Search NASASearch

SEARCH · Search NASA

Results for “Reliability growth”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Estimating the Loss of Crew and Loss of Mission for Crew Spacecraft

Once the US Space Shuttle retires in 2011, the Russian Soyuz Launcher and Soyuz Spacecraft will comprise the only means for crew transportation to and from the International Space Station (ISS). The U.S. Government and NASA have contracted for crew transportation services to the ISS with Russia. The resulting implications for the US space program including issues such as astronaut safety must be carefully considered. Are the astronauts and cosmonauts safer on the Soyuz than the Space Shuttle system? Is the Soyuz launch system more robust than the Space Shuttle? The Soyuz launcher has been in operation for over 40 years. There have been only two loss of life incidents and two loss of mission incidents. Given that the most recent incident took place in 1983, how do we determine current reliability of the system? Do failures of unmanned Soyuz rockets impact the reliability of the currently operational man-rated launcher? Does the Soyuz exhibit characteristics that demonstrate reliability growth and how would that be reflected in future estimates of success? NASA s next manned rocket and spacecraft development project will have to meet the Agency Threshold requirements set forth by NASA. The reliability targets are currently several times higher than the Shuttle and possibly even the Soyuz. Can these targets be compared to the reliability of the Soyuz to determine whether they are realistic and achievable? To help answer these questions this paper will explore how to estimate the reliability of the Soyuz Launcher/Spacecraft system, compare it to the Space Shuttle, and its potential impacts for the future of manned spaceflight. Specifically it will look at estimating the Loss of Crew (LOC) and Loss of Mission (LOM) probability using historical data, reliability growth, and Probabilistic Risk Assessment techniques used to generate these numbers.

Lutomski, Michael G.

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing

Estimating the Reliability of a Soyuz Spacecraft Mission

Once the US Space Shuttle retires in 2010, the Russian Soyuz Launcher and Soyuz Spacecraft will comprise the only means for crew transportation to and from the International Space Station (ISS). The U.S. Government and NASA have contracted for crew transportation services to the ISS with Russia. The resulting implications for the US space program including issues such as astronaut safety must be carefully considered. Are the astronauts and cosmonauts safer on the Soyuz than the Space Shuttle system? Is the Soyuz launch system more robust than the Space Shuttle? Is it safer to continue to fly the 30 year old Shuttle fleet for crew transportation and cargo resupply than the Soyuz? Should we extend the life of the Shuttle Program? How does the development of the Orion/Ares crew transportation system affect these decisions? The Soyuz launcher has been in operation for over 40 years. There have been only two loss of life incidents and two loss of mission incidents. Given that the most recent incident took place in 1983, how do we determine current reliability of the system? Do failures of unmanned Soyuz rockets impact the reliability of the currently operational man-rated launcher? Does the Soyuz exhibit characteristics that demonstrate reliability growth and how would that be reflected in future estimates of success? NASA s next manned rocket and spacecraft development project is currently underway. Though the projects ultimate goal is to return to the Moon and then to Mars, the launch vehicle and spacecraft s first mission will be for crew transportation to and from the ISS. The reliability targets are currently several times higher than the Shuttle and possibly even the Soyuz. Can these targets be compared to the reliability of the Soyuz to determine whether they are realistic and achievable? To help answer these questions this paper will explore how to estimate the reliability of the Soyuz Launcher/Spacecraft system, compare it to the Space Shuttle, and its potential impacts for the future of manned spaceflight. Specifically it will look at estimating the Loss of Mission (LOM) probability using historical data, reliability growth, and Probabilistic Risk Assessment techniques

Lutomski, Michael G.

Probabilistic design applications for the Space Transportation Main Engines

All of the current rocket engine designs are based on deterministic design analysis methods. The most recently designed engine, Space Shuttle Main Engines (SSME), was designed and developed using these techniques in the 1970's and 80's. The Space Transportation Main Engine (STME) design objective is to use a robust design methodology and to pro-actively assess and improve the design during the design process. The design approach is a combination of the traditional deterministic methodologies and recently developed probabilistic methodologies. The designer must use a more rigorous structural criteria, conduct pro-active reliability assessments (reliability allocations, failure modes and effects analysis, reliability growth studies, and design reliability assessment), use a damage tolerant design philosophy and perform probabilistic analyses. Rigorous application of this structured methodology will develop a better engine product.

Ohara, Kevin

Development of confidence limits by pivotal functions for estimating software reliability

The utility of pivotal functions is established for assessing software reliability. Based on the Moranda geometric de-eutrophication model of reliability growth, confidence limits for attained reliability and prediction limits for the time to the next failure are derived using a pivotal function approach. Asymptotic approximations to the confidence and prediction limits are considered and are shown to be inadequate in cases where only a few bugs are found in the software. Departures from the assumed exponentially distributed interfailure times in the model are also investigated. The effect of these departures is discussed relative to restricting the use of the Moranda model.

Dotson, Kelly J.

High purity isotopically enriched Ge-70 and Ge-74 single crystals - Isotope separation, growth, and properties

Ge-70 and Ge-74 isotopes were successfully separated from natural Ge, and were zone purified. Several highly enriched, high purity Ge-70 and Ge-74 single crystals were grown by the vertical Bridgman method. The growth system was designed for reliable growth of low dislocation density, high purity Ge single crystals of about 4 g weight. A Ge-70 and a Ge-74 crystal were selected for complete characterization. In spite of the large surface-to-volume ratio of these ingots, both Ge-70 and Ge-74 crystals contain low electrically active chemical net-impurity concentrations of about 2 x 10 exp 12/cu cm, which is 2 orders of magnitude better than that of Ge-74 crystals previously grown by two different groups. Isotopic enrichment of the Ge-70 and the Ge-74 crystals is 96.3 percent and 96.8 percent, respectively. The residual donors and acceptors present in both crystals were identified as phosphorus and copper, respectively. In addition, less than 10 exp 11/cu cm Ga, Al, and In were found in the Ge-70 crystal.

Itoh, Kohei

Four Problematic Methods in Reliability Analysis

Some basic methods used in reliability analysis are problematic because they produce incorrect and overoptimistic predictions. Initially gratifying forecasts are often invalidated by testing and operational experience. The problematic methods in reliability analysis include estimating the system failure rate as the sum of component failure rates, assuming that reliability growth continues indefinitely during testing, overestimating the benefits of redundancy, and using the fault tolerance count instead of a detailed reliability analysis. Reliability analysis can produce more optimism than accuracy. This bug may now be a feature. The optimistic bias inevitable in project planning should be corrected by realistic reliability analysis that reflects relevant experience. That the repeated poor performance of reliability analysis is found to be surprising suggests willful blindness. Rigorous methods and impartial critical review are necessary to improve reliability analysis.

Reliability analysis

Four Problematic Methods in Reliability Analysis

Some basic methods used in reliability analysis are problematic because they produce incorrect and overoptimistic predictions. Initially gratifying forecasts are often invalidated by testing and operational experience. The problematic methods in reliability analysis include estimating the system failure rate as the sum of component failure rates, assuming that reliability growth continues indefinitely during testing, overestimating the benefits of redundancy, and using the fault tolerance count instead of a detailed reliability analysis. Reliability analysis can produce more optimism than accuracy. This bug may now be a feature. The optimistic bias inevitable in project planning should be corrected by realistic reliability analysis that reflects relevant experience. That the repeated poor performance of reliability analysis is found to be surprising suggests willful blindness. Rigorous methods and impartial critical review are necessary to improve reliability analysis.

Reliability analysis

Large Area Silicon Sheet by EFG

Progress made in the development of EFG ribbon growth is discussed. Specific areas covered include: (1) demonstration of multiple growth for ribbons 5 cm wide in runs of 12 and 20 hours duration; (2) a single cartridge crystal growth station was built expanding observational capacity by virtue of an anamorphic optical-video system which allows close observation of the meniscus over 7.5 cm wide, as well as video taping of the ribbon growth process; (3) growth station no.1 achieved reproducible and reliable growth of 7.5 cm wide ribbon at speeds up to 4 cm/min; (4) introduction of the 'mini cold shoe'; (5) increases in cell efficiency due to interface shaping using the 'displaced die' concept; and (6) clarification of the role of gaseous impurities in cartridge furnaces and stabilization of their destabilizing influence on growth.

Wald, F. V.

Development of Biocompatibility Procedures for Assessment of Plant Growth in Ground Test Hardware for the EMCS

The European Modular Cultivation System (EMCS) is an European Space Agency-developed facility designed to support plant research in microgravity on the IS NASA is responsible for providing US specific hardware to use within the EMCS. In preparation for flight, research will be developed and tested at Ames Research Center in the EMCS ground test hardware, the Experiment Reference Module (ERM) In order to determine the acceptability of the ERM for such purposes, biocompatibility tests will be performed to determine that the hardware functions as intended and successfully supports the' growth of plants. In this report, we describe the development of procedures and the collection of baseline data against which to compare ERM function, e.g. biocompatibility testing. A simple and robust system was developed to grow whole Arabidopsis thaliana plants within the confined volumes characteristic of spaceflight hardware. Our system for growing plants eliminated the necessity of a water/nutrient delivery system and allowed for quantifiable assessment of individual plants, as well as entire population dynamics. To insure uniform germination, seeds were started in small straw segments and transplanted into modified scintillation vials. Seedlings were selected prior to transplantation to decrease genetic variability. Plants were grown for a total of 24 days in standard laboratory plant growth chambers under controlled conditions. Sequential digital still images were taken on a daily basis. Analysis of these images allowed for the quantification of even minute environmental effect, on growth dynamics whole plants. The data collected provide reliable growth curves against which to compare plants grown in the ERM.

Bowman, R. N.

Parametric estimation of R&M parameters during the conceptual design of space vehicles

Reliability and maintainability parameters of proposed space vehicles are estimated based on a comparability analysis of similar aircraft subsystems. Using multiple regression techniques, parametric equations are developed for each subsystem to predict mean flying hours between failure as a function of vehicle design and performance specifications. These estimates are then adjusted to account for reliability growth, environmental differences, and new technologies. Overall vehicle mission reliability may then be computed from subsystem reliability estimates.

Ebeling, Charles E.

Recalibrating software reliability models

In spite of much research effort, there is no universally applicable software reliability growth model which can be trusted to give accurate predictions of reliability in all circumstances. Further, it is not even possible to decide a priori which of the many models is most suitable in a particular context. In an attempt to resolve this problem, techniques were developed whereby, for each program, the accuracy of various models can be analyzed. A user is thus enabled to select that model which is giving the most accurate reliability predictions for the particular program under examination. One of these ways of analyzing predictive accuracy, called the u-plot, in fact allows a user to estimate the relationship between the predicted reliability and the true reliability. It is shown how this can be used to improve reliability predictions in a completely general way by a process of recalibration. Simulation results show that the technique gives improved reliability predictions in a large proportion of cases. However, a user does not need to trust the efficacy of recalibration, since the new reliability estimates produced by the technique are truly predictive and so their accuracy in a particular application can be judged using the earlier methods. The generality of this approach would therefore suggest that it be applied as a matter of course whenever a software reliability model is used.

Brocklehurst, Sarah

Recalibrating software reliability models

In spite of much research effort, there is no universally applicable software reliability growth model which can be trusted to give accurate predictions of reliability in all circumstances. Further, it is not even possible to decide a priori which of the many models is most suitable in a particular context. In an attempt to resolve this problem, techniques were developed whereby, for each program, the accuracy of various models can be analyzed. A user is thus enabled to select that model which is giving the most accurate reliability predicitons for the particular program under examination. One of these ways of analyzing predictive accuracy, called the u-plot, in fact allows a user to estimate the relationship between the predicted reliability and the true reliability. It is shown how this can be used to improve reliability predictions in a completely general way by a process of recalibration. Simulation results show that the technique gives improved reliability predictions in a large proportion of cases. However, a user does not need to trust the efficacy of recalibration, since the new reliability estimates prodcued by the technique are truly predictive and so their accuracy in a particular application can be judged using the earlier methods. The generality of this approach would therefore suggest that it be applied as a matter of course whenever a software reliability model is used.

Brocklehurst, Sarah

Solid Rocket Booster Large Main and Drogue Parachute Reliability Analysis

The parachutes on the Space Transportation System (STS) Solid Rocket Booster (SRB) are the means for decelerating the SRB and allowing it to impact the water at a nominal vertical velocity of 75 feet per second. Each SRB has one pilot, one drogue, and three main parachutes. About four minutes after SRB separation, the SRB nose cap is jettisoned, deploying the pilot parachute. The pilot chute then deploys the drogue parachute. The drogue chute provides initial deceleration and proper SRB orientation prior to frustum separation. At frustum separation, the drogue pulls the frustum from the SRB and allows the main parachutes that are mounted in the frustum to unpack and inflate. These chutes are retrieved, inspected, cleaned, repaired as needed, and returned to the flight inventory and reused. Over the course of the Shuttle Program, several improvements have been introduced to the SRB main parachutes. A major change was the replacement of the small (115 ft. diameter) main parachutes with the larger (136 ft. diameter) main parachutes. Other modifications were made to the main parachutes, main parachute support structure, and SRB frustum to eliminate failure mechanisms, improve damage tolerance, and improve deployment and inflation characteristics. This reliability analysis is limited to the examination of the SRB Large Main Parachute (LMP) and drogue parachute failure history to assess the reliability of these chutes. From the inventory analysis, 68 Large Main Parachutes were used in 651 deployments, and 7 chute failures occurred in the 651 deployments. Logistic regression was used to analyze the LMP failure history, and it showed that reliability growth has occurred over the period of use resulting in a current chute reliability of R = .9983. This result was then used to determine the reliability of the 3 LMPs on the SRB, when all must function. There are 29 drogue parachutes that were used in 244 deployments, and no in-flight failures have occurred. Since there are no observed drogue chute failures, Jeffreys Prior was used to calculate a reliability of R =.998. Based on these results, it is concluded that the LMP and drogue parachutes on the Shuttle SRB are suited to their mission and changes made over their life have improved the reliability of the parachute.

Clifford, Courtenay B.

Predicting software reliability

A detailed look is given to software reliability techniques. A conceptual model of the failure process is examined, and some software reliability growth models are discussed. Problems for which no current solutions exist are addressed, emphasizing the very difficult problem of safety-critical systems for which the reliability requirements can be enormously demanding.

Littlewood, B.

NASA Applications and Lessons Learned in Reliability Engineering

Since the Shuttle Challenger accident in 1986, communities across NASA have been developing and extensively using quantitative reliability and risk assessment methods in their decision making process. This paper discusses several reliability engineering applications that NASA has used over the year to support the design, development, and operation of critical space flight hardware. Specifically, the paper discusses several reliability engineering applications used by NASA in areas such as risk management, inspection policies, components upgrades, reliability growth, integrated failure analysis, and physics based probabilistic engineering analysis. In each of these areas, the paper provides a brief discussion of a case study to demonstrate the value added and the criticality of reliability engineering in supporting NASA project and program decisions to fly safely. Examples of these case studies discussed are reliability based life limit extension of Shuttle Space Main Engine (SSME) hardware, Reliability based inspection policies for Auxiliary Power Unit (APU) turbine disc, probabilistic structural engineering analysis for reliability prediction of the SSME alternate turbo-pump development, impact of ET foam reliability on the Space Shuttle System risk, and reliability based Space Shuttle upgrade for safety. Special attention is given in this paper to the physics based probabilistic engineering analysis applications and their critical role in evaluating the reliability of NASA development hardware including their potential use in a research and technology development environment.

Safie, Fayssal M.

Redundancy: How Many Unreliable Spares are Needed for High Reliability and Confidence on a Time Limited Mission?

This paper investigates the number of redundant units needed to achieve high reliability with high confidence. The approach applies to the case where the unit failure rate is too high for a single unit to provide the required reliability over the mission duration. To achieve high reliability, the design then uses N redundant units, one operating unit and N – 1 spares. If the unit failure rate is f, the mission length is L, and f * L is small (not the case assumed here), the unit failure probability over the mission duration is F1 = f * L << 1. In this case, the probability that all N units will fail is FN = F1N, and the needed N = LN(FN)/LN(F1). For the case of large f * L assumed here, F1 = f * L > 1, and F1 is the expected number of failures during the mission. The needed redundancy, N, to achieve the specified N unit reliability, FN, can be computed using the cumulative Poisson distribution with mean equal to F1. The number of spares, N - 1, is increased until the probability - that the total number of failures will be less than N -1 - achieves the required reliability. The confidence that this reliability can be achieved can be computed using the cumulative Poisson distribution or the chi-square distribution. Since the measured unit failure rate, f, has some uncertainty, the confidence that the rate is not lower than the actual failure rate and the required reliability is not overestimated is about 50%. Adding more redundant units increases the confidence that the required reliability, FN, will be achieved. For a fixed number of redundant units, the expected reliability and confidence can be traded off, since lower reliability goals have higher confidence in being achieved. Both the required reliability and confidence can be specified initially and the needed number of redundant units computed using the measured failure rate. The unit failure rate is determined by initial reliability growth testing to remove design errors and to better estimate the final constant failure rate. Reducing the failure rate and reducing its variance both reduce the number of redundant units needed for the required reliability and confidence. Since the total cost is the sum of the costs of the units and of the testing, there is an optimum test time that produces minimum cost.

Harry W. Jones