Search NASA⌕ Search

SEARCH · Search NASA

Results for “RFP”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

53 records · Page 3

The design of a long-range megatransport aircraft

Aircraft manufacturers are examining the market and feasibility of long-range passenger aircraft carrying more than 600 passengers. These aircraft would carry travelers at reduced cost and, at the same time, reduce congestion around major airports. The design of a large, long-range transport involves broad issues such as: the integration of airport terminal facilities; passenger loading and unloading; trade-offs between aircraft size and the cost to reconfigure these existing facilities; and, defeating the 'square-cube' law. Thirteen Purdue design teams generated RFP's that defined passenger capability and range, based upon team perception of market needs and infrastructure constraints. Turbofan engines were designed by each group to power these aircraft. The design problem and the variety of solutions developed are reviewed.

Weisshaar, Terrence A.↗

RECON Replacement Project

The background, project components, and interface requirements of the RECON/STIMS Replacement Project are described. A requirements document was developed outlining the desired functions, architecture, and capabilities to be covered in the procurement process and a Request for Proposal (RFP) was disseminated. The data structure of the existing bibliographic records and files were examined and an inventory of all existing data elements in RECON records was performed. The goal is a standards based, open architecture system.

Hill, Linda↗

Open system environment procurement

Relationships between the request for procurement (RFP) process and open system environment (OSE) standards are described. A guide was prepared to help Federal agency personnel overcome problems in writing an adequate statement of work and developing realistic evaluation criteria when transitioning to an OSE. The guide contains appropriate decision points and transition strategies for developing applications that are affordable, scalable and interoperable across a broad range of computing environments. While useful, the guide does not eliminate the requirement that agencies posses in-depth expertise in software development, communications, and database technology in order to evaluate open systems.

Fisher, Gary↗

Central coast designs: The Eightball Express. Taking off with convention, cruising with improvements and landing with absolute success

The airline industry is very competitive, resulting in most U.S. and many international airlines being unprofitable. Because of this competition the airlines have been engaging in fare wars (which reduce revenue generated by transporting passengers) while inflation has increased. This situation of course is not developing revenue for the airlines. To revive the airlines to profitability, the difference between revenue received and airline operational cost must be improved. To solve these extreme conditions, the Eightball Express was designed with the main philosophy of developing an aircraft with a low direct operating cost and acquisition cost. Central Coast Designs' (CCD) aircraft utilizes primarily aluminum in the structure to minimize manufacturing cost, supercritical airfoil sections to minimize drag, and fuel efficient engines to minimize fuel burn. Furthermore, the aircraft was designed using Total Quality Management and Integrated Product Development to minimize development and manufacturing costs. Using these primary cost reduction techniques, the Eightball Express was designed to meet the Lockheed/AIAA Request for Proposal (RFP) requirements of a low cost, 153 passenger, 3000 nm. range transport. The Eightball Express is able to takeoff on less than a 7000 ft. runway, cruise at Mach 0.82 at an altitude of 36,000 ft. for a range of 3,000 nm., and lands on a 5,000 ft. runway. lt is able to perform this mission at a direct operating cost of 3.51 cents/available seat mile in 1992 dollars while the acquisition cost is only $28 million in 1992 dollars. By utilizing and improving on proven technologies, CCD has produced an efficient low cost commercial transport for the future.

Davis, Ryan Edwin↗

A preliminary design proposal for a maritime patrol strike aircraft: MPS-2000 Condor

The four member graduate design team assembled to submit a proposal for the 1993/1994 RFP at the University of Kansas has designed a four seat, variable swept wing, twin turbofan aircraft with STOL capabilities. The aircraft is named the MPS-2000 Condor and is capable of carrying air-to-surface or air-to-air weapon systems along with attack and surveillance radar and IRF systems. The aircraft has a cruise range of 800 nautical miles, a loiter of 4 hours, and a dash speed of 500 kts.

Source record↗

Work Breakdown Structure (WBS) and WBS dictionary

This document is intended to provide the framework for defining all work to be accomplished under the proposed contract for the mission support program as defined by Section J-1 Statement of Work (SOW) of the RFP No.8-1-3-TA-50030 dated 11/2/93. The time period of performance of this contract will be from 3/1/94 through to the end of fiscal 1999. In addition to providing the framework for the integration of the cost, schedule, and manpower planning necessary to accomplish this work it establishes the association among the WBS elements, the SOW, and the Technical Proposal.

Cocuzzo, F.↗

Research Laboratory for Engineering and Tehnology (ReLEnT)-Summer Program

During the fiscal years 1994-1995 students at Central State University (CSU) have worked diligently under the supervision of the PI and associates to plan, design and conduct a four-week hands on summer program for high school students in grades 9 to 12. These workshops consists of experiments and computer aided design and manufacturing, designed to constructively stimulate interests in engineering and technology, and promote enrollment at CSU after they matriculate from high school. The experience gained in two years will be utilized to realize one of the deliverables for CSU engineering program during 1996. In FY-96 a new total of 30 students are now being interviewed for the 1996 program. This grant also provides resource for students enrolled in CSU's engineering program to work as undergraduate research assistants and ReLEnT tuition scholarship awards. These students are involved in the development of research, design projects, workshop procedures, laboratory exercises and seminars. Undergraduate students receiving tuition scholarships are required to maintain a cumulative grade point average of 3.0 or higher. Finally, the ReLEnT award has made it possible for CSU to acquire some experimental and CFD capability which now provides us with the opportunity to compete and respond to RFP's on a competitive basis and a timely manner.

Okhio, Cyril B.↗

Corporate Memory and Spacecraft Course Development

The Florida Space Grant Consortium (FSGC) entered into a cooperative agreement with NASA's Kennedy Space Center (KSC) to manage two programs, (1) Corporate Memory and (2) Spacecraft Course Development. The FSGC, with its central office at the University of Florida, administered these programs. In conjunction with KSC, the FGSC was responsible for the release of the Request for Proposals (RFP's) and its distribution to all its affiliates. FSGC received the applications, forwarded them to KSC for evaluations, and awarded grants to the institutions chosen by KSC.

Source record↗

SOFIA Science Working Group

This grant supported travel to attend meetings of the SOFIA Science Working Group during the two year period above. The Stratospheric Observatory for Infrared Astronomy (SOFIA) is a modified Boeing 747 that contains a 2.5 meter infrared optimized telescope. SOFIA's mission is to explore star formation and galaxy formation in the early Universe through far-infrared spectroscopy and photometry. The two years encompassed by this grant were critical to the anticipated first fight with SOFIA in 2002. During this period, the'technical details of the facility were developed and NASA was guided in the release of the SOFIA aircraft development and management RFP. This grant supported travel for the PI during this period both to NASA Ames, and Washington, DC to attend working group meetings. There were no inventions under this grant.

Stacey, Gordon J.↗

Teaming for Exploration

A multibillion-dollar NASA contracting effort, the largest since the Apollo, shuttle, and space station developments, is formally underway with the release of the draft request for proposals for the Crew Exploration Vehicle (CEV) to replace the shuttle and eventually return astronauts to the Moon as a stepping-stone to Mars. With guidance from the draft request for proposals (RFP) now in hand, contractors are beginning a flurry of activity to posture for formal bids and to align their earlier in-house concepts with major new exploration program specifics, including strong guidelines on managing cost and risk. And Lockheed Martin will announce this week that it is teaming with EADS Space Transportation for the CEV contract. Should this team win, Europe's largest aerospace contractor would be in line for a key role in developing a replacement for the shuttle and renewed human operations on the lunar surface.

Covault, Craig↗

How NASA Expanded its Innovation Framework to Find New Solutions to Old Problems

A radio frequency engineer from rural New Hampshire contributed the best solution to a public challenge issued by NASA's Space Life Sciences Directorate. This is a clear example of what Aneesh Chopra, the US Federal Chief Technology Officer, describes as the notion that in our society, knowledge is widely dispersed. And if it s widely dispersed, how do we capture the insights from the American people?" Chopra later said, to a live audience at the 2010 Rethinking Government event: "A semi-retired radio frequency engineer was able to share his idea about how to solve this problem, and it so blew away other ideas that NASA said it exceeded their requirements! No complicated RFP, the need for lobbyists, some convoluted processes, etc. Just a smart person who was paid a modest fee for his insight."

Davis, Jeffrey R.↗

ESMD Risk Management Workshop: Systems Engineering and Integration Risks

This report has been developed by the National Aeronautics and Space Administration (NASA) Exploration Systems Mission Directorate (ESMD) Risk Management team in close coordination with the Systems Engineering Team. This document provides a point-in-time, cumulative, summary of key lessons learned derived from the SE RFP Development process. Lessons learned invariably address challenges and risks and the way in which these areas have been addressed. Accordingly the risk management thread is woven throughout the document.

Systems Engineering↗

Lunar Mega Project: Processes, Work Flow and Terminology of the Terrestrial Construction Industry versus the Space Industry

Recent developments around the world show an increased interest and international activity toward developing a lunar surface human and robotic presence with a long term, sustainable vision. In Europe, the construction of a "Moon Village" has been proposed, and China has stated its intention to build a research station with a crew at the lunar South Pole. Russia stated it will land cosmonauts on the Moon in the 2030's. India has sent an orbiter, a robotic lander, and rover to the Moon. The USA intends to land the first woman and a man on the Moon by 2024 to initiate a sustained human lunar presence.A lunar research station with associated commercial activities will require infrastructure to become a permanent capability. Landing and launch pads, propellant storage and distribution farms, spacecraft access and handling structures, cranes, blast protection berms or walls, roads, graded areas, dust stabilized areas, foundations, parking lots, radiation shelters, micro-meteorite protection hangars, habitats and other human shelters, greenhouse farms, utility trenches, power plants, industrial water and oxygen extraction plants, communications antenna towers, thermal protection, mining zones, crater access and sub-surface access will be required to create a safe and sustainable lunar operations capability. This infrastructure will require significant construction activities in an extreme environment, with risky and expensive operations. On Earth, there are similar large and expensive projects (>$1 Billion) in difficult locations that attract a lot of public attention. These are known as "Mega Projects" and examples include bridges, tunnels, highways, railways, airports, seaports, power plants, dams, wastewater projects, Special Economic Zones (SEZ), oil and natural gas extraction projects, public buildings, information technology systems, aerospace projects, and weapons systems. Large consortiums consisting of public and private entities typically implement these infrastructure Mega-Projects.This paper will compare the typical design process, project management process, and work flow in the terrestrial construction industry to the space industry in order to create a better understanding between the terrestrial construction industry and the space industry, to further enable collaboration on a lunar Mega Project to build infrastructure on the Moon. In addition, a glossary of respective industry terminology with annotated linkages and definitions has been compiled. This information will enable contracts and business practices to be formulated for generating requests for proposals (RFP) by governments to consortiums consisting of construction and space industry companies that will bid on Lunar Infrastructure Projects that could lead to contracts to build the permanent capabilities.

Robert P Mueller↗

NASA’s Human Landing System: Enabling the Next Generation of Lunar Science

The Human Landing System (HLS) is the mode of transportation that will take astronauts to the lunar surface as part of NASA's Artemis exploration program. HLS also serves as a research platform both on the surface and in lunar orbit, enabling critical scientific investigations on and of the Moon. With support at NASA centers around the country, the HLS program, based at Marshall Space Flight Center in Huntsville, Alabama, is working closely with its commercial partners throughout the development process to design and build innovative and technically advanced lunar landers – new vehicles designed for the modern era of space travel – leveraging decades of human spaceflight experience and the speed of the commercial sector. In 2019, NASA asked U.S. industry for proposals to design and develop a human lander for the first human mission to the lunar surface under Artemis. Initial contracts were awarded to Blue Origin Federation, Dynetics, and SpaceX to advance their designs. Following the execution of the ten-month Base Period, NASA announced in April 2021 that the agency selected SpaceX to move forward with its human landing system [1] and land the first two astronauts on the lunar surface during the Artemis III mission. Following two protest periods, NASA awarded the contract, known as Option A, to SpaceX in July 2021 and resumed work in November 2021 (Fig. 1). In parallel, the HLS program has been preparing for the acquisition that will procure regular crewed transportation to the lunar surface following Artemis III. NASA released a request for information (RFI) in July 2021 asking U.S. industry for feedback to help inform the future solicitation, known as Lunar Exploration Transportation Services (LETS) [2]. Also in July 2021, NASA released the NextSTEP-2 Appendix N broad agency announcement soliciting new work from U.S. industry to mature their HLS designs and perform risk reduction activities in advance of the LETS procurement [3]. NASA selected Blue Origin Federation, Dynetics, Lockheed Martin, Northrop Grumman, and SpaceX to participate [4]. This work will also help better inform the LETS procurement and prepare industry to propose. NASA hopes to release a draft request for proposals (RFP) in Spring 2022.

R C Weber↗

Commercial Smallsat Data Acquisition Program On-ramp #2 Airbus U.S. Synthetic Aperture Radar (SAR) Evaluation Report

In 2017, NASA’s Earth Science Division (ESD) launched the Private-Sector Small Constellation Satellite Data Product Pilot, now referred to as the Commercial Smallsat Data Acquisition (CSDA) program. The objective of CSDA is to identify, evaluate, and acquire commercial remote sensing data that support NASA’s Earth science research and application activities. The Pilot successfully concluded in early 2020, when CSDA transitioned into a sustained program with on-ramping opportunities for new vendors as the industry emerges with new candidates and capabilities. In October 2019, a Request for Information (RFI) seeking capability statements from parties interested in providing data from spaceborne platforms was released for the CSDA on-ramp #2 evaluations. To be responsive to the RFI, the commercial satellite constellations had to consist of three or more operating spacecraft actively collecting data in a non-geostationary orbit with full latitudinal coverage and be U.S. companies. Two vendors responded to the RFI and were evaluated by a committee composed of NASA ESD leadership, program managers, and scientists. Both vendors satisfied the RFI requirements and were asked to respond to a Request for Proposal (RFP). After review of the proposals, NASA entered into a Blanket Purchase Agreement (BPA) with Airbus Defense and Space GEO, Inc. (Airbus) U.S. in September 2021 and with BlackSky Geospatial Solutions, Inc. (BlackSky) in November 2021. In this report, CSDA provides an evaluation of the usefulness of data provided by the Airbus U.S. Synthetic Aperture Radar (SAR) satellite constellation, consisting of TerraSAR-X (launched in 2007), TanDEM-X (launched in 2010), and PAZ (launched in 2018), for advancing NASA’s Earth system science research and applications. The evaluation of the BlackSky commercial data will be provided in a separate report. To conduct the Airbus evaluation, NASA’s ESD augmented 13 existing research projects that could potentially benefit from, and had the expertise to evaluate, the commercial data being considered for longer-term purchase. Investigators from NASA’s Research and Analysis Program science focus areas and from NASA’s Applied Sciences Program elements participated in the evaluation. A summary of the research areas evaluated by the Principal Investigator (PI) teams is presented in Figure 3. CSDA also funded a dedicated activity to evaluate the satellite data quality (calibration and geolocation) independently by assessing the accuracy of data from Airbus. Evaluation activities were carried out by the selected PIs from December 7, 2022, to December 7, 2023. Delivery of datasets requested by the researchers began in January 2023. The vendors were evaluated on the accessibility of data, accuracy and completeness of metadata, and promptness and quality of user support services. Datasets purchased during the evaluation have been archived by NASA and will be made available to current and future government-funded researchers in accordance with the End User License Agreement (EULA). This synthesis report distills and integrates the findings of research reports commissioned by NASA for the Airbus evaluation. This report also includes recommendations that inform the way ahead for the program. The scientific results from the evaluations demonstrated that the commercial data from Airbus were able to advance NASA research and applications. However, the PIs encountered limitations that diminished the usefulness of the data due to the amount of effort that was required to access, preprocess, and analyze these data. One significant issue encountered was the limited spatial and temporal coverage of the data in the Airbus archive that could be used to conduct time series analyses or assessments over large spatial scales. Overall, however, the utility and the quality of the evaluated data outweighed the difficulties encountered, and NASA has concluded that the Airbus SAR data would complement NASA’s existing Earth observation capabilities and Airbus U.S. would qualify to participate in the sustained phase of the program.

Batuhan Osmanoglu↗

NASA’s Approach to Lunar Communication and Navigation: Artemis and Beyond

NASA’s Space Communications and Navigation (SCaN) program is developing a support structure of networks, partners, and technologies to provide communication, position, navigation, and timing services at the Moon. In this paper, we describe the progress and status of these diverse efforts and the ways in which they will be used during NASA’s crewed lunar exploration program, Artemis. We provide an update on developments at NASA which are targeted to cislunar space, including the Orion Artemis II Optical Communications System (O2O) demonstration mission, planned Lunar Exploration Ground Sites (LEGS) that will offer a dedicated Direct to Earth (DTE) capability servicing the cislunar region, and a recently released RFP for commercial Lunar Communications Relay and Navigation Services as well as Direct to Earth communications capabilities. We also describe the current status and key role of the LunaNet Interoperability Specification (LNIS), a collaborative standards framework developed by NASA, international partner agencies, and commercial stakeholders. A common thread, weaving these efforts together, is the support of commercial enterprises that can meet the Artemis challenge. Together, these projects and activities will enable safe, robust, and reliable communications and position, navigation, and timing (PNT) services for both crewed and uncrewed missions across cislunar space. SCaN and NASA, with our partners, are helping to build the foundation for a long term, sustainable human presence at the Moon –one that will set the stage for similar efforts at Mars.

LunaNet↗

Contracting Quality Early in the Lifecycle Using AS9145 Data Deliverables

Development schedules and a highly dynamic supply chain are a challenge to developers of complex systems produced at low volume. Flaws in designs, parts and materials availability problems, poor manufacturability, and a lack of knowledge about critical items and key process attributes can be realized well before traditional second-party quality assurance activities begin. Supplier audits and product inspections may have little mitigating effect once these foundational problems have been realized. Their impacts can be significant lifecycle disruption, cost overruns, inability to deliver to plan, and even project cancellation. AS9145, Requirements for Advanced Product Quality Planning and Production Part Approval Process, can be used to drive quality engineering practices into early development lifecycles to significantly reduce this late-cycle risk and to reduce the cost of quality overall. Since its initial publication in 2016, it has had very limited adoption by the DoD, no adoption by NASA, and sparse adoption in the aerospace and defense supply chain. A task group within the Aerospace Industries Association's (AIA) Joint Strategic Quality Council (JSQC) identified that both acquirers and suppliers see as AS9145 as a cost-adder and are hesitant to use it as an alternative to late-stage-heavy quality assurance approaches. A lack of prior use creates large capability gaps in request-for-proposal (RFP) teams, proposal teams, suppliers’ quality management systems (QMS), and in experienced personnel executing the early lifecycle approach. To create a more realizable on-ramp for using AS9145 in the space and defense sectors, the AIA JSQC task team created five deliverable requirements descriptions (DRDs) that can be used in a contract to begin to engage both parties in early lifecycle quality engineering and quality assurance activities, that reduce exposure to late-stage cost and schedule collapse due to unidentified risks in design, supply chain, and manufacturability. These DRDs drive the parties to engage in planning and analysis discussions early on to understand what production risks can be known and how they will focus resources based on safety criticality and the key elements of design and construction. The suppliers and acquirers who will produce the data and information required by the DRD will be able to incrementally evolve their QMS and the acquirer will incrementally be able to track and understand the benefits of cost shifting from late to early development phases. A white paper describing this approach and the five recommended DRDs will be published by the AIA in late 2024 or early 2025.

Jeannette Plante↗