Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

SURE (Science User Resource Expert): A science planning and scheduling assistant for a resource based environment

SURE (Science User Resource Expert) is one of three components that compose the SURPASS (Science User Resource Planning and Scheduling System). This system is a planning and scheduling tool which supports distributed planning and scheduling, based on resource allocation and optimization. Currently SURE is being used within the SURPASS by the UARS (Upper Atmospheric Research Satellite) SOLSTICE instrument to build a daily science plan and activity schedule and in a prototyping effort with NASA GSFC to demonstrate distributed planning and scheduling for the SOLSTICE II instrument on the EOS platform. For the SOLSTICE application the SURE utilizes a rule-based system. Development of a rule-based program using Ada CLIPS as opposed to using conventional programming, allows for capture of the science planning and scheduling heuristics in rules and provides flexibility in inserting or removing rules as the scientific objectives and mission constraints change. The SURE system's role as a component in the SURPASS, the purpose of the SURE planning and scheduling tool, the SURE knowledge base, and the software architecture of the SURE component are described.

Thalman, Nancy E.↗

A Length Adaptive Algorithm-Hardware Co-design of Transformer on FPGA Through Sparse Attention and Dynamic Pipelining

Transformers are considered one of the most important deep learning models since 2018, in part because it establishes state-of-the-art (SOTA) records and could potentially replace existing Deep Neural Networks (DNNs). Despite the remarkable triumphs, the prolonged turnaround time of Transformer models is a widely recognized roadblock. The variety of sequence lengths imposes additional computing overhead where inputs need to be zero-padded to the maximum sentence length in the batch to accommodate the parallel computing platforms. This paper targets the field-programmable gate array (FPGA) and proposes a coherent sequence length adaptive algorithm–hardware co-design for Transformer acceleration. Particularly, we develop a hardware-friendly sparse attention operator and a length-aware hardware resource scheduling algorithm. The proposed sparse attention operator brings the complexity of attention-based models down to linear complexity and alleviates the off-chip memory traffic. The proposed length-aware resource hardware scheduling algorithm dynamically allocates the hardware resources to fill up the pipeline slots and eliminates bubbles for NLP tasks. Experiments show that our design has very small accuracy loss and has 80.2 × and 2.6 × speedup compared to CPU and GPU implementation, and 4 × higher energy efficiency than state-of-the-art GPU accelerator optimized via CUBLAS GEMM.

Peng, Hongwu↗

A Heterogeneity-Aware Task Scheduler for Spark

Big data processing systems such as Spark are employed in an increasing number of diverse applications-such as machine learning, graph computation, and scientific computing-each with dynamic and different resource needs. These applications increasingly run on heterogeneous hardware, e.g., with out-of-core accelerators. However, big data platforms do not factor in the multi-dimensional heterogeneity of applications and hardware. This leads to a fundamental mismatch between the application and hardware characteristics, and the resource scheduling adopted in big data platforms. For example, Hadoop and Spark consider only data locality when assigning tasks to nodes, and typically disregard the hardware capabilities and suitability to specific application requirements. In this paper, we present RUPAM, a heterogeneity-aware task scheduling system for big data platforms, which considers both task-level resource characteristics and underlying hardware characteristics, as well as preserves data locality. RUPAM adopts a simple yet effective heuristic to decide the dominant scheduling factor (e.g., CPU, memory, or I/O), given a task in a particular stage. Our experiments show that RUPAM is able to improve the performance of representative applications by up to 62.3% compared to the standard Spark scheduler.

Computer Science↗

NUMA-Aware Thread Scheduling for Big Data Transfers over Terabits Network Infrastructure

The evergrowing trend of big data has led scientists to share and transfer the simulation and analytical data across the geodistributed research and computing facilities. However, the existing data transfer frameworks used for data sharing lack the capability to adopt the attributes of the underlying parallel file systems (PFS). LADS (Layout-Aware Data Scheduling) is an end-to-end data transfer tool optimized for terabit network using a layout-aware data scheduling via PFS. However, it does not consider the NUMA (Nonuniform Memory Access) architecture. In this paper, we propose a NUMA-aware thread and resource scheduling for optimized data transfer in terabit network. First, we propose distributed RMA buffers to reduce memory controller contention in CPU sockets and then schedule the threads based on CPU socket and NUMA nodes inside CPU socket to reduce memory access latency. We design and implement the proposed resource and thread scheduling in the existing LADS framework. Experimental results showed from 21.7% to 44% improvement with memory-level optimizations in the LADS framework as compared to the baseline without any optimization.

97 MATHEMATICS AND COMPUTING↗

Wind Tunnel Management and Resource Optimization: A Systems Modeling Approach

Time, money, and, personnel are becoming increasingly scarce resources within government agencies due to a reduction in funding and the desire to demonstrate responsible economic efficiency. The ability of an organization to plan and schedule resources effectively can provide the necessary leverage to improve productivity, provide continuous support to all projects, and insure flexibility in a rapidly changing environment. Without adequate internal controls the organization is forced to rely on external support, waste precious resources, and risk an inefficient response to change. Management systems must be developed and applied that strive to maximize the utility of existing resources in order to achieve the goal of "faster, cheaper, better". An area of concern within NASA Langley Research Center was the scheduling, planning, and resource management of the Wind Tunnel Enterprise operations. Nine wind tunnels make up the Enterprise. Prior to this research, these wind tunnel groups did not employ a rigorous or standardized management planning system. In addition, each wind tunnel unit operated from a position of autonomy, with little coordination of clients, resources, or project control. For operating and planning purposes, each wind tunnel operating unit must balance inputs from a variety of sources. Although each unit is managed by individual Facility Operations groups, other stakeholders influence wind tunnel operations. These groups include, for example, the various researchers and clients who use the facility, the Facility System Engineering Division (FSED) tasked with wind tunnel repair and upgrade, the Langley Research Center (LaRC) Fabrication (FAB) group which fabricates repair parts and provides test model upkeep, the NASA and LARC Strategic Plans, and unscheduled use of the facilities by important clients. Expanding these influences horizontally through nine wind tunnel operations and vertically along the NASA management structure greatly increases the complexity of developing a model that can be used for successfully implementing a standardized management planning tool. The objective of this study was to implement an Integrated Wind Tunnel Planning System to improve the operations within the aeronautics testing and research group, in particular Wind Tunnel Enterprise. The study included following steps: Conducted literature search and expert discussions (NASA and Old Dominion University faculty), Performed environmental scan of NASA Langley wind tunnel operations as foundation for problem definition. Established operation requirements and evaluation methodologies. Examined windtunnel operations to map out the common characteristics, critical components, and system structure. Reviewed and evaluated various project scheduling and management systems for implementation, Evaluated and implemented "Theory of Constraints (TOC)" project scheduling methodology at NASA Langley wind tunnel operations together with NASA staff.

Jacobs, Derya, A.↗

Energy-efficient cooperative resource allocation and task scheduling for Internet of Things environments

Offloading Internet of Things (IoT) tasks to the cloud for further processing might not always lead to an optimal execution time, particularly in situations such as resource contention, under-provisioning, over-provisioning, and fragmentation. In addition, dynamically optimizing the number of Virtual Machines (VMs) for resource scheduling in order to meet application requirements remains a major research challenge. Further, existing resource scheduling algorithms focus primarily on minimizing operational costs while maximizing resource sharing and utilization. Considering energy utilization as part of the resource allocation and scheduling process as an optimization objective for maintaining load balancing has often been neglected. To address these challenges and more, we propose a cooperative energy-aware resource allocation and scheduling strategy based on a Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) multi-criteria decision-making method. Here we used the Grid Workloads Archive dataset to evaluate our proposed approach named TOPREAL. Experimental results with respect to the allocation of VM resources when considering processing a large segment of tasks indicate that TOPREAL outperforms existing algorithms in terms of energy savings, with an average improvement of 40.25%, while maintaining an average improvement of 16.21% when it comes to execution time. Results also demonstrate that our method can save an average of 78.06 processing hours and 63,215kJ of energy when compared to existing scheduling algorithms. These results demonstrate the effectiveness of our proposed model and the viability of using multi-criteria decision-making techniques such as TOPSIS to solve the resource allocation and scheduling problem in edge environments.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Automated Platform Management System Scheduling

The Platform Management System was established to coordinate the operation of platform systems and instruments. The management functions are split between ground and space components. Since platforms are to be out of contact with the ground more than the manned base, the on-board functions are required to be more autonomous than those of the manned base. Under this concept, automated replanning and rescheduling, including on-board real-time schedule maintenance and schedule repair, are required to effectively and efficiently meet Space Station Freedom mission goals. In a FY88 study, we developed several promising alternatives for automated platform planning and scheduling. We recommended both a specific alternative and a phased approach to automated platform resource scheduling. Our recommended alternative was based upon use of exactly the same scheduling engine in both ground and space components of the platform management system. Our phased approach recommendation was based upon evolutionary development of the platform. In the past year, we developed platform scheduler requirements and implemented a rapid prototype of a baseline platform scheduler. Presently we are rehosting this platform scheduler rapid prototype and integrating the scheduler prototype into two Goddard Space Flight Center testbeds, as the ground scheduler in the Scheduling Concepts, Architectures, and Networks Testbed and as the on-board scheduler in the Platform Management System Testbed. Using these testbeds, we will investigate rescheduling issues, evaluate operational performance and enhance the platform scheduler prototype to demonstrate our evolutionary approach to automated platform scheduling. The work described in this paper was performed prior to Space Station Freedom rephasing, transfer of platform responsibility to Code E, and other recently discussed changes. We neither speculate on these changes nor attempt to predict the impact of the final decisions. As a consequence some of our work and results may be outdated when this paper is published.

Hull, Larry G.↗

Automating CPM-GOMS

CPM-GOMS is a modeling method that combines the task decomposition of a GOMS analysis with a model of human resource usage at the level of cognitive, perceptual, and motor operations. CPM-GOMS models have made accurate predictions about skilled user behavior in routine tasks, but developing such models is tedious and error-prone. We describe a process for automatically generating CPM-GOMS models from a hierarchical task decomposition expressed in a cognitive modeling tool called Apex. Resource scheduling in Apex automates the difficult task of interleaving the cognitive, perceptual, and motor resources underlying common task operators (e.g. mouse move-and-click). Apex's UI automatically generates PERT charts, which allow modelers to visualize a model's complex parallel behavior. Because interleaving and visualization is now automated, it is feasible to construct arbitrarily long sequences of behavior. To demonstrate the process, we present a model of automated teller interactions in Apex and discuss implications for user modeling. available to model human users, the Goals, Operators, Methods, and Selection (GOMS) method [6, 21] has been the most widely used, providing accurate, often zero-parameter, predictions of the routine performance of skilled users in a wide range of procedural tasks [6, 13, 15, 27, 28]. GOMS is meant to model routine behavior. The user is assumed to have methods that apply sequences of operators and to achieve a goal. Selection rules are applied when there is more than one method to achieve a goal. Many routine tasks lend themselves well to such decomposition. Decomposition produces a representation of the task as a set of nested goal states that include an initial state and a final state. The iterative decomposition into goals and nested subgoals can terminate in primitives of any desired granularity, the choice of level of detail dependent on the predictions required. Although GOMS has proven useful in HCI, tools to support the construction of GOMS models have not yet come into general use.

GOMS↗

Exploring Enhanced Dominant Resource Fairness Using Linear Programming Calculated Weights

Maintaining resource fairness while achieving optimization for various performance metrics such as resource utilization, turnaround time and job latency is a well-known resource scheduling challenge in cloud computing. Despite the significant progress made with the introduction of dominant resource fairness by Ghodsi et al., which ensures major allocation properties such as sharing incentive, strategy-proofness, envy-freeness and Pareto efficiency to be achieved

Yan, Bo [Binghamton University]↗

Management Tools

Manugistics, Inc. (formerly AVYX, Inc.) has introduced a new programming language for IBM and IBM compatible computers called TREES-pls. It is a resource management tool originating from the space shuttle, that can be used in such applications as scheduling, resource allocation project control, information management, and artificial intelligence. Manugistics, Inc. was looking for a flexible tool that can be applied to many problems with minimal adaptation. Among the non-government markets are aerospace, other manufacturing, transportation, health care, food and beverage and professional services.

Source record↗

Application of Banking Scoring and Rating for Coherent Risk Measures in Electricity Systems ABSCORES

This project developed a framework for asset and system risk management that can be incorporated into current electricity system operations to improve economic efficiency and establish an Electric Assets Risk Bureau. We leveraged scoring and ratings from banking and financial institutions alongside current optimization methods in dispatching power systems to help system operators and electricity markets schedule resources. This approach is based on the observation that there are major discrepancies between the power scheduled by a system operator and the actual power generated/consumed. These discrepancies—exacerbated by unplanned contingencies (e.g., natural disasters)—are caused by multiple factors, including the different financial, environmental and risk preferences of power producers, consumers, and aggregators. We developed a framework that counteracts two failures in electricity system operations: imperfect information and missing markets for products. The technical approach included five tasks. Tasks 1 and 2 supported the development of risk scores at the asset level with historical data collected for this project. Tasks 3, 4, and 5 incorporated scoring into decision-making at the system level. The proposed effort achieved PERFORM's Program Objectives because the proposed outputs and algorithms do not exist in the electricity industry and are an innovative approach to managing risk. Since the acknowledged need to better assess and act upon risk profiles for grid assets has not been met by the industry, this project will also impact ARPA-E's Mission Areas, including improving energy efficiency and giving the U.S. a technological lead in advanced energy technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Lifting and Dropping VMs to Dynamically Transition Between Time- and Space-sharing for Large-Scale HPC Systems

As HPC environments increasingly integrate with edge based systems, system architectures will need to handle a broader class of workloads and scheduling requirements. One result of this shift will be the need to simultaneously support bulk-synchronous parallel (BSP) and on-demand service based applications on the same infrastructure. This in turn will require that future resource management approaches utilize both space-shared as well as time-shared resource scheduling strategies. In this work we introduce the concept of "VM-lifting'' (and its inverse "VM-Dropping'') which allows dynamically switching an HPC workload between space-shared and time-shared scheduling regimes. Our work targets co-kernel based HPC system software environments, in which multiple specialized OS kernels execute natively on dedicated physical resource partitions inside a single compute node. With VM-lifting, a native co-kernel can be migrated at runtime to and from locally hosted Virtual Machine Environments due to changing scheduling requirements of the node. This allows an HPC node to be dynamically (re-)configured as either a time-shared Infrastructure-as-a-Service (IaaS) resource or a dedicated space shared resource based on the current workload demands. We have implemented this approach in the context of the Hobbes Exascale System Software stack and have demonstrated that a node can be reconfigured with minimal impact on the running applications.

Gordon, Nick↗

Scheduling algorithm for mission planning and logistics evaluation users' guide

The scheduling algorithm for mission planning and logistics evaluation (SAMPLE) program is a mission planning tool composed of three subsystems; the mission payloads subsystem (MPLS), which generates a list of feasible combinations from a payload model for a given calendar year; GREEDY, which is a heuristic model used to find the best traffic model; and the operations simulation and resources scheduling subsystem (OSARS), which determines traffic model feasibility for available resources. The SAMPLE provides the user with options to allow the execution of MPLS, GREEDY, GREEDY-OSARS, or MPLS-GREEDY-OSARS.

Chang, H.↗

The Wallops Flight Facility Rapid Response Range Operations Initiative

While the dominant focus on short response missions has appropriately centered on the launch vehicle and spacecraft, often overlooked or afterthought phases of these missions have been launch site operations and the activities of launch range organizations. Throughout the history of organized spaceflight, launch ranges have been the bane of flight programs as the source of expense, schedule delays, and seemingly endless requirements. Launch Ranges provide three basic functions: (1) provide an appropriate geographical location to meet orbital other mission trajectory requirements, (2) provide project services such as processing facilities, launch complexes, tracking and data services, and expendable products, and (3) assure safety and property protection to participating personnel and third-parties. The challenge with which launch site authorities continuously struggle, is the inherent conflict arising from projects whose singular concern is execution of their mission, and the range s need to support numerous simultaneous customers. So, while tasks carried out by a launch range committed to a single mission pale in comparison to efforts of a launch vehicle or spacecraft provider and could normally be carried out in a matter of weeks, major launch sites have dozens of active projects separate sponsoring organizations. Accommodating the numerous tasks associated with each mission, when hardware failures, weather, maintenance requirements, and other factors constantly conspire against the range resource schedulers, make the launch range as significant an impediment to responsive missions as launch vehicles and their cargo. The obvious solution to the launch site challenge was implemented years ago when the Department of Defense simply established dedicated infrastructure and personnel to dedicated missions, namely an Inter Continental Ballistic Missile. This however proves to be prohibitively expensive for all but the most urgent of applications. So the challenge becomes how can a launch site provide acceptably responsive mission services to a particular customer without dedicating extensive resources and while continuing to serve other projects? NASA's Wallops Flight Facility (WFF) is pursuing solutions to exactly this challenge. NASA, in partnership with the Virginia Commercial Space Flight Authority, has initiated the Rapid Response Range Operations Initiative (R3Ops). R3Ops is a multi-phased effort to incrementally establish and demonstrate increasingly responsive launch operations, with an ultimate goal of providing ELV-class services in a maximum of 7-10 days from initial notification routinely, and shorter schedules possible with committed resources. This target will be pursued within the reality of simultaneous concurrent programs, and ideally, largely independent of specialized flight system configurations. WFF has recently completed Phase 1 of R3Ops, an in-depth collection (through extensive expert interviews) and software modeling of individual steps by various range disciplines. This modeling is now being used to identify existing inefficiencies in current procedures, to identify bottlenecks, and show interdependencies. Existing practices are being tracked to provide a baseline to benchmark against as new procedures are implemented. This paper will describe in detail the philosophies behind WFF's R3Ops, the data collected and modeled in Phase 1, and strategies for meeting responsive launch requirements in a multi-user range environment planned for subsequent phases of this initiative.

Underwood, Bruce E.↗

A distributed computing approach to mission operations support

Computing mission operation support includes orbit determination, attitude processing, maneuver computation, resource scheduling, etc. The large-scale third-generation distributed computer network discussed is capable of fulfilling these dynamic requirements. It is shown that distribution of resources and control leads to increased reliability, and exhibits potential for incremental growth. Through functional specialization, a distributed system may be tuned to very specific operational requirements. Fundamental to the approach is the notion of process-to-process communication, which is effected through a high-bandwidth communications network. Both resource-sharing and load-sharing may be realized in the system.

Larsen, R. L.↗

Software-Defined Network for End-to-end Networked Science at the Exascale

Domain science applications and workflow processes are currently forced to view the network as an opaque infrastructure into which they inject data and hope that it emerges at the destination with an acceptable Quality of Experience. There is little ability for applications to interact with the network to exchange information, negotiate performance parameters, discover expected performance metrics, or receive status/troubleshooting information in real time. The work we presen here is motivated by a vision for a new smart network and smart application ecosystem that will provide a more deterministic and interactive environment for domain science workflows. The Software-Defined Network for End-to-end Networked Science at Exascale (SENSE) system includes a model-based architecture, implementation, and deployment which enables automated end-to-end network service instantiation across administrative domains. An intent based interface allows applications to express their high-level service requirements, an intelligent orchestrator and resource control systems allow for custom tailoring of scalability and real-time responsiveness based on individual application and infrastructure operator requirements. This allows the science applications to manage the network as a first-class schedulable resource as is the current practice for instruments, compute, and storage systems. Deployment and experiments on production networks and testbeds have validated SENSE functions and performance. Emulation based testing verified the scalability needed to support research and education infrastructures. Key contributions of this work include an architecture definition, reference implementation, and deployment. This provides the basis for further innovation of smart network services to accelerate scientific discovery in the era of big data, cloud computing, machine learning and artificial intelligence.

97 MATHEMATICS AND COMPUTING↗

Software-defined network for end-to-end networked science at the exascale

Domain science applications and workflow processes are currently forced to view the network as an opaque infrastructure into which they inject data and hope that it emerges at the destination with an acceptable Quality of Experience. There is little ability for applications to interact with the network to exchange information, negotiate performance parameters, discover expected performance metrics, or receive status/troubleshooting information in real time. The work presented here is motivated by a vision for a new smart network and smart application ecosystem that will provide a more deterministic and interactive environment for domain science workflows. The Software-Defined Network for End-to-end Networked Science at Exascale (SENSE) system includes a model-based architecture, implementation, and deployment which enables automated end- to-end network service instantiation across administrative domains. An intent based interface allows applications to express their high-level service requirements, an intelligent orchestrator and resource control systems allow for custom tailoring of scalability and real-time responsiveness based on individual application and infrastructure operator requirements. This allows the science applications to manage the network as a first-class schedulable resource as is the current practice for instruments, compute, and storage systems. Deployment and experiments on production networks and testbeds have validated SENSE functions and performance. Emulation based testing verified the scalability needed to support research and education infrastructures. Key contributions of this work include an architecture definition, reference implementation, and deployment. This provides the basis for further innovation of smart network services to accelerate scientific discovery in the era of big data, cloud computing, machine learning and artificial intelligence.

47 OTHER INSTRUMENTATION↗

The key to successful management of STS operations: An integrated production planning system

Space Transportation System operations managers are being confronted with a unique set of challenges as a result of increasing flight rates, the demand for flight manifest/production schedule flexibility and an emphasis on continued cost reduction. These challenges have created the need for an integrated production planning system that provides managers with the capability to plan, schedule, status and account for an orderly flow of products and services across a large, multi-discipline organization. With increased visibility into the end-to-end production flow for individual and parallel missions in process, managers can assess the integrated impact of changes, identify and measure the interrelationships of resource, schedule, and technical performance requirements and prioritize productivity enhancements.

Johnson, W. A.↗