Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Next Generation Integrated Environment for Collaborative Work Across Internets

We are now well-advanced in our development, prototyping and deployment of a high performance next generation Integrated Environment for Collaborative Work. The system, aimed at using the capability of ESnet and Internet2 for rapid data exchange, is based on the Virtual Room Videoconferencing System (VRVS) developed by Caltech. The VRVS system has been chosen by the Internet2 Digital Video (I2-DV) Initiative as a preferred foundation for the development of advanced video, audio and multimedia collaborative applications by the Internet2 community. Today, the system supports high-end, broadcast-quality interactivity, while enabling a wide variety of clients (Mbone, H.323) to participate in the same conference by running different standard protocols in different contexts with different bandwidth connection limitations, has a fully Web-integrated user interface, developers and administrative APIs, a widely scalable video network topology based on both multicast domains and unicast tunnels, and demonstrated multiplatform support. This has led to its rapidly expanding production use for national and international scientific collaborations in more than 60 countries. We are also in the process of creating a 'testbed video network' and developing the necessary middleware to support a set of new and essential requirements for rapid data exchange, and a high level of interactivity in large-scale scientific collaborations. These include a set of tunable, scalable differentiated network services adapted to each of the data streams associated with a large number of collaborative sessions, policy-based and network state-based resource scheduling, authentication, and optional encryption to maintain confidentiality of inter-personal communications. High performance testbed video networks will be established in ESnet and Internet2 to test and tune the implementation, using a few target application-sets.

97 MATHEMATICS AND COMPUTING↗

Sealed source peer review plan

Sealed sources are known quantities of radioactive materials that have been encapsulated in quantities that produce known radiation fields. Sealed sources have multiple uses ranging from instrument calibration sources to sources that produce radiation fields for experimental applications. The Off-Site Source Recovery (OSR) Project at Los Alamos National Laboratory (LANL), created in 1999, under the direction of the Waste Management Division of the U.S. Department of Energy (DOE) Albuquerque has been assigned the responsibility to recover and manage excess and unwanted radioactive sealed sources from the public and private sector. LANL intends to ship drums containing qualified sealed sources to the Waste Isolation Pilot Plant (WIPP) for disposal. Prior to shipping, these drums must be characterized with respect to radiological content and other parameters. The U. S. Environmental Protection Agency (EPA) requires that ten radionulcides be quantified and reported for every container of waste to be disposed in the WIPP. The methods traditionally approved by the EPA include non-destructive assay (NDA) in accordance with Appendix A of the Contact-Handled Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant (DOE, 2002) (CH WAC). However, because of the nature and pedigree of historical records for sealed sources and the technical infeasibility of performing NDA on these sources, LANL proposes to characterize the content of these waste drums using qualified existing radiological data in lieu of direct measurement. This plan describes the process and documentation requirements for the use of the peer review process to qualify existing data for sealed radiological sources in lieu of perfonning radioassay. The peer review process will be performed in accordance with criteria provided in 40 CFR {section} 194.22 which specifies the use of the NUREG 1297 guidelines. The plan defines the management approach, resources, schedule, and technical requirements for the subject peer review.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

End-to-End Network QoS via Scheduling of Flexible Resource Reservation Requests

Modern data-intensive applications move vast amounts of data between multiple locations around the world. To enable predictable and reliable data transfer, next generation networks allow such applications to reserve network resources for exclusive use. In this paper, we solve an important problem (called SMR3) to accommodate multiple and concurrent network reservation requests between a pair of end-sites. Given the varying availability of bandwidth within the network, our goal is to accommodate as many reservation requests as possible while minimizing the total time needed to complete the data transfers. We first prove that SMR3 is an NP-hard problem. Then we solve it by developing a polynomial-time heuristic, called RRA. The RRA algorithm hinges on an efficient mechanism to accommodate large number of requests by minimizing the bandwidth wastage. Finally, via numerical results, we show that RRA constructs schedules that accommodate significantly larger number of requests compared to other, seemingly efficient, heuristics.

97 MATHEMATICS AND COMPUTING↗

Optimal Renewable Resource Allocation and Load Scheduling of Resilient Communities

This paper presents a methodology for enhancing community resilience through optimal renewable resource allocation and load scheduling in order to minimize unserved load and thermal discomfort. The proposed control architecture distributes the computational effort and is easier to be scaled up than traditional centralized control. The decentralized control architecture consists of two layers: The community operator layer (COL) allocates the limited amount of renewable energy resource according to the power flexibility of each building. The building agent layer (BAL) addresses the optimal load scheduling problem for each building with the allowable load determined by the COL. Both layers are formulated as a model predictive control (MPC) based optimization. Simulation scenarios are designed to compare different combinations of building weighting methods and objective functions to provide guidance for real-world deployment by community and microgrid operators. The results indicate that the impact of power flexibility is more prominent than the weighting factor to the resource allocation process. Allocation based purely on occupancy status could lead to an increase of PV curtailment. Further, it is necessary for the building agent to have multi-objective optimization to minimize unserved load ratio and maximize comfort simultaneously.

model predictive control↗

Experience in using commercial clouds in CMS

Historically high energy physics computing has been performed on large purpose-built computing systems. In the beginning there were single site computing facilities, which evolved into the Worldwide LHC Computing Grid (WLCG) used today. The vast majority of the WLCG resources are used for LHC computing and the resources are scheduled to be continuously used throughout the year. In the last several years there has been an explosion in capacity and capability of commercial and academic computing clouds. Cloud resources are highly virtualized and intended to be able to be flexibly deployed for a variety of computing tasks. There is a growing interest amongst the cloud providers to demonstrate the capability to perform large scale scientific computing. In this presentation we will discuss results from the CMS experiment using the Fermilab HEPCloud Facility, which utilized both local Fermilab resources and Amazon Web Services (AWS). The goal was to work with AWS through a matching grant to demonstrate a sustained scale approximately equal to half of the worldwide processing resources available to CMS. We will discuss the planning and technical challenges involved in organizing the most IO intensive CMS workflows on a large-scale set of virtualized resource provisioned by the Fermilab HEPCloud. We will describe the data handling and data management challenges. Also, we will discuss the economic issues and cost and operational efficiency comparison to our dedicated resources. At the end we will consider the changes in the working model of HEP computing in a domain with the availability of large scale resources scheduled at peak times.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Advance Resource Provisioning in Bulk Data Scheduling

Today?s scientific and business applications generate mas- sive data sets that need to be transferred to remote sites for sharing, processing, and long term storage. Because of increasing data volumes and enhancement in current net- work technology that provide on-demand high-speed data access between collaborating institutions, data handling and scheduling problems have reached a new scale. In this paper, we present a new data scheduling model with ad- vance resource provisioning, in which data movement operations are defined with earliest start and latest comple- tion times. We analyze time-dependent resource assign- ment problem, and propose a new methodology to improve the current systems by allowing researchers and higher-level meta-schedulers to use data-placement as-a-service, so they can plan ahead and submit transfer requests in advance. In general, scheduling with time and resource conflicts is NP-hard. We introduce an efficient algorithm to organize multiple requests on the fly, while satisfying users? time and resource constraints. We successfully tested our algorithm in a simple benchmark simulator that we have developed, and demonstrated its performance with initial test results.

97 MATHEMATICS AND COMPUTING↗

Scalable Circuit Cutting and Scheduling in a Resource-constrained and Distributed Quantum System

Despite quantum computing's rapid development, current systems remain limited in practical applications due to their limited qubit count and quality. Various technologies, such as superconducting, trapped ions, and neutral atom quantum computing technologies are progressing towards a fault tolerant era, however they all face a diverse set of challenges in scalability and control. Recent efforts have focused on multi-node quantum systems that connect multiple smaller quantum devices to execute larger circuits. Future demonstrations hope to use quantum channels to couple systems, however current demonstrations can leverage classical communication with circuit cutting techniques. This involves cutting large circuits into smaller subcircuits and reconstructing them post-execution. However, existing cutting methods are hindered by lengthy search times as the number of qubits and gates increases. Additionally, they often fail to effectively utilize the resources of various worker configurations in a multi-node system. To address these challenges, we introduce FitCut, a novel approach that transforms quantum circuits into weighted graphs and utilizes a community-based, bottom-up approach to cut circuits according to resource constraints, e.g., qubit counts, on each worker. FitCut also includes a scheduling algorithm that optimizes resource utilization across workers. Implemented with Qiskit and evaluated extensively, FitCut significantly outperforms the Qiskit Circuit Knitting Toolbox, reducing time costs by factors ranging from 3 to 2000 and improving resource utilization rates by up to 3.88 times on the worker side, achieving a system-wide improvement of 2.86 times.

Kan, Shuwen [Fordham University]↗

Replacement of Melter 2 at the Defense Waste Processing Facility (DWPF) - 18608

The original DWPF melter was replaced in 2002 with an identical unit, and radioactive operation of Melter 2 commenced in 2003. After nearly 14 years of service, a lower electrode failure of Melter 2 occurred in February 2017 which required its removal and replacement with Melter 3. The scope of the replacement outage involves several significant evolutions: - Shutdown of Melter 2 and placement into a safe state; - Remote external and internal inspection of Melter 2 to chronicle its condition prior to removal; - Disassembly and removal of Melter 2 from the process cell; - Placement of Melter 2 into a storage box and transport to a storage vault; - Preparation and initial testing of Melter 3 prior to transport to the DWPF; - Transport to the DWPF and installation of Melter 3 in the process cell; - Final startup testing and initiation of radioactive operation. Upon determination that repair of Melter 2 was not feasible, DWPF created an outage team to integrate schedules and resources needed to execute melter replacement as well as including maintenance scope for facility work that can only be performed when the melter is de-energized. The execution of this scope required integration with other mission critical outage activities already in progress, and planned to start, including initial facility tie-in scope for the new Salt Waste Processing Facility (SWPF). This unplanned addition of the melter replacement scope to the existing outage scope resulted in the longest facility outage period since the initiation of radioactive operations at the DWPF in 1996. Successful completion of this scope across all Liquid Waste facilities would require balance - for schedules, resources, priority, funding, etc. To overcome the significant challenges created by this additional scope, a WAR Room was established to ensure adequate integration and coordination of critical resources, and daily progress. The execution of this scope has required the integration of nearly two dozen work groups across multiple facilities at Savannah River Site (SRS), in addition to support from nearly a dozen vendors. The melter replacement outage was executed with a high degree of disciplined operation to ensure the facility was ready to resume glass pouring operation in time to support restart of the Liquid Waste program at the Savannah River Site (SRS). This paper will provide a brief overview of Melter 2 operational history. The execution of the removal and replacement operations will be described with a specific focus on lessons learned and opportunities where the outage execution diverged from the original Melter 1 replacement outage. It is expected to be of interest to vitrification facilities, as well as facilities, which require remote maintenance and replacement of large process equipment. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spread spectrum scheduling requests for wireless communication resource

Apparatuses, systems and methods are disclosed for wireless communication. A base station may communicate with a plurality of user equipments (UEs) without allocating spectral resources to the UEs for communicating scheduling requests. The base station may detect a scheduling request from a requesting UE of the plurality of UEs. The scheduling request may include a spread spectrum signal based on a spreading sequence. The scheduling request may indicate an identity for a requesting UE without indicating information other than the identity. The base station may grant spectral resources to the requesting UE in response to detecting a scheduling request.

Moradi, Hussein↗

Understanding Diurnal Patterns in Wind Power Generation Data

Integrating wind energy on the power grid is a challenging task given the intermittent nature of these resources. When the percentage of wind energy was small, control room operators did not have a major problem in scheduling wind resources. However, as this percentage has increased, it is clear that the operators will need more accurate forecasts, as well as any additional information they can exploit, to make better-informed scheduling decisions. In this paper, we investigate diurnal patterns observed in wind-power time series data. Using actual wind generation data from two sites, we try to identify these patterns, understand them better, and determine if it is possible to use weather conditions in the vicinity of the wind farms to predict the pattern for a day. Such analysis could provide insights useful in scheduling wind resources on days with inaccurate forecasts.

17 WIND ENERGY↗

Building a Wide-Area File Transfer Performance Predictor: An Empirical Study

Wide-area data transfer is central to geographically distributed scientific workflows. Faster delivery of data is important for these workflows. Predictability is equally (or even more) important. With the goal of providing a reasonably accurate estimate of data transfer time to improve resource allocation & scheduling for workflows and enable end-to-end data transfer optimization, we apply machine learning methods to develop predictive models for data transfer times over a variety of wide area networks. To build and evaluate these models, we use 201,388 transfers, involving 759 million files totaling 9 PB transferred, over 115 heavily used source-destination pairs (“edges”) between 135 unique endpoints. We evaluate the models for different retraining frequencies and different window size of history data. In the best case, the resulting models have a median prediction error of ≤21% for 50% of the edges, and ≤32% for 75% of the edges. We present a detailed analysis of these results that provides insights into the cause of some of the high errors. We envision that the performance predictor will be informative for scheduling geo-distributed workflows. The insights also suggest obvious directions for both further analysis and transfer service optimization.

Liu, Zhengchun↗

Advanced Technology System Scheduling Governance Model

In the fall of 2005, the Advanced Simulation and Computing (ASC) Program appointed a team to formulate a governance model for allocating resources and scheduling the stockpile stewardship workload on ASC capability systems. This update to the original document takes into account the new technical challenges and roles for advanced technology (AT) systems and the new ASC Program workload categories that must be supported. The goal of this updated model is to effectively allocate and schedule AT computing resources among all three National Nuclear Security Administration (NNSA) laboratories for weapons deliverables that merit priority on this class of resource. The process outlined below describes how proposed work can be evaluated and approved for resource allocations while preserving high effective utilization of the systems. This approach will provide the broadest possible benefit to the Stockpile Stewardship Program (SSP).

97 MATHEMATICS AND COMPUTING↗

Production Agency Quality Assurance Management Execution Strategy [Thesis]

There are multiple federal directives that Los Alamos National Laboratory (LANL) must follow for the proper implementation of quality assurance, strategic planning, and execution of manufacturing and surveillance operations. Recent assessments identified that manufacturing in all processing areas is dynamic due to influencing scope changes, design modifications, funding adjustments, and staff attrition. In response, this project was started to develop a comprehensive PAQ execution strategy to support the success of LANL’s manufacturing mission. This project’s method for developing an updated architecture was to create an integrated, flexible, reliable, and agile strategic process. The execution plan has five deliverables: 1) an integrated schedule view of PAQ work scope, 2) a resource management plan that aligns with the required scope, 3) a metrics monitoring dashboard, 4) a project management plan for sustaining NAP 401.1A implementation, and 5) a risk management plan. The research design is a mixed-method approach focused on data collection for each deliverable. The methodology entails qualitative and quantitative research, metrics monitoring, data analysis, and the creation of a dashboard. The qualitative methods used include literature reviews and interviews. The quantitative methods include resource, financial, schedule and survey data analysis. Preliminary and final results were peer reviewed by subject matter experts both within the ALDWP organization and deployed support.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The research on meta-job scheduling heuristics in heterogeneous environments

As the core of rational utilization of computing resources, the scheduling algorithm has gained the interest of many researchers. Aimed at meta-job scheduling in heterogeneous environments, this paper puts forward three algorithms: the meta-job scheduling algorithm based on deviation (MaxD-min heuristic), the meta-job scheduling algorithm based on relative deviation (MaxRD-min heuristic), and the Cordwood algorithm (CA). The former two Algorithm are improvements of the classic Min-min algorithm. The latter CA algorithm is a new method that tries to place each building block on the tray with minimal amount of Sufferage. In conclusion, the result of experimenting shows that the three algorithms, in comparison to Min-Min and Max-Min algorithm, can effectively reduce the total span of scheduling (makespan).

97 MATHEMATICS AND COMPUTING↗