Deep Space Network Scheduling Using Evolutionary Computational Methods

The paper presents the specific approach taken to formulate the problem in terms of gene encoding, fitness function, and genetic operations. The genome is encoded such that a subset of the scheduling constraints is automatically satisfied. Several fitness functions are formulated to emphasize different aspects of the scheduling problem. The optimal solutions of the different fitness functions demonstrate the trade-off of the scheduling problem and provide insight into a conflict resolution process.

Deep Space Network (DSN)↗

Mixed Integer Programming and Heuristic Scheduling for Space Communication Networks

In this paper, we propose to solve the constrained optimization problem in two phases. The first phase uses heuristic methods such as the ant colony method, particle swarming optimization, and genetic algorithm to seek a near optimal solution among a list of feasible initial populations. The final optimal solution can be found by using the solution of the first phase as the initial condition to the SQP algorithm. We demonstrate the above problem formulation and optimization schemes with a large-scale network that includes the DSN ground stations and a number of spacecraft of deep space missions.

Communication Network Scheduling↗

Technology Estimating 2: A Process to Determine the Cost and Schedule of Space Technology Research and Development

As a leader in space technology research and development, NASA is continuing in the development of the Technology Estimating process, initiated in 2012, for estimating the cost and schedule of low maturity technology research and development, where the Technology Readiness Level is less than TRL 6. NASA' s Technology Roadmap areas consist of 14 technology areas. The focus of this continuing Technology Estimating effort included four Technology Areas (TA): TA3 Space Power and Energy Storage, TA4 Robotics, TA8 Instruments, and TA12 Materials, to confine the research to the most abundant data pool. This research report continues the development of technology estimating efforts completed during 2013-2014, and addresses the refinement of parameters selected and recommended for use in the estimating process, where the parameters developed are applicable to Cost Estimating Relationships (CERs) used in the parametric cost estimating analysis. This research addresses the architecture for administration of the Technology Cost and Scheduling Estimating tool, the parameters suggested for computer software adjunct to any technology area, and the identification of gaps in the Technology Estimating process.

Cole, Stuart K.↗

Mixed Integer Programming and Heuristic Scheduling for Space Communication Networks

We developed framework and the mathematical formulation for optimizing communication network using mixed integer programming. The design yields a system that is much smaller, in search space size, when compared to the earlier approach. Our constrained network optimization takes into account the dynamics of link performance within the network along with mission and operation requirements. A unique penalty function is introduced to transform the mixed integer programming into the more manageable problem of searching in a continuous space. The constrained optimization problem was proposed to solve in two stages: first using the heuristic Particle Swarming Optimization algorithm to get a good initial starting point, and then feeding the result into the Sequential Quadratic Programming algorithm to achieve the final optimal schedule. We demonstrate the above planning and scheduling methodology with a scenario of 20 spacecraft and 3 ground stations of a Deep Space Network site. Our approach and framework have been simple and flexible so that problems with larger number of constraints and network can be easily adapted and solved.

Mixed Integer Programming↗

The foundations of reusability: Successful experience and important conclusions from planning and scheduling of space operations

NASA's Office of Space Communications is sponsoring a combined technical and management initiative to dramatically decrease the cost of preparing for and conducting space operations. The authors present their successful experience and important conclusions from producing generalized and readily reusable solutions and systems for planning and scheduling applications. While generality by itself should enable reuse, generality alone may not produce the desired cost savings. Generality achieved by accumulating numerous special cases within a software system often increases the complexity of the software to the extent that maintenance costs overtake development savings. Because of this phenomenon, the authors have insisted on simplicity, as well as generality, to achieve cost-effective operation reusability. Simplicity and generality can be accomplished simultaneously when the basic 'Building Blocks' for a problem domain, in this paper, planning and scheduling, are discovered and implemented with reuse in mind. The Building Blocks for planning and scheduling are described. The authors also present examples of how these Building Blocks have accommodated various scenarios that were previously treated as mission-peculiar. Two case histories are presented to demonstrate operational reusability and cost effectiveness.

Hornstein, Rhoda Shaller↗

An AI approach for scheduling space-station payloads at Kennedy Space Center

The Payload Processing for Space-Station Operations (PHITS) is a prototype modeling tool capable of addressing many Space Station related concerns. The system's object oriented design approach coupled with a powerful user interface provide the user with capabilities to easily define and model many applications. PHITS differs from many artificial intelligence based systems in that it couples scheduling and goal-directed simulation to ensure that on-orbit requirement dates are satisfied.

Castillo, D.↗

Learning Search Control Knowledge for Deep Space Network Scheduling

While the general class of most scheduling problems is NP-hard in worst-case complexity, in practice, for specific distributions of problems and constraints, domain-specific solutions have been shown to perform in much better than exponential time.

Deep Space Network Search Control↗

Constraint-based integration of planning and scheduling for space-based observatory management

Progress toward the development of effective, practical solutions to space-based observatory scheduling problems within the HSTS scheduling framework is reported. HSTS was developed and originally applied in the context of the Hubble Space Telescope (HST) short-term observation scheduling problem. The work was motivated by the limitations of the current solution and, more generally, by the insufficiency of classical planning and scheduling approaches in this problem context. HSTS has subsequently been used to develop improved heuristic solution techniques in related scheduling domains and is currently being applied to develop a scheduling tool for the upcoming Submillimeter Wave Astronomy Satellite (SWAS) mission. The salient architectural characteristics of HSTS and their relationship to previous scheduling and AI planning research are summarized. Then, some key problem decomposition techniques underlying the integrated planning and scheduling approach to the HST problem are described; research results indicate that these techniques provide leverage in solving space-based observatory scheduling problems. Finally, more recently developed constraint-posting scheduling procedures and the current SWAS application focus are summarized.

Muscettola, Nicola↗

An algorithm for the space shuttle scheduling problem

The problem of determining launch times for a set of missions is considered. Launch times must satisfy early start time and resource constraints. The investigation reported is concerned with the minimization of the number of missions which are launched after specified late start times. An algorithm is presented which, under certain restrictive assumptions, provides an optimal solution. If the restrictive assumptions are not satisfied, the algorithm may be used to obtain a lower bound on the number of missions flown late.

Fisher, M. L.↗

Technology Estimating: A Process to Determine the Cost and Schedule of Space Technology Research and Development

NASA is investing in new technologies that include 14 primary technology roadmap areas, and aeronautics. Understanding the cost for research and development of these technologies and the time it takes to increase the maturity of the technology is important to the support of the ongoing and future NASA missions. Overall, technology estimating may help provide guidance to technology investment strategies to help improve evaluation of technology affordability, and aid in decision support. The research provides a summary of the framework development of a Technology Estimating process where four technology roadmap areas were selected to be studied. The framework includes definition of terms, discussion for narrowing the focus from 14 NASA Technology Roadmap areas to four, and further refinement to include technologies, TRL range of 2 to 6. Included in this paper is a discussion to address the evaluation of 20 unique technology parameters that were initially identified, evaluated and then subsequently reduced for use in characterizing these technologies. A discussion of data acquisition effort and criteria established for data quality are provided. The findings obtained during the research included gaps identified, and a description of a spreadsheet-based estimating tool initiated as a part of the Technology Estimating process.

Cole, Stuart K.↗

Timeline-Based Space Operations Scheduling with External Constraints

We describe a timeline-based scheduling algorithm developed for mission operations of the EO-1 earth observing satellite. We first describe the range of operational constraints for operations focusing on maneuver and thermal constraints that cannot be modeled in typical planner/schedulers. We then describe a greedy heuristic scheduling algorithm and compare its performance to both the prior scheduling algorithm - documenting an over 50% increase in scenes scheduled with estimated value of millions of dollars US. We also compare to a relaxed optimal scheduler showing that the greedy scheduler produces schedules with scene count within 15% of an upper bound on optimal schedules.

Chien, Steve↗

Report of Apollo 204 Review Board to the Administrator, National Aeronautics and Space Administration : Schedule of Physical Evidence - Appendix F

Immediately following the Apollo 204 accident of January 27, 1961. all associated equipment and material were impounded. Release of this equipment and material for normal use was under the close control of the Apollo 204 Review Board. Apollo Review Board Administrative Procedure No. 11, February 11, 1961, established the Apollo 204 Review Board Material Release Record (MRR). This MRR was the official form used to release material from full impoundment and was valid only after being approved by the Board and signed by a Member. The form was used as the authority to place any impounded item into one of the three Categories defined in Administrative Procedure No. 11. This appendix contains all of the authorized MRR's. Each item submitted on an MRR was given a control number; a description, including the part number and serial number; the relevance and location to the accident; any constraints before release; and the control category. The categories placed on the equipment were as follows: Category A - Items which may have a significant influence or bearing on the results or findings of the Apollo 204 Review Board; Category B - All material other than Category A which is considered relevant to the Apollo 204 Review Board investigation; Category C - Material released from Board jurisdiction. Several classes of equipment were released by special Board action prior to the establishment of the MRR system. The operating procedure for release of these classes is Enclosure F-l to this appendix.

Source record↗

Solution and reasoning reuse in space planning and scheduling applications

In the space domain, as in other domains, the CSP (Constraint Satisfaction Problems) techniques are increasingly used to represent and solve planning and scheduling problems. But these techniques have been developed to solve CSP's which are composed of fixed sets of variables and constraints, whereas many planning and scheduling problems are dynamic. It is therefore important to develop methods which allow a new solution to be rapidly found, as close as possible to the previous one, when some variables or constraints are added or removed. After presenting some existing approaches, this paper proposes a simple and efficient method, which has been developed on the basis of the dynamic backtracking algorithm. This method allows previous solution and reasoning to be reused in the framework of a CSP which is close to the previous one. Some experimental results on general random CSPs and on operation scheduling problems for remote sensing satellites are given.

Verfaillie, Gerard↗

Deep space network resource scheduling approach and application

Deep Space Network (DSN) resource scheduling is the process of distributing ground-based facilities to track multiple spacecraft. The Jet Propulsion Laboratory has carried out extensive research to find ways of automating this process in an effort to reduce time and manpower costs. This paper presents a resource-scheduling system entitled PLAN-IT with a description of its design philosophy. The PLAN-IT's current on-line usage and limitations in scheduling the resources of the DSN are discussed, along with potential enhancements for DSN application.

Eggemeyer, William C.↗

NASA Deep Space Network Operations Scheduling

The functioning of the Deep Space Network Operations Scheduling, Jet Propulsion Laboratory, CA is reviewed. The primary objectives of the Operations Scheduling are: to schedule the worldwide global allocation of ground communications, tracking facilities, and equipment; and to provide deep space telecommunications for command, tracking, telemetry, and control in support of flight mission operations and tests. Elements of the earth set are Deep Space Stations (DSS) which provide the telecommunications link between the earth and spacecraft; NASA Communications Network; Network Data Processing Area; Network Operations Control Area which provides operational direction to the DSS; Mission Control and Computing systems; and Mission Support areas which provide flight control of the spacecraft. Elements of the space set include mission priorities and requirements which determine the spacecraft queue for allocating network resources. Scheduling is discussed in terms of long-range (3 years), mid-range (8 weeks), and short-range (2 weeks).

Enari, D. M.↗

Scheduling the future NASA Space Network: Experiences with a flexible scheduling prototype

NASA's Space Network (SN) provides telecommunications and tracking services to low earth orbiting spacecraft. One proposal for improving resource allocation and automating conflict resolution for the SN is the concept of flexible scheduling. In this concept, each Payload Operations Control Center (POCC) will possess a Space Network User POCC Interface (SNUPI) to support the development and management of flexible requests. Flexible requests express the flexibility, constraints, and repetitious nature of the user's communications requirements. Flexible scheduling is expected to improve SN resource utilization and user satisfaction, as well as reduce the effort to produce and maintain a schedule. A prototype testbed has been developed to better understand flexible scheduling as it applies to the SN. This testbed consists of a SNUPI workstation, an SN scheduler, and a flexible request language that conveys information between the two systems. All three are being evaluated by operations personnel. Benchmark testing is being conducted on the scheduler to quantify the productivity improvements achieved with flexible requests.

Happell, Nadine↗

Applications of dynamic scheduling technique to space related problems: Some case studies

The paper discusses the applications of 'Dynamic Scheduling' technique, which has been invented for the scheduling of Flexible Manufacturing System, to two space related scheduling problems: operation scheduling of a future space transportation system, and resource allocation in a space system with limited resources such as space station or space shuttle.

Nakasuka, Shinichi↗

i-SAIRAS '90; Proceedings of the International Symposium on Artificial Intelligence, Robotics and Automation in Space, Kobe, Japan, Nov. 18-20, 1990

The present conference on artificial intelligence (AI), robotics, and automation in space encompasses robot systems, lunar and planetary robots, advanced processing, expert systems, knowledge bases, issues of operation and management, manipulator control, and on-orbit service. Specific issues addressed include fundamental research in AI at NASA, the FTS dexterous telerobot, a target-capture experiment by a free-flying robot, the NASA Planetary Rover Program, the Katydid system for compiling KEE applications to Ada, and speech recognition for robots. Also addressed are a knowledge base for real-time diagnosis, a pilot-in-the-loop simulation of an orbital docking maneuver, intelligent perturbation algorithms for space scheduling optimization, a fuzzy control method for a space manipulator system, hyperredundant manipulator applications, robotic servicing of EOS instruments, and a summary of astronaut inputs on automation and robotics for the Space Station Freedom.

Source record↗