Search NASA⌕ Search

SEARCH · Search NASA

Results for “REACTOR SITES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

An improved characterization method for international accountancy measurements of fresh and irradiated mixed oxide (MOX) fuel: helping achieve continual monitoring and safeguards through the fuel cycle

Nuclear fuel accountancy measurements are conducted at several points through the nuclear fuel cycle to ensure continuity of knowledge (CofK) of special nuclear material (SNM). Non-destructive assay (NDA) measurements are performed on fresh fuel (prior to irradiation in a reactor) and spent nuclear fuel (SNF) post-irradiation. We have developed a fuel assembly characterization system, based on the novel concept of 'neutron fingerprinting' with multiplicity signatures to ensure detailed CofK of nuclear fuel through the entire fuel cycle. The neutron fingerprint in this case is determined by the measurement of the various correlated neutron signatures, specific to fuel isotopic composition, and therefore offers greater sensitivity to variations in fissile content among fuel assemblies than other techniques such as gross neutron counting. This neutron fingerprint could be measured at the point of fuel dispatch (e.g. from a fuel fabrication plant prior to irradiation, or from a reactor site post-irradiation), monitored during transportation of the fuel assembly, and measured at a subsequent receiving site (e.g. at the reactor site prior to irradiation, or reprocessing facility post-irradiation); this would confirm that no unexpected changes to the fuel composition or amount have taken place during transportation and/ or reactor operations. Changes may indicate an attempt to divert material for example. Here, we present the current state of the practice of fuel measurements for both fresh mixed oxide (MOX) fuel and SNF (both MOX and uranium dioxide). This is presented in the framework of international safeguards perspectives from the US and UK. We also postulate as to how the neutron fingerprinting concept could lead to improved fuel characterization (both fresh MOX and SNF) resulting in: (a) assured CofK of fuel across the nuclear fuel cycle, (b) improved detection of SNM diversion, and (c) greater confidence in safeguards of SNF transportation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An Analysis of Potentially Implementing Standardized Canisters in the U.S. Commercial Waste Management System

This analytical study focuses on loading standardized transportation, aging, and disposal canisters (STADs) at commercial reactor sites and subsequent transportation, e.g., to a consolidated interim storage facility (CISF). Specifically, the amount of spent nuclear fuel (SNF) available to load into STADs with varying deployment dates is explored, and the scenarios are compared with a scenario in which STADs are never loaded at reactor sites. Two key findings are that about half of the U.S. inventory of commercial SNF could be captured in STADs if they were fully deployed by 2035 and that the percentage of SNF available to load into STADs decreases as STAD deployment is delayed.In additional scenarios, the effects of shipping STADs directly from at-reactor spent fuel pools (SFPs) to a CISF are analyzed for a STAD full deployment year of 2035. A key finding from the analysis is that the dry storage of SNF in STADs at reactor sites can be minimized by direct shipment to a CISF from reactor site SFPs. Furthermore, minimizing dry storage at reactor sites means maximizing the receipt rate for STADs at a CISF, and there is likely a more optimal point between the two scenarios for an overall cost-effective operation of waste management systems.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Siting Analyses for Advanced Nuclear Advisors (Final CRADA Report)

This report summarizes siting evaluation assistance provided to Advanced Nuclear Advisors (ANA) under CRADA/NFE-25-10693 for suitability of advanced nuclear technologies to meet siting criteria from the Nuclear Regulatory Commission (NRC) and associated guidance documents including the Electric Power Research Institute (EPRI) siting guide and other proprietary datasets. Advanced Nuclear Advisors provided sites for reactor siting evaluations using the Oak Ridge – Siting Analysis for power Generation Expansion (OR-SAGE) tool. Individual data packages for each site are provided separately.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Siting Analyses for Elementl Power (Final CRADA Report)

This report summarizes siting evaluation assistance provided to Elementl Power under CRADA/NFE-23-09638 for suitability of advanced nuclear technologies to meet siting criteria from the Nuclear Regulatory Commission (NRC) and associated guidance documents including the Electric Power Research Institute (EPRI) siting guide and other proprietary datasets. Elementl Power provided sites for reactor siting evaluations using the Oak Ridge – Siting Analysis for power Generation Expansion (OR-SAGE) tool. Individual data packages for each site are provided separately.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Remedial Investigation of Hanford Site Releases to the Columbia River - 13603

In south-central Washington State, the Columbia River flows through the U.S. Department of Energy Hanford Site. A primary objective of the Hanford Site cleanup mission is protection of the Columbia River, through remediation of contaminated soil and groundwater that resulted from its weapons production mission. Within the Columbia River system, surface water, sediment, and biota samples related to potential Hanford Site hazardous substance releases have been collected since the start of Hanford operations. The impacts from release of Hanford Site radioactive substances to the Columbia River in areas upstream, within, and downstream of the Hanford Site boundary have been previously investigated as mandated by the U.S. Department of Energy requirements under the Atomic Energy Act. The Remedial Investigation Work Plan for Hanford Site Releases to the Columbia River [1] was issued in 2008 to initiate assessment of the impacts under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 [2]. The work plan established a phased approach to characterize contaminants, assess current risks, and determine whether or not there is a need for any cleanup actions. Field investigation activities over a 120-mile stretch of the Columbia River began in October 2008 and were completed in 2010. Sampled media included surface water, pore water, surface and core sediment, island soil, and fish (carp, walleye, whitefish, sucker, small-mouth bass, and sturgeon). Information and sample results from the field investigation were used to characterize current conditions within the Columbia River and assess whether current conditions posed a risk to ecological or human receptors that would merit additional study or response actions under CERCLA. The human health and ecological risk assessments are documented in reports that were published in 2012 [3, 4]. Conclusions from the risk assessment reports are being summarized and integrated with remedial investigation/feasibility study (RI/FS) reports developed for upland areas, riparian areas, and groundwater in the Hanford Site River Corridor. The RI/FS reports will evaluate the impacts to soil, groundwater, and river sediments and lead to proposed cleanup actions and records of decision to address releases from the Hanford Site reactor operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Accelerating Nuclear-Integrated Data Centers in the USA: SWOT Analysis, Power-Thermal Management Strategies, and Industrial-Scale Demonstration and Potential Deployment

Driven by the growth in digital services, cloud computing, AI, and manufacturing, data centers face rising energy demands that challenge traditional power sources and cooling efficiency. This study explores using nuclear power to meet these demands, focusing on accelerated reactor technology deployment and highlighting needs such as N+1/N+2 power supplies and integrated power-thermal management. A SWOT analysis addresses grid connectivity, reactors, and site selection, particularly DOE sites. Reactor technology demonstration and deployment could be accelerated by leveraging test facilities such as MARVEL, MAGNET, TED, FAS, DOME, LOTUS, ATR, Energy System Proving Grounds, and upcoming Energy Launch Pads, along with modeling and simulation tools such as RELAP5, MOOSE, VERA, RAVEN, and FORCE. The potential power and thermal management options, including various cooling technologies, waste-heat utilization, and an industrial-scale demonstration plan, aim to accelerate the integration of nuclear power and data centers in the USA, while emphasizing community and stakeholder engagement and synergistic efforts.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

System impacts of accelerated transfer of used nuclear fuel to dry storage - 15220

In the wake of the September 11, 2001 terror attacks, and again after the March 11, 2011, accident at the Fukushima Dai-Ichi station from the Great East Japan Earthquake/tsunami, concern was expressed regarding security of current spent fuel storage practices in the United States. An approach recurrently proposed to reduce the potential for fire and the release of radionuclides in an accident or sabotage scenario is to reduce the loading of the reactor fuel pools, which are frequently maintained near their full capacity at many reactor sites in the U.S. We assess the impact on the waste management system of different scenarios for accelerating the schedule of used nuclear fuel (UNF) transfer from reactor pools to dry storage casks. We consider scenarios where the spent fuel pools are drawn down to 50% or 25% of full capacity over 5- or 10-year schedules. The scenarios include status quo, where UNF continues to remain in dry storage at the reactor sites, as well as scenarios with UNF transfer to interim storage and eventually to a mined geologic repository. The primary purpose is to evaluate how the different scenarios for accelerating the transfer of UNF to at-reactor dry storage would affect the performance of the entire UNF management system. Areas that were considered include an estimate of the additional system costs that could be incurred and where the existing infrastructure at the reactor sites would come under stress from the transfer demands. This study considered only the fuel-handling logistics and rough-order-of-magnitude cost at reactor sites, interim storage facility, and operations to package UNF into disposal canisters. The effects of minimum fuel age that could be transferred and the accelerated transfer starting date are also examined, but found to have relatively little effect. Impacts on safety and worker dose are not evaluated quantitatively, although effects can be inferred from increases in handling operations, etc. from the scenarios considered. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fuel Cycle Study to Developing a Viable Long Term Nuclear Power Scenario for the UK

Within the UK a closed fuel cycle has been in operation for decades but with the introduction of a new build programme to create 16 GWe capacity using LWR technology and with the closure of the UK's reprocessing industry, an open fuel cycle will be implemented beyond 2020. However, it is expected that 16 GWe nuclear capacity will not be enough for the UK to curb greenhouse gas emissions through increased demand for low carbon electricity, and tackle energy security. As such further nuclear expansion scenarios are being considered between 40 and 75 GWe by 2050. This study evaluates a viable 40 GWe UK nuclear scenario, evaluating the extent to which key drivers can impact a future UK nuclear energy strategy, including; the ability to sustain a relatively high nuclear capacity, fresh uranium availability, accumulation of spent fuel at decommissioning nuclear reactor sites and capacity requirements of future GDF host sites. The thermal reactor open fuel cycle is the de-facto standard around the world for many reasons including the reliance on extremely mature technology, significant operational experience and most importantly a relatively low cost. However, the premise that a thermal reactor open fuel cycle is the correct one to adopt long term is dependent on the notion that large quantities of UO{sub 2} spent fuel can eventually be disposed of in a geological disposal facility and the future availability of fresh uranium. The total amount of available uranium is unknown and if extraction from seawater proves to be economic and practical then any future concerns regarding supply disappear. Spent fuel disposability on the other hand has never been performed on a commercial scale and there is some uncertainty when and whether this can be achieved. This paper will follow from previous work already presented in 2013 [REF] which examined UK fuel cycles involving the transition to a closed fast reactor fleet by the end of this century. The revised scenarios now assume fast reactors are required later in the scenario, in-line with other countries. In addition, the new study has used physics methods originally developed by SKB to assess the physical size of the repository required to dispose of all intermediate and high level waste whilst ensuring temperature limits imposed by the engineered barriers and surrounding geology are adhered to. The disposition of less Am-241 in the repository will no doubt lead to a reduction in GDF footprint. However, this may not be important to GDF design and economics. The purpose of this paper is to also critically review the importance of and put into perspective a smaller GDF footprint and lower fissile inventory. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Initiating Events for Multi-Reactor Plant Sites

Inherent in the design of modular reactors is the increased likelihood of events that initiate at a single reactor affecting another reactor. Because of the increased level of interactions between reactors, it is apparent that the Probabilistic Risk Assessments (PRAs) for modular reactor designs need to specifically address the increased interactions and dependencies.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Systems and Tools to Facilitate Aging Management Inspections of Used Nuclear Fuel Dry Storage Systems - 18382

The Used Nuclear Fuel (UNF) dry storage systems (DSSs) are currently used at almost all the nuclear plants in the USA for the storage of their UNF as the spent fuel pools are running out of capacity to store any additional discharged fuel. Even though these DSSs are supposed to be at the reactor site for a short amount of time, they are expected to be at the reactor sites for an extended duration due to the unavailability of Interim Storage Facilities (ISF) or a permanent disposal sites like Yucca Mountain. Maintaining the integrity of the DSS canisters and storage overpacks so they can safely protect the fuel and maintain the integrity of UNF is of utmost importance during storage at reactor site ISFSI or at the ISF. Comprehensive and robust Aging Management Program (AMP) is an important aspect for DSSs to satisfy these requirements. In order to address this industry need, TN Americas have developed an enhanced NUHOMS{sup R} DSS licensed by NRC under 10 CFR Part 72 regulations and a comprehensive AMP development which includes prevention, inspection, monitoring and mitigation of any corrosion or degradation of DSS components. For DSC and HSM inspection, two remotely operating delivery systems have been developed using non-destructive examination (NDE) methods including robotic crawler and inspection ring system. This paper describes details of these developments and status of their deployment for implementation at various utility ISFSI sites. TN Americas completed the detailed design of the DSC inspection system and conducted functional tests of the inspection system on a DSC mockup and the system is ready for deployment at any NUHOMS{sup R} ISFSI site. TN Americas is committed to offer the most robust and comprehensive AMP systems, tools and services to the industry to assure the safety of the deployed DSS at the utility sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Potential Cost Implications of an Interim Storage Facility for Commercial SNF+ - 17132

The question of whether or not consolidated interim storage of commercial spent nuclear fuel (SNF) should be part of the federal waste management system as an intermediate step before permanent disposal has been debated for more than four decades. This paper summarizes an evaluation of the cost implications of incorporating a consolidated interim storage facility (ISF) into the waste management system (WMS). In this study, the order-of-magnitude estimates of total system costs were calculated and tabulated. The analyzed scenarios involve shipment of SNF from reactors in dual-purpose storage and transportation canisters (DPCs) currently being used by utilities for dry storage at reactor sites. A number of pertinent conclusions can be drawn from this evaluation, including: - Delay in repository availability increases total system costs. Any delay in opening a repository increases total system costs, regardless of whether the system has an ISF or not. This is due to the increased cost associated with an extended duration for storage, whether at multiple independent spent fuel storage installations (ISFSIs) or at an ISF, until waste can be disposed of.- There is a potential total system lifecycle cost avoidance in realistic scenarios with an ISF when compared to scenarios with no ISF. However, most of the cost avoidance occurs several decades after the ISF is opened. The total WMS cost differential over the long term is mainly attributed to the reduced operational costs of storing the fuel in a consolidated facility rather than at individual reactor sites. - Earlier establishment of an ISF allows for more avoidance of post-shutdown at-reactor storage costs for any repository opening date. An ISF allows earlier acceptance of fuel from reactors, which reduces at-reactor costs from a total system perspective. - Transportation costs have little impact on a WMS with or without an ISF. These impacts range from 3-11% of the total cost in all scenarios. Therefore, transporting the fuel twice does not appear to be a significant cost concern driver relative to other system costs. In conclusion, designing, licensing, and constructing an ISF will require a large near-term financial investment. However, reduced annual operating and maintenance costs for an integrated waste management system with an ISF, compared to a system without an ISF, could eventually result in system-wide (integrated) cost avoidance due to reductions in at-reactor storage costs in the long term. The largest cost avoidances would not occur for several decades, so assumptions about inflation, escalation, and discount rates will have a significant effect on potential economic impacts of an ISF. It should be noted that other benefits associated with the investment of an ISF-such as earlier removal of SNF from shutdown reactor sites, earlier prospects for site re-utilization, and additional overall integrated waste management system flexibility-were not addressed in this study. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites

This report fulfills the M2 milestone M2FT-13PN0912022, “Stranded Sites De-Inventorying Report.” In January 2013, the U.S. Department of Energy (DOE) issued the Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (DOE 2013). Among the elements contained in this strategy is an initial focus on accepting used nuclear fuel from shutdown reactor sites. This focus is consistent with the recommendations of the Blue Ribbon Commission on America’s Nuclear Future, which identified removal of stranded used nuclear fuel at shutdown sites as a priority so that these sites may be completely decommissioned and put to other beneficial uses (BRC 2012). Shutdown sites are defined as those commercial nuclear power reactor sites where the nuclear power reactors have been shut down and the site has been decommissioned or is undergoing decommissioning. In this report, a preliminary evaluation of removing used nuclear fuel from 12 shutdown sites was conducted. The shutdown sites were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, and San Onofre. These sites have no other operating nuclear power reactors at their sites and have also notified the U.S. Nuclear Regulatory Commission that their reactors have permanently ceased power operations and that nuclear fuel has been permanently removed from their reactor vessels. Shutdown reactors at sites having other operating reactors are not included in this evaluation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SAVANNAH RIVER SITE R REACTOR DISASSEMBLY BASIN IN SITU DECOMMISSIONING

The US DOE concept for facility in-situ decommissioning (ISD) is to physically stabilize and isolate in tact, structurally sound facilities that are no longer needed for their original purpose of, i.e., generating (reactor facilities), processing(isotope separation facilities) or storing radioactive materials. The 105-R Disassembly Basin is the first SRS reactor facility to undergo the in-situ decommissioning (ISD) process. This ISD process complies with the105-R Disassembly Basin project strategy as outlined in the Engineering Evaluation/Cost Analysis for the Grouting of the R-Reactor Disassembly Basin at the Savannah River Site and includes: (1) Managing residual water by solidification in-place or evaporation at another facility; (2) Filling the below grade portion of the basin with cementitious materials to physically stabilize the basin and prevent collapse of the final cap - Sludge and debris in the bottom few feet of the basin will be encapsulated between the basin floor and overlying fill material to isolate if from the environment; (3) Demolishing the above grade portion of the structure and relocating the resulting debris to another location or disposing of the debris in-place; and (4) Capping the basin area with a concrete slab which is part of an engineered cap to prevent inadvertent intrusion. The estimated total grout volume to fill the 105-R Reactor Disassembly Basin is 24,424 cubic meters or 31,945 cubic yards. Portland cement-based structural fill materials were design and tested for the reactor ISD project and a placement strategy for stabilizing the basin was developed. Based on structural engineering analyses and work flow considerations, the recommended maximum lift height is 5 feet with 24 hours between lifts. Pertinent data and information related to the SRS 105-R-Reactor Disassembly Basin in-situ decommissioning include: regulatory documentation, residual water management, area preparation activities, technology needs, fill material designs and testing, and fill placement strategy. This information is applicable to decommissioning both the 105-P and 105-R facilities. The ISD process for the entire 105-P and 105-R reactor facilities will require approximately 250,000 cubic yards (191,140 cubic meters) of grout and 2,400 cubic yards (1,840 cubic meters) of structural concrete which will be placed over a twelve month period to meet the accelerated schedule ISD schedule. The status and lessons learned in the SRS Reactor Facility ISD process will be described.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Fit for Purpose Remote Technology Decommissioning Solutions - 18630

The Magnox Decommissioning Project is actively progressing clean-up and decommissioning of 12 reactor sites across England, Scotland and Wales. Funded and directed by the United Kingdom's Nuclear Decommissioning Authority (NDA) and managed by the Cavendish Fluor Partnership (CFP), the Magnox Decommissioning Project introduces a wide range of radiological and industrial hazards warranting deployment of remote technologies to safely de-inventory, decontaminate and decommission a vast array of nuclear facilities. The Magnox Decommissioning Project encompasses 22 former Magnox nuclear power production reactors across 10 reactor sites and five research/test reactors at two former research sites. Decommissioning activities have been underway at some sites for nearly 20 years with early focus on retrieving and stabilising wastes and draining and stabilising spent fuel ponds. The Magnox decommissioning strategy invokes a programme perspective to drive consistency in tackling similar decommissioning and waste challenges across multiple sites. Programme central teams have worked with technology suppliers to foster learning from industry experience to develop and deploy tooling and robotics. The programme approach has also facilitated learning from one site to the next. In many cases, this central programme approach has promoted an evolution of technologies resulting in optimisation of simple remote tooling. In other instances, collaboration with suppliers is producing state-of-the-art technologies to tackle more unique challenges including, most recently, early demonstration of laser cutting for reactor vessel dismantling. This paper will outline the programme management approach and the scalable optioneering process Magnox employs to select the engineered controls and technologies used in decommissioning and waste management activities. It will provide an overview of the broad range of remote tooling and robotics deployed across the 12 Magnox sites by exploring some specific examples. Lastly, the paper will summarise key lessons learned in the now extensive history of selecting and using remote technologies to decommission Magnox nuclear facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

System Analysis Modeling and Intermodal Transportation for Commercial Spent Nuclear Fuel

The United States Department of Energy (DOE) has long term goals to develop solutions for managing the nation’s spent nuclear fuel (SNF) and high-level waste (HLW) inventory. The Integrated Waste Management (IWM) program under the DOE office of Nuclear Energy (DOE-NE) is employing system-level engineering and analysis principles to inform potential future waste management system architectures. Managing the spent nuclear waste requires the use of system-level analysis software that takes various aspects of the fuel cycle into account like waste generation, on-site/centralized storage, transportation infrastructure, and long-term disposal. The Next Generation System Analysis Model (NGSAM) is an agent-based model that was developed to simulate the transportation and storage of SNF and HLW. As an agent-based model, NGSAM has the capability to detail the interaction and movement of individual components and groups, such as rail cars and casks. The SNF inventory from commercial nuclear reactors is currently in temporary storage at multiple locations spread across the United States. Shipping of SNF from these locations relies on one of three transportation modes: rail, heavy-haul truck, or barge. Out of the three modes identified, rail is generally the most preferred due to the size of the canisters and casks the SNF would be shipped in. However, under some scenarios, a direct rail route might not be readily available to a reactor site or improving the rail infrastructure at shutdown sites might be too cost-prohibitive for utilities to opt for a direct rail transfer. Under such scenarios, using a barge or heavy haul truck to de-inventory the site and transfer the SNF to a nearby intermodal transfer site with adequate rail infrastructure where the payload could be transferred to a rail car might prove to be an attractive option. This work initially presents the various intermodal transportation options that could be used to transfer SNF from reactor sites to rail cars. This is followed by exploring the operational steps in each of these modes to move the SNF from a reactor site and transfer it to a rail car. This work also presents the procedure of implementing the intermodal transfer methodology in NGSAM using various Java methods. Finally, the process times for accomplishing each of the individual steps are furnished. The implementation ideology, assumptions, and future steps are presented in this work.

Gadey, Harish Reddy↗

Initial Site-Specific Studies for Removing SNF from Six Shutdown Sites - 18042

The US Department of Energy (DOE) is exploring options for developing a large-scale transportation system for the safe transport of spent nuclear fuel (SNF) and high-level radioactive waste to future storage or disposal facilities. This complex, large-scale transportation system will involve coordinated, integrated activities. Interfaces with various transportation and non-transportation activities must be defined, and systems must be developed to ensure successful integration when the system becomes operational. To provide an understanding of the tasks and interfaces required for the complete de-inventory of particular sites where SNF is stored, DOE solicited bids from integrating contractors to develop initial site-specific de-inventory reports. The reports were developed for several nuclear power plant sites selected to represent a range of geographic locations, existing on-site SNF storage systems, and expected transportation modal options. Each report is presented in a self-contained narrative describing a potential campaign for removing all SNF and greater-than-class-C low-level radioactive waste (GTCC waste) from each specified site. Each study narrative includes site information; an analysis of the near-site transportation infrastructure; a concept of operations for the de-inventory; an estimated budget and schedule for the duration of operations; and a safety and security plan with site-specific considerations, emergency response considerations, and recommendations for the next steps DOE could take to de-inventory the site. The reports provide cost estimates for analytical purposes only; they do not attempt to specify the party or parties responsible for the costs. These reports present a first look at how an integrating contractor might recommend removing SNF from particular sites. They are written from the perspective of the contractor and do not represent DOE's plans. At this writing, six sites have been studied: - Connecticut Yankee, - Big Rock Point, - Humboldt Bay, - Maine Yankee, - Trojan, - Kewaunee. DOE may develop de-inventory reports for all reactor sites, with an initial focus on shutdown reactor sites. The order in which sites have been selected for study should not be considered an indicator of the order used by DOE to remove SNF from the sites. Since the SNF's destination is not important for the purpose of this work, DOE tasked the contractor with planning transportation of the SNF from the site to a generic railroad location in the approximate geographical center of the United States. These reports represent an initial study of the specific sites. Per the terms of the contract, the contractor was not permitted to engage in dialogue with power plant site personnel; near-site railroad personnel; or any local, state, or regional stakeholders about the studies. DOE provided site-specific data. The contractor was tasked to rely on past corporate experience, data available from DOE, and publicly available data when making site-specific recommendations for removing all SNF from each site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sampling for Confidence: Guidance for Evaluating the Quality of Canister Sampling Plans

There is a need for an inspection frequency that demonstrates reasonable assurance that the confinement function of dual-purpose-canisters (DPCs) is maintained as these DPCs are returned to storage service following transportation. The DPCs contain spent fuel from shutdown reactor sites. The currently-proposed 100% DPC inspection frequency is overly conservative and unnecessary to demonstrate reasonable assurance that the confinement function of all DPCs is maintained for return to storage service. Testing all DPCs does not appropriately reflect the very low risk of leakage (i.e., low probability based on design and low consequences based on analysis). Currently, there are 1066 DPCs forecast to be loaded at reactor sites which either are shutdown or plan to cease operations by 2025. These DPCs may be transported by rail in sets of 3 to 5 DPCs per shipment. Assuming each rail consist originates at a single reactor site, an alternative proposal to test one canister/consist/site would result in 356 to 214 canisters, respectively, being tested given the population of 1,066 canisters This Savannah River National Laboratory (SRNL) report outlines statistically-based, random sampling plans that provide guidance on the number of samples of these canisters that are needed to establish bounds on the quality of the outcome of such sampling. The quality of each proposed sampling plan is expressed in the form of a statement that the number of undetected, unacceptable canisters in the population is less than some number, call it D, at a high level of confidence. In addition, evaluations using a similar approach for random sampling at the proposed levels of 214 and 356 canisters are provided.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sampling for Confidence: Guidance for Evaluating the Quality of Canister Sampling Plans

There is a need for an inspection frequency that demonstrates reasonable assurance that the confinement function of dual-purpose-canisters (DPCs) is maintained as these DPCs are returned to storage service following transportation. The DPCs contain spent fuel from shutdown reactor sites. The currently-proposed 100% DPC inspection frequency is overly conservative and unnecessary to demonstrate reasonable assurance that the confinement function of all DPCs is maintained for return to storage service. Testing all DPCs does not appropriately reflect the very low risk of leakage (i.e., low probability based on design and low consequences based on analysis). Currently, there are 1066 DPCs forecast to be loaded at reactor sites which either are shutdown or plan to cease operations by 2025. These DPCs may be transported by rail in sets of 3 to 5 DPCs per shipment. Assuming each rail consist originates at a single reactor site, an alternative proposal to test one canister/consist/site would result in 356 to 214 canisters, respectively, being tested given the population of 1,066 canisters This Savannah River National Laboratory (SRNL) report outlines statistically-based, random sampling plans that provide guidance on the number of samples of these canisters that are needed to establish bounds on the quality of the outcome of such sampling. The quality of each proposed sampling plan is expressed in the form of a statement that the number of undetected, unacceptable canisters in the population is less than some number, call it D, at a high level of confidence. In addition, evaluations using a similar approach for random sampling at the proposed levels of 214 and 356 canisters are provided. This is a technical report that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed upon contract amendment. To the extent discussions or recommendations in this report conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗