Search NASA⌕ Search

SEARCH · Search NASA

Results for “Reliability & Maintainability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

The New NASA Approach to Reliability and Maintainability

In 2017, after 20 years, NASA issued a major revision of its reliability and maintainability (R&M) policy, NASA-STD- 8729.1A. Formerly NASA required certain specific R&M activities during each succeeding phase of project development. Now NASA requires a project to start by including the initial development of R&M requirements and the devising of strategies to implement and verify them. Rather than resolving all the requirements first and then designing the system, as has been usual in systems design, the design process now is to work top down by layers. It begins by first identifying the top level requirements and suggesting top level design strategies for those, then making these higher strategies the basis for a lower level set of requirements, and so on down to the lowest components. This approach is intended to ensure that R&M is designed in from the beginning rather than added later with difficulty to a completed design concept. The new R&M standard uses an innovative and effective top-down system design approach intended to effectively implement R&M.

Jones, Harry W.↗

The New NASA Approach to Reliability and Maintainability

In 2017, after 20 years, NASA issued a major revision of its reliability and maintainability (R&M) policy, NASA-STD-8729.1A [1]. Formerly NASA required certain specific R&M activities during each succeeding phase of project development. Now NASA requires a project to start by including the initial development of R&M requirements and the devising of strategies to implement and verify them. Rather than resolving all the requirements first and then designing the system, as has been usual in systems design, the design process now is to work top down by layers. It begins by first identifying the top level requirements and suggesting top level design strategies for those, then making these higher strategies the basis for a lower level set of requirements, and so on down to the lowest components. This approach is intended to ensure that R&M is designed in from the beginning rather than added later with difficulty to a completed design concept. The new R&M standard uses an innovative and effective top-down system design approach intended to effectively implement R&M.

Jones, Harry W.↗

Improving Reliability and Maintainability (R&M) in Space Life Support

This paper considers how to improve the reliability and maintainability (R&M) of future NASA space life support systems. If these systems are procured under an industry contract, defining the R&M requirements would take precedence over providing technical guidance on designing the system. Imposing a specific R&M design could be over constraining. However, the mission may define the overall R&M approach, as the International Space Station (ISS) did by requiring Orbital Replacement Units (ORUs). Before defining the R&M requirements for the next mission, the life support research program should understand and plan the R&M approach. The recent NASA technical standard on R&M has moved away from requiring specific R&M activities during each of the traditional project phases to instead developing and planning to implement the R&M requirements to meet the top level project R&M objectives. The emphasis is on providing the evidence to show that the R&M requirements are met, rather than on conducting specific prescribed R&M activities. The technical standard on R&M defines a comprehensive hierarchy of specific R&M objectives and identifies particular strategies to implement them at each level. That is, the top level R&M objective is defined and then one or more design strategies to implement it are developed immediately, before the next lower objectives are defined and the strategies to achieve those are designed. This step-by-step, top-down approach is similar to the axiomatic design method. The objectives are the R&M requirements, and the strategies are the hardware designs or operations plans developed to meet these requirements. The new R&M process is aligned with the systems design process and helps ensure that the methods to meet the R&M requirements are built into the design.

Jones, Harry W.↗

Radiation Protection Instrument Reliability and Maintainability Data

This report is a collection of reliability and maintenance data on several types of radiation protection instrumentation. Some radiation detectors are used for personnel safety; others are used for environmental stewardship. Six types of instruments are addressed in this report. These are: continuous air monitors, tritium room air monitors, facility vent stack monitors, tritium bubbler monitors, tritium in effluent water monitors, and general purpose radiation survey meters. Literature searches, operating experience data, and occurrence reports were used to identify failure modes and to estimate quantitative failure rates for several general types of radiation protection instruments. Likewise, data on instrument repair has been found when possible and used to estimate the mean time to repair. These data can be useful for facility safety assessment, personnel safety assessment, environment assessment, and for equipment and labor planning purposes.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Reliability and Maintainability Data for Liquid Metal Cooling Systems

One of the coolants of interest for future fusion breeding blankets is lead-lithium. As a liquid metal it offers the advantages of high temperature operation for good station efficiency, low pressure, and moderate flow rate. This coolant is also under examination for use in test blanket modules to be used in the ITER international project. To perform reliability, availability, maintainability and inspectability (RAMI) assessment as well as probabilistic safety assessment (PSA) of lead-lithium cooling systems, component failure rate data are needed to quantify the system models. RAMI assessment also requires repair time data and inspection time data. This paper presents a new survey of the data sets that are available at present to support RAMI and PSA quantification. Recommendations are given for the best data values to use when quantifying system models.

maintainability data↗

Reliability and Maintainability Analysis of a High Air Pressure Compressor Facility

This paper discusses a Reliability, Availability, and Maintainability (RAM) independent assessment conducted to support the refurbishment of the Compressor Station at the NASA Langley Research Center (LaRC). The paper discusses the methodologies used by the assessment team to derive the repair by replacement (RR) strategies to improve the reliability and availability of the Compressor Station (Ref.1). This includes a RAPTOR simulation model that was used to generate the statistical data analysis needed to derive a 15-year investment plan to support the refurbishment of the facility. To summarize, study results clearly indicate that the air compressors are well past their design life. The major failures of Compressors indicate that significant latent failure causes are present. Given the occurrence of these high-cost failures following compressor overhauls, future major failures should be anticipated if compressors are not replaced. Given the results from the RR analysis, the study team recommended a compressor replacement strategy. Based on the data analysis, the RR strategy will lead to sustainable operations through significant improvements in reliability, availability, and the probability of meeting the air demand with acceptable investment cost that should translate, in the long run, into major cost savings. For example, the probability of meeting air demand improved from 79.7 percent for the Base Case to 97.3 percent. Expressed in terms of a reduction in the probability of failing to meet demand (1 in 5 days to 1 in 37 days), the improvement is about 700 percent. Similarly, compressor replacement improved the operational availability of the facility from 97.5 percent to 99.8 percent. Expressed in terms of a reduction in system unavailability (1 in 40 to 1 in 500), the improvement is better than 1000 percent (an order of magnitude improvement). It is worthy to note that the methodologies, tools, and techniques used in the LaRC study can be used to evaluate similar high value equipment components and facilities. Also, lessons learned in data collection and maintenance practices derived from the observations, findings, and recommendations of the study are extremely important in the evaluation and sustainment of new compressor facilities.

Safie, Fayssal M.↗

ETARA PC version 3.3 user's guide: Reliability, availability, maintainability simulation model

A user's manual describing an interactive, menu-driven, personal computer based Monte Carlo reliability, availability, and maintainability simulation program called event time availability reliability (ETARA) is discussed. Given a reliability block diagram representation of a system, ETARA simulates the behavior of the system over a specified period of time using Monte Carlo methods to generate block failure and repair intervals as a function of exponential and/or Weibull distributions. Availability parameters such as equivalent availability, state availability (percentage of time as a particular output state capability), continuous state duration and number of state occurrences can be calculated. Initial spares allotment and spares replenishment on a resupply cycle can be simulated. The number of block failures are tabulated both individually and by block type, as well as total downtime, repair time, and time waiting for spares. Also, maintenance man-hours per year and system reliability, with or without repair, at or above a particular output capability can be calculated over a cumulative period of time or at specific points in time.

Hoffman, David J.↗

Analysis of Shuttle Orbiter Reliability and Maintainability Data for Conceptual Studies

In order to provide a basis for estimating the expected support required of new systems during their conceptual design phase, Langley Research Center has recently collected Shuttle Orbiter reliability and maintainability data from the various data base sources at Kennedy Space Center. This information was analyzed to provide benchmarks, trends, and distributions to aid in the analysis of new designs. This paper presents a summation of those results and an initial interpretation of the findings.

Morris, W. D.↗

Reliability and Maintainability Issues for the Next Linear Collider

Large accelerators for high energy physics research traditionally have been designed using informal best design, engineering, and management practices to achieve acceptable levels of operational availability. However, the Next Linear Collider(NLC) project presents a particular challenge for operational availability due to the unprecedented size and complexity of the accelerator systems required to achieve the physics goals of high center-of-mass energy and high luminosity. Formal reliability and maintainability analysis, design, and implementation will be required to achieve acceptable operational availability for the high energy physics research program. This paper introduces some of the basic concepts of reliability analysis and applies them to the 2.6-cm microwave power system of the two 10-km-long, 250-GeV linacs that are currently proposed for the NLC design.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Using Synchrophasors to Improve Bulk Power System Reliability in North America

Maintaining reliable operation of the bulk power system is a fundamental aspect of grid operation, and focuses on ensuring the system can withstand sudden disturbances or unanticipated failures of system elements such that instability, uncontrolled separation, or cascading failures will not occur. Phasor measurement units (PMUs) provide the capability for enhanced real-time monitoring and control room solutions as well as improved power system analysis in the planning horizon. With over 1,700 PMUs deployed in the North American grid, numerous PMU-based applications have been developed. This paper summarizes synchrophasor-based applications and presents utility synchrophasor experience.

PMU, oscillation monitoring, Power Plant Model Val↗

Explained: Fundamentals of Power Grid Reliability and Clean Electricity

Maintaining reliability of the bulk power system, which supplies and transmits electricity, is a critical priority for electric grid planners, operators, and regulators. As we move toward a cleaner electricity system with more technologies like wind, solar, and battery storage, the way in which we plan for and achieve reliability will change. This fact sheet provides additional technical background to the topics covered in three other reliability explainers on how we measure, enforce, and plan for reliable systems with more clean electricity.

POWER TRANSMISSION AND DISTRIBUTION↗

An economic assessment of behind-the-meter photovoltaics paired with batteries on the Hawaiian Islands.

Due to natural variability and uncertainty, the ever-increasing penetration of solar generation in Hawaii presents challenges to power grid operators to maintain reliable system operation. Demand response (DR) has the potential to be a cost-effective tool for Hawaii to reach its aggressive renewable energy goals while maintaining the reliability of power grids. The Hawaii Public Utilities Commission has approved the Hawaiian Electric Company's revised portfolio of DR programs. The companies have released a grid services purchase agreement and subscribed an initial tranche of load into their DR programs. This paper presents innovative analytical methods and comprehensive economic assessment for distributed photovoltaics (PV) paired with battery energy storage systems (BESSs) for two new DR programs, including fast frequency response and capacity grid service. Optimal dispatch and sizing methods are proposed for the paired system considering different tariff schedules and PV compensation programs across five islands. It was found that while the best resource configuration and potential economic benefits vary with tariff structure, a BESS paired with PV can be optimally dispatched to generate multiple value streams simultaneously. Compensation from DR programs is an important value stream to help increase the cost-effectiveness of the integrated system.

Battery energy storage system↗

Reliability and Maintainability (RAM) Training

The theme of this manual is failure physics-the study of how products, hardware, software, and systems fail and what can be done about it. The intent is to impart useful information, to extend the limits of production capability, and to assist in achieving low-cost reliable products. In a broader sense the manual should do more. It should underscore the urgent need CI for mature attitudes toward reliability. Five of the chapters were originally presented as a classroom course to over 1000 Martin Marietta engineers and technicians. Another four chapters and three appendixes have been added, We begin with a view of reliability from the years 1940 to 2000. Chapter 2 starts the training material with a review of mathematics and a description of what elements contribute to product failures. The remaining chapters elucidate basic reliability theory and the disciplines that allow us to control and eliminate failures.

Lalli, Vincent R.↗

NASA R&M Efficiency through Findable, Accessible, Interoperable, and Reusable (FAIR) Digital Assets

At the intersection of mission, technology, and place is NASA’s need to modernize for a digital-forward future. Digitalization, the process of moving toward digital business, is occurring everywhere and remains an ongoing process across the federal government.”[1] Whereas, Digital Transformation is “employing digitization/digital technologies (e.g., Artificial Intelligence (AI), mobile, cloud, data) to change a process, product, or capability so dramatically (e.g., real-time, intelligent, personalized, anywhere, anytime) that it is unrecognizable compared to its traditional form.” [2] In order to facilitate a digital transformation it is essential for NASA to understand and identify where data exists today and which data are value-needed in the future, understand where there are unfulfilled data needs that limit the advancement of NASA work, and ensure NASA efficiency through Findable, Accessible, Interoperable, and Reusable (FAIR) digital assets in the future. Therefore, NASA’s Reliability & Maintainability (R&M) Enterprise Data Sharing team is working to leverage both Digitization and Digital Transformation to achieve their vision of developing an R&M data discovery framework that enables our community, our partners, and our stakeholders with the ability to efficiently, robustly, and seamlessly access information that enables real-time knowledge and model-based, analytics driven, decision-making impacting R&M. As a result the R&M Enterprise Data Sharing team has conducted a survey of its Reliability, Maintainability, and Availability (RMA) community members to identify data existence (created or used) and where there are corresponding barriers to data acquisition and/or R&M or other issues as shown within this presentation.

Digital Transformation↗