Search NASA⌕ Search

SEARCH · Search NASA

Results for “Regulatory Barrier”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Economic Impact of Permitting Timelines on Produced Geothermal Power

Despite having a large geothermal power potential in the United States, only a small fraction has been developed for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to lower contribution of geothermal energy in the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. This study shows that the geothermal permitting timelines can vary from six months to several years, depending on the presence or absence of biological resources, cultural resources, and sensitive environmental issues at the project site. The potential impacts of these permit barriers can range from investors abandoning geothermal development to making the product (i.e., electricity) more expensive and uncompetitive.

15 GEOTHERMAL ENERGY↗

Assessment of Economic Impact of Permitting Timelines on Produced Geothermal Power in Imperial County, California

Despite having a large geothermal power potential in the United States, only a small fraction has been developed for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to lower contribution of geothermal energy in the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. Our study shows that the geothermal permitting timelines can vary from six months to several years, depending on the presence or absence of biological resources, cultural resources, and sensitive environmental issues at the project site. The potential impacts of these permit barriers can range from investors abandoning geothermal development to making the product (i.e., electricity) more expensive and uncompetitive. In this study, we conducted economic analysis to assess the impact of permitting timelines on cost of produced electricity from geothermal resources using data from existing geothermal plants as well as prospective sites. In this paper, we present collected timelines data, approach, and results of economic impact of permitting timelines on geothermal power. We evaluated the various environmental management and permit review processes by considering a hypothetical geothermal project in the Salton Sea Known Geothermal Resource Area. Because of the variety of the biological and environmental issues and the involvement of local, state, and federal agencies with overlapping jurisdictions, this project could go through one of the many California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) review scenarios that range from the least to the most complex in its circumstances. The fastest CEQA/NEPA review timelines would have the project completed in six years. In contrast, the project would substantially need longer time to complete if it were located in an area with significant environmental resources or cultural issues that required permitting from various agencies. With increasing project completion timelines, the simplified levelized cost of electricity (sLCOE) can be 4 to 11% higher with longer CEQA/NEPA review timelines than the sLCOE value with the fastest CEQA/NEPA review timeline. Lengthier CEQA/NEPA review timelines could also result in loss of $64 million to $227 million in potential revenue. Such significant economic impacts could determine the success of a geothermal project.

15 GEOTHERMAL ENERGY↗

Considerations for Improving the Technoeconomic Viability of Heat Pipe Microreactors by Employing a Functional Containment Approach

The economic cost of a microreactor is being investigated by leveraging MARVEL cost information in conjunction with some simplified design and analysis activities to present a hypothetical, yet feasible, option for investigation. This bottom-up cost estimate for a hypothetical commercial microreactor will be used to provide guidance to the industry and research communities regarding where priorities should be set to improve the viability of broad microreactor deployment. To support the design and analysis activities required to present a feasible option, some understanding of maximum accidental radionuclide releases and consequences is needed to provide bounding estimates on containment or confinement systems for radionuclide retention. To estimate fission product barrier and retention performance, a gaussian plume dose and dispersion model is employed, with isotopic inventories being propagated between barriers assuming conservative fractional release rates. Demonstrably conservative meteorological assumptions are also assumed. Standard reference release rates are assumed where safety requirements could be easily and economically employed. Results are provided in units of total effective dose equivalent as a function of distance from the release (i.e., the reactor). Initial results indicate that the hypothetical microreactor will likely need to credit the fuel cladding and at least one other barrier, or combination of barriers, to ensure public health and safety as required during a postulated accident. This approach is referred to as “functional containment,” since no single barrier will be relied upon for satisfying regulatory requirements and fundamental safety functions for radionuclide retention. Finally, a set of barrier options are provided so that future economic analyses can select the most viable design path.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Policy and Regulatory Environment for Utility-Scale Energy Storage: India

This report is part of a series investigating the potential for utility-scale energy storage in South Asia. The first part of the work is focused on opportunities and barriers for energy storage within existing policy and regulatory frameworks in the region. This report applies the previously-developed Energy Storage Readiness Assessment to evaluate the policy and regulatory environment for energy storage in India. Forthcoming reports will expand this analysis to other countries in South Asia. These evaluations are designed to provide insights on the opportunities and barriers for energy storage growth and deployment in each country. The second part of this work consists of techno-economic analysis to understand the drivers of energy storage investments in South Asia. Using NREL’s power system planning and operational models of South Asia, this analysis will identify potential storage applications and growth under various cost, policy, and demand growth scenarios. In addition, the regulatory and policy barriers and incentive mechanisms identified in the first task will be incorporated into the modeling task to understand their impact on energy storage deployment and operation. Together these studies will inform the applications and value of energy storage on South Asia power systems and policy and regulatory pathways to realize this value.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Considerations for Introducing Artificial Intelligence into Nuclear Power Plants

Advanced computational tools and techniques such as artificial intelligence and machine learning (AI/ML) can transform the nuclear power industry. This is necessary given that the economic viability of the existing fleet is in jeopardy and its labor-centric approach to operations and maintenance. Currently, AI/ML research is being undertaken for reactor system design and analysis including fault and accident prognosis, nuclear risk analysis such as plant safety and security evaluation, and plant operations and maintenance including predictive maintenance. Applications include both existing and advanced reactor technologies with the aim of improving operational and business efficiencies. Most every aspect of the organization can benefit, from instrumentation and control, to work planning, to human-machine interactions and business management. AI/ML in nuclear can simplify complex problems and produce more effective decision-making. Nonetheless, careful consideration must be given to the implementation of an AI/ML initiative. The aims of this research are to 1) review barriers to AI/ML adoption within the nuclear power industry, and 2) suggest potential solutions. These barriers are organized along five distinct categories (Figure 1) that are interconnected. The first are historical barriers that track the industry’s development over the decades including worldwide nuclear events that shaped public perceptions. The resulting federal scrutiny and intense safety culture that emerged are discussed. Technical barriers to AI/ML adoption are considerable, and include data privacy concerns, data governance, and the current lack of AI/ML expert knowledge at the plants. The main business case barrier remains cost, but an absence of an industry-wide vision and wide-scale adoption also produces reluctance. Stakeholder readiness is reviewed with special attention given to regulatory readiness. The 5-year strategic plan for AI readiness recently published by the U.S. Nuclear Regulatory Commission is highlighted. Last, adoption barriers at the user level are addressed including the importance of user experience and explainable AI. The AI adoption barriers described here are inter-related and ideally should be addressed in a holistic fashion.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Nurturing the Industrial Accelerator Technology Base in the US

The purpose of this white paper is to discuss the importance of having a world class domestic industrial vendor base, capable of supporting the needs of the particle accelerator facilities, and the necessary steps to support and develop such a base in the United States. The paper focuses on economic, regulatory, and policy-driven barriers and hurdles, which presently limit the depth and scope of broader industrial participation in US accelerator facilities. It discusses the international competition landscape and proposes steps to improve the strength and vitality of US industry.

43 PARTICLE ACCELERATORS↗

Research to Develop Flood Barrier Testing Strategies for Nuclear Power Plants

The U.S. Nuclear Regulatory Commission has developed regulations regarding the siting and design of nuclear power plants (NPPs) that are aimed at addressing various natural hazards, including flooding. Flood barriers are designed to prevent water from entering NPP areas containing structures, systems, and components (SSCs) important to safety. The barriers are used at NPPs along with drains, sumps, pumps, valves, plugs, and site grading as part of the plant flood protection features that protect SSCs from experiencing external or internal flooding and mitigate the effects of flooding on NPP operations. The performance of flood protection features, including flood barriers at NPPs, has been an ongoing concern. Domestic and international operational experience provides clear indications that flood barrier performance has significant safety implications, especially for aging NPPs. The observed deficiencies show that flood barriers should be designed and installed properly, then adequately tested, inspected, and maintained in order to ensure that they perform their intended functions during flooding events. Here, this paper reviews available information related to flood barriers employed at U.S. NPPs and provides an overview and categorization of NPP flood barriers. It identifies potential domestic and international flood barrier testing facilities, including operating and decommissioned U.S. NPPs. Finally, this paper presents the technical and logistical considerations that should be made when developing specific testing strategies and protocols for flood barriers, such as the selection of flood barriers, test locations, testing approach, performance criteria, and testing parameters.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Simple Data-Centric Methodology for Producible Geothermal Well Determinations: Preprint

The Bureau of Land Management (BLM) has traditionally lacked a standardized methodology for determining if a newly drilled geothermal well is "producible," a designation essential for deciding whether a lease should be "held by production." This is a straightforward problem to solve in oil and gas: Demonstrate that a well is economically viable, meaning it produces sufficient oil or gas to exceed direct operating costs and lease-related expenses, such as rentals or minimum royalties. In geothermal, the problem is more complex: Geothermal wells are tightly coupled with the downstream infrastructure - specifically, the power plant, which is often not designed until well after a lease is deemed as "held by production." Although this designation is critical for advancing geothermal power plant development on BLM-managed lands, current geothermal well assessments often rely on ad hoc approaches that can be complex, operator-biased, and heavy in assumptions related to economic viability. To address this, we have developed two complementary methodologies: a minimum power requirement-based approach and a productivity index (PI)-based approach. These methods leverage key flow test data - pressure, temperature, flow rate, and specific enthalpy - to provide reliable and standardized producible well determinations. The minimum power requirement-based approach evaluates wells against specific power output thresholds informed by reservoir experts and the associated temperature requirements. The PI-based approach assesses well productivity using widely accepted reservoir engineering metrics, proposing a threshold of 2.5 kg/s/bar. Both methods are data-driven and grounded in empirical production data from operational geothermal wells, avoiding uncertain economic assumptions while maintaining decision-making accuracy. Wells falling below key performance thresholds (i.e., PI, specific power) are deemed non-producible. These methodologies aim to streamline BLM's decision-making process, reduce nontechnical barriers to geothermal energy adoption, and enable regulatory expansion into states lacking geothermal expertise. Preliminary results indicate clear trends and thresholds in production data that provide actionable insights for evaluating well producibility. Validation using well completion report (WCR) data is ongoing, with promising results demonstrating the potential for these standardized methodologies to impact geothermal development significantly.

15 GEOTHERMAL ENERGY↗

Transformational Challenge Reactor Safety Design and Radionuclide Retention Strategy

An integrated safety design and radionuclide (RN) retention strategy is developed to support the Transformational Challenge Reactor (TCR) demonstration. This demonstration aims to showcase viability for rapid deployment of a novel reactor by leveraging the advances in materials, manufacturing, and computational sciences through a highly integrated and agile design and development approach. This strategy provides a logical description and understanding of how RNs are contained within the facility. Rather than discussing fission product barriers individually between separate design and safety basis reports, this paper provides a consistent description and narrative to better facilitate regulatory interactions and focus safety design efforts. The principal barriers credited include the various coating layers in the tristructural isotropic (TRISO) fuel particle, the silicon carbide (SiC) matrix hosting the particles within the fuel element, the helium pressure boundary, and the confinement system. The choice and assumed performance of the credited barriers are highly conservative, which is a direct reflection of the low hazard that the TCR demonstration presents and the need to simplify and focus the safety review process accordingly. However, the strategy and the associated framework are generalized and may be adopted and tailored to support other advanced reactor demonstration efforts.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Addressing Regulatory Challenges to Tribal Solar Deployment

This project, Addressing Regulatory Challenges to Tribal Solar Deployment, seeks to unlock some of this potential by bringing Tribal, regulatory, utility, and other stakeholders together to articulate key barriers to Tribal solar adoption and develop replicable solutions. By increasing institutional capacity and developing frameworks, trainings, and a technical document repository for regulatory bodies, utilities, and Tribes, this project can help expand an emerging market.

14 SOLAR ENERGY↗

Addressing Regulatory Challenges to Tribal Solar Deployment: Key Findings

Tribal land in the United States represents approximately 2% of the country's total landmass and holds more than 5% of solar photovoltaic potential (Doris, Lopez, and Beckley 2013). This resource is largely untapped. Many Tribes note that regulatory challenges often are roadblocks to taking advantage of solar potential. This report serves as a summary of a larger project, Addressing Regulatory Challenges to Tribal Solar Deployment. The project seeks to unlock some of this potential by bringing Tribal, regulatory, utility, and other stakeholders together to articulate key barriers to Tribal solar adoption and develop replicable solutions. By increasing institutional capacity and developing frameworks, trainings, and a technical document repository for regulatory bodies, utilities, and Tribes, this project can help expand an emerging market.

14 SOLAR ENERGY↗

Enhancers that direct gene expression to central nervous system vascular endothelial cells in vivo

CNS vascular endothelial cells (ECs) exhibit a distinctive gene expression program that is foundational for the blood-brain barrier (BBB). Previous research identified candidate cis-regulatory elements (CREs) that were hypothesized to control this program. In this work, transgenic mice and recombinant adeno-associated virus (rAAV) vectors have been used to interrogate these candidate CREs in vivo. These experiments show that an 850 bp genomic DNA segment ∼60 kb 5′ of Slc2a1 possesses enhancer activity that is (1) specific for BBB+ CNS ECs and (2) both necessary and sufficient for BBB+ EC gene expression. A screen of >8,000 genomic DNA segments from CNS EC-specific CRE candidates reveals several hundred with enhancer activity. Transcription factors ERG and LEF1 are shown to occupy sites in brain ECs that are highly enriched in candidate and experimentally validated CREs, lending strong support to a model in which canonical Wnt signaling activates the BBB program via LEF1.

CUT&RUN↗

Dataset for report: Non-Technical Barriers to Geothermal Development in California and Nevada

In California and Nevada, geothermal projects are subject to non-technical barriers, which may create development delays leading to higher project costs and risks and decreased competitiveness with other electricity generation technologies. These non-technical barriers may include federal and state permits, authorizations, environmental reviews, and other regulatory requirements that are applicable throughout different phases of geothermal project development. The 2022 National Renewable Energy Laboratory (NREL) report, "Non-Technical Barriers to Geothermal Development in California and Nevada" presents findings of a study on non-technical barriers that may influence geothermal project development. The set of data resources relied upon for the report includes: 1) interviews conducted with relevant geothermal stakeholders including regulators and project developers, 2) federal and state environmental review documents developed for specific projects, 3) a techno-economic analysis conducted using the NREL Annual Technology Baseline (ATB) framework, and 4) an analysis of the impacts of site-specific land access and permitting considerations on project development readiness conducted using the Geothermal Resource Portfolio Optimization and Reporting Technique (GeoRePORT) Socioeconomic Assessment Tool (SEAT).

15 GEOTHERMAL ENERGY↗

What Role Do Aggregators Play in Power System Security and Resilience?

Barriers to the participation of distributed energy resources (DERs) in wholesale electricity markets have limited the use of DERs for power system security and resilience. In September 2020, the Federal Energy Regulatory Commission (FERC) approved an order to reduce these barriers. FERC Order No. 2222 enables the participation of DER aggregators in wholesale electricity markets. DERs include renewable generation and technologies that support the integration of renewable generation by increasing grid flexibility and resilience. Requiring wholesale energy markets to allow DER aggregator participation provides a path for DERs to become competitive in these markets. As the contribution from aggregated DERs continues to increase, the aggregator's role in supporting grid security and resilience will become more critical. This paper reviews work that demonstrates how DER aggregators can provide resilience support through technical capabilities, operational strategies, and secure communication architectures. Socioeconomic influences and impacts of aggregators, including implications for social resilience, are presented. In surveying the current state-of-the-art across different but interconnected topics, we illustrate how aggregators can be power system participants that enhance grid security. There is no one-size-fits-all approach to enhancing resilience in a power grid that includes a growing cohort of DER aggregators, but there are many options for aggregators to contribute to a more resilient and secure power grid.

aggregator↗

What Role Do Aggregators Play in Power System Security and Resilience? Preprint

Barriers to the participation of distributed energy resources (DERs) in wholesale electricity markets have limited the use of DERs for power system security and resilience. In September 2020, the Federal Energy Regulatory Commission (FERC) approved an order to reduce these barriers. FERC Order No. 2222 enables the participation of DER aggregators in wholesale electricity markets. DERs include renewable generation and technologies that support the integration of renewable generation by increasing grid flexibility and resilience. Requiring wholesale energy markets to allow DER aggregator participation provides a path for DERs to become competitive in these markets. As the contribution from aggregated DERs continues to increase, the aggregator's role in supporting grid security and resilience will become more critical. This paper reviews work that demonstrates how DER aggregators can provide resilience support through technical capabilities, operational strategies, and secure communication architectures. Socioeconomic influences and impacts of aggregators, including implications for social resilience, are presented. There is no one-size-fits-all approach to enhancing resilience in a power grid that includes a growing cohort of DER aggregators, but there are many options for aggregators to contribute to a more resilient and secure power grid.

aggregator↗

The rise of electric vehicles—2020 status and future expectations

Electric vehicles (EVs) are experiencing a rise in popularity over the past few years as the technology has matured and costs have declined, and support for clean transportation has promoted awareness, increased charging opportunities, and facilitated EV adoption. Suitably, a vast body of literature has been produced exploring various facets of EVs and their role in transportation and energy systems. This paper provides a timely and comprehensive review of scientific studies looking at various aspects of EVs, including: (a) an overview of the status of the light-duty-EV market and current projections for future adoption; (b) insights on market opportunities beyond light-duty EVs; (c) a review of cost and performance evolution for batteries, power electronics, and electric machines that are key components of EV success; (d) charging-infrastructure status with a focus on modeling and studies that are used to project charging-infrastructure requirements and the economics of public charging; (e) an overview of the impact of EV charging on power systems at multiple scales, ranging from bulk power systems to distribution networks; (f) insights into life-cycle cost and emissions studies focusing on EVs; and (g) future expectations and synergies between EVs and other emerging trends and technologies. The goal of this paper is to provide readers with a snapshot of the current state of the art and help navigate this vast literature by comparing studies critically and comprehensively and synthesizing general insights. This detailed review paints a positive picture for the future of EVs for on-road transportation, and the authors remain hopeful that remaining technology, regulatory, societal, behavioral, and business-model barriers can be addressed over time to support a transition toward cleaner, more efficient, and affordable transportation solutions for all.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Addressing Regulatory Challenges to Tribal Solar Deployment (Abbreviated Final Technical Report)

Tribal land in the United States represents approximately 2% of the country’s total landmass and holds more than 5% of the solar photovoltaic potential (Doris, Lopez, and Beckley 2013). Though many Tribes have explored options to install solar photovoltaic (PV) generation capacity on their land, regulatory hurdles have often prevented them from doing so. The National Renewable Energy Laboratory (NREL) and the Midwest Tribal Energy Resources Association (MTERA) partnered on this 3-year project, Addressing Regulatory Challenges to Tribal Solar Deployment. The project sought to unlock Tribal solar potential by bringing together Tribal, regulatory, utility, and other stakeholders to articulate key barriers to Tribal solar PV adoption and develop replicable solutions.

14 SOLAR ENERGY↗