Search NASA⌕ Search

SEARCH · Search NASA

Results for “River Current”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

A Comprehensive Assessment Tool for Low-TRL Current Energy Converters: Preprint

Along with a market-competitive levelized cost of energy, a current energy converter technology strongly benefits from an extensive consideration of socioeconomic, environmental, and regulatory factors early in the design process. As part of a technology performance level assessment, a series of assessment questions and guidance are developed and presented to evaluate an early-stage current energy technology on holistic criteria considering the entire device lifecycle. The assessment represents an accumulation of industry and research experience to date and relies on regular updates to ensure alignment with industry best-practices, regulatory requirements, and up-to-date technical understanding. A cradle-to-grave (materials, manufacturing, installation and deployment, operations and maintenance, and end-of-life) assessment of capabilities and functional requirements for tidal, river, and ocean current technologies has been completed. This work presents the evaluation questions and qualitative performance criteria for current energy converters deployed in tidal, ocean current, and/or river applications. Key considerations related to manufacturing and installation include supply chain robustness, manufacturability and related job creation in the end-user and/or adjacent communities, and the time-to-repayment of the embodied energy debt. During deployment and maintenance operations, the safety of the device and subsystems during disconnect or grid failure, the difficulty and frequency of offshore heavy-lift activities, the avoidance or mitigation of area use conflicts, the sea-states and weather conditions that permit maintenance access, and the availability of contingency plans (should conditions change unexpectedly) are a portion of the considered assessment criteria. Results include the potential impact of early-stage design decisions on the socioeconomic, environmental, and regulatory performance of a technology that allows developers to increase the product value and probability of success, and minimize costly late-stage design iterations through early and broad consideration of factors affecting overall performance and acceptability.

industry support↗

Tank 11H Low Temperature Aluminum Dissolution and Inhalation Dose Potential Analyses at Savannah River Site – 26018

Currently, there is approximately 34 million gallons of high-level radioactive tank waste in the Tank Farm at the Savannah River Site (SRS). The ultimate goal of operations at the Tank Farm is to remove the high level waste (HLW) from the tanks followed by stabilization of the waste through vitrification of the HLW into glass or grouting the decontaminated waste into saltstone. After bulk removal of the HLW consisting of sludge, saltcake, and supernatant, further efforts are made to reduce the residual waste present in the tank in order to declare preliminary cease waste removal (PCWR) signifying completion of HLW removal. These reduction efforts can include tank washing to remove soluble salts and radioisotopes and dissolution of solids including aluminum. Aluminum in the form of gibbsite and boehmite is relatively insoluble in water. Through addition of aqueous sodium hydroxide, the aluminum can be dissolved at mild temperatures. In order for the waste tank to meet closure mode requirements of the Concentration, Storage, and Transfer Facilities (CSTF), which includes the Tank Farm, Documented Safety Analysis (DSA), a component of the safety basis, the inhalation dose potential (IDP) and the radiolytic hydrogen generation rate of the stored waste must be demonstrated to be lower than their respective designated limits. These parameters are calculated from measured radiochemical analyses of isotopes that emit a high amount of radioactivity including Cs-137, Sr-90, Pu-238, Pu-239, Pu-240, Pu-241, Am-241, and Cm-244. Following the low temperature aluminum dissolution (LTAD) process, Tank 11H slurry samples were pulled from the tank and sent to Savannah River National Laboratory (SRNL) to measure the extent of aluminum dissolution, hydroxide concentration, densities of slurry and supernatant, weight percent solids analyses, and radionuclide activities. The analyses of the composite sample found that approximately 90% of the total aluminum in the slurry was dissolved, indicating successful reduction of the insoluble aluminum in the waste tank. Additionally, the weight percent insoluble solids (slurry basis) measurement of the composite sample was found to be approximately 1%, demonstrating that minimal solids still remain in the tank. Finally, the radiochemical analyses of the composite sample determined that the waste contents of the tank met the IDP and radiolytic hydrogen generation rate requirements of the CSTF DSA. These measurements have shown that the LTAD process in Tank 11H was successful in waste reduction efforts and a positive step towards declaring PCWR and tank closure at SRS.

Dekarske, John [Savannah River National Laboratory↗

RESULTS OF CESIUM MASS TRANSFER TESTING FOR NEXT GENERATION SOLVENT WITH HANFORD WASTE SIMULANT AP-101

SRNL has performed an Extraction, Scrub, Strip (ESS) test using the next generation solvent and AP-101 Hanford Waste simulant. The results indicate that the next generation solvent (MG solvent) has adequate extraction behavior even in the face of a massive excess of potassium. The stripping results indicate poorer behavior, but this may be due to inadequate method detection limits. SRNL recommends further testing using hot tank waste or spiked simulant to provide for better detection limits. Furthermore, strong consideration should be given to performing an actual waste, or spiked waste demonstration using the 2cm contactor bank. The Savannah River Site currently utilizes a solvent extraction technology to selectively remove cesium from tank waste at the Multi-Component Solvent Extraction unit (MCU). This solvent consists of four components: the extractant - BoBCalixC6, a modifier - Cs-7B, a suppressor - trioctylamine, and a diluent, Isopar L{trademark}. This solvent has been used to successfully decontaminate over 2 million gallons of tank waste. However, recent work at Oak Ridge National Laboratory (ORNL), Argonne National Laboratory (ANL), and Savannah River National Laboratory (SRNL) has provided a basis to implement an improved solvent blend. This new solvent blend - referred to as Next Generation Solvent (NGS) - is similar to the current solvent, and also contains four components: the extractant - MAXCalix, a modifier - Cs-7B, a suppressor - LIX-79{trademark} guanidine, and a diluent, Isopar L{trademark}. Testing to date has shown that this 'Next Generation' solvent promises to provide far superior cesium removal efficiencies, and furthermore, is theorized to perform adequately even in waste with high potassium concentrations such that it could be used for processing Hanford wastes. SRNL has performed a cesium mass transfer test in to confirm this behavior, using a simulant designed to simulate Hanford AP-101 waste.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Integration of Water Resource Models with Fayetteville Shale Decision Support and Information System

Significant issues can arise with the timing, location, and volume of surface water withdrawals associated with hydraulic fracturing of gas shale reservoirs as impacted watersheds may be sensitive, especially in drought years, during low flow periods, or during periods of the year when activities such as irrigation place additional demands on the surface supply of water. Significant energy production and associated water withdrawals may have a cumulative impact to watersheds over the short-term. Hence, hydraulic fracturing based on water withdrawal could potentially create shifts in the timing and magnitude of low or high flow events or change the magnitude of river flow at daily, monthly, seasonal, or yearly time scales. These changes in flow regimes can result in dramatically altered river systems. Currently little is known about the impact of fracturing on stream flow behavior. Within this context the objective of this study is to assess the impact of the hydraulic fracturing on the water balance of the Fayetteville Shale play area and examine the potential impacts of hydraulic fracturing on river flow regime at subbasin scale.

04 OIL SHALES AND TAR SANDS↗

Monte Carlo N-Particle Transport Performance of Predicting Digital Radiographic IQI Inspection

The identification of porosity, geometric noncompliance, and other defect types are critical to the qualification of materials and components. X-ray radiographic nondestructive testing is a common industrial inspection method for process quality control and component qualification and certification. Digital radiography provides a quick and efficient alternative when compared to traditional film-based inspection. The quality of radiographic inspection is dependent on equipment specifications, such as the source spot size and detector pixel size, and the specific parameters selected for use for the radiographic technique. To evaluate if an x-ray system and technique is sufficient for a given requirement, a radiographic image quality indicator (IQI) can be used. Radiographic IQIs in hard to machine materials or hard to manufacture defects can be time consuming and expensive to manufacture. This study was conducted to evaluate current Savannah River National Laboratory (SRNL) x-ray imaging systems with a custom tantalum IQI and using Monte Carlo simulations to predict the performance of future systems. The tantalum IQI was tested using a Siefert Isovolt 420 keV x-ray tube with a Perkin Elmer XRD 1611 flat panel with 100-micron pixels. Using the Monte Carlo N-Particle transport software, the radiographic tally was used to simulate the photon flux through an identical tantalum IQI. These simulations provided a benchmark as to the best theoretical identification on a given system using our tantalum IQI. The simulations were refined to match SRNL’s current systems’ noise levels, leading to confidence in their ability to predict the performance of other systems that may be purchased and deployed in the future at the Savannah River Site. Future studies will be conducted to prove this research can be extended to artificially evaluate the ability for systems to identify critical defect sizes through x-ray radiographic inspection, drastically reducing the cost and time burdens of producing high-fidelity radiographic test articles.

digital X-ray radiography↗

WILD PIGS: BIOLOGY, DAMAGE, CONTROL TECHINQUES AND MANAGEMENT

The existence of problems with wild pigs (Sus scrofa) is nothing new to the Western Hemisphere. Damage by these introduced animals was reported as far back as 1505 by the early Spanish colonies in the Caribbean, where wild pigs were killing the colonists cattle. Droves of these animals also ravaged cultivated crops of maize and sugarcane on islands in the West Indies during this same time period. These wild pigs reportedly were very aggressive and often attacked Spanish soldiers hunting rebellious Indians or escaped slaves on these islands, especially when these animals were cornered. The documentation of such impacts by introduced populations of this species in the United States has subsequently increased in recent years, and continued up through the present (Towne and Wentworth. 1950, Wood and Barrett 1979, Mayer and Brisbin 1991, Dickson et al. 2001). In spite of a fairly constant history in this country since the early 1900s, wild pigs have had a dramatic recent increase in both distribution and numbers in the United States. Between 1989 and 2009, the number of states reporting the presence of introduced wild pigs went from 19 up to as many as 44. This increase, in part natural, but largely manmade, has caused an increased workload and cost for land and resource managers in areas where these new populations are found. This is the direct result of the damage that these introduced animals do. The cost of both these impacts and control efforts has been estimated to exceed a billion dollars annually (Pimentel 2007). The complexity of this problem has been further complicated by the widespread appeal and economic potential of these animals as a big game species (Tisdell 1982, Degner 1989). Wild pigs are a controversial problem that is not going away and will likely only get worse with time. Not only do they cause damage, but wild pigs are also survivors. They reproduce at a rate faster than any other mammal of comparable size, native or introduced; they can eat just about anything; and, they can live just about anywhere. On top of that, wild pigs are both very difficult to control and, with the possible exception of island ecosystems, almost impossible to eradicate (Dickson et al. 2001, Sweeney et al. 2003). The solution to the wild pig problem has not been readily apparent. The ultimate answer as to how to control these animals has not been found to date. In many ways, wild pigs are America's most successful large invasive species. All of which means that wild pigs are a veritable nightmare for land and resource managers trying to keep the numbers of these animals and the damage that they do under control. Since the more that one knows about an invasive species, the easier it is to deal with and hopefully control. For wild pigs then, it is better to 'know thy enemy' than to not, especially if one expects to be able to successfully control them. In an effort to better 'know thy enemy,' a two-day symposium was held in Augusta, Georgia, on April 21-22, 2004. This symposium was organized and sponsored by U.S.D.A. Forest Service-Savannah River (USFS-SR), U. S. Department of Energy-Savannah River Operations Office (DOE-SR), the Westinghouse Savannah River Company (WSRC), the South Carolina Chapter of the Soil & Water Conservation Society, and the Savannah River Ecology Laboratory (SREL). The goal of this symposium was to assemble researchers and land managers to first address various aspects of the biology and damage of wild pigs, and then review the control techniques and management of this invasive species. The result would then be a collected synopsis of what is known about wild pigs in the United States. Although the focus of the symposium was primarily directed toward federal agencies, presenters also included professionals from academic institutions, and private-sector control contractors and land managers. Most of the organizations associated with implementing this symposium were affiliated with the Savannah River Site (SRS), a 803 km{sup 2} federal nuclear facility, located in western South Carolina along the Savannah River. The SRS was a very appropriate facility to host this symposium. The SRS has been dealing with its wild pig problem since the early 1950s. A lot has been learned about these animals at the site over the ensuing decades. Between the USFS-SR, DOE-SR, SREL, and the site's management and operations contractor, which is currently Savannah River Nuclear Solutions, SRS organizations have conducted a wealth of research on this wild pig population, spanning a broad spectrum of topics and disciplines. In fact, the SRS wild pig population is among the most studied, and possibly is the best studied population of this invasive species found in the United States today. Unfortunately, with all of that work, the ultimate answer to controlling wild pigs and their impacts still has not been found. This volume represents the collected synopsis that was the goal of the aforementioned symposium.

54 ENVIRONMENTAL SCIENCES↗

Water Quality Trends in the Entiat River Subbasin: Final Annual Report to BPA and NOAA Fisheries, 2008.

The Integrated Status and Effectiveness Monitoring Project (ISEMP) program monitors the status and trend of water quality elements that may affect restoration project effectiveness in the Entiat subbasin. As part of this effort, the PNW Research Station (PNW) measures, analyzes and interprets temporal trends in natural stream water pH, dissolved oxygen, specific conductance and temperature. The Entiat River is currently on the Clean Water Act 303(d) list for pH exceedence, and there is insufficient information to determine the spatial and temporal extent or potential causes of this exceedence. In the late spring 2007, PNW deployed data-logging, multiparameter probes at four locations in the Entiat subbasin to measure water quality parameters, focusing on pH. Data collection was seasonally interrupted by river ice in early December. Daily average pH did not exceed the water quality standard of 8.5 at any of the measurements sites. However, instantaneous values did exceed this standard near the mouth of the Entiat River during late summer-fall period. This suggested that in the lowest portion of the river peaks in pH may be occurring because of photosynthesis caused by high rates of periphyton productivity in response to increased sunlight, temperature, and possible nutrient enrichment. Conversely, dissolved oxygen reached annual low levels during this same late summer-fall period, in part because of increased water temperatures and increased biochemical oxygen demand.

13 HYDRO ENERGY↗

Water Quality Trends in the Entiat River Subbasin: Final 2008 Annual Report.

The ISEMP program monitors the status and trend of water quality elements that may affect restoration project effectiveness in the Entiat subbasin. As part of this effort, the PNW Research Station (PNW) measures, analyzes and interprets temporal trends in natural stream water pH, dissolved oxygen, specific conductivity and temperature. The Entiat River is currently on the Clean Water Act 303(d) list for pH exceedence, and there is insufficient information to determine the spatial and temporal extent or potential causes of this exceedence. In the spring 2008, PNW redeployed data-logging, multiparameter probes at four locations in the Entiat subbasin to measure water quality parameters, focusing on pH. This resumed previous data collection that was interrupted by river ice in early December 2007. Instruments were again removed from the river in early December 2008. This annual report covers the period from December 2007 through December 2008. The highest pH values occurred during the low-flow period from midsummer through the following midspring then dropped sharply during the annual snowmelt runoff period from late spring through early summer. Water temperature began rapidly increasing during the receding limb of the annual snowmelt hydrograph. Highest mean monthly temperatures occurred in July and August, while instantaneous maxima occurred during the period July-September. Dissolved oxygen reached its lowest levels during the period of highest water temperature in July-September. Specific conductivity remained very low at all sites throughout the year.

13 HYDRO ENERGY↗

Acoustic Doppler Velocimeter (ADV) data from the University of New Hampshire Atlantic Marine Energy Center (UNH-AMEC ) Tidal Energy Test Site during a Perigean Spring Tide

The ADV measurements contained in this submission were taken on the floating turbine deployment platform (TDP) located at the Memorial Bridge in Portsmouth, NH. The measurements were conducted 11/4/2021-11/9/2021 with the fastest currents occurring on 11/7/2021. Along with the submission of ADV data, a .ppt and text document further explaining the ADV deployment location is included.

16 TIDAL AND WAVE POWER↗

Value of Information and Data Management Platform Promoting Modern Data Analysis Utilization. STTR Phase I, Final Technical Report

The immense growth in weather and river sensor data availability along with increases in computational power and algorithmic sophistication have enabled the widespread application of physical, machine learning, and artificial intelligence algorithms to river forecasting. The forecasts produced by widely varying model approaches are inherently limited in different ways, such as by the number and quality of training observations, producing biased predictions that achieve optimal skill only over specific ranges of weather and river conditions. Thus, despite the growing availability and new sources of forecasts, hydropower owners cannot fully leverage the information because they lack an effective mechanism to determine the “best” forecast for given conditions or objectives. Tools are needed to consolidate forecast information, demonstrate skill, and extract optimal forecast guidance from the range of possibilities. Such tools will increase uptake and beneficial use of the growing wealth of forecast information, and lead to improved operating decisions, optimal power generation, and enhanced system value. This research proposes to improve the value of forecasts by developing a broadly accessible verification framework and applying machine learning techniques to identify the ‘best’ forecast from an ensemble of sources given the current weather, river, and operating conditions.

13 HYDRO ENERGY↗

Implementation of Arizona's nuclear future 153192.doc10 - 15319

The Arizona Energy Education Fund (AEEF), now a 501(c) (3) non-profit entity, is an assembly of stakeholders from the private sector, government, education and energy industries dedicated to supporting K-12 (kindergarten through 12. grade), community colleges and universities through an enhanced program of smart nuclear generator expansion, isotope production, testing of breeder reactor power plants, recycling spent nuclear fuel in power generation facilities, and nuclear fuel cycle support. AEEF priorities are to collaborate with stakeholders in Arizona to develop safe plans that will make Arizona the most nuclear friendly state benefiting all stakeholders. Long-term plans include promoting: - education of K-12 students as well as the general Arizona population so that they fully understand the benefits and safe use of nuclear power; - reliable supply of medical and industrial radioisotopes; - Arizona as host of new reactor concepts which are being developed and demonstrated; - development of nuclear engineering programs in Arizona universities to drive the development of the next generation of nuclear power plants; and - supply of nuclear-generated electricity to California and Sonora, Mexico to power desalinisation plants in exchange for Colorado River water currently allocated to California and Sonora. The development described will generate significant long-term employment for Arizona while delivering a critical service to the nation. Arizona's location advantages include the lack of significant seismic activity, hurricanes, tsunamis, floods or frigid weather. Interstate highways and railroads are well developed and provide good, all-weather access to many potential development sites. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The HydroBio Dataset: a new data resource for evaluating existing and potential hydropower capacity and freshwater biodiversity in the conterminous United States

Hydropower is a critical source of affordable and reliable electricity and energy system stability services in the United States. Opportunities to expand US hydropower production include retrofitting existing non-powered dams to produce power, retrofitting existing hydropower dams to improve efficiency or increase capacity, or constructing new hydropower infrastructure on currently unregulated river reaches. We created the HydroBio Dataset, which summarizes existing and potential hydropower capacity and freshwater biodiversity at the sub-basin scale in the conterminous US to contextualize existing and potential grid contributions with the freshwater ecosystems in which dams are situated. We demonstrate a use-case of this dataset by rescaling and comparing potential non-powered dam nominal capacity to rarity-threat-weighted freshwater species richness for sub-basins where both types of data exist. On average, normalized freshwater biodiversity exceeded normalized potential non-powered dam nominal capacity in these sub-basins. Potential non-powered dam nominal capacity was concentrated in sub-basins in the Upper Mississippi and Ohio hydrologic regions while freshwater biodiversity was concentrated in the South Atlantic-Gulf, Ohio, and Tennessee hydrologic regions. Additionally, non-powered dams and existing hydropower dams are located in sub-basins with similar indices of freshwater biodiversity. The HydroBio Dataset adds an additional ecological dimension of context to our understanding of current and potential future US hydropower capabilities and is a valuable decision support tool for stakeholders tasked with balancing gains in services to the US power grid with the public and environmental benefits of freshwater ecosystems.

Biodiversity↗

Case study on the novel permitting and authorization of PacWave South, a US grid-connected wave energy test facility: Development, challenges, and insights

Marine energy (i.e., energy from waves, tides, currents, and rivers) in the United States is a nascent industry. In particular, permitting processes—an uncertainty for industry advancement that can be costly and time consuming to navigate—have rarely been tested and used for marine energy. The novelty of the marine energy industry and utilization of open ocean permitting processes that were not originally developed for marine energy have led to extensive efforts to gain consensus amongst state and federal regulatory agencies to authorize marine energy projects. In 2021, Oregon State University successfully completed permitting of a wave energy test facility, called PacWave South, off the coast of Oregon, which is designed to advance wave energy research and development. This article documents the multi-year process that Oregon State University used to receive federal and state authorization for a pre-permitted commercial-scale grid connected facility by detailing the development of the test facility, management of uncertainty and challenges, and key decisions. The PacWave South case study provides insights for the larger marine energy community as the industry advances towards commercialization.

16 TIDAL AND WAVE POWER↗

3D-printed, integrated plug-and-play turbine-generator set for very-low-head hydro. Final Technical Report DOE-EMotors-15757-1

Hydro power has been used since the early days of electricity, but is generally limited to very large facilities. There remains a vast array of untapped locations, either rivers, tidal currents, or also man-made facilities where energy harvesting is technically feasible, but still too costly. E-Motors, in partnership with MTI, is developing an integrated design aimed at facilitating manufacturing, installation, and retrofitting. The integrated design includes a rim on the outside of the turbine runner to house the electrical generator rotor, a so-called rim drive. With this approach, a compact, in-line assembly can be produced and placed in straight pipes, without having to resort to elbows, shafts, and outside generators, thus improving efficiency and facilitating assembly. The long term goal of the project is to develop a realistic prototype for market development and start of manufacturing. During this Phase I grant, in collaboration with the University of Wisconsin-Milwaukee (UWM), the team pursued two objectives: First, design and test a small (3”) system in a laboratory at UWM, and second develop a prototype design at higher power between 50 and 100 kW. The tests showed the potential for integrating the generator rotor with the turbine runner. Output power is so far limited due to test conditions, but CFD calculations show good efficiency potential. With the larger system, a number of possibilities were explored, including: a generator design matching the turbine output, and capable of generating a peak of 86 kW from a flow of 136 cfs at 9’ of head; various intake tube geometries, showing that an elliptical shape is quite favorable; removing the hub, something made possible with a rim design, which can improve efficiency by about 10 percentage points.

13 HYDRO ENERGY↗

Reduction of Porosity in Cementitious Waste Forms to Reduce Effective Diffusivity

Although current practices meet regulations for grout waste forms, development of sequestration materials and techniques for contaminants of concern could expand the use of grout waste forms and reduce risk to established processes from future compositional changes. There are contaminants in waste streams that are not permanently and completely sequestered in current grout waste forms under certain conditions. These contaminants include methyl mercury, 129 I, 99 Tc, and nitrate. Each of these species have minor fractions that are not permanently and completely isolated from the environment and therefore potentially contribute to long-term environmental impacts. An approach of interest includes the technique of reducing porosity to result in reduced leachability of all contaminants simultaneously. The current Savannah River Site (SRS) saltstone formulation was used to evaluate the relationship between leachability and porosity reduced waste forms by altering the water-to-binder ratio. Results indicated decreasing the water-to-binder directly reduced porosity and resulted in the waste form’s ability to more effectively immobilize nitrate. This work was funded by the Department of Energy Office of Environmental Management (DOE-EM) Technology Operations Office (TOO) Project # HQ221818.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Oil Filled Flow Shield Performance Evaluation

When hydrophones are used to monitor underwater sound in areas with currents, like rivers or tidal channels, flow noise caused by turbulent flow past a hydrophone can mask low frequency acoustic signals of interest. Flow shields can reduce the impacts of flow noise on hydrophone data. A prior study conducted by PNNL compared three flow shield designs and determined that an oil-filled urethane shield performed better than other designs and was likely sufficiently robust for long-duration marine deployments. However, that study did not assess the high frequency performance of the oil-filled flow shield or conduct long-duration field testing. Further, the prototype flow shield was difficult to assemble. This report details the results of design refinement and testing to address these gaps. Design refinements resulted in a straightforward and repeatable assembly method. Field testing indicated that the flow shields reduce flow noise by over 20 dB below 50 Hz at flow speeds greater than 0.5 m/s and are proven to survive deployments more than 6 months long. Calibration of the same hydrophone with and without a flow shield installed indicated that the shields attenuate propagating sound by no more than 2 dB at frequencies below 30 kHz.

42 ENGINEERING↗

Cle Elum and Supplementation Research Facility : Monthly Progress Report October 2008.

FISH PRODUCTION: On October 7th the 2008 spawning season was completed. 823 adults were transferred to the facility for the 2008 season. The overall adult mortality was 6.9% (1.3% pre-spawning mortality and 5.6% encountered after sorting). Wild/natural salmon collected included 278 females, 173 males, and 29 jacks for a total 480 fish for the 2008 brood. Supplemented brood stock collected included 149 adults (85 females, 35 males and 29 jacks). Hatchery control brood collected for research included 194 adults (91 females, 68 males and 35 jacks). Eggs will be inventoried in November with an actual summary of eggs numbers to be submitted for the November report. The estimated egg takes (production) for the 2008 season was 1,375,146 eggs with 1,006,063 comprising of W x W crosses and 250,755 eggs of H x H crosses with 118,328 supplement crosses. Total fish on hand for the 2007 brood is 768,751 with an average fish per pound of 30.6 f/lb. FISH CULTURE: The marking and pit-tagging operation started on October 13th. The pit-tagging portion was completed on October 23rd. A total 40,000 juveniles were pit-tagged (2,000 from each of the production ponds and 4,000 each for the hatchery juvenile ponds 9 & 10). Cle Elum staff began shocking, sorting, counting and splitting eggs in incubation. Shocking eggs will separate live eggs from dead eggs. Eggs are treated with formalin three times a week to control fungus. The focus for the culturists during the month of October entail completing the final spawn (egg take) on the 7th, pond cleaning, keeping the marking trailers supplied with fish and end of month sampling. The adult holding ponds were power washed and winterized for the shut down period. Facility crew members Greg Strom and Mike Whitefoot assisted Joe Blodgett and his crew with fish brood collection on the 22nd of October. Fall Chinook and Coho salmon were seined up and put in tanker trucks from Chandler canal and transported to holding ponds for later spawning. Charlie, Simon and Vernon assisted with sorting and spawning Summer Chinook at the Wells hatchery for the Summer Chinook reintroduction program on the lower Yakima River. WATER PRODUCTION: The current combined well and river water supply to the complex is 12,909 gallons/min. Four river pumps (12,400gpm) and one well pump No.2 (509gpm) are supplying water to the facility main head box and the egg incubation building. ACCLIMATION SITES: Easton had much activity in October, the electrical power panel that's switches commercial power operation to generator power (transfer switch) malfunctioned. Charlie called Wallace Electric as well as ASCO Services to trouble shoot the problem which has yet to be determined. Heaters have been turned on in all service buildings at the acclimation sites. Pacific States Marine Fisheries Commission traveled to Easton to install a pole to mount a satellite and a new ups backup system with new monitors and computers for pit tag data recording and transmitting. Brown and Jackson pumped out the septic tanks at Easton and Clark Flat. AMB Tools performed maintenance on the compressors at the acclimation sites as well as Cle Elum (5 total). VEHICLE MAINTENANCE: Day Wireless performed maintenance on all handheld and vehicle radios. Day Wireless repaired radio communications (static noise) on the 6th also. All vehicles mileages and conditions are reported monthly to Toppenish. Cle Elum staff continues to clean and maintain all facility vehicles weekly. MAINTENANCE BUILDING MAINTENANCE: Kevin of Raincountry was called in response to repairs needed to the water chiller system. Cle Elum staff winterized all irrigation as well as shop grounds. Brown and Jackson pumped out the septic tank at the hatchery on the 22nd. HATCHERY BUILDING MAINTENANCE: The incubation room has been set up for transfer of eggs from isolation buckets to vertical stacks, temperature units are recorded daily. RESENTDENTIAL HOUSING: Residents irrigation has been winterized and fall fertilizer was applied to all grass on facility. Four Seasons performed maintenance on all heating systems and replaced a thermostat on resident house No.391. Alden Plumbing replaced a water faucet in a sink at resident house No.1001. Shaw's Furniture & Appliance replaced three faulty microwaves in residents No.391, 411 and 871. RIVER PUMP STATION MAINTENANCE: All river pumps are in operation and supply river water to the main facility. Approximately 12,400 gallons per minute are being pumped to eighteen raceways. Weekly cleaning and upkeep is performed by Cle Elum staff. WELL FIELD MAINTENANCE: Weekly test holes are measured, recorded and sent to CH2MHILL. Pump No.1 is in operation and the flow meter is recorded weekly. On the 3rd well pumps 5 and 6 were shut down and winterized for the season. Well pump No.2 had fence damage repaired on the 16th. SAFETY AND TRAINING: A safety meeting was held on the 21st. On the 15th ABC Fire Prevention did maintenance on all fire extinguishers.

13 HYDRO ENERGY↗

TREATABILITY TEST REPORT FOR THE REMOVAL OF CHROMIUM FROM GROUNDWATER AT 100-D AREA USING ELECTROCOAGULATION

The U.S. Department of Energy (DOE) has committed to accelerate cleanup of contaminated groundwater along the Columbia River. The current treatment approach was driven by a series of Interim Action Records of Decision (IAROD) issued in the mid-1990s. Part of the approach for acceleration involves increasing the rate of groundwater extraction for the chromium plume north of the 100-D Reactor and injecting the treated water in strategic locations to hydraulically direct contaminated groundwater toward the extraction wells. The current treatment system uses ion exchange for Cr(VI) removal, with off-site regeneration of the ion exchange resins. Higher flow rates will increase the cost and frequency of ion exchange resin regeneration; therefore, alternative technologies are being considered for treatment at high flow rates. One of these technologies, electrocoagulation (EC), was evaluated through a pilot-scale treatability test. The primary purpose of the treatability study was to determine the effectiveness of Cr(VI) removal and the robustness/implementability of an EC system. Secondary purposes of the study were to gather information about derivative wastes and to obtain data applicable to scaling the process from the treatability scale to full-scale. The treatability study work plan identified a performance objective and four operational objectives. The performance objective for the treatability study was to determine the efficiency (effectiveness) of hexavalent chromium removal from the groundwater, with a desired concentration of {le} 20 micrograms per liter ({micro}g/L) Cr(VI) in the effluent prior to re-injection. Influent and effluent total chromium and hexavalent chromium data were collected using a field test kit for multiple samples per week, and from off-site laboratory analysis of samples collected approximately monthly. These data met all data quality requirements. Two of three effluent chromium samples analyzed in the off-site (that is, fixed) laboratory met the performance objective during the continuous operational testing. Effluent hexavalent chromium analyzed by the field laboratory met the performance goal in over 90 percent of the samples. All effluent hexavalent chromium samples during the batch testing with high influent hexavalent chromium concentrations ({approx}2000 {micro}g/L) met the performance objective. Although the EC system was able to meet the performance goal, it must be noted that it was not uncommon for the system to be operated in recycle mode to achieve the performance goal. The EC unit was sometimes, but not always, capable of a single pass treatment efficiency high enough to meet the performance goal, and recycling water for multiple treatment passes was effective. An operational objective was to determine the volume and composition of the waste streams to enable proper waste designation. The toxicity characteristic leaching procedure (TCLP) concentrations, pH, and free liquids were determined for solid material from the EC electrodes (mechanically removed scale), the filter press, and the tank bottoms for the effluent and waste collector tanks. These data met all data quality requirements. All solid-phase secondary waste streams were found to be below the TCLP limits for the toxicity characteristic, and a pH value within the limits for the corrosivity characteristic. Out of three samples, two (one of scale from the EC unit and one from filter press solids) failed the free liquid (paint filter) test, which is one of the acceptability criteria for Hanford's Environmental Restoration Disposal Facility (ERDF). The solid-phase waste generation rate was about 0.65-gallon of solid waste per 100 gallons of water treated. It is concluded that the solid-phase secondary waste generated from this technology under the conditions at the test site will meet the toxicity and corrosivity criteria for disposal. It is also concluded that with engineering and/or operational improvements, a solid-phase secondary waste could be produced that would meet the free liquid disposal requirements. The second operational objective was to assess the operational reliability and safety of the system. For the continuous operations testing period from July 23 to September 12,2007, the system was not able to operate unattended. An extensive period of startup and adjustment preceded continuous operations, but was unsuccessful in providing a suitable and robust operating condition. Primary operational reliability problems were related to the sensitivity of the solid separation process to operational conditions such that a robust operating procedure (for example, chemical dosage) was not identified during the treatability test. Poor solids separation and high effluent iron concentrations also led to operational difficulties associated with injection well fouling.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗