Search NASA⌕ Search

SEARCH · Search NASA

Results for “Risk-Informed Performance-Based”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

42 records · Page 3

Modularity-at-scale for advanced reactors presentation

Modularity options have been limited for traditional nuclear energy deployment due to the conventional light water reactor (LWR) safety requirements, such as high pressure retaining heavy and robust containment structures. However, a relatively new regulatory approach called ‘Functional Containment’ has potential to allow less expensive and more flexible designs for non-LWRs. Functional containment provides flexibility in design and deployment based on risk-informed and performance-based criteria, so that reactors are not over-designed. Non-nuclear industry has successfully used modular design approaches in automotive, aerospace, chemical processing, building construction, and ship building. These industries have shown that modular construction reduces construction time by around 30% - 50% compared to the conventional stick-built approach. The nuclear industry can use similar approaches to reduce construction time and costs, balanced with safety requirements, using the functional containment approach. This paper discussing the background of modularity in nuclear energy, examples of less learned, modularity approaches in non-nuclear industries and the potential of cost and schedule savings through the emerging regulatory design flexibilities potentially enabling combination of modular deployment at different scales.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Advancing Multi-Hazard Risk and Safety Considerations for Aging Nuclear Facilities

While probabilistic risk assessment (PRA) of nuclear facilities is expected to include internal and external hazards for a risk-informed and performance-based design, the current state of practice treats each hazard independently. However, such an independent treatment of hazards may not account for the correlations between different hazards and their response of and damage to the structures, systems, and components (SSCs) in a plant resulting in underestimating the overall risk. This project proposes to advance the multi-hazard PRA of nuclear facilities to more adequately evaluate concurrent hazards and contribute to an increased safety of nuclear plants. A framework for multi-hazard PRA will be developed by identifying concurrent hazard events (both internal and external) and event sequences that include interdependencies through the response of SSCs. An example application of the multi-hazard PRA framework will be demonstrated by considering a generic pressurized water reactor (PWR) subjected to seismic and internal flooding hazards. Computational models for the response of components will be developed to generated multi-hazard fragility surfaces under seismic and flooding loads. A PRA model consisting of event and fault trees will also be developed to quantify the multi-hazard risk profile and compare it with the independent hazard risk profile. Overall, by advancing the multi-hazard PRA of nuclear facilities, this project enhances nuclear safety and reduces costs by mitigating unforeseen consequences caused by correlations between concurrent hazards.

97 - MATHEMATICS AND COMPUTING↗

Robotic and Crewed Mars Missions Increasing the Demand for Planetary Protection Technology Needs

Planetary protection (PP) policy seeks to avoid harmful contamination by limiting biological and relevant organic contamination from spacecraft as well as preventing adverse changes to Earth’s biosphere when extraterrestial samples are brought back to Earth. The PP policy at NASA was updated in 2021 (NPR 8715.24) and 2022 (NASA-STD-8719.27) to enable missions by expanding the decades old prescriptive requirements to allow for an option of adopting performance-based requirements that are objectivesdriven, risk-informed and case-assured. In parallel, the final PP knowledge gap workshop was completed representing the international consensus on the key areas to be considered in developing crew PP policy. These knowledge gaps focused on key technology development areas in 1) microbial and human health monitoring, 2) technical and operations needed for contamination control and 3) natural transport of contamination on Mars. As robotic missions start to implement performance-based approaches and research and technology efforts commence to inform crew policy the demand for data quality driven verification and validation in relevant space environments. Examples of the types of testing that is envisioned includes test as you fly validation and verification of decontamination systems in a relevant on-orbit and Mars environment, developing lethality curves of terrestrial organisms to further our understanding of the biocidal impacts of Mars and the space environment, and particle transport model validation and verification. Thus, the PP discipline has identified the need for groundbased space environments to perform preliminary testing as validation and verification of flight systems and to advance the technology readiness level prior to further testing on-orbit or lunar environments to prepare for Mars.

J. Nick Benardini↗

Robotic and Crewed Mars Missions Increasing the Demand for Planetary Protection Technology Needs

Planetary protection (PP) policy seeks to avoid harmful contamination by limiting biological and relevant organic contamination from spacecraft as well as preventing adverse changes to Earth’s biosphere when extraterrestrial samples are brought back to Earth. The PP policy at NASA was updated in 2021 (NPR 8715.24) and 2022 (NASA-STD-8719.27) to enable missions by expanding the decades old prescriptive requirements to allow for an option of adopting performance-based requirements that are objectives-driven, risk-informed and case-assured. In parallel, the final PP knowledge gap workshop was completed representing the international consensus on the key areas to be considered in developing crew PP policy. These knowledge gaps focused on key technology development areas in 1) microbial and human health monitoring, 2) technical and operations needed for contamination control and 3) natural transport of contamination on Mars. As robotic missions start to implement performance-based approaches and research and technology efforts commence to inform crew policy the demand for data quality driven verification and validation in relevant space environments. Examples of the types of testing that is envisioned includes test as you fly validation and verification of decontamination systems in a relevant on-orbit and Mars environment, developing lethality curves of terrestrial organisms to further our understanding of the biocidal impacts of Mars and the space environment, and particle transport model validation and verification. Thus, the PP discipline has identified the need for ground-based space environments to perform preliminary testing as validation and verification of flight systems and to advance the technology readiness level prior to further testing on-orbit or lunar environments to prepare for Mars.

J Nick Benardini↗

NASA System Safety Handbook: System Safety Framework and Concepts for Implementation - Volume 1

System safety assessment is defined in NPR 8715.3C, NASA General Safety Program Requirements as a disciplined, systematic approach to the analysis of risks resulting from hazards that can affect humans, the environment, and mission assets. Achievement of the highest practicable degree of system safety is one of NASA's highest priorities. Traditionally, system safety assessment at NASA and elsewhere has focused on the application of a set of safety analysis tools to identify safety risks and formulate effective controls.1 Familiar tools used for this purpose include various forms of hazard analyses, failure modes and effects analyses, and probabilistic safety assessment (commonly also referred to as probabilistic risk assessment (PRA)). In the past, it has been assumed that to show that a system is safe, it is sufficient to provide assurance that the process for identifying the hazards has been as comprehensive as possible and that each identified hazard has one or more associated controls. The NASA Aerospace Safety Advisory Panel (ASAP) has made several statements in its annual reports supporting a more holistic approach. In 2006, it recommended that "... a comprehensive risk assessment, communication and acceptance process be implemented to ensure that overall launch risk is considered in an integrated and consistent manner." In 2009, it advocated for "... a process for using a risk-informed design approach to produce a design that is optimally and sufficiently safe." As a rationale for the latter advocacy, it stated that "... the ASAP applauds switching to a performance-based approach because it emphasizes early risk identification to guide designs, thus enabling creative design approaches that might be more efficient, safer, or both." For purposes of this preface, it is worth mentioning three areas where the handbook emphasizes a more holistic type of thinking. First, the handbook takes the position that it is important to not just focus on risk on an individual basis but to consider measures of aggregate safety risk and to ensure wherever possible that there be quantitative measures for evaluating how effective the controls are in reducing these aggregate risks. The term aggregate risk, when used in this handbook, refers to the accumulation of risks from individual scenarios that lead to a shortfall in safety performance at a high level: e.g., an excessively high probability of loss of crew, loss of mission, planetary contamination, etc. Without aggregated quantitative measures such as these, it is not reasonable to expect that safety has been optimized with respect to other technical and programmatic objectives. At the same time, it is fully recognized that not all sources of risk are amenable to precise quantitative analysis and that the use of qualitative approaches and bounding estimates may be appropriate for those risk sources. Second, the handbook stresses the necessity of developing confidence that the controls derived for the purpose of achieving system safety not only handle risks that have been identified and properly characterized but also provide a general, more holistic means for protecting against unidentified or uncharacterized risks. For example, while it is not possible to be assured that all credible causes of risk have been identified, there are defenses that can provide protection against broad categories of risks and thereby increase the chances that individual causes are contained. Third, the handbook strives at all times to treat uncertainties as an integral aspect of risk and as a part of making decisions. The term "uncertainty" here does not refer to an actuarial type of data analysis, but rather to a characterization of our state of knowledge regarding results from logical and physical models that approximate reality. Uncertainty analysis finds how the output parameters of the models are related to plausible variations in the input parameters and in the modeling assumptions. The evaluation of unrtainties represents a method of probabilistic thinking wherein the analyst and decision makers recognize possible outcomes other than the outcome perceived to be "most likely." Without this type of analysis, it is not possible to determine the worth of an analysis product as a basis for making decisions related to safety and mission success. In line with these considerations the handbook does not take a hazard-analysis-centric approach to system safety. Hazard analysis remains a useful tool to facilitate brainstorming but does not substitute for a more holistic approach geared to a comprehensive identification and understanding of individual risk issues and their contributions to aggregate safety risks. The handbook strives to emphasize the importance of identifying the most critical scenarios that contribute to the risk of not meeting the agreed-upon safety objectives and requirements using all appropriate tools (including but not limited to hazard analysis). Thereafter, emphasis shifts to identifying the risk drivers that cause these scenarios to be critical and ensuring that there are controls directed toward preventing or mitigating the risk drivers. To address these and other areas, the handbook advocates a proactive, analytic-deliberative, risk-informed approach to system safety, enabling the integration of system safety activities with systems engineering and risk management processes. It emphasizes how one can systematically provide the necessary evidence to substantiate the claim that a system is safe to within an acceptable risk tolerance, and that safety has been achieved in a cost-effective manner. The methodology discussed in this handbook is part of a systems engineering process and is intended to be integral to the system safety practices being conducted by the NASA safety and mission assurance and systems engineering organizations. The handbook posits that to conclude that a system is adequately safe, it is necessary to consider a set of safety claims that derive from the safety objectives of the organization. The safety claims are developed from a hierarchy of safety objectives and are therefore hierarchical themselves. Assurance that all the claims are true within acceptable risk tolerance limits implies that all of the safety objectives have been satisfied, and therefore that the system is safe. The acceptable risk tolerance limits are provided by the authority who must make the decision whether or not to proceed to the next step in the life cycle. These tolerances are therefore referred to as the decision maker's risk tolerances. In general, the safety claims address two fundamental facets of safety: 1) whether required safety thresholds or goals have been achieved, and 2) whether the safety risk is as low as possible within reasonable impacts on cost, schedule, and performance. The latter facet includes consideration of controls that are collective in nature (i.e., apply generically to broad categories of risks) and thereby provide protection against unidentified or uncharacterized risks.

Dezfuli, Homayoon↗

First-of-a-Kind Risk-Informed Digital Twin for Operational Decision Making

A digital twin (DT) is a digital model or a collection of models of a physical entity. DTs in the nuclear arena can be used from plant design through decommissioning. Decisions are typically a priori or made offline. Risk-informed decision making is identifying what can go wrong, its frequency, and the consequences of its failure. Ideally risk-informed decision making reflects the current state of the plant and provides a decision in real time. Traditionally, probabilistic risk assessments (PRAs) evaluate the failures of safety systems, the risk of core damage, and the offsite dose as the consequence. However, this DT evaluates the decisions on the control side rather than the protection side. It uses the same risk methods to probabilistically inform the decision-making process but in a different way. Rather than evaluating the risk of core damage, this DT evaluates the likelihood of avoiding a trip set point while maintaining plant safety. Performance-based assessments are identified via its probabilistic evaluation of operational alternatives based on system status. Because the purpose of the control system is to maintain system variables within prescribed operating ranges, upsets or challenges that can exceed a trip set point resulting in a plant transient and a challenge to plant mitigating systems based on actual plant conditions, are evaluated to safely maintain the plant within the operating ranges. The probabilistic portion of the model is autonomously and automatically adjusted, and the metric of interest (i.e. likelihood of avoiding a trip set point) is recalculated. The digital representation of the physical system (i.e. the DT) performs a deterministic performance–based assessment of the probabilistically identified alternatives identified to validate the probabilistic assessment. A decision-making algorithm selects the appropriate option based on the probabilistic and deterministic assessments and transmits a control signal to a component(s) to initiate a corrective action or informs an operator of its decision.

digital twin↗