NASA's Space Launch System Transitions From Design To Production

NASA's Space Launch System (SLS) successfully completed its Critical Design Review (CDR) in 2015, a major milestone on the journey to an unprecedented era of exploration for humanity. CDR formally marked the program's transition from design to production phase just four years after the program's inception and the first such milestone for a human launch vehicle in 40 years. While challenges typical of a complex development program lie ahead, CDR evaluators concluded that the design is technically and programmatically sound and ready to press forward to Design Certification Review (DCR) and readiness for launch of Exploration Mission 1 (EM-1) in the 2018 timeframe. SLS is prudently based on existing propulsion systems, infrastructure and knowledge with a clear, evolutionary path as required by mission needs. In its initial configuration, designated Block 1, SLS will a minimum of 70 metric tons (t) (154,324 pounds) of payload to low Earth orbit (LEO). It will evolve to a 130 t (286,601 pound) payload capacity by upgrading its engines, boosters, and upper stage, dramatically increasing the mass and volume of human and robotic exploration while decreasing mission risk, increasing safety, and simplifying ground and mission operations. CDR was the central programmatic accomplishment among many technical accomplishments that will be described in this paper. The government/industry SLS team successfully test-fired a flight-like five-segment solid rocket motor, as well as seven hotfire development tests of the RS-25 core stage engine. The majority of the major test article and flight barrels, rings, and domes for the core stage liquid oxygen, liquid hydrogen, engine section, intertank, and forward skirt were manufactured at NASA's Michoud Assembly Facility in New Orleans, Louisiana. Renovations to the B-2 test stand for stage green run testing were completed at NASA's Stennis Space Center (SSC), near Bay St. Louis, Mississippi. Core stage test stands are reaching completion at NASA's Marshall Space Flight Center in Huntsville, Alabama. The modified Pegasus barge for core stage transportation from manufacturing to testing and launch sites was delivered to SSC. The Interim Cryogenic Propulsion System test article was also completed. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Askins, Bruce R.↗

NASA's Space Launch System: Developing the World's Most Powerful Solid Booster

NASA's Journey to Mars has begun. Indicative of that challenge, this will be a multi-decadal effort requiring the development of technology, operational capability, and experience. The first steps are under way with more than 15 years of continuous human operations aboard the International Space Station (ISS) and development of commercial cargo and crew transportation capabilities. NASA is making progress on the transportation required for deep space exploration - the Orion crew spacecraft and the Space Launch System (SLS) heavy-lift rocket that will launch Orion and large components such as in-space stages, habitat modules, landers, and other hardware necessary for deep-space operations. SLS is a key enabling capability and is designed to evolve with mission requirements. The initial configuration of SLS - Block 1 - will be capable of launching more than 70 metric tons (t) of payload into low Earth orbit, greater mass than any other launch vehicle in existence. By enhancing the propulsion elements and larger payload fairings, future SLS variants will launch 130 t into space, an unprecedented capability that simplifies hardware design and in-space operations, reduces travel times, and enhances the odds of mission success. SLS will be powered by four liquid fuel RS-25 engines and two solid propellant five-segment boosters, both based on space shuttle technologies. This paper will focus on development of the booster, which will provide more than 75 percent of total vehicle thrust at liftoff. Each booster is more than 17 stories tall, 3.6 meters (m) in diameter and weighs 725,000 kilograms (kg). While the SLS booster appears similar to the shuttle booster, it incorporates several changes. The additional propellant segment provides additional booster performance. Parachutes and other hardware associated with recovery operations have been deleted and the booster designated as expendable for affordability reasons. The new motor incorporates new avionics, new propellant grain, asbestos-free case insulation, a redesigned nozzle, streamlined manufacturing processes, and new inspection techniques. New materials and processes provide improved performance, safety, and affordability but also have led to challenges for the government/industry development team. The team completed its first full-size qualification motor test firing in early 2015. The second is scheduled for mid-2016. This paper will discuss booster accomplishments to date, as well as challenges and milestones ahead.

Priskos, Alex↗

NASA's Space Launch Transitions: From Design to Production

NASA's Space Launch System (SLS) successfully completed its Critical Design Review (CDR) in 2015, a major milestone on the journey to an unprecedented era of exploration for humanity. CDR formally marked the program's transition from design to production phase just four years after the program's inception and the first such milestone for a human launch vehicle in 40 years. While challenges typical of a complex development program lie ahead, CDR evaluators concluded that the design is technically and programmatically sound and ready to press forward to Design Certification Review (DCR) and readiness for launch of Exploration Mission 1 (EM-1) in the 2018 timeframe. SLS is prudently based on existing propulsion systems, infrastructure and knowledge with a clear, evolutionary path as required by mission needs. In its initial configuration, designated Block I, SLS will a minimum of 70 metric tons (t) of payload to low Earth orbit (LEO). It can evolve to a 130 t payload capacity by upgrading its engines, boosters, and upper stage, dramatically increasing the mass and volume of human and robotic exploration while decreasing mission risk, increasing safety, and simplifying ground and mission operations. CDR was the central programmatic accomplishment among many technical accomplishments that will be described in this paper. The government/industry SLS team successfully test fired a flight-like five-segment solid rocket motor, as well as seven hotfire development tests of the RS-25 core stage engine. The majority of the major test article and flight barrels, rings, and domes for the core stage liquid oxygen, liquid hydrogen, engine section, intertank, and forward skirt were manufactured at NASA's Michoud Assembly Facility. Renovations to the B-2 test stand for stage green run testing were completed at NASA Stennis Space Center. Core stage test stands are rising at NASA Marshall Space Flight Center. The modified Pegasus barge for core stage transportation from manufacturing to testing and launch sites was delivered. The Interim Cryogenic Propulsion System test article was also completed. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Askins, Bruce↗

High Thermal Conductivity NARloy-Z-Diamond Composite Liner for Advanced Rocket Engines

NARloy-Z (Cu-3Ag-0.5Zr) alloy is state-of-the-art combustion chamber liner material used in liquid propulsion engines such as the RS-68 and RS-25. The performance of future liquid propulsion systems can be improved significantly by increasing the heat transfer through the combustion chamber liner. Prior work1 done at NASA Marshall Space Flight Center (MSFC) has shown that the thermal conductivity of NARloy-Z alloy can be improved significantly by embedding high thermal conductivity diamond particles in the alloy matrix to form NARloy-Z-diamond composite (fig. 1). NARloy-Z-diamond composite containing 40vol% diamond showed 69% higher thermal conductivity than NARloy-Z. It is 24% lighter than NARloy-Z and hence the density normalized thermal conductivity is 120% better. These attributes will improve the performance and life of the advanced rocket engines significantly. The research work consists of (a) developing design properties (thermal and mechanical) of NARloy-Z-D composite, (b) fabrication of net shape subscale combustion chamber liner, and (c) hot-fire testing of the liner to test performance. Initially, NARloy-Z-D composite slabs were made using the Field Assisted Sintering Technology (FAST) for the purpose of determining design properties. In the next step, a cylindrical shape was fabricated to demonstrate feasibility (fig. 3). The liner consists of six cylinders which are sintered separately and then stacked and diffusion bonded to make the liner (fig. 4). The liner will be heat treated, finish-machined, and assembled into a combustion chamber and hot-fire tested in the MSFC test facility (TF 115) to determine perform.

Bhat, Biliyar↗

Additive Manufacturing for Affordable Rocket Engines

Additive manufacturing (also known as 3D printing) technology has the potential to drastically reduce costs and lead times associated with the development of complex liquid rocket engine systems. NASA is using 3D printing to manufacture rocket engine components including augmented spark igniters, injectors, turbopumps, and valves. NASA is advancing the process to certify these components for flight. Success Story: MSFC has been developing rocket 3D-printing technology using the Selective Laser Melting (SLM) process. Over the last several years, NASA has built and tested several injectors and combustion chambers. Recently, MSFC has 3D printed an augmented spark igniter for potential use the RS-25 engines that will be used on the Space Launch System. The new design is expected to reduce the cost of the igniter by a factor of four. MSFC has also 3D printed and tested a liquid hydrogen turbopump for potential use on an Upper Stage Engine. Additive manufacturing of the turbopump resulted in a 45% part count reduction. To understanding how the 3D printed parts perform and to certify them for flight, MSFC built a breadboard liquid rocket engine using additive manufactured components including injectors, turbomachinery, and valves. The liquid rocket engine was tested seven times in 2016 using liquid oxygen and liquid hydrogen. In addition to exposing the hardware to harsh environments, engineers learned to design for the new manufacturing technique, taking advantage of its capabilities and gaining awareness of its limitations. Benefit: The 3D-printing technology promises reduced cost and schedule for rocket engines. Cost is a function of complexity, and the most complicated features provide the largest opportunities for cost reductions. This is especially true where brazes or welds can be eliminated. The drastic reduction in part count achievable with 3D printing creates a waterfall effect that reduces the number of processes and drawings, decreases the amount of touch labor required, and increases reliability. When certification is achieved, NASA missions will be able to realize these benefits.

West, Brian↗

Space Launch System Base Heating Test: Environments and Base Flow Physics

The NASA Space Launch System (SLS) vehicle is composed of four RS-25 liquid oxygen- hydrogen rocket engines in the core-stage and two 5-segment solid rocket boosters and as a result six hot supersonic plumes interact within the aft section of the vehicle during ight. Due to the complex nature of rocket plume-induced ows within the launch vehicle base during ascent and a new vehicle con guration, sub-scale wind tunnel testing is required to reduce SLS base convective environment uncertainty and design risk levels. This hot- re test program was conducted at the CUBRC Large Energy National Shock (LENS) II short-duration test facility to simulate ight from altitudes of 50 kft to 210 kft. The test program is a challenging and innovative e ort that has not been attempted in 40+ years for a NASA vehicle. This presentation discusses the various trends of base convective heat ux and pressure as a function of altitude at various locations within the core-stage and booster base regions of the two-percent SLS wind tunnel model. In-depth understanding of the base ow physics is presented using the test data, infrared high-speed imaging and theory. The normalized test design environments are compared to various NASA semi- empirical numerical models to determine exceedance and conservatism of the ight scaled test-derived base design environments. Brief discussion of thermal impact to the launch vehicle base components is also presented.

Mehta, Manish↗

Determination of Heritage SSME Pogo Suppressor Resistance and Inertance from Waterflow Pulse Testing

Waterflow tests of a heritage Space Shuttle Main Engine pogo suppressor were performed to experimentally quantify the resistance and inertance provided by the suppressor. Measurements of dynamic pressure and flow rate in response to pulsing flow were made throughout the test loop. A unique system identification methodology combined all sensor measurements with a one-dimensional perturbational flow model of the complete water flow loop to spatially translate physical measurements to the device under test. Multiple techniques were then employed to extract the effective resistance and inertance for the pogo suppressor. Parameters such as steady flow rate, perturbational flow rate magnitude, and pulse frequency were investigated to assess their influence on the behavior of the pogo suppressor dynamic response. These results support validation of the RS-25 pogo suppressor performance for use on the Space Launch System Core Stage.

McDougal, Chris↗

Reduced Order Modeling of SLS Liquid Hydrogen Pre-Valve Flow Guide to Enable Rapid Transient Analysis

NASA is developing a new launch vehicle, called the Space Launch System (SLS), which is intended on taking humans out of low earth orbit to destinations including the moon, asteroids, and Mars. The propulsion system for the core stage of this vehicle includes four RS-25 Liquid Hydrogen/Oxygen rocket engines. These engines are upgraded versions of the Space Shuttle Main Engines (SSME); the upgrades include higher power levels and affordability enhancements. As with any new vehicle, the Main Propulsion System (MPS), which include the feedlines and ancillary hardware connecting the engines to the fuel and oxidizer tanks, had to be redesigned (figure 1 - export clearance in progress), as the previous MPS for the SSME's was inherently part of the Space Shuttle System, which had a completely different overall configuration.

Brown, Andrew M.↗

NASA's Space Launch System Takes Shape

Significant hardware and software for NASA's Space Launch System (SLS) began rolling off assembly lines in 2016, setting the stage for critical testing in 2017 and the launch of new capability for deep-space human exploration. (Figure 1) At NASA's Michoud Assembly Facility (MAF) near New Orleans, LA, full-scale test articles are being joined by flight hardware. Structural test stands are nearing completion at NASA's Marshall Space Flight Center (MSFC), Huntsville, AL. An SLS booster solid rocket motor underwent test firing, while flight motor segments were cast. An RS-25 and Engine Control Unit (ECU) for early SLS flights were tested at NASA's Stennis Space Center (SSC). The upper stage for the first flight was completed, and NASA completed Preliminary Design Review (PDR) for a new, powerful upper stage. The pace of production and testing is expected to increase in 2017. This paper will discuss the technical and programmatic highlights and challenges of 2016 and look ahead to plans for 2017.

Askins, Bruce R.↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, SLS is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress is on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance (ULA) in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the OSA and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center (MSFC) in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 t to LEO, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the EUS, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the proving ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

NASA's Space Launch System: Systems Engineering Approach for Affordability and Mission Success

NASA is working toward the first launch of a new, unmatched capability for deep space exploration, with launch readiness planned for 2018. The initial Block 1 configuration of the Space Launch System will more than double the mass and volume to Low Earth Orbit (LEO) of any launch vehicle currently in operation - with a path to evolve to the greatest capability ever developed. The program formally began in 2011. The vehicle successfully passed Preliminary Design Review (PDR) in 2013, Key Decision Point C (KDPC) in 2014 and Critical Design Review (CDR) in October 2015 - nearly 40 years since the last CDR of a NASA human-rated rocket. Every major SLS element has completed components of test and flight hardware. Flight software has completed several development cycles. RS-25 hotfire testing at NASA Stennis Space Center (SSC) has successfully demonstrated the space shuttle-heritage engine can perform to SLS requirements and environments. The five-segment solid rocket booster design has successfully completed two full-size motor firing tests in Utah. Stage and component test facilities at Stennis and NASA Marshall Space Flight Center are nearing completion. Launch and test facilities, as well as transportation and other ground support equipment are largely complete at NASA's Kennedy, Stennis and Marshall field centers. Work is also underway on the more powerful Block 1 B variant with successful completion of the Exploration Upper Stage (EUS) PDR in January 2017. NASA's approach is to develop this heavy lift launch vehicle with limited resources by building on existing subsystem designs and existing hardware where available. The systems engineering and integration (SE&I) of existing and new designs introduces unique challenges and opportunities. The SLS approach was designed with three objectives in mind: 1) Design the vehicle around the capability of existing systems; 2) Reduce work hours for nonhardware/ software activities; 3) Increase the probability of mission success by focusing effort on more critical activities.

Hutt, John J.↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already also underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, Space Launch System (SLS), is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations program is transforming Kennedy Space Center into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 metric tons to low Earth orbit, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the Exploration Upper Stage, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the Proving Ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

NASA's Space Launch System Gains Momentum Toward Integration and Testing

NASA's Space Launch System (SLS) entered a new phase in 2017, completing major structural manufacturing on the core stage and delivering the first flight hardware to NASA's Kennedy Space Center (KSC). The program is now transitioning to integration, assembly and testing in preparation for launch readiness in late 2019. Core stage prime contractor Boeing concluded welding of the major core stage components for Exploration Mission 1 (EM-1) with the liquid hydrogen flight tank, following completion of the engine section, liquid oxygen tank, and forward skirt. Technicians also completed assembly of the bolted intertank, and all sections are currently in hardware integration. The engine section structural test article was shipped to NASA's Marshall Space Flight Center (MSFC) and began testing in 2017. The core stage pathfinder shipped to NASA's Michoud Assembly Facility (MAF). Booster prime contractor Orbital ATK made significant progress casting motor segments for SLS, with several segments finishing processing and in storage. Forward and aft sections of the boosters are being refurbished at KSC. RS-25 prime contractor Aerojet Rocketdyne completed SLS adaptation testing and qualification of four new EM-1 controllers. The four EM-1 engines are ready and waiting for shipment from NASA's Stennis Space Center (SSC) to Michoud Assembly Facility (MAF) for core stage integration in preparation for green run testing at SSC. The EM-1 Interim Cryogenic Propulsion System (ICPS) became the first major piece of SLS to arrive at KSC. Welding is complete on the EM-1 Launch Vehicle Stage Adapter (LVSA) and the flight Orion Stage Adapter (OSA). SLS is critical to U.S. leadership in future human and robotic space exploration, including a presence on the moon in preparation for missions deeper into space. This paper will elaborate on 2017 SLS progress and progress envisioned for 2018.

Askins, Bruce R.↗

NASA Additive Manufacturing Initiatives for Deep Space Human Exploration

Additive Manufacturing (AM) is being infused into aerospace industries at an accelerated pace. Reasons for this rapid adoption include: (1) Innovation Capability e.g. design features such as topology optimization, integrated fluid passages, and mesh structures; (2) Rapid Development and Optimization - ability to quickly iterate the design, development, and test cycle; (3) Affordability - reductions in part counts, cost, and schedule. NASA's Marshall Space Flight Center (MSFC) has taken a leadership role in application of AM technologies for deep space human exploration, leading the Agency's In Space Manufacturing (ISM) initiative and the application of AM for a broad variety of space propulsion systems. MSFC has championed the development of ISM capabilities since our first reduced-gravity aircraft experiment flew in 1999. Partnering with Made In Space, MSFC placed the first 3D Printer on ISS in 2014 and the second generation printer, the Additive Manufacturing Facility, in 2016. The next ISS technology demonstration will be the Refabricator, a recycler/basic printer scheduled to launch in late Fall 2018. Ground-based development is progressing in common use materials, metals 3D printing, printed electronics, and the new cornerstone of ISM, the FabLab. The latest developments in each area will be described. An overview of NASA's In Space Robotic Manufacturing and Assembly (IRMA) ground-based risk reduction projects will also be presented. MSFC has aggressively incorporated AM capabilities for design and development of space propulsion components. The capabilities have been rapidly matured and extensively exercised to produce and hot-fire test the Additive Manufacturing Demonstrator Engine, an in-space class prototype engine. This experience base has been extended to support Aerojet Rocketdyne in the application of AM to the RS-25, the Space Launch System Core Stage engine, and to small propulsion systems and thrusters for small satellites and cubesats. The latest developments will be described. In responding to a request from NASA's Commercial Crew Program for a consistent methodology for evaluation of AM processes and parts, MSFC began development of a draft standard for AM space flight hardware in late 2014. The draft was broadly disseminated for comments in mid-2015, and subsequently revised into two documents, a standard and a specification for AM space flight hardware, which were formally released by MSFC in October 2017. An overview of the key elements of these documents will be presented.

Clinton, Raymond↗

NASA Technology Transfer Program: Bringing NASA Technology Down To Earth

Contents: SLS Launch, 0:00-1:30; Ultrasonic Welding, 1:30-2:31; Solid Rocket Booster Test, 2:31-3:14; Modular Tooling, 3:14-4:45; Solar Flares, 4:45-5:28; Thermal Stir Welding, 5:28-5:51; RS-25 Engine Test, 5:51-6:21; Ultrasonic Weld, 6:21-7:13; Earth from Space, 7:21-8:24; Modular Tooling, 8:25-9:43; ISS (International Space Station) Fly Through, 9:43-10:55; Thermal Stir Welding, 10:55-11:21.

Larsen, Jordan A.↗

NASA's Space Launch System Moves into Testing and Integration

NASA's Space Launch System (SLS) has moved from design and manufacturing into testing and integration for its first flight as early as December 2019. In 2017, the NASA/industry team completed manufacturing of all major structural elements for the launch vehicle for Exploration Mission-I (EM-1 ). That work included shipping the first major flight hardware element to the launch site. The team processed all four RS-25 engines for stage integration, cast all 10 booster flight motor segments, and manufactured all five major sections of the core stage. The program also completed major structural work on the B-2 test stand at Stennis Space Center, which will be used for the core stage "green run" test; delivered the core stage and engine simulators used for training; and much of the transportation equipment for the core stage. Engineers completed structural testing on the upper stage/payload section of the vehicle as well as the engine section test article. In 2018, the program will deliver the Orion Stage Adapter (OSA) to Exploration Ground Systems (EGS) at KSC and send the test articles for the core stage liquid hydrogen tank, liquid oxygen tank, and intertank to NASA's Marshall Space Flight center for structural testing. Additionally, workers will begin the challenging process of integrating the major sections of the 212-foot EM-1 core stage. This work is focused on the initial Block 1 variant of SLS, capable of launching more than 70 metric tons (t) to low Earth orbit (LEO). However, work concurrently is underway on the Block lB variant, which will enable 105 t to LEO and more than 37t to trans-lunar injection (TLI). Block lB will be the workhorse vehicle of NASA's lunar exploration plans. As the needs of the nation's deep space exploration program grow, SLS performance is designed to evolve to a payload mass of 130 t to LEO and up to 45t to TLI. The advantages of this mass - as well as volume- are critical to the entire exploration architecture for deep space exploration. They translate to greater capability, greater infrastructure and operational simplicity, less overall mission risk, and opportunities to accomplish unprecedented exploration and discovery. This paper will discuss SLS progress to date and planned future work.

Honeycutt, John↗

NASA's Space Launch System: Unprecedented Payload Capabilities

As NASA turns 60 and plans to transition the International Space Station (ISS) and other low-Earth orbit (LEO) activities to commercial enterprises, the Agency's human exploration program turns its focus to deep space. With missions planned to send astronauts back to the Moon and to construct a lunar orbiting Gateway for surface access as well as science experiments and technology demonstrations, NASA requires a vehicle with capabilities for launching more mass and volume than is currently commercially available. To that end, NASA and its private sector partners are building the Space Launch System (SLS) super heavy-lift launch vehicle, which will send the new Orion crew capsule, eventually with a complement of four astronauts, to cislunar space for the first time since the Apollo Program in the 1960s and 1970s. NASA Kennedy Space Center's (KSC's) Exploration Ground Systems (EGS) Program has upgraded and refurbished ground and launch facilities to process, assemble and launch NASA's new deep space exploration system, which is managed by the Exploration Systems Development (ESD) organization in the Human Exploration and Operations Mission Directorate (HEOMD). Offering an unmatched combination of power, payload capacity and departure energy, the evolvable SLS features the world's most proven propulsion system: solid rocket boosters and RS-25 main engines with a modified Delta Cryogenic Second Stage (DCSS) cryogenic upper stage. The initial SLS configuration, Block 1, will deliver at least 26 metric tons (t) to trans-lunar injection (TLI). The second variant, Block 1B, will deliver at least 34 t to TLI in its crew configuration and at least 40 t to TLI in its cargo configuration. The Block 1 cargo vehicle will fly with an industry-standard 5 m fairing while the Block 1B cargo configuration will accommodate 8 m-diameter fairings in varying lengths. The Block 2 vehicle will incorporate upgraded boosters and possibly larger fairings for launching Mars-class payloads to deep space. Although designed to enable human exploration of deep space, the vehicle also provides game-changing benefits for large science payloads and even harnesses excess capacity to provide small satellites with access to deep space. Three flights of the Block 1 vehicle are now planned; the first vehicle, being built for a test flight known as Exploration Mission-1 (EM-1), is nearing completion at NASA and contractor sites across the United States. In fact, hardware for the second mission has also been built. This paper will provide an overview of the SLS vehicle, with a focus on its payload accommodations and the missions enabled by the unprecedented payload volume and departure energy of SLS. This paper also describes the status of the manufacturing and integration for first flight and beyond.

Exploration Mission-1↗

Identification of Noise Sources in a Rocket Engine Test Stand using Microphone Phased Array

A new, phased array of microphones, suitable for the harsh environment of a rocket launch, was built and tested during a static firing of a RS-25 engine. It uses 70 piezo-resistive, dynamic pressure sensors, optimally distributed on a 10.5ft diameter open frame dome structure, and has a 200-ft long cable bundle to carry the signals to a weather-protected cabinet containing the data systems. The test stand was imaged using an infra-red camera and a visible wavelength camera, and the beamformed noise maps were superimposed on the photographs. The first-time data from a full-scale engine test stand showed that the plume deflector at the bottom of the engine to be the primary noise source. The openings of the test stand around the nozzle exit were also found to be noise sources particularly at higher frequencies. The final goal is to use the array during NASA’s Artemis-II launch at Kennedy Space Center.

Identification of Noise Source↗