Search NASA⌕ Search

SEARCH · Search NASA

Results for “Regolith bed”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Martian regolith geochemistry and sampling techniques

Laboratory study of samples of the intermediate and fine-grained regolith, including duricrust peds, is a fundamental prerequisite for understanding the types of physical and chemical weathering processes on Mars. The extraordinary importance of such samples is their relevance to understanding past changes in climate, availability (and possible physical state) of water, eolian forces, the thermal and chemical influences of volcanic and impact processes, and the inventory and fates of Martian volatiles. Fortunately, this regolith material appears to be ubiquitous over the Martian surface, and should be available at many different landing sites. Viking data has been interpreted to indicate a smectite-rich regolith material, implying extensive weathering involving aqueous activity and geochemical alteration. An all-igneous source of the Martian fines has also been proposed. The X-ray fluorescence measurement data set can now be fully explained in terms of a simple two-component model. The first component is silicate, having strong geochemical similarities with Shergottites, but not other SNC meteorites. The second component is salt. Variations in these components could produce silicate and salt-rich beds, the latter being of high potential importance for microenvironments in which liquid water (brines) could exist. It therefore would be desirable to scan the surface of the regolith for such prospects.

Clark, B. C.↗

NASA JSC’s Simulant Development Lab Capabilities and Artemis Testing

The Simulant Development Lab (SDL) is a multifunctional collaborative workspace that supports the development, curation, analysis, testing, and distribution of planetary regolith simulants – including lunar, Martian, asteroidal, and other granular materials. The lab provides a multidisciplinary setting for scientific characterization of simulant physical properties and for engineering evaluations conducted with simulant test beds. To enable this work, the SDL curates and maintains a stock of more than 35 metric tons of simulant material. To evaluate these materials and support testing goals, the lab is equipped with a comprehensive suite of processing tools and analytical instruments. These capabilities enable the SDL’s mission at NASA’s Johnson Space Center to distribute, develop, process, characterize, and test regolith simulants for mission relevant applications. Through controlled and repeatable testing environments that replicate the physical and compositional properties of lunar regolith, the SDL supports Artemis hardware maturation, providing safe, Earth‑based analogs for evaluating systems that must withstand regolith dust interactions, physical wear and abrasion, and operational loads. The facility’s extensive simulant inventory and integrated geological and engineering test infrastructure accelerate technology readiness for Artemis and future exploration campaigns (e.g., future crewed or robotic missions to Mars).

Simulant Development Lab↗

Extraction and Capture of Water from Martian Regolith Experimental Proof-of-Concept

Mars Design Reference Architecture 5.0:Lists in-situ resource utilization (ISRU) as enabling for robust human Mars missionsLO2LCH4 ascent propulsion 25,000 kg oxygen from atmosphere for ascent and life support Atmospheric based ISRU processes less operationally complex than surface based limited concept evaluation to date and Mars surface water property and distribution uncertainty would not allow [Mars soil water processing] to be base lined at this time Limited Concept Evaluation to Date Lunar regolith O2 extraction processing experience Lunar regolith is fluidized and heated to high temperatures with H2 to produce H2O from iron-bearing minerals Mars similarity concept: Soil placed in fluidized bed reactor Heated to moderate temperatures Inert gas flow used to fluidize the bed and help with water desorption Challenges: High-temperature dusty seals Working gas requires downstream separation and recycling to reduce consumables loss Batch process heating thermally inefficient.

in situ resource utilization↗

Mars Ecopoiesis Testbed

Mars surface conditions where liquid water is absent were simulated for the purposes of laboratory research. A pressure-temperature (P-T) profile was maintained in which no combination of pressure or temperature corresponds to the liquid region of the water phase diagram. The triple point of pure water occurs at T = 0.1oC and P(H2O) = 6.01 mbar; therefore all temperatures and pressures must be kept below these values, respectively. A 35-day test was performed in a commercial planetary simulation system (Techshot, Inc., Greenville, IN) in which the minimum night-time temperature was -80oC, the maximum daytime temperature was +26oC, the simulated day-night light cycle in earth hours was 12-on and 12-off, and the total pressure of the pure CO2 atmosphere was maintained below 11 mbar. Any water present was allowed to equilibrate with the changing temperature and pressure. The gas phase was sampled into a CR1-A condensation-mirror low-pressure hygrometer, which uses liquid nitrogen (down to 77oK) to determine the dew point (Buck Technologies, Boulder, CO). Dew point was measured once every hour and recorded on a data logger, along with the varying temperature in the chamber, from which the partial pressure of water was calculated. The resulting calculated daily cycles were tracked on the water P-T diagram, and no points were found to fall within the liquid-phase region of the diagram. It is concluded that there was no liquid water present throughout the test except during the initial pump-down period when aqueous specimens were introduced on the first day (less than 1 hour). Mars regolith simulant was present during this test, and further investigation is needed to determine whether liquid water could have been present or absent in the regolith in the form of brine. Biological samples consisting of Cyanobacteria: Anabena sp., Chroococcidiopsis CCMEE171, Plectonema boryanum; Eubacteria: Bacillus subtilis, Pseudomonas aeruginosa, and Eukaryota: Chlorella ellipsoidia were maintained in the simulator under the above-described conditions. The exposed specimens were tested for intracellular esterase activity, chlorophyll content (where appropriate) and reproductive survival. All tests yielded low-level positive results in all cases. In parallel to these terrestrial studies a planned design study was undertaken for the proposed test bed. Design requirements include compact assembly for transport and installation on the planetary surface (multiple units per mission would be expected), protective internal package for the release of organisms, a means of atmosphere exchange, access to sunlight, a means of penetrating the planetary surface, and most importantly a means of acquiring regolith while meeting the requirements of planetary protection. In consultation with advisers a design was created, and a large-scale mock-up of this design was fabricated by additive manufacturing at Techshot, Inc. with moving parts that simulated the components of the design. The mock-up assembly has been demonstrated to interested parties. A means of detecting live metabolism will also be included in the test bed. Several options were reviewed, and it is concluded that, by the time the ecopoiesis test bed is ready for testing the optimum instrument will be the equivalent of a hand-held mass spectrometer for metabolic gas analysis. This will maximize versatility and reveal much more information than could a detector of a single product (such as molecular oxygen), and the

Ecopoiesis↗

A Versatile Lifting Device for Lunar Surface Payload Handling, Inspection and Regolith Transport Operations

Devices for lifting and transporting payloads and material are critical for efficient Earth-based construction operations. Devices with similar functionality will be needed to support lunar-outpost construction, servicing, inspection, regolith excavation, grading and payload placement. Past studies have proposed that only a few carefully selected devices are required for a lunar outpost. One particular set of operations involves lifting and manipulating payloads in the 100 kg to 3,000 kg range, which are too large or massive to be handled by unassisted astronauts. This paper will review historical devices used for payload handling in space and on earth to derive a set of desirable features for a device that can be used on planetary surfaces. Next, an innovative concept for a lifting device is introduced, which includes many of the desirable features. The versatility of the device is discussed, including its application to lander unloading, servicing, inspection, regolith excavation and site preparation. Approximate rules, which can be used to size the device for specific payload mass and reach requirements, are provided. Finally, details of a test-bed implementation of the innovative concept, which will be used to validate the structural design and develop operational procedures, is provided.

Doggett, William R.↗

Lunar Polar Environmental Testing: Regolith Simulant Conditioning

As ISRU system development approaches flight fidelity, there is a need to test hardware in relevant environments. Extensive laboratory and field testing have involved relevant soil (lunar regolith simulants), but the current design iterations necessitate relevant pressure and temperature conditions. Including significant quantities of lunar regolith simulant in a thermal vacuum chamber poses unique challenges. These include facility operational challenges (dust tolerant hardware) and difficulty maintaining a pre-prepared soil state during pump down (consolidation state, moisture retention).For ISRU purposes, the regolith at the lunar poles will be of most interest due to the elevated water content. To test at polar conditions, the regolith simulant must be doped with water to an appropriate percentage and then chilled to cryogenic temperatures while exposed to vacuum conditions. A 1m tall, 28cm diameter bin of simulant was developed for testing these simulant preparation and drilling operations. The bin itself was wrapped with liquid nitrogen cooling loops (100K) so that the simulant bed reached an average temperature of 140K at vacuum. Post-test sampling was used to determine desiccation of the bed due to vacuum exposure. Depth dependent moisture data is presented from frozen and thawed soil samples.Following simulant only evacuation tests, drill hardware was incorporated into the vacuum chamber to test auguring techniques in the frozen soil at thermal vacuum conditions. The focus of this testing was to produce cuttings piles for a newly developed spectrometer to evaluate. This instrument, which is part of the RESOLVE program science hardware, detects water signatures from surface regolith. The drill performance, behavior of simulant during drilling, and characteristics of the cuttings piles will be offered.

lunar regolith↗

Lunar Polar Environmental Testing: Regolith Simulant Conditioning

As ISRU system development approaches flight fidelity, there is a need to test hardware in relevant environments. Extensive laboratory and field testing have involved relevant soil (lunar regolith simulants), but the current design iterations necessitate relevant pressure and temperature conditions. Including significant quantities of lunar regolith simulant in a thermal vacuum chamber poses unique challenges. These include facility operational challenges (dust tolerant hardware) and difficulty maintaining a pre-prepared soil state during pump down (consolidation state, moisture retention).For ISRU purposes, the regolith at the lunar poles will be of most interest due to the elevated water content. To test at polar conditions, the regolith simulant must be doped with water to an appropriate percentage and then chilled to cryogenic temperatures while exposed to vacuum conditions. A 1m tall, 28cm diameter bin of simulant was developed for testing these simulant preparation and drilling operations. The bin itself was wrapped with liquid nitrogen cooling loops (100K) so that the simulant bed reached an average temperature of 140K at vacuum. Post-test sampling was used to determine desiccation of the bed due to vacuum exposure. Depth dependent moisture data is presented from frozen and thawed soil samples.Following simulant only evacuation tests, drill hardware was incorporated into the vacuum chamber to test auguring techniques in the frozen soil at thermal vacuum conditions. The focus of this testing was to produce cuttings piles for a newly developed spectrometer to evaluate. This instrument, which is part of the RESOLVE program science hardware, detects water signatures from surface regolith. The drill performance, behavior of simulant during drilling, and characteristics of the cuttings piles will be offered.

in situ resource utilization↗

The Origin of Chondrites: Metal-Silicate Separation Experiments Under Microgravity Conditions, Experiment 2

Chondrites are categorized into different groups by several properties, including the metal-to-silicate ratio. Various processes have been suggested to produce distinct metal/silicate ratios, some based on sorting in the early solar nebular and others occurring after accretion on the parent body. Huang et al. suggested that a weak gravitational field accompanied by degassing, could result in metal/silicate separation on parent bodies. We suggest that asteroids were volatile-rich, at least early in their histories. Spectroscopic evidence from asteroid surfaces indicates that one-third of all asteroids maybe rich in clays and hydrated minerals, similar to carbonaceous chondrites. Internal and/or external heating could have caused volatiles to evaporate and pass through a surface dust layer. Spacecraft images of asteroids show they have a thick regoliths. Housen, and Asphaug and Nolan proposed that even a 10 km diameter asteroid could potentially have a significant regolith. Grain size and grain density sorting could occur in the unconsolidated layer by the process known as fluidization. This process occurs when an upward stream of gas is passed through a bed of particles which are lifted against a gravitational force. Fluidization is commonly used commercially to sort particulates. This type of behavior is based upon the bed, as a whole, and differs from aerodynamic sorting. Two sets of reduced gravity experiments were conducted during parabolic flights aboard NASA's KC-135 aircraft. The first experiment employed 310 tubes of 2.5 cm diameter, containing mixtures of sand and metal grains. A gas source was used to fluidize the mixture at reduced gravity conditions and mixtures were analyzed after the flight. However, this experiment did not allow a description of the fluidization as a function of gravity. A second experiment was conducted on the KC-135 aircraft in the summer of 2001, consisting of two Plexiglas cylinders containing a metal/silicate mixture, and video cameras to record the experiment on tape. Here we summarize this experiment and discusses the implications for metalsilicate separation on asteroid bodies.

Moore, S. R.↗

Post Impact Mars Climate Simulations Using a GCM

The first images returned by the Mariner 7 spacecraft of the Martian surface showed a landscape heavily scared by impacts. Mariner 9 imaging revealed geomorphic features including valley networks and outflow channels that suggest liquid water once flowed at the surface of Mars. Further evidence for water erosion and surface modification has come from the Viking Spacecraft, Mars Pathfinder and Mars Global Surveyor's (MGS) Mars Obiter Camera (MOC). This evidence includes apparent paleolake beds, fluvial fans and sedimentary layers (Cabrol and Grinn, 1999; Heberle et al., 2001). There is evidence for subsurface water as well. Rampart crates suggest an abundance of water in the near surface regolith (Mouginis-Mark, 1986). The estimated erosion rates necessary to explain the observed surface morphologies (Golombek and Bridges, 2000) present a conundrum. The rates of erosion appear to be highest when the early sun was fainter and only 75% as luminous as it is today. Furthermore the rates of erosion appear to correlate with the rate at which Mars was impacted (Carr and Waenke, 1992). All of this evidence suggests to a very different climate than what exists on Mars today.

A Colaprete↗

Developments to Increase the Performance, Operational Versatility and Automation of a Lunar Surface Manipulation System

The objective of this paper is to describe and summarize the results of the development efforts for the Lunar Surface Manipulation System (LSMS) with respect to increasing the performance, operational versatility, and automation. Three primary areas of development are covered, including; the expansion of the operational envelope and versatility of the current LSMS test-bed, the design of a second generation LSMS, and the development of automation and remote control capability. The first generation LSMS, which has been designed, built, and tested both in lab and field settings, is shown to have increased range of motion and operational versatility. Features such as fork lift mode, side grappling of payloads, digging and positioning of lunar regolith, and a variety of special end effectors are described. LSMS operational viability depends on bei nagble to reposition its base from an initial position on the lander to a mobility chassis or fixed locations around the lunar outpost. Preliminary concepts are presented for the second generation LSMS design, which will perform this self-offload capability. Incorporating design improvements, the second generation will have longer reach and three times the payload capability, yet it will have approximately equivalent mass to the first generation. Lastly, this paper covers improvements being made to the control system of the LSMS test-bed, which is currently operated using joint velocity control with visual cues. These improvements include joint angle sensors, inverse kinematics, and automated controls.

Dorsey, John T.↗

Primary sedimentary structures and the internal architecture of a Martian sand body in search of evidence for sand transport and deposition

Lunar experiences show that unmanned sample return missions, despite limitations on sample size, can produce invaluable data to infer crustal processes, regolith processes, regolith-atmosphere/ionosphere interaction processes, etc. Drill cores provide a record of regolith evolution as well as a more complete sample of the regolith than small scoops and/or rakes. It is proposed that: (1) a hole be drilled in a sand body to obtain continuous oriented cores; a depth of about 10 m would be compatible with what we know of bed form hierarchy of terrestrial stream deposits; (2) two trenches, at right angles to each other and close to the drill-hole, be dug and the walls scraped lightly such that primary/internal sedimentary structures of the sand body become visible; (3) the walls of the trenches be made gravitationally stable by impregnation techniques; (4) acetate or other peels of a strip on each wall be taken; and (5) appropriately scaled photographs of the walls be taken at different sun-angles to ensure maximum ease of interpretation of sedimentary structures; and, to correlate these structural features with those in the core at different depth levels of the core.

Basu, Abhijit↗

High-Vacuum Triboelectric Charging of Space Materials

In the high-vacuum environment of space and the surface of the moon, static electricity on surfaces lacks the atmospheric dissipation mechanisms found on earth. As a result, the ubiquitous triboelectric charging mechanism can lead to high levels of charge on surfaces. This static charge can result in damage to sensitive devices, interfere with communications, and electrostatic levitation of lunar dust. At the NASA Electrostatics and Surface Physics Laboratory (ESPL), we use different apparatuses and techniques to tribo-charge materials in high-vacuum (10-5 torr), including a tribo-robot and a triboelectric regolith-material stage (TRMS). The tribo-robot is used to rub two materials together, and fieldmeters and electrometers can be used to determine how much charge is on the materials. The TRMS is used to drag different materials onto a bed of lunar simulant. This system is used to characterize how materials may interact with lunar dust using fieldmeters, electrometers, and laser scattering. Using these methods, we are building a database of how different space materials charge when contacting each other at high-vacuum, and how materials triboelectrically interact with the lunar surface.

Joseph Toth↗

Microwave Structure Construction Capability Year One Accomplishments

The Microwave Structure Construction Capability (MSCC) element, part of the Moon to Mars Planetary Autonomous Construction Project (MMPACT) was initiated in 2020. MSCC is responsible for creating horizontal and vertical infrastructure on the moon using microwave energy. Microwave energy was selected since it is the only method to volumetrically heat the regolith. All other sintering/melting methods rely on thermal conduction through the very low conductivity surface, resulting in an inefficient process. Advances were achieved in materials characterization and understanding, microwave sintering in vacuum, and microwave design and analyses. Two dielectric property testing systems have been developed at Radiance Technologies and JPL. These will examine dielectric properties at cryogenic temperatures and over a broad frequency range. Permittivity and permeability testing at -60 ̊C in vacuum from 0.05 to 3 GHz has been generated at JPL. Additional modifications will be made to go to -190 ̊C (LN2). Radiance Technologies created a test system to measure dielectric properties at greater than 10 GHz and initiated work on developing a vacuum capable, portable test system to measure dielectric properties of Apollo regolith and simulants from 100 MHz to 18 GHz. These tests are to identify optimal heating frequencies and protocols. During microwave sintering at about 1100 ̊C, volatiles were creating difficulty in achieving a reasonably dense specimen. Due to processing in vacuum and the nature of the lunar regolith, some volatiles and porosity are expected. However, the Earth produced simulants have non-lunar materials in them that create volatiles that aren’t representative of lunar regolith. Therefore, a five month effort was conducted to establish a heat treat method to remove these non-lunar materials. Tests were conducted using TGA mass spectrometry, heating in vacuum and conducting mass spectrometry, dielectric and DTA, Raman, BET, particle size analysis, morphological analysis, carbon and sulfur chemical content determination and microscopy. The process has been scaled-up to 6 kg batch size and undergoing evaluation. A 36 kg batch size is the target for JSC-1A and other limited availability simulants. These calcining protocols will be standard for NASA and beyond. MSCC has also created scalable processes for fabricating synthetic lunar materials. Processes to fabricate Anorthite (plagioclase CaAl2Si2O8), Diopside (pyroxene CaMgSi₂O₆), and Enstatite (pyroxene Mg2Si2O6) have been generated. These materials will enable generation of microwave sintering models to bound various composition ranges anticipated on the Moon, therefore mitigating the need for a precise simulant with respect to location on the Moon. Successful microwave sintering in air using a horn applicator was demonstrated. All previous microwave vacuum sintering in the literature was at small scale and in a contained enclosure thus taking advantage of reflections. This is the first to use a lunar like microwave applicator to sinter ceramic in a bed as it would be done on the Moon. Small scale and inert sintering were conducted to assist in developing protocols with quicker turnaround times than larger scale testing. Testing has anchored thermal analysis predicting heat flow in vacuum during microwave sintering. Thermal conductivity testing was also initiated. Microwave coupling to the regolith has been modeled by multiple organizations and with different software packages. At least six horn designs and applicator configurations for both magnetron and solid state sources are being examined. Optimal simulant container designs for microwaves have also been generated. The power and electronics design for the solid state microwave system has been initiated. Concept designs for a lander based microwave sintering have been evaluated.

microwave↗

Permissible Exposure Level for Lunar Dusts: Gaps are Closing

Space faring nations plan to return human explorers to the moon within the next decade. Experience during the Apollo flights suggests that lunar dust will invariably get into the habitat where the finest portion (less than 5 micrometers) could be inhaled by the crew before it is cleared from the atmosphere. NASA is developing a database from which a 6-month, episodic exposure standard for lunar dust can be set. Three kinds of moon dust were prepared from a parent sample of Apollo 14 regolith #14003,96. Our goal was to prepare each type of dust sample with a mean diameter less than 2 m, which is suitable for instillation into the lungs of rats. The three samples were prepared as follows: separation from the parent sample using a fluidized bed, grinding using a jet mill grinder, or grinding with a ball-mill grinder. Grinding simulated restoration of surface activation of dust expected to occur at the surface of the moon on native lunar dust. We used two grinding methods because they seemed to produce different modes of activation. The effects of grinding were preserved by maintaining the dust in ultra-pure nitrogen until immediately before it was placed in suspension for administration to rats. The dust was suspended in physiological saline with 10% Survanta, a lung surfactant. Rats were given intratrachael instillations of the dust suspension at three doses. In addition to the three moon dusts (A, C and E), we instilled the same amount of a negative control (TiO2, B) and a highly-toxic, positive control (quartz, D). These additional mineral dusts were selected because they have well-established and very different permissible exposure levels (PELs). Our goal was to determine where lunar dusts fit between these extremes, and then estimate a PEL for each lunar dust. We evaluated many indices of toxicity to the lung. The figure shows the changes in lactate dehydrogenase (LDH), a marker of cell death, for the five dusts. Benchmark dose software (Version 2.1.2) from the Environmental Protection Agency was used to estimate the 10% effect levels (BMD(sub 10)) using five models. The best-fitting model was used to estimate the optimal BMD(sub 10) (table)

James, John T.↗

Geochemical evolution of the northern plains of Mars - Early hydrosphere, carbonate development, and present morphology

An equilibrium geochemical model of the primitive Martian atmosphere-regolith-ocean system that could have existed early in the history of Mars is developed. The results of this model are used to examine the evolution of the volatile budget of Mars and the processes occurring in the Martian ocean that may have contributed to the deposition of large carbonate beds on the northern plains. Results of this model are compared to those of the Pollack et al. (1987) model.

Schaefer, Martha W.↗

Lunar Water Resource Demonstration (LWRD) Test Results

NASA has undertaken the In-Situ Resource Utilization (lSRU) project called RESOLVE (Regolith and Environment Science & Oxygen and Lunar Volatile Extraction). This project is an Earth-based lunar precursor demonstration of a system that could be sent to explore permanently shadowed polar lunar craters, where it would drill into regolith, quantify the volatiles that are present, and extract oxygen by hydrogen reduction of iron oxides. The RESOLVE chemical processing system was mounted within the CMU rover "Scarab" and successfully demonstrated on Hawaii's Mauna Kea volcano in November 2008. This technology could be used on Mars as well. As described at the 2008 Mars Society Convention, the Lunar Water Resource Demonstration (LWRD) supports the objectives of the RESOLVE project by capturing and quantifying water and hydrogen released by regolith upon heating. Field test results for the quantification of water using LWRD showed that the volcanic ash (tephra) samples contained 0.15-0.41% water, in agreement with GC water measurements. Reduction of the RH in the surge tank to near zero during recirculation show that the water is captured by the water beds as desired. The water can be recovered by heating the Water Beds to 230 C or higher. Test results for the capture and quantification of pure hydrogen have shown that over 90% of the hydrogen can be captured and 98% of the absorbed hydrogen can be recovered upon heating the hydride to 400 C and desorbing the hydrogen several times into the evacuated surge tank. Thus, the essential requirement of capturing hydrogen and recovering it has been demonstrated. ,

Muscatello, Anthony C.↗

A lunar/Martian anchor emplacement system

On the Moon or Mars, it is necessary to have an anchor, or a stable, fixed point able to support the forces necessary to rescue a stuck vehicle, act as a stake for a tent in a Martian gale, act as a fulcrum in the erection of general construction poles, or support tent-like regolith shields. The anchor emplacement system must be highly autonomous. It must supply the energy and stability for anchor deployment. The goal of the anchor emplacement system project is to design and build a prototype anchor and to design a conceptual anchor emplacement system. Various anchors were tested in a 1.3 cubic meter test bed containing decomposed granite. A simulated lunar soil was created by adjusting the moisture and compaction characteristics of the soil. We conducted tests on emplacement torque, amount of force the anchor could withstand before failure, anchor pull out force at various angles, and soil disturbances caused by placing the anchor. A single helix auger anchor performed best in this test bed based on energy to emplace, and the ultimate holding capacity. The anchor was optimized for ultimate holding capacity, minimum emplacement torque, and minimum soil disturbance in sandy soils yielding the following dimensions: helix diameter (4.45 cm), pitch (1.27 cm), blade thickness (0.15 cm), total length (35.56 cm), shaft diameter (0.78 cm), and a weight of 212.62 g. The experimental results showed that smaller diameter, single-helix augers held more force than larger diameter augers for a given depth. The emplacement system consists of a flywheel and a motor for power, sealed in a protective box supported by four legs. The flywheel system was chosen over a gear system based on its increased reliability in the lunar environment.

Clinton, Dustin↗