Search NASA⌕ Search

SEARCH · Search NASA

Results for “SURVEYOR SPACECRAFT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Failure Engineering Study and Accelerated Stress Test Results for the Mars Global Surveyor Spacecraft's Power Shunt Assemblies

An Engineering-of-Failure approach to designing and executing an accelerated product qualification test was performed to support a risk assessment of a "work-around" necessitated by an on-orbit failure of another piece of hardware on the Mars Global Surveyor spacecraft. The proposed work-around involved exceeding the previous qualification experience both in terms of extreme cold exposure level and in terms of demonstrated low cycle fatigue life for the power shunt assemblies. An analysis was performed to identify potential failure sites, modes and associated failure mechanisms consistent with the new use conditions. A test was then designed and executed which accelerated the failure mechanisms identified by analysis. Verification of the resulting failure mechanism concluded the effort.

Gibbel, Mark↗

Orbit Determination of the Mars Global Surveyor Spacecraft Using Laser Altimetry

Many of the scientific investigations of the Mars Global Surveyor (MGS) mission require high precision orbital information and some are limited entirely by its quality. These include the laser altimeter (MOLA) the Mars gravity field and atmospheric occultation investigations by radio science, and the planetary dynamics and celestial mechanics investigations. The precision of the orbits can usually be assessed by comparing overlapping orbits for a given period; but these results tend to reflect the repeatability rather than the accuracy. The re-constructed orbits from the doppler and range tracking data on MGS are (to date) at the few meter level radially, and a few hundreds of meters horizontally, using the best gravity models, presently available. With the laser altimeter on MGS we have a mechanism to measure the quality and to actually make significant improvements in the orbital accuracy by incorporating the altimetry data as a tracking datatype. By adding the altimeter measurements at orbital cross-over locations we have been able to reduce die radial error to 1 meter of less on average and have reduced the along track and out of plane error by almost 2 orders of magnitude down to a few meters. It is apparent that the altimeter observation provides a geometric strength to the orbit that it is not possible to obtain from the present doppler and the range data alone. We discuss the results obtained for the first year of the MGS mapping orbit. This work is supported by the NASA Mars Program.

Smith, David E.↗

Failure Engineering Study and Accelerated Stress Test Results for the Mars Global Surveyor Spacecraft's Power Shunt Assemblies

Due to a post launch failure of a part a new plan for the Mars Global Surveyor was developed. This new plan involved the addition of many deep thermal cycles to the Power Shunt Assemblies (PSA's). This new plan exceeds the previous acceptance cold level, and fatigue life on packaging design. This presentation reviews the experiments that were used to test the capabilities of the PSA to function in the new situation. It also reviews the analyses preformed to verify the most likely failure mechanism, and the likelihood that these failures would impact the new mission requirements.

Gibbel, Mark↗

Movement of the Surveyor 3 spacecraft

It was concluded that the Surveyor 3 spacecraft moved, probably as a result of a sudden failure of the leg 3 shock absorber, between May 1967 and November 1969. The time at which the movement occurred can be estimated only from comparison of the shielded and unshielded portions of footpad 3 and a knowledge of the mechanism and rate of the process that tans the painted surface.

Scott, R. F.↗

The Surveyor program

The Surveyor program consisted of seven unmanned lunar missions. Five of these spacecraft, Surveyor 1, 3, 5, 6, and 7, successfully soft-landed on the lunar surface. These missions and the resulting data are discussed. In addition to demonstrating the feasibility of lunar surface landings, the Surveyor missions obtained lunar and cislunar photographs and both scientific and technological information needed for the Apollo manned landing program. Four spacecraft, Surveyor 1, 3, 5, and 6, returned data from selected mare sites for Apollo program support, and Surveyor 7 provided data from a contrasting rugged highland region.

Source record↗