the effectiveness of ventilation, HVAC filtration, and upper-room germicidal ultraviolet disinfection for coarse particles, as relatively few particles reach the return grille or upper room under most conditions.

Air mixing↗

Warping of unsymmetric cross-ply graphite/epoxy laminates

Warping in unsymmetric graphite/epoxy laminates was studied with particular attention given to the change of residual stresses resulting from long term environmental exposure. Square, cured prepreg sheets were measured for edge deflection with a cathetometer, then quartered and remeasured. Two postcuring durations were then used, 7.5 and one hr at 177 C; varying cooldown rates after curing were used for other samples, and one set was stored in vacuum at 75 C. Maximum deflections and weight changes were measured periodically at room temperature. Average curvatures, the effect of postcure, and the effect of long-term exposure were determined. Larger panels exhibited cylindrical warping and smaller panels underwent anticlastic warping. The deflections were related to weight changes, i.e. moisture absorption, and the lower the moisture content, the higher the deflection. Relaxation of residual stresses at 75 C was neglibible after 220 days.

Hahn, H. T.↗

Status Report on ASME Code Development for Nonmetallic Core Components in 2020

The purpose of this report is to provide a status update on the progress and ongoing activities of the current ASME Boiler Pressure Vessel (BPV) Code Section III, Division 5, on nonmetallic core components and assemblies which includes the design rules for graphite and ceramic composite materials. Section III is concerned with the design and construction of nuclear reactor components and Division 5 focuses on high temperature reactors (HTR). The ASME Section III Committee’s function for nuclear items other than pressure-retaining components, is to establish rules of safety related to structural integrity. The term “construction” refers to the all-inclusive effort comprising of materials, design, fabrication, examination, inspection, testing, certification, and pressure relief. The Department of Energy (DOE) supports industry codes and standards development through focused research providing the technical basis for new or modified codes and standards and the participation of subject matter experts in codes and standards committees. The activities for the nonmetallic core components and assemblies committees are the pursuit of two working groups that meet quarterly during ASME BPV Code Week meetings. The two working groups are General Requirements for Graphite and Ceramic Composite Core Components and Assemblies (GR GCCCCA) and Nonmetallic Design and Materials (NDM). The rules on general requirements for nonmetallic core components are discussed in the articles of Subsection HA subpart B. Ceramic composites were recently incorporated within the rules, and the GR GCCCCA working group is now in the process of aligning the requirements with the subsections and articles of ASME BPV Code Section III NCA, the general requirements for Division 1 and 2 of the code. The NDM working group is concerned with the design rules for graphite and composite materials for core components and assemblies discussed in Subsection HH (Class SN Nonmetallic Core Components) subpart A and subpart B which reference graphite and composite materials respectively. The bulk of the progress and work is done within this working group. A significant undertaking, with discussion that started in 2015, is to gain endorsement of ASME Section III, Division 5, by the U.S. Nuclear Regulatory Commission (NRC). In June 2018, ASME formally recommended endorsement to the NRC. The NRC has since initiated the endorsement review process, which is to be concluded early in 2021. ASME task groups on metallic structures and components, as well as non-metallic core support structures, have been formed to define potential pathways and schedules for NRC endorsement of Division 5. NRC determined to perform a review on the 2017 edition of Section III Division 5 as a baseline. As a result, the use of graphite as nonmetallic core components formed part of the review, but it excluded composite materials (which were first introduced in the 2019 edition). This report documents progress in FY 2020 directed toward ASME’s efforts to develop design codes for graphite and composites. Progress includes a major code review by NRC, the first code enquiry, and its solution, an overhaul of the treatment of Weibull Statistics, and the addition of Nonmandatory Appendices to the composites code relating to carbon-carbon composite materials.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Hybrid propulsion technology program. Volume 1: Conceptional design package

A concept design study was performed to configure two sizes of hybrid boosters; one which duplicates the advanced shuttle rocket motor vacuum thrust time curve and a smaller, quarter thrust level booster. Two sizes of hybrid boosters were configured for either pump-fed or pressure-fed oxygen feed systems. Performance analyses show improved payload capability relative to a solid propellant booster. Size optimization and fuel safety considerations resulted in a 4.57 m (180 inch) diameter large booster with an inert hydrocarbon fuel. The preferred diameter for the quarter thrust level booster is 2.53 m (96 inches). As part of the design study critical technology issues were identified and a technology acquisition and demonstration plan was formulated.

Jensen, Gordon E.↗