Search NASA⌕ Search

SEARCH · Search NASA

Results for “Risk mitigation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Trajectory Design to Mitigate Risk on the Transiting Exoplanet Survey Satellite (TESS) Mission

The Transiting Exoplanet Survey Satellite (TESS) will employ a highly eccentric Earth orbit, in 2:1 lunar resonance, reached with a lunar flyby preceded by 3.5 phasing loops. The TESS mission has limited propellant and several orbit constraints. Based on analysis and simulation, we have designed the phasing loops to reduce delta-V and to mitigate risk due to maneuver execution errors. We have automated the trajectory design process and use distributed processing to generate and to optimize nominal trajectories, check constraint satisfaction, and finally model the effects of maneuver errors to identify trajectories that best meet the mission requirements.

design↗

Trajectory Design Enhancements to Mitigate Risk for the Transiting Exoplanet Survey Satellite (TESS)

The Transiting Exoplanet Survey Satellite (TESS) will employ a highly eccentric Earth orbit, in 2:1 lunar resonance, which will be reached with a lunar flyby preceded by 3.5 phasing loops. The TESS mission has limited propellant and several constraints on the science orbit and on the phasing loops. Based on analysis and simulation, we have designed the phasing loops to reduce delta-V (DV) and to mitigate risk due to maneuver execution errors. We have automated the trajectory design process and use distributed processing to generate and optimal nominal trajectories; to check constraint satisfaction; and finally to model the effects of maneuver errors to identify trajectories that best meet the mission requirements.

satellite↗

Satellite Breakup Risk Mitigation

Many satellite breakups occur as a result of an explosion of stored energy on-board spacecraft or rocket-bodies. These breakups generate a cloud of tens or possibly hundreds of thousands of debris fragments which may pose a transient elevated threat to spaceflight crews and vehicles. Satellite breakups pose a unique threat because the majority of the debris fragments are too small to be tracked from the ground. The United States Human Spaceflight Program is currently implementing a risk mitigation strategy that includes modeling breakup events, establishing action thresholds, and prescribing corresponding mitigation actions in response to satellite breakups.

Leleux, Darrin P.↗

A Probabilistic Risk Mitigation Model for Cyber-Attacks to PMU Networks

The power grid is becoming more dependent on information and communication technologies. Complex networks of advanced sensors such as phasor measurement units (PMUs) are used to collect real time data to improve the observability of the power system. Recent studies have shown that the power grid has significant cyber vulnerabilities which could increase when PMUs are used extensively. Therefore, recognizing and responding to vulnerabilities are critical to the security of the power grid. This paper proposes a risk mitigation model for optimal response to cyber-attacks to PMU networks. We model the optimal response action as a mixed integer linear programming (MILP) problem to prevent propagation of the cyber-attacks and maintain the observability of the power system.

Cyber-attack↗

Establishing the Assurance Efficacy of Automated Risk Mitigation Strategies

Verification and validation of increasingly autonomous aviation systems is a major challenge. Traditional techniques for the assurance of high-confidence, safety-critical systems are not equipped to handle the complexity, uncertainty, and lack of predictability inherent in non-deterministic systems. Techniques such as run time monitoring, formal methods, and testing and simulation have been applied to some effect, but it is difficult to properly assess the success of such measures. The authors propose the concept of Assurance Efficacy to address this gap. Assurance Efficacy is seen as a parameter, criteria, or perspective by which to evaluate, identify and explore safety risk mitigation strategies and operational assurance architectures. Validation of the utility of this concept through flight testing is a first step in determining its potential role in assessing the overall safety of complex, increasingly autonomous systems that cannot be fully assured in the design phase.

system safety↗

Modeling the U.S. Western Electric Interconnection to Understand the Consequences of Hydrometeorological Extremes and Options for Risk Mitigation

Electricity grid operators around the world face a dual challenge; withstanding increasingly severe weather and the longer term impacts of climate change, while simultaneously decarbonizing. Extreme weather events such as heat waves and droughts are rising in both severity and frequency, which is threatening the reliability of electricity grids through increased demand, generation capacity losses, and equipment failures. Consequently, incorporating hydrometeorological stressors into computational power systems analysis is becoming an even more critical tool in long term planning and short term operations. However, there is a general lack of open-source customizable grid simulation software capable of exhaustively stress testing the grid under hydrometeorological uncertainty, and/or examining potential risk mitigation pathways. A related, persistent challenge for power system modelers is striking an appropriate balance between model fidelity (e.g. spatial scale and time resolution) and computational tractability (wall clock run-time). In this study, we are proposing a solution to this problem with open-source software that allows users to seamlessly customize the scale and track the accuracy of grid operations models. Our approach allows users to search over numerous model parameters (network topology, mathematical formulation, economic hurdle rates, and transmission line scaling) to identify model instantiations that accommodate experimental design. Further, we use this approach to demonstrate the importance of including extreme weather events in model validation and model selection. Focusing on the occurrence of heatwaves and droughts in the U.S. Western Interconnection, we examine role of extreme events in balancing tradeoffs between model fidelity and run-time at the model design stage.

Economics↗

Biotechnology System Facility: Risk Mitigation on Mir

NASA is working with its international partners to develop space vehicles and facilities that will give researchers the opportunity to conduct scientific investigations in space. As part of this activity, NASA's Biotechnology Cell Science Program (BCSP) at the Johnson Space Center (JSC) is developing a world-class biotechnology laboratory facility for the International Space Station (ISS). This report describes the BCSP, including the role of the BTS. We identify the purpose and objectives of the BTS and a detailed description of BTS facility design and operational concept, BTS facility and experiment-specific hardware, and scientific investigations conducted in the facility. We identify the objectives, methods, and results of risk mitigation investigations of the effects of microgravity and cosmic radiation on the BTS data acquisition and control system. These results may apply to many other space experiments that use commercial, terrestrial-based data acquisition technology. Another focal point is a description of the end-to-end process of integrating and operating biotechnology experiments on a variety of space vehicles. The identification of lessons learned that can be applied to future biotechnology experiments is an overall theme of the report. We include a brief summary of the science results, but this is not the focus of the report. The report provides some discussion on the successful 130-day tissue engineering experiment performed in BTS on Mir and describes a seminal gene array investigation that identified a set of unique genes that are activated in space.

Gonda, Steve R., III↗

NASA Technology Evaluation for Environmental Risk Mitigation Remediation Technology Collaboration Development

NASA is committed to finding solutions to agency cleanup problems that are better, cheaper, and more effective than the status quo. Unfortunately, some potential solutions involve innovative technologies for which NASA remediation managers may not have a high level of understanding or confidence. Since 2004, NASA's Stennis Space Center (SSC) in Mississippi has been pumping groundwater contaminated with trichloroethylene (TCE) and other halogenated volatile organic compounds (HVOC) from their cleanup location designated "Area G" through extraction wells to an aboveground treatment system. Over time, however, the effectiveness of this treatment strategy has diminished and an alternative approach is needed. In 2012, professionals from NASA's Principal Center for Technology Evaluation for Environmental Risk Mitigation (TEERM) introduced SSC managers to an innovative technology for enhancing the performance of SSC's existing pump and treat system. The technology, generally referred to as in situ chemical oxidation (ISCO), involves slowly and continuously injecting a strong but safe chemical oxidant into the groundwater. Treatment is enhanced by a "surfactant-type effect" which causes residual contamination from saturated soil to be released into the dissolved-phase where it can be readily oxidized. Any dissolved-phase contamination that was not oxidized can be collected by the extraction well network and treated aboveground. SSC was not familiar with the technology so to increase their confidence, TEERM identified a contractor who was willing to demonstrate their product and process at a significantly reduced price. An initial, small-scale demonstration of ISCO began at sse in March 2012 and completed in August 2012. This successful demonstration was followed by three larger-scale ISCO demonstrations between August and December 2012. The contractor's innovative Continuous Injection System (CIS) incorporated "green" and sustainable technologies and practices. A slow injection rate was maintained autonomously by the CIS, eliminating the need for multiple mobilizations of personnel and powered equipment. The CIS was calibrated to deliver only as much reagent as the formation would accept without "short circuiting", minimizing material waste. Public utility water pressure was used to mix, dilute, and inject the reagent. NASA personnel were trained to operate and maintain the system and remote monitoring and injection control capabilities were developed, further reducing the need for contractor mobilizations to the site. An integrated solar photovoltaic panel was used to power the control valves and web monitoring telemetry. SSC provided hydrogen peroxide for the process using their existing supplier for the aboveground pump and treat systems. The only consumable required from the contractor was their proprietary activator to catalyze SSC's peroxide.

Romeo, James↗

Case Study of Risk Mitigation Based on Hardware/Software Integration (HSI) Testing for the International Space Station (ISS) Node 2 Module

Within the pressurized elements of the International Space Station (ISS), requirements exist to ensure a safe, habitable environment for the crew. In order to provide this environment, thermal control components work in conjunction with software controls to provide heat rejection for subsystem avionics equipment, for the environmental control system and for experiment payloads. It is essential to ISS operations, mission success and crew safety that necessary testing incorporates the extreme conditions to ensure proper performance. This paper provides a general description and methodology applied to thermal related Hardware/Software Integration (HSI) tests for the ISS Node 2 module. A detailed test plan was developed and implemented with two objectives: the first was for risk mitigation of the thermal control algorithms and software qualification, and the second was for data collection which will substantiate thermalhydraulic models of the Internal Active Thermal Control System (IATCS). Analytical models are utilized to determine on-orbit performance for conditions and scenarios where the simulation of actual on-orbit system performance is limited by test configuration constraints. Node 2 IATCS HSI activities were performed at the Alenia Spazio facility in Torino, Italy with participation from the National Aeronautics and Space Administration (NASA), Alenia Spazio, Jacobs Engineering Sverdrup (JE Sverdrup) and Boeing.

Holt, James Mike↗

Decision Aid for Conjunction Risk Mitigation by Differential Drag

The NASA Conjunction Assessment Risk Analysis (CARA) team has conducted are view of the historical record of high-risk conjunctions involving CARA-protected missions and evaluated whether (and how much) differential drag can provide effective mitigation. From this analysis, CARA has identified a rule of thumb: missions with perigees below 560 km capable of tripling their drag area for 72 hours(or a larger scale factor for a lesser amount of time) can reliably use differential drag to remediate high-risk events.

mission design↗

Mission design considerations for nuclear risk mitigation

Strategies for the mitigation of the nuclear risk associated with two specific mission operations are discussed. These operations are the safe return of nuclear thermal propulsion reactors to earth orbit and the disposal of lunar/Mars spacecraft reactors.

Stancati, Mike↗

Ensuring Success of Adaptive Control Research Through Project Lifecycle Risk Mitigation

Lessons Learne: 1. Design-out unnecessary risk to prevent excessive mitigation management during flight. 2. Consider iterative checkouts to confirm or improve human factor characteristics. 3. Consider the total flight test profile to uncover unanticipated human-algorithm interactions. 4. Consider test card cadence as a metric to assess test readiness. 5. Full-scale flight test is critical to development, maturation, and acceptance of adaptive control laws for operational use.

Pavlock, Kate M.↗

Extravehicular Activity on the Lunar Surface: Mapping Mitigation Risk Consequence for Crew Needing Assistance or Rescue

The lunar environment offers unique challenges for human health and safety over the course of performing Extravehicular Activities (EVAs) during early Artemis missions. Driver medical conditions leading to an injured EVA crewmember needing assistance or rescue were analyzed and correlated to established, defined consequence categories. Catastrophic Drivers were identified, and three mitigation strategies were analyzed to determine if there was a potential change in consequence with their application. Risk consequence across the mitigations were compared with each other and the original risk without mitigations. Mitigations were further evaluated in a broader context with prospective preventions to understand the design and risk trade space associated with an early Artemis EVA.

Risk↗

Extravehicular Activity on the Lunar Surface: Mapping Mitigation Risk Consequence for Crew Needing Assistance or Rescue

The lunar environment offers unique challenges for human health and safety over the course of performing Extravehicular Activities (EVAs) during early Artemis missions. Driver medical conditions leading to an injured EVA crewmember needing assistance or rescue were analyzed and correlated to established, defined consequence categories. Catastrophic Drivers were identified, and three mitigation strategies were analyzed to determine if there was a potential change in consequence with their application. Risk consequence across the mitigations were compared with each other and the original risk without mitigations. Mitigations were further evaluated in a broader context with prospective preventions to understand the design and risk trade space associated with an early Artemis EVA.

Risk↗

Mapping Mitigation Risk Consequence for Crew Needing Assistance or Rescue on the Lunar Surface

Extravehicular activity (EVA) on the lunar surface presents unique risks to crew with possibility for injury. Without appropriate assistance or rescue capability, inability to nominally ambulate and return to a lander, especially during early Artemis missions, could have catastrophic consequences. Mapping likelihood and consequence safety risk associated with identified injury scenarios establishes a baseline from which to assess potential mitigation solutions to ensure crew health and safety.

lunar surface↗