Search NASA⌕ Search

SEARCH · Search NASA

Results for “SALT WASTE PROCESSING FACILITY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Ion Exchange Column Thermal Modeling: Prevention of Process Effluent Boiling - 18577

The Savannah River Site treats and disposes of legacy high-level waste, which resulted from 60 years of nuclear material production, medical research, and other nuclear related work. Complex mixtures of soluble and insoluble solids occupy tanks of which the South Carolina Department of Health and Environmental Control recognizes as the single largest environmental risk state-wide. The risk is reduced through removal, treatment, and solidification of decontaminated salt waste. Presently, SRS decontaminates the soluble salt component of the waste, a solution containing actinides and cesium, via implementation of the Actinide Removal Process and the Modular Caustic Side Solvent- Extraction Unit. Caustic solvent extraction is set to increase in scale by late 2018, with startup of the newly constructed Salt Waste Processing Facility. In conjunction with Salt Waste Processing Facility startup, Savannah River Remediation has been tasked by the Department of Energy to demonstrate modular ion exchange technology. The Tank Closure Cesium Removal project aims to demonstrate the feasibility of modular ion exchange processes for future Department of Energy applications. The Tank Closure Cesium Removal system is scheduled to begin operation in mid-2018. Dissolved salt solution, or influent, will be fed through a filter and ion exchange columns in lead-lag configuration, producing effluent. The effluent is fed to a separate high-level waste tank, for future disposition at Salt-stone Production Facility. Once the demonstration project is complete, the loaded ion exchange columns will be purged, dried, and placed in interim safe storage, awaiting final disposition. The ion exchange media selected for the Tank Closure Cesium Removal system is Honeywell UOP IONSIV{sup C} R-9120. The media is a prime candidate for separation of cesium from radioactive high-level waste. UOP R-9120{sup C} is inorganic and has high capacity, selectivity, and affinity for cesium. During operation, influent is fed to the ion exchange columns, contacting UOP R-9210{sup C} packed within the media vessel. Contact initiates loading of isotopes, and given ample time the solid phase (ion exchange media) and solution achieve thermodynamic equilibrium. UOP R-9120{sup C} is a prime candidate for separation of cesium and dissolved fission products. Although the properties of UOP R-9120{sup C} are favorable for separation, the same properties lead to accumulation of a heat source in the ion exchange bed. Cesium-137 and its daughter product, barium-137 m, generate a clear majority of heat (i.e. ∼ 94%). During operation salt solution flows through each column and transports heat from the ion exchange bed. Once operation is terminated, the effluent contained within the porous bed volume becomes essentially static. In the absence of engineering controls, the heat generated may boil the effluent. Rapid vaporization of aqueous salt solution would lead to bed over pressurization. Over pressurization and an associated release of high-level waste would result in adverse impacts to human health and the environment. This paper focuses on modeling the heat transfer associated with the Tank Closure Cesium Removal system ion exchange column. The model evaluates the maximum heat generation and the associated radionuclide loadings that prevent boiling within of the media vessel, under no flow conditions. A safety significant control, maintaining loadings less than the established loading limit ensures associated impacts to human health and the environment are prevented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of Savannah River Site FY23 Salt Waste Qualification Data

The Savannah River National Laboratory (SRNL) analyzed samples from Savannah River Site (SRS) Waste Tanks 41H and 21H to support qualification of Salt Waste Processing Facility (SWPF) Waste Batches 8 and 9 for processing (the FY23 Salt Batch Qualification samples). These Tanks (i.e. 41H and 21H) are blend tanks for feed to SWPF. None of the samples displayed any unusual or unexpected characteristics such as large amounts of solids, floating solids, or unusual color. Characterization of these samples confirmed similar chemical composition and characteristics to previous salt waste batches. The results for Batches 8 and 9 were provided by SRNL to Savannah River Mission Completion (SRMC), the Liquid Waste Operations subcontractor at SRS, as External Sample Results (Laboratory Information Management System (LIMS)) Reports. Additionally, a separate technical memo was issued by SRNL to report re-test data for Batch 8 for Cs-137 for filtered samples only which were run at the request of SWPF. For Batch 9, a set of samples was also analyzed in parallel by the SWPF-Analytical Laboratory (SWPF-AL). The SWPF-AL data is included herein for comparison with the SRNL data where applicable. The analytical results (both rapid, typically 4 weeks, and long term, typically 8 weeks) for Batches 8 and 9 are now summarized and discussed in this technical report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of Savannah River Site FY24 Salt Waste Qualification Data

Savannah River Mission Completion (SRMC), the Liquid Waste Operations subcontractor at SRS, and Savannah River National Laboratory (SRNL) analyzed samples from Savannah River Site (SRS) Waste Tanks 21H, 41H, and 42H to support qualification of Salt Waste Processing Facility (SWPF) Waste Batches 10, 11, 12, and 13 for processing (the FY24 Salt Batch Qualification samples). These Tanks (i.e. 21H, 41H and 42H) are blend tanks for feed to SWPF. This report focuses on the characterization of the Salt Batch Qualification sub-samples (i.e., any adjustments after qualification or as a part of processing are documented elsewhere). None of the samples displayed any unusual or unexpected characteristics such as large amounts of solids, floating solids, or unusual color. Characterization of these samples confirmed similar chemical composition and characteristics to previous salt waste batches. The analytical results (both rapid, typically 4 weeks, and long-term, typically 8 weeks) for Salt Batches 10, 11, 12, and 13 are now summarized and discussed in this technical report. SRMC-Analytical Laboratory (SRMC-AL), for the first time, provided all the short-term analyses data used in the qualification evaluations of SWPF Salt Batches 10, 11, 12, and 13. These SRMC short-term results are presented along with the results for the long-term analyses provided by SRNL.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 55: US DOE Savannah River Operations Office: Liquid Waste Progress

This panel provided an overview of the SRS HLW Liquid Waste Program (history, challenges, opportunities, and future) including discussions of the Defense Waste Processing Facility (DWPF), Tank Closures, Actinide Removal Process/Modular Caustic Side Solvent Extraction Unit, Tank Closure Cesium Removal, and the Salt Waste Processing Facility (SWPF). Panelists with presentations: SRS Liquid Waste Program (James Folk); SRS Liquid Waste Progress (Mark Schmitz); Salt Waste Processing Facility (Frank Sheppard)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Session 078 - Panel: Start-Up of Three Major DOE Treatment Facilities -SWPF, IWTU and DFLAW (2/2) (R2.4)

This panel focused on the successes and challenges of the DOE High-Level radioactive tank waste management program, with an emphasis on the completion of construction and startup of three major treatment facilities - the Salt Waste Processing Facility (SWPF) at Savannah River, the Integrated Waste Treatment Unit (IWTU) at Idaho, and Direct Feed Low-Activity Waste (DFLAW) processing at Hanford. As a companion to Session 23, DOE managers and federal project directors discussed the status of facility startup efforts from a federal management and oversight perspective, highlighting readiness planning, challenges and lessons learned. Panelists with presentations: Transitioning Oversight: A Project Becomes an Operating Facility (James Folk); Tools for SU/C (Tom Fletcher); Startup and Commissioning -Integrate Waste Treatment Unit-Federal Perspective (Joel Case)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utilizing Commercial Submersible Mixer Pumps for Sludge Removal in Savannah River Site's Tank 26 - 20289

The Savannah River Site (SRS) Liquid Waste System (LWS) safely manages, stores, treats, and dispositions liquid radioactive waste. The LWS consists of 51 underground waste storage tanks (eight of which are operationally closed and filled with grout), waste evaporators, treatment facilities, and solidification facilities, known as the Defense Waste Processing Facility (DWPF) and Saltstone Production Facility (SPF). One of the waste storage tanks, Tank 26, was placed into service in 1980 as an F Tank Farm (FTF) Evaporator Feed Tank. From 1980 to 2013, Tank 26 received F Canyon receipts and dilute supernate that was then transferred to the 242-16F FTF Evaporator for volume reduction. In 2013, the steam tube bundle failed in the FTF Evaporator, and the decision was made not to repair/resume evaporator operation. During operation of Tank 26, solids built up to a level of 2.03 m in the tank with a volume of 1062.9 kL. Due to the evaporator failure and subsequent shutdown, the solids in Tank 26 were selected to feed Sludge Batch 10, which is collected and prepped prior to being sent to DWPF for final disposition. To accomplish solids removal, Commercial Submersible Mixer Pumps (CSMPs) were selected to slurry the solids in preparation to be sent to Tank 51. Four CSMPs were installed in Tank 26 with each one installed in a separate quadrant of Tank 26. This work would mark the first deployment of CSMPs in an SRS waste tank. The CSMPs were developed in response to operational issues from previous mixing pumps and budgetary constraints. The CSMPs use the concept of modifying commercially available equipment for nuclear waste applications. The CSMPs consist of a 230-horsepower submersible mixing pump (manufactured by GPM, Inc.) joined to a mast fabricated at SRS. For this application, Savannah River Remediation (SRR) design services was challenged to provide a mast design that required no steel superstructure support system on top of Tank 26. Also, SRR design services provided a simplified Tank 26 riser interface that did not require extensive machine parts to adjust height of the suction screen of the CSMP within the tank. Other design improvements include no requirements for tank top radiation monitors and no requirements for flushing of the CSMPs during startup/shutdown operations. The CSMPs were operated at an initial height of 2.29 m above the Tank 26 bottom for 10 days. After sludge sounding, the CSMPs were lowered to a height of 1.52 m with no issues due to proper work planning and the simplified riser interface. With the CSMPs lowered to a level of 1.52 meters above the tank bottom, the CSMPs were operated for 12 days and another sounding was performed. The sounding level came back matching the disturbance depth results of the first pump run. Chemistry samples were analyzed while the tank was left to settle. The analysis revealed enough weight percent solids to provide good feed to Sludge Batch 10. Also, the results revealed the supernate within the mixture would provide good salt solution feed to Salt Waste Processing Facility (SWPF) Salt Batch 3. So, the plan was modified to let the disturbed solids settle and decant the salt solution for addition to SWPF Salt Batch 3. Then water will be added back to Tank 26, and the CSMPs run in order to wash the solids to decrease settling time prior to being sent to Tank 51 for Sludge Batch 10. Utilizing CSMPs for waste removal in an SRS Tank has provided a cost-effective means for further waste removal efforts. In addition, the CSMPs are easier to operate by utilizing a robust and simplified design. The CSMPs performed quite well with no process shutdown or delays during operation. As a result, CSMPs are integral to the future of removing radioactive waste from storage tanks at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of Savannah River Site FY21 Salt Waste Qualification Data and Characterization Data from Salt Waste Batches Processed Since 2008

The Savannah River National Laboratory analyzed samples from Savannah River Site Waste Tank 41H and 21H to support qualification of Salt Waste Processing Facility Waste Batches 3 and 4 (the FY21 Salt Batch Qualification samples) for processing. Neither of the samples displayed any unusual or unexpected characteristics such as large amounts of solids, floating solids, or unusual color. Characterization of these samples confirmed similar chemical composition and characteristics to previous salt waste batches. These results were initially provided to Savannah River Remediation (Liquid Waste Operations Sub-contractor) as External Sample Results LIMS Reports. The analytical results (both expedited and routine) are now summarized and discussed in this technical report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of Long-Term Analyses of the Salt (Macro) Batch 13 Tank 42H Qualification Sample

Savannah River National Laboratory (SRNL) analyzed samples from Tank 42H in support of qualification of Salt Waste Processing Facility (SWPF) Salt Batch 13. This document reports the long-term results of the analyses of the sample of Tank 42H. Analysis of this sample indicates that the material does not display any unusual characteristics or observations, such as visually apparent solids. This report satisfies Deliverable 3 of the Technical Task Request (TTR).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of Long-Term Analyses of the Salt (Macro) Batch 11 Tank 21H Qualification Sample

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Salt Waste Processing Facility (SWPF) Salt Batch 11. This document reports the long-term results of the analyses of the sample of Tank 21H. Analysis of this sample indicates that the material does not display any unusual characteristics or observations, such as visually apparent solids. However, the sample was dark colored. This report satisfies Deliverable 3 of the Technical Task Request (TTR).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of Long-Term Analyses of the Salt (Macro) Batch 14 Tank 21H Qualification Sample

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Salt Waste Processing Facility (SWPF) Salt Batch 14. This document reports the long-term results of the analyses of the sample of Tank 21H. Analysis of this sample indicates that the material does not display any unusual characteristics or observations, such as visually apparent solids. This report satisfies Deliverable 3 of the Technical Task Request (TTR).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of Long-Term Analyses of the Salt (Macro) Batch 11 Tank 21H Qualification Sample

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Salt Waste Processing Facility (SWPF) Salt Batch 11. This document reports the long-term results of the analyses of the sample of Tank 21H. Analysis of this sample indicates that the material does not display any unusual characteristics or observations, such as visually apparent solids. However, the sample was dark colored. This report satisfies Deliverable 3 of the Technical Task Request (TTR). This revision adds a further triplicate analysis for 129 I content.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of Long-Term Analyses of the Salt (Macro) Batch 5 Tank 41H Qualification Sample (Resample)

Savannah River National Laboratory (SRNL) analyzed samples from Tank 41H in support of qualification of Salt Waste Processing Facility (SWPF) Salt Batch 5. This document reports the long-term results of the analyses of samples of Tank 41H. Analysis of the Tank 41H Salt Batch 5 sample indicates that the material does not display any unusual characteristics or observations, such as floating solids, the presence of large amounts of solids, or unusual colors. This memo satisfies Deliverable 3 of the Technical Task Request (TTR). After a data review it was found that the original results reported in the revision 0 of this document were actually from Salt Batch 4 (Tank 21H). A new set of samples were sent for analysis to satisfy Deliverable 3 of the TTR. The results from the original analyses have been replaced with the recent analyses of the actual Salt Batch 5 sample.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of the Short-Term Analyses of the Salt (Macro) Batch 5 Tank 41H Qualification Sample (Resample)

Savannah River National Laboratory (SRNL) analyzed samples from Tank 41H in November 2021 in support of qualification of Salt Waste Processing Facility (SWPF) Salt Batch 5. This document reports the short-term results of the analyses of samples of Tank 41H. Analysis of the Tank 41H Salt Batch 5 sample indicates that the material does not display any unusual characteristics or observations, such as floating solids, the presence of large amounts of solids, or unusual colors. Further sample results will be reported in a future document. This report satisfies part of Deliverable 3 of the Technical Task Request (TTR). After a data review it was found that the original results reported in the revision 0 of this document were actually from Salt Batch 4 (Tank 21H). A new set of samples was sent for analysis to satisfy deliverable 3 of the TTR. The results from the original analyses have been replaced with the recent analyses of the actual Salt Batch 5 sample.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of the Short-Term Analyses of the Salt (Macro) Batch 5 Tank 41H Qualification Sample (Resample)

Savannah River National Laboratory (SRNL) analyzed samples from Tank 41H in November 2021 in support of qualification of Salt Waste Processing Facility (SWPF) Salt Batch 5. This document reports the short-term results of the analyses of samples of Tank 41H. Analysis of the Tank 41H Salt Batch 5 sample indicates that the material does not display any unusual characteristics or observations, such as floating solids, the presence of large amounts of solids, or unusual colors. Further sample results will be reported in a future document. This report satisfies part of Deliverable 3 of the Technical Task Request (TTR). After a data review it was found that the original results reported in the revision 0 of this document were actually from Salt Batch 4 (Tank 21H). A new set of samples was sent for analysis to satisfy deliverable 3 of the TTR. The results from the original analyses have been replaced with the recent analyses of the actual Salt Batch 5 sample.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Increased Fissile Loading Flowsheet Review

A request was made by H-Canyon Process Engineering to assess the impact of blending dissolved, neutralized Spent Nuclear Fuel (SNF) with future sludge batches and their impact on downstream processing facilities including the Concentration, Storage and Transfer Facilities (CSTF), the Salt Waste Processing Facility (SWPF), the Defense Waste Processing Facility (DWPF), Saltstone, and the Effluent Treatment Facility (ETF). The purpose of this change is to accelerate the deinventory of SNF which is currently stored in the L-Area Disassembly Basin. The addition of SNF increases the mass of fissiles in each future sludge batch, due to their high enrichment. This high enrichment has the potential to complicate the programs to eliminate criticality events in the downstream processing facilities and will increase the number of canisters produced by DWPF because of the SNF mass increase. A separate report addressed the impacts to glass. The review and subsequent calculations were based on average predicted compositions of Accelerated Basin Deinventory (ABD) slurry, average compositions for predicted future sludge batches, average past salt batches and average past recycle batches to predict the feeds that will be processed in SWPF, DWPF, Saltstone, the 2H evaporator and ETF. Each of the processes was evaluated for potential issues.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Filtration Improvements in Support of Increased Salt Waste Processing Throughput at the Savannah River Site - 16173

Crossflow Filtration is currently used at the U.S. Department of Energy (DOE) Savannah River Site (SRS) for the removal of actinides, strontium and sludge solids from the high-level salt waste stored in underground tanks. At SRS, crossflow filtration is deployed in the Actinide Removal Process (ARP). Salt waste is transferred from an underground waste tank to one of two strike tanks where it is struck with Monosodium Titanate (MST), which adsorbs uranium, plutonium and strontium. The MST laden salt waste is then transferred to the ARP filtration facility, which contains the crossflow filter. The filtrate, which is called Clarified Salt Solution (CSS), is sent to a downstream facility for cesium removal, while the MST and sludge solids are concentrated at the filtration facility and eventually sent to the Defense Waste Processing Facility (DWPF) for vitrification. ARP and the downstream cesium removal facility, the Modular Caustic Side Solvent Extraction Unit (MCU), were both developed as an interim salt waste processing technology and as smaller scale radioactive demonstration plants for the Salt Waste Processing Facility (SWPF), which is currently under construction. Since the beginning of ARP in 2008, there have been challenges with achieving desired filtration rates through the crossflow filter system. Historically the crossflow filter system has been the flow limiter in salt waste processing and many changes have been made and are planned to achieve desired throughput, especially as MCU increases its processing capacity. Some of these changes include the design of a new crossflow filter, the implementation of a new process chemistry flowsheet and several operational changes. The modifications to the ARP crossflow filter have helped contribute to periods of record throughput in salt waste processing in FY 2015. This paper will discuss the technical challenges and system limitations of retrofitting an older facility as well as past, present and future modifications to the ARP filtration process in order to achieve salt waste processing goals at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Assessment of the Materials of Construction for the Transfer Lines and Unit Operations Equipment Associated with the Recycle Diversion Process

The Defense Waste Processing Facility (DWPF) processes and vitrifies radioactive waste that it receives from the Concentration, Storage, and Transfer Facility (CSTF) and Salt Waste Processing Facility (SWPF). As a result of the evaporation of water during both the melter feed preparation and the melter feed vitrification steps in DWPF, a recycle waste stream is generated, neutralized, and sent back to the CSTF. The recycle waste is a dilute water stream originating from the collection of condensate liquids containing some minor sludge and frit solids and other waste components primarily resulting from entrainment into the condensate during foam-over events. The recycle stream volume is significant and is expected to approach 3 million gallons per year once the SWPF reaches full operation. Diverting the bulk of the recycle waste stream from the CSTF is essential for the eventual closure of the waste tanks, and hence the completion of the SRS liquid waste mission.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges and Solutions in Operation and Lay-Up of the Modular Caustic- Side Solvent Extraction Unit - 20078

The Modular Caustic-Side Solvent Extraction (CSSX) Unit (MCU) was designed and constructed to provide interim salt waste processing so that the Liquid Waste Disposition Program (LWDP) could continue waste removal and tank closure until start-up of the Salt Waste Processing Facility (SWPF). MCU processes Clarified Salt Solution (CSS), or salt solution (SS) that has undergone actinide removal/filtration, to produce two waste streams: the cesium laden Strip Effluent (SE), which is incorporated into glass at the Defense Waste Processing Facility (DWPF), and the cesium depleted Decontaminated SS (DSS), which is incorporated into grout at the Saltstone Production Facility (SPF). MCU completed start-up in 2008 with an initial operating life of 3 years and design life of 5 years. Prior to reaching the end of the design life, multiple critical components were upgraded and/or replaced to mitigate risks associated with any delays in SWPF start-up. During the remainder of operation (until June 2019), MCU was challenged to maximize processing with minimal additional modifications to repair/improve aging infrastructure, while maintaining low levels of risk to workers and the environment. Notable challenges during the extended operating life of the facility involved both mechanical and operational issues. Two of the most significant issues were the increased frequency of Process Vessel Ventilation (PVV) High Efficiency Particulate Air (HEPA) filter change-outs and the biofouling of the SE coalescer (SEC). The major impacts of both issues were that replacement of these components 1) resulted in high exposure to workers, and 2) required substantial downtime, thus hindering achievement of processing goals. PVV HEPA filter replacements are required based on dose rate and differential pressure (dP) limits. After introducing a higher-curie feed to MCU, the operating time between change outs was reduced by approximately half. SEC replacements are required based on dP limits. After restarting from an extended outage, the operating life of the SEC was significantly reduced by more than half due to biofouling. As a result of extensive troubleshooting and process improvements, the facility was able to recover performance and extend the operating life of the PVV HEPA filters and the SEC media. Through troubleshooting both of these issues, the facility was also able to learn from prior experience and adapt in order to minimize down time and maintain throughput. Although the facility took advantage of short periods of downtime to perform nonintrusive troubleshooting and minor corrective/preventative maintenance activities, longer outages were periodically required for corrective maintenance involving process cell entry. During these outages, remote tools and specialized shield plates were employed to minimize dose to workers. Mock-ups of non-routine maintenance activities were critical to early identification of potential issues and improvements, which shortened outage duration. Consistent with the facility's operational strategy, evolutions needed for MCU layup were identified and sequenced to ensure safe conditions within the facility, meet pre-defined criteria for lay-up configuration, and protect workers, while minimizing the impact to SWPF integration. De-inventory and flushing of process areas was prioritized so that the total residual inventory was reduced as efficiently as possible. This paper discusses lessons learned and best practices from troubleshooting unique issues, performing complex maintenance activities, and implementing a layup strategy that best supports the overall system mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗