Search NASA⌕ Search

SEARCH · Search NASA

Results for “Shutdown Initiating Events”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

52 records · Page 3

Decommissioning, Dismantling and Disarming: a Unique Information Showroom Inside the G2 Reactor at Marcoule Centre (France) - 12068

The paper aims at presenting the new information showroom called 'Escom G2' (for 'Espace Communication') inaugurated by the French Atomic Energy and Alternative Energies Commission (CEA) in spring 2011. This showroom is settled directly inside the main building of the G2 nuclear reactor: a facility formerly dedicated to weapon-grade plutonium production since the late 1950's at the Marcoule nuclear centre, in south of France. After its shutdown, and reprocessing of the last spent fuels, a first dismantling step was successfully completed from 1986 to 1996. Unique in France and in Europe, Escom G2 is focused on France dismantling expertise and its action for disarmament. This showroom comprises of a 300-square meters permanent exhibition, organized around four themes: France strategy for disarmament, decommissioning and dismantling technical aspects, uranium and plutonium production cycles. Each of these topics is illustrated with posters, photos, models and technical pieces from the dismantled plants. It is now used to present France's action in disarmament to highly ranked audiences such as: state representatives, diplomats, journalists... The paper explains the background story of this original project. As a matter of fact, in 1996 France was the first nuclear state to decide to shut down and dismantle its fissile material production facilities for nuclear weapons. First, the paper presents the history of the G2 reactor in the early ages of Marcoule site, its operating highlights as well as its main dismantling operations, are presented. In Marcoule, where the three industrial-scale reactors G1, G2 and G3 used to be operated for plutonium production (to be then reprocessed in the nearby UP1 plant), the initial dismantling phase has now been completed (in 1980's for G1 and in 1996 for G2 and G3). The second phase, aimed at completely dismantling these three reactors, will restart in 2020, and is directly linked to the opening of a future national storage facility for irradiated graphite waste. Then, the paper recalls communication events and official visits hosted in Pierrelatte and Marcoule, following a formal invitation from the French President Mr. Nicolas Sarkozy. These visits, which were organized in order to illustrate the irreversibility of these dismantling operations, allowed visitors to discovers places that used to be former highly classified areas. Three official visits were organized in 2008 and 2009 for representatives of the Conference on Disarmament Member States, non-governmental experts and journalists. All participants visited the dismantled uranium enrichment plant in Pierrelatte, the G2 reactor and the UP1 plant in Marcoule. The visits were successful and visitors were especially impressed by the G2 reactor and its massive industrial architecture, symbolic of the early ages of nuclear history. In late 2010, this feedback convinced CEA Military Application Directorate (CEA DAM) that a permanent showroom could be installed inside the reactor, making it possible to preserve the cultural value of this historical landmark, and to continue its ongoing effort of communication and outreach. The paper explains the design of this concept: the museography project with a professional designer, the communication material conception and the features of such an original place. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improved Beam Loss Accounting with Fast Data Acquisition (DAQ) Chassis

Identifying the source of beam loss events in the CE-BAF accelerator can be a challenging task. However, with our new prototype system, this task becomes more effi-cient. The system, developed in the fall of 2022, utilizes a dispersive beam position monitor (BPM) and the exist-ing switched electrode electronics BPM hardware. Previ-ously a commercial off-the-shelf data acquisition (DAQ) system was employed to capture BPM wire signals at a sample rate of 20 kS/s. The fast shutdown signal triggered the system, which disables the beam at the injector. Analysis of beam position and energy variation before a beam loss event was used to determine if the beam loss event was associated with an energy transient. The proto-type system, implemented using National Instruments hardware and LabVIEW® software, relied on a software trigger. Manual post-processing was required to ascertain whether the fault was due to an un-tripped cavity with a gradient or phase transient. This work focuses on deploying a Fast DAQ Chassis to monitor BPM hardware in real time and during beam loss events. This system was originally developed and in-stalled in CEBAF to monitor the time-domain RF control signals in the legacy analog RF systems. This technology was leveraged to also monitor BPM signals. As the new system employs a hardware trigger, developing tools to automatically identify faults linked to energy transients unrelated to cavity faults will be straightforward. This paper will discuss the project's initial updates, underlin-ing the crucial role of each member of our team in this achievement

Tiskumara, J.↗

Elementary Particle Physics (Final Report)

vATLAS and the LHC are delivering on the promise of discovery physics at the high energy frontier. Using 4.8 fb -1 of 2011 $\sqrt{s}$=7 TeV data and the first 5.8 fb -1 of 2012 $\sqrt{s}$=8 TeV data, ATLAS published the observation of a new particle with a mass of 126 GeV with a significance of 5.9σ that is compatible with a Standard Model (SM) Higgs. The LHC is outperforming initial projections for the 2012 run, and ATLAS is on track to integrate ~20 fb -1 of proton-proton collisions in 2012 before Long Shutdown 1 (LS1) begins in Spring 2013. University of Texas at Dallas (UTD) physicists will complete work on two ATLAS analyses this fall. The first is the search for the gauge bosons of a hypothesized dark sector. For 2011 data, UTD is responsible for the dark photon search in the electron-jet channel, and we are looking forward to an expanded leadership role in the dark photon search using the full 2012 data set. Our second analysis interest is the study of X/Y/Z exotic states having cc content, which builds on our experience in this field from the BABAR experiment After completing a measurement of the Xc(3872) production cross section this fall, we will search for evidence of the Z(4430)+ which is reported by Belle but not confirmed by BABAR. The UTD group has played a strong role in ATLAS operations, with group members serving as Pixel Run Coordinator, ATLAS Shift Leader, and Pixel/Inner Detector Shifter. For most of the current 3-year funding cycle, a group member coordinated the development of the Pixel DAQ code, and another continues to build and maintain the data quality monitoring (DQM) application that is used by the Inner Detector control room shifter. Additionally, members of our group take Pixel on-call expert shifts for DQM and DAQ. We led an optoboard lifetime study to assess concerns of premature on-detector VCSEL failure using the Pixel working prototype detector at CERN. Physicists based at UTD participated through Pixel Offline DQM and ATLAS Distributed Computing Operations Shifts (ADCoS) During Summer 2012, UTD joined upgrade activities in preparation for LS1. We took a major role in the testing of Electro-Readout (ER) Bundle testing for new Service Quarter Panels (nSQPs), and we developed two utilities to measure the timing jitter and bit error rate of the Pixel readout chain for use commissioning Pixel detector upgrades. During BABAR's heyday, the UTD group pioneered the use of e + e - annihilation events with hard Initial State Radiation (ISR) to study the charm threshold region, and we carried out the first BABAR double-cc analysis. Our most recent ISR paper, written in collaboration with A. Palano (Bari) is Exclusive Production of Ds + Ds - , D S *+ Ds - , and Ds *+ Ds *- via e+ e- Annihilation with Initial-State-Radiation was published in Physical Review D 82, 052004 (2010). Work continues on a study of ISR Λc + Λc - production, and a new search to establish and study double-ss production is starting.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Study of Neutron-Induced Stable and Radioactive Nuclides in a Post Detonation Urban Environment

In the event of a nuclear detonation in an urban environment, response time for triage by first responders, and forensic sample collection are of the utmost importance. When it comes to response planning, decision makers within the government need to have the most up-to-date information regarding several quantities of interest so that the maximum amount of lives can be saved. Quantities of interest in a post-detonation scenario include the spatial distribution of neutron-induced stable and radioactive isotopes in the environment, fallout patterns, blast and re damage zones [1]. The UMPRINDER toolkit is developed to calculate the prompt neutron-induced stable and radioactive isotopes in the surrounding environment in a nuclear forensics post-detonation scenario. The distribution of these isotopes in the environment can be used to provide guidance in determining best routes for first responders in order to minimize dose, debris sample collection routes for subsequent radiochemical analysis, and provide initial radionuclide inventories to fallout codes in order to improve fallout zone fidelity. Other methods have approached isotope transmutation on unstructured mesh for the fusion community concerning shutdown dose rates associated with fusion reactors. UMPRINDER is the first method to be focused on calculating some of the quantities of interest for the nuclear forensics and weapon effects communities.

61 RADIATION PROTECTION AND DOSIMETRY↗

Effect of Delayed Energy Release on Power Normalization in Reactor Depletion Calculations

Reactor depletion calculations typically assume that the thermal power of the reactor is directly proportional to the instantaneous fission rate within the core. However, approximately 7% of the sensible energy released per fission comes from the radioactive decay of fission products, which occurs alter the fission event. Thus, the assumed direct relationship between reactor power and fission rate implies that all fission products have reached secular equilibrium within the core. In situations where fission product concentrations have not reached equilibrium (e.g., shortly after reactor startup or a change in reactor power during operation), the delayed energy release due to fission product decay creates a nonlinear relationship between reactor power and fission rate. This non-linear relationship, in turn, affects the neutron flux levels and fuel consumption rate required to maintain the desired thermal power output for the reactor. For example, during initial startup of a commercial light water reactor the apparent energy release per fission is ∼7{sup %} lower than the typical value of ∼200 MeV/fission due to the potential energy stored in radioactive fission products. As a consequence, the flux level (and, therefore, uranium consumption rate) in the reactor must be correspondingly higher to preserve the desired reactor power. As the reactor operates and fission product inventories increase, the decay heat produced by the reactor will rise, producing a corresponding increase in the apparent energy release per fission. The characteristic time-dependent behavior of energy release due to the decay of fission products (i.e., decay heat) following reactor startup, shutdown, or changes in reactor power is well-known and widely-used in reactor safety analyses. However, to our knowledge, the effects of time-dependent decay heating rates on reactor depletion calculations have not been thoroughly investigated. In this paper, we present a simple methodology for explicitly accounting for delayed energy release due to the decay of fission products in reactor depletion calculations. In the proposed method, the balance equations for fission product decay energy are incorporated into the depletion coefficient matrix, using a strategy similar to that described by Isotalo in 2016. The modified system of differential equations can be solved via a matrix exponential approximation (or other suitable numerical method) to yield solutions for both nuclide densities and decay energy emission densities as a function of time. Numerical results from the method are presented for simplified (one-group point (0-D) and 1-D) representations of a commercial pressurized water reactor (PWR), in order to estimate the effect of delayed energy release on fuel consumption and flux level immediately following reactor startup.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

AVESTAR Center for Operational Excellence of Electricity Generation Plants

To address industry challenges in attaining operational excellence for electricity generation plants, the U.S. Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) has launched a world-class facility for Advanced Virtual Energy Simulation Training and Research (AVESTARTM). This presentation will highlight the AVESTARTM Center simulators, facilities, and comprehensive training, education, and research programs focused on the operation and control of high-efficiency, near-zero-emission electricity generation plants. The AVESTAR Center brings together state-of-the-art, real-time, high-fidelity dynamic simulators with full-scope operator training systems (OTSs) and 3D virtual immersive training systems (ITSs) into an integrated energy plant and control room environment. AVESTAR’s initial offering combines--for the first time--a “gasification with CO2 capture” process simulator with a “combined-cycle” power simulator together in a single OTS/ITS solution for an integrated gasification combined cycle (IGCC) power plant with carbon dioxide (CO2) capture. IGCC systems are an attractive technology option for power generation, especially when capturing and storing CO2 is necessary to satisfy emission targets. The AVESTAR training program offers a variety of courses that merge classroom learning, simulator-based OTS learning in a control-room operations environment, and immersive learning in the interactive 3D virtual plant environment or ITS. All of the courses introduce trainees to base-load plant operation, control, startups, and shutdowns. Advanced courses require participants to become familiar with coordinated control, fuel switching, power-demand load shedding, and load following, as well as to problem solve equipment and process malfunctions. Designed to ensure work force development, training is offered for control room and plant field operators, as well as engineers and managers. Such comprehensive simulator-based instruction allows for realistic training without compromising worker, equipment, and environmental safety. It also better prepares operators and engineers to manage the plant closer to economic constraints while minimizing or avoiding the impact of any potentially harmful, wasteful, or inefficient events. The AVESTAR Center is also used to augment graduate and undergraduate engineering education in the areas of process simulation, dynamics, control, and safety. Students and researchers gain hands-on simulator-based training experience and learn how the commercial-scale power plants respond dynamically to changes in manipulated inputs, such as coal feed flow rate and power demand. Students also analyze how the regulatory control system impacts power plant performance and stability. In addition, students practice start-up, shutdown, and malfunction scenarios. The 3D virtual ITSs are used for plant familiarization, walk-through, equipment animations, and safety scenarios. To further leverage the AVESTAR facilities and simulators, NETL and its university partners are pursuing an innovative and collaborative R&D program. In the area of process control, AVESTAR researchers are developing enhanced strategies for regulatory control and coordinated plant-wide control, including gasifier and gas turbine lead, as well as advanced process control using model predictive control (MPC) techniques. Other AVESTAR R&D focus areas include high-fidelity equipment modeling using partial differential equations, dynamic reduced order modeling, optimal sensor placement, 3D virtual plant simulation, and modern grid. NETL and its partners plan to continue building the AVESTAR portfolio of dynamic simulators, immersive training systems, and advanced research capabilities to satisfy industry’s growing need for training and experience with the operation and control of clean energy plants. Future dynamic simulators under development include natural gas combined cycle (NGCC) and supercritical pulverized coal (SCPC) plants with post-combustion CO2 capture. These dynamic simulators are targeted for use in establishing a Virtual Carbon Capture Center (VCCC), similar in concept to the DOE’s National Carbon Capture Center for slipstream testing. The VCCC will enable developers of CO2 capture technologies to integrate, test, and optimize the operation of their dynamic capture models within the context of baseline power plant dynamic models. The objective is to provide hands-on, simulator-based “learn-by-operating” test platforms to accelerate the scale-up and deployment of CO2 capture technologies. Future AVESTAR plans also include pursuing R&D on the dynamics, operation, and control of integrated electricity generation and storage systems for the modern grid era. Special emphasis will be given to combining load-following energy plants with renewable and distributed generating supplies and fast-ramping energy storage systems to provide near constant baseload power.

97 MATHEMATICS AND COMPUTING↗

WIPP - February 2014 operational events and the compliance re-certification application (CRA) 2014 - 15293

On Wednesday, February 5, 2014, an underground mine fire involving a salt haul truck occurred at the Waste Isolation Pilot Plant (WIPP). There were 86 workers in the mine when the fire occurred. All workers were evacuated. Nine days later, on Friday, February 14, 2014, there was an incident in the underground repository at WIPP which resulted in the release of americium and plutonium from one or more transuranic (TRU) waste containers into the environment. The release was detected by an underground continuous air monitor and then directed through high-efficiency particulate air (HEPA) filter banks located in the surface exhaust building. However, a measurable portion bypassed the HEPA filters via leakage through two ventilation system dampers and was discharged directly to the environment from an exhaust duct. No personnel were determined to have received external contamination; however, some individuals that were on site were identified through bioassay to have initially tested positive for low level amounts of internal contamination. Trace amounts of americium and plutonium were detected off-site.While significant to day-to-day operations, these events have no impact to the long-term performance of the repository. Because WIPP's re-certification is based solely on the post-closure performance of the repository (40 CFR 191, Subparts B and C), these recent events do not affect the long-term performance predictions or its technical and scientific basis. In this paper we will further explore the requirements for WIPP's re-certification, and the basis for our contention that the recent WIPP operational events do not impact long-term repository performance or have any implications on salt as a geologic disposal media, and that re-certification efforts should continue uninterrupted. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SMART SiC Power ICs: Scalable, Manufacturable, and Robust Technology for SiC Power Integrated Circuits (Final Technical Report)

This collaborative project was initiated with the goal of developing Scalable, Manufacturable, and Robust Technology for SiC Power Integrated Circuits (SMART SiC Power ICs). In pursuit of this objective, innovative designs and fabrication processes were implemented, enabling the development of large-scale (>1 cm²) SiC Complementary Metal-Oxide-Semiconductor (CMOS) integrated circuits and high-voltage (400–600 V) lateral power MOSFETs (HV-LDMOS) on 150 mm 4H-SiC substrates. The resulting SMART SiC Power ICs are tailored to support a wide range of applications requiring diverse voltage and power levels, including automotive systems, industrial equipment, electronic data processing, energy harvesting, and power conditioning. To achieve the proposed ‘SMART’ technology for SiC ICs, the team focused on 1) the Development of highly scalable CMOS (with high channel mobilities for n-type and p-type MOSFETs), LDMOS (~600V, 10A rated), and IC technologies, 2) Establishment of a manufacturable process baseline in a production-grade-, 150mm, SiC fabrication facility, and 3) Demonstration of SMART SiC ICs. The project initially comprised of fabricating 5 lots. In lot 1 monolithic integration using a single process was achieved. Here, we were able to successfully accomplish Integrated HV NMOSFET with LV CMOS on N-epi/N+ Substrate. The HV NMOS demonstrated a Breakdown Voltage (BV) more than 600V. Circuit demonstration of CMOS was also another achievement from this lot. In lot 2, priority was in place for isolation and integration. Here we addressed the isolation concerns and integrated the HV NMOS and LV CMOS using the N-epi/P-epi/N+ substrate. Similar to the lot 1, we were able to achieve a BV of 600 V for HV NMOS. Optimized gate oxide process with high channel mobilities, better gate oxide reliability, development of SPICE models, successful ohmic process development, novel wafer area saving design layouts, P+ isolation schemes with channeling implantations and high temperature operational circuits demonstrations are some of the key highlights from lot 1 and lot2. In lot 3, discrete device performances of HV NMOS with a BV ~700V and reliable LV CMOS performances were achieved. Also, novel architectural solutions were successfully implemented to suppress the electric field crowding at the gate oxide for reliable operations. In lot 4, half bridge power driver ICs with a conversion efficiency of (target 90% to 95%) in the 1-5MHz switching frequency range for output power between 25 W to 3 kW have been included in. However, due to the unfortunate events of sudden foundry shutdown (SiCamore Semi) the processing of lot 4 wafers came to a complete stop (January 2024). Arrangements have recently been made to shift the fabrication to another foundry, General Electric Aerospace. The fabrication process now on course (as of December 2024). Characterizations are delayed due to this unfortunate circumstance. The proposed trench architectural-based devices and ICs (lot 5) underwent modifications from the original project proposal. This change was necessitated by limitations in the availability of trench-based processes at commercial production-grade fabrication facilities in the US. Apart from above achievements, a Process Development Kit (PDK) was successfully developed for planar type SiC CMOS/LDMOS.

42 ENGINEERING↗

STS-51 pad abort. OV103-engine 2033 (ME-2) fuel flowmeter sensor open circuit

The STS-51 initial launch attempt of Discovery (OV-103) was terminated on KSC launch pad 39B on 12 Aug. 1993 at 9:12 AM E.S.T. due to a sensor redundancy failure in the liquid hydrogen system of ME-2 (Engine 2033). The event description and time line are summarized. Propellant loading was initiated on 12 Aug. 1993 at 12:00 AM EST. All space shuttle main engine (SSME) chill parameters and Launch Commit Criteria (LCC) were nominal. At engine start plus 1.34 seconds a Failure Identification (FID) was posted against Engine 2033 for exceeding the 1800 spin intra-channel (A1-A2) Fuel Flowrate sensor channel qualification limit. The engine was shut down at 1.50 seconds followed by Engines 2032 and 2030. All shut down sequences were nominal and the mission was safely aborted. SSME Avionics hardware and software performed nominally during the incident. A review of vehicle data table (VDT) data and controller software logic revealed no failure indications other than the single FID 111-101, Fuel Flowrate Intra-Channel Test Channel A disqualification. Software logic was executed according to requirements and there was no anomalous controller software operation. Immediately following the abort, a Rocketdyne/NASA failure investigation team was assembled. The team successfully isolated the failure cause to an open circuit in a Fuel Flowrate Sensor. This type of failure has occurred eight previous times in ground testing. The sensor had performed acceptably on three previous flights of the engine and SSME flight history shows 684 combined fuel flow rate sensor channel flights without failure. The disqualification of an Engine 2 (SSME No. 2033) Fuel Flowrate sensor channel was a result of an instrumentation failure and not engine performance. All other engine operations were nominal. This disqualification resulted in an engine shutdown and safe sequential shutdown of all three engines prior to ignition of the solid boosters.

Source record↗

Present status and future plans for the restoration of Fukushima Daiichi NPS

There are many challenges at Fukushima-Daiichi Nuclear Power Station, even though the reactors have reached a condition equivalent to cold shutdown. Cooling of reactors is maintained using the circulating cooling system, which contains some temporary equipments and consists of long pipes reaching to about 4 km. The reliability of the cooling system is one of the keys to maintaining the stabilized condition. Therefore a variety of activities, such as the replacement of hoses with more durable pipes, is being conducted to improve the reliability of the cooling system. The first fuel bundle will be removed from the spent fuel pool (SFP) at Unit 4 in November, which is earlier than the original plan. In preparation for the fuel debris removal, investigations inside the primary containment vessel (PCVs) have been initiated. Visual images and other data, such as water level, radiation dose and temperature inside the PCVs, have been taken at Units 1 and 2. The issue of excessive contaminated water is the most urgent one. About 400 tons of ground water is intruding into the turbine and reactor buildings every day. This intruding water mixes with the core cooling water and becomes a large amount of contaminated water. It has to be stored on the site, despite the fact that some radioactive nuclides remain in it even after cesium is removed. The amount of water stored on the site has reached about 290,000 tons so far and is increasing. Counter measures for this issue, such as reduction of intruding water, cleaning up of the contaminated water and securing of water storage tanks, are under consideration and being conducted. However, certain recent events, such as the power loss of the SFP cooling systems and leakage of contaminated water from the underground tanks, have raised concerns about reliability. Vulnerabilities have been evaluated systematically and counter measures are being taken. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Initial Core Physics and Safety Analyses Supporting the Versatile Test Reactor

The Versatile Test Reactor (VTR) is a proposed integrated facility for investigations into the behavior of fuels and materials subjected to high, fast neutron fluxes prototypical of fast reactor environments. Detailed design of the reactor is currently being performed by a group of U.S. National Laboratories, including Argonne National Laboratory. The current design of the reactor is a 300 MW sodium-cooled pool-type fast reactor fueled with ternary U-20Pu-10Zr metallic fuel. This report documents reactor core physics and preliminary safety analyses that have been performed. The reference VTR core has 313 assembly positions, 66 of which contain fuel assemblies. The remaining assembly positions are loaded with reflector, shield, control rod duct, and test assemblies. Ten positions are available in the reference design for experimental or test assemblies, however the VTR will support test assemblies in any position in the core for alternate core loadings. The performance of the reference VTR core has been assessed for an assumed equilibrium cycle. The core power distribution and reactivity feedback coefficients have been calculated. Preliminary assessments of the reactivity coefficients have shown that each of them results in a negative reactivity change for increasing temperatures. Safety analysis of a VTR layout has been performed using the SAS4A/SASSYS-1 fast reactor safety analysis code. A model has been developed to represent the current core design and a reference heat transport system design. The model has been used to simulate and perform analysis of protected and unprotected loss of heat sink, station blackout, and transient overpower accident scenarios. These scenarios represent the three main ways to perturb the reactor core, through changes to the core inlet temperature, mass flow rate, or reactivity insertions and are credible bounding scenarios for the evaluated transient categories. The results of these simulations have been assessed against simplified criteria for Anticipated Operational Occurrences for the protected transients and for Beyond Design Basis Events for the unprotected transients. Because the primary heat transport system is able to transition quickly and effectively to natural circulation and because the shutdown heat removal system provides sufficient heat rejection capability, large margins for all criteria were predicted for all protected transients. Large margins were also predicted for the unprotected loss of heat sink and station blackout transients due to the strong negative reactivity feedbacks generated by the core. Because of the high power density in the reactor, smaller fuel melting margins are predicted for the unprotected transient overpower accident.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

STS-55 pad abort: Engine 2011 oxidizer preburner augmented spark igniter check valve leak

The STS-55 initial launch attempt of Columbia (OV102) was terminated on KSC launch pad A March 22, 1993 at 9:51 AM E.S.T. due to violation of an ME-3 (Engine 2011) Launch Commit Criteria (LCC) limit exceedance. The event description and timeline are summarized. Propellant loading was initiated on 22 March, 1993 at 1:15 AM EST. All SSME chill parameters and launch commit criteria (LCC) were nominal. At engine start plus 1.44 seconds, a Failure Identification (FID) was posted against Engine 2011 for exceeding the 50 psia Oxidizer Preburner (OPB) purge pressure redline. The engine was shut down at 1.50 seconds followed by Engines 2034 and 2030. All shut down sequences were nominal and the mission was safely aborted. The OPB purge pressure redline violation and the abort profile/overlay for all three engines are depicted. SSME Avionics hardware and software performed nominally during the incident. A review of vehicle data table (VDT) data and controller software logic revealed no failure indications other than the single FID 013-414, OPB purge pressure redline exceeded. Software logic was executed according to requirements and there was no anomalous controller software operation. Immediately following the abort, a Rocketdyne/NASA failure investigation team was assembled. The team successfully isolated the failure cause to the oxidizer preburner augmented spark igniter purge check valve not being fully closed due to contamination. The source of the contaminant was traced to a cut segment from a rubber O-ring which was used in a fine clean tool during valve production prior to 1992. The valve was apparently contaminated during its fabrication in 1985. The valve had performed acceptably on four previous flights of the engine, and SSME flight history shows 780 combined check valve flights without failure. The failure of an Engine 3 (SSME No. 2011) check valve to close was sensed by onboard engine instruments even though all other engine operations were normal. This resulted in an engine shutdown and safe sequential shutdown of all three engines prior to ignition of the solid boosters.

Source record↗

Utilizing FLEX Equipment for O&M Cost Reduction in Nuclear Power Plants

There are many ways of reducing the O&M costs; this work presents an innovative framework of reducing O&M costs by utilizing the onsite Flex equipment at NPPs. Flex strategies were postulated by the U.S. Nuclear Regulatory Commission (NRC) in the wake of Fukushima Dai-ichi accident to address beyond-design-basis accidents and improve plant flexibility. Onsite Flex includes equipment such as portable pumps, generators, batteries, compressors, and other supporting equipment or tools, all stored in a dedicated and secure building designed to withstand external hazards. In the past years, several NPPs have invested in procuring and maintaining the onsite Flex asset that stands unutilized most of the time. Recently there have been active efforts to develop strategies through which NPPs can take credit for the Flex equipment. This work focuses on identifying areas where Flex equipment can be utilized during normal plant operation and develop a framework that would aide in reduction of O&M costs without impacting plant safety. Earlier work in the current project, published in INL/EXT 18 51531, had presented the risk- and cost-analysis framework for utilizing FLEX portable equipment during technical specification required shutdown due to component failure. The licensee event report (LER) database of the NRC shows that the commercial NPPs in the US reported 86 technical specification required shutdowns since year 2010. When a component failure or unavailability leads to a technical specification required shutdown, the NPPs suffers both direct costs in terms of loss of revenue arising from the loss of generation and indirect costs in form of reporting and inspection required by the NRC. The earlier work developed the following framework and implemented it on a demonstration probabilistic risk assessment (PRA) model to utilize the portable Flex equipment when a component failure could potentially lead to a technical specification required shutdown: 1. Identify the components, the failure or unavailability of which would result in a 10 CFR 50.73(a)(2)(i)A-reportability requirement, postulated by the NRC for technical specification required shutdown to be reported in NRC’s LER database. 2. Identify the Flex equipment that can be utilized as a standby to the failed component. 3. Develop a probabilistic risk assessment (PRA) model that incorporates the Flex equipment within the current plant PRA model. 4. Perform PRA calculations to determine change in core damage frequency and change in risk-informed allowable outage time. 5. Perform cost-benefit analysis to determine the economic feasibility of implementing the Flex equipment The current work, presented in this report, implement the above framework in a plant PRA model obtained from a US commercial nuclear power plant by prestaging onsite FLEX equipment as a redundancy to the existing auxiliary feedwater system, and pre-coordinating with offsite FLEX centers. The new configuration increased the allowable outage time by about a fifty percent overall for the diesel generator being out of service. The benefits to NPPs of utilizing the Flex equipment during normal operations, and performing the PRA developed in this work, include: 1. A risk-informed plant shutdown alternative to the current technical specification required shutdown. 2. Extension of allowable outage time to initiate technical specification required shutdown. 3. Reducing economic impact of component failure, avoiding plant shutdown, and maximizing generation. 4. Save the direct and indirect costs associated with technical specification required shutdown.

42 ENGINEERING↗

FY23 Report on Water NSTF Testing at Two-Phase Conditions: Off-normal Scenarios

Under support from the Department of Energy (DOE) and the Office of Advanced Reactor Technologies (ART), a large-scale test facility has been constructed at Argonne National Laboratory to generate NQA-1 qualified validation data for passive decay heat removal systems in advanced reactors. The Natural convection Shutdown heat removal Test Facility (NSTF) reflects key features of a ½ scale, water-based, Reactor Cavity Cooling System (RCCS) and is intended to study the behavior, bound performance, and ultimately guide design decisions for passive decay heat removal systems for advanced reactors. In addition to the experimental activities detailed in this report, a supportive computational modeling effort is on-going which has been demonstrated to significantly strengthen the experimental program while also improving accuracy of the computer models. Together these create a mutually beneficial relationship integral to meeting the overall program objective of examining the heat removal performance of the RCCS concept. This report details the experimental activities and upgrades performed during the program’s fifth year of water-based operation. The theme of this year of testing was examining off-normal scenarios. In practice, that meant examining scenarios with blockages or other design basis conditions. From a maintenance and capability standpoint that meant assessing valving options for implementing blockages, assessing drain and refill capabilities, and ensuring in all cases that operators could safely, efficiently, and repeatably bring the facility to an off-normal condition and return it to the normal operating state. In one notable case, no solution existed, nor was a solution commercially available, that met the facility needs for implementing blockages within the two-phase region of the chimney. A valve and feedthrough were custom-designed for NSTF to operate submerged in saturated water while being safely actuated from outside the tank. The fifth year of testing included eight matrix tests consisting of 162 hours of active heating, 9,735 kWh of electrical heating, with seven tests classified as Accepted per NQA-1 and one as Trending. All matrix tests were performed at two-phase flow conditions. The power parametric series from previous years was extended to include another scenario with a decay load equivalent to 1.75 MWt, full scale, further resolving the system flow oscillation response as a function of input power. A depletion test was performed to extend previous work and examine the system’s approach to stagnation and geysering that were not previously observed. This test began at an initial inventory level of 50%, prototypic power of 2.1 MWt, and employed an accelerated drain of 0.75 gpm plus boiloff until stagnation conditions were achieved and multiple geysering events were recorded. Further exploring the geysering phenomenon was a separate effects test examining static boiling in the risers and chimney. This static boiling test was performed at 48 kWe, a higher power than testing in the previous year, and included enhancements to the drain system to remove inventory in a better-controlled and more reliable manner. Two tests were performed, at prototypic conditions of 1.4 MWt and 2.4 MWt, respectively, examining the system response to throttled conditions in the singlephase region of the piping. A ball valve immediately before he riser inlet header was increasingly throttled, progressing the system through a repeatable pattern of two-phase oscillations and stable regimes before ultimately inducing stagnation and geysering. Concluding the year, two tests were performed at baseline conditions of 70% initial inventory level and 2.1 MWt of prototypic decay heat to examine both repeatability and the response to throttling within the two-phase region, at the inventory tank inlet using the custom valve mentioned above. The first such test repeated transient operating conditions and revealed significant sensitivity t

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

FY24 Report on Water NSTF Testing: Lower Tank Inlet Piping Configuration

The following report serves as a summary of the accomplishments and testing results by the Natural convection Shutdown heat removal Test Facility (NSTF) experimental program over the past 12-month period. A major activity included reconfiguration of the chimney piping geometry which altered the discharge position into the tank from the original 50% tank height to a new lower position at a 10.9% tank height. This modification increases the volume of available coolant thus extending long-term operating capacity, however also results in a decreased liquid driving head which has the potential to reduce the natural circulation efficiency and decrease overall performance. Examination of the tradeoffs for these two configurations is an area of interest for RCCS designers and drove planned test activities this year. Ten matrix tests were performed in FY24, totaling 195 hours of heated operations and 12.9 MWh of electrical heating throughout the year, with eight classified as Accepted per NQA-1 and two classified as Trending. Testing prior to the facility reconfiguration examined the facility response to throttling at the tank inlet, demonstrating increased sensitivity of flow instabilities to throttling within the two-phase region when compared to throttling at the lower sensitivity single-phase inlet region. Testing after the chimney reconfiguration began with a baseline test at conditions of 80% inventory fill and prototypic thermal power input of 2.1 MW t . In addition to establishing a reference for nominal system behavior and performance, repeat testing with multiple subsequent runs demonstrated strong repeatability between tests performed at the same conditions in this new configuration. These tests also examined if influences would occur to system behavior with installation of new higher-resolution instrumentation within the upper chimney. In this critical region where boiling and flashing phenomena dominate, the test results provided confidence that the new instrumentation does not uncharacteristically influence the observed behaviors. An inventory parametric series was then initiated to examine system behavior with the new chimney configuration at six varying initial inventory levels, ranging from high 80% to low 20% fill. Two-phase oscillations with similar peak and mean flow rates were observed when comparing to the previous mid tank configuration. Generally, similar system response trends with inventory were also observed, such as two phase oscillations suppressing as inventories were lowered. However, in one absolute inventory comparison at the highest fill of 80%, flow oscillations saw a gradual growth over the 4 hours of two-phase operation in the new lower tank inlet configuration, opposite of the gradual dampening observed in the mid tank inlet configuration. This can be attributed to, in part, a greater hydrostatic head pressure above the two-phase discharge region where the boiling front is developed. Furthermore, the change resulted in greater sensitivity to liquid degassing phenomena during single-phase heating, causing loop instabilities to form which trigged moderate flow degradation during the period approaching saturation and boiling conditions. This behavior had been observed previously under some conditions but was a common occurrence in recent testing with the newer lower tank inlet configuration. Initial observations from these first data sets suggest an overall larger window of stability for the mid tank inlet configuration compared to the lower tank inlet. Lastly, the lowest inventory fill test was repeated over an extended testing window to examine depletion behavior. Natural circulation flow and effective heat removal performance were observed during most of the testing period; only after the tank became fully drained (0% fill) did flow stagnate and violent geysering events occur. This early observation confirms one relative advantage over the mid tank inlet configuration, which stagnated under comparable conditions at ~20% inventory remaining in the tank.

42 ENGINEERING↗

NPP Simulators for Coupled Thermal and Electric Power Dispatch

The Light Water Reactor Sustainability (LWRS) program within the United States Department of Energy supports extending the operation of the U.S. commercial nuclear power plant (NPP) fleet. Within the LWRS program, the Flexible Plant Operation and Generation (FPOG) Pathway works to diversify the revenue streams of light water reactors (LWRs) by opening opportunities for the co-generation of non-electric products in addition to supplying electrical power to the grid. Recent events have added greater motivation to these efforts. For example, the recent Inflation Reduction Act (IRA) passed by the U.S. federal government offers substantial tax incentives for producing clean hydrogen, the technology readiness level of dispatchable and high-efficiency hydrogen production has dramatically increased in a short time, and societal response to world climate change is driving a transition away from fossil fuels. Producing hydrogen with maximum efficiency using nuclear power requires dispatching both electrical and thermal power from the nuclear plant to the hydrogen plant, so testing concepts of operations for combined electrical and thermal power dispatch (TPD) from an NNP to a hydrogen plant is of interest. This report documents achievement of the Light Water Reactor Sustainability (LWRS) program milestone “Install and demonstrate a vendor-developed simulator on the Human Systems Simulation Laboratory (HSS) for dispatch of LWR electrical power to a close-coupled electrolysis plant” with a due date of Dec. 22, 2022. Several factors provide motivation for this effort. Coupling the power generation deck of a nuclear power plant to a hydrogen production facility introduces new possibilities for operational transients that must be addressed. In particular, the performance of the integrated system during startup and shutdown of the hydrogen production facility, as well as offnormal conditions, need to be evaluated to ensure there are no adverse effects on the operation of the existing NPP. The concept of operations involving the NPP, the hydrogen plant, and the electric power grid must be tested using NPP simulators and operating procedures that have been modified for TPD operations. These tests must also include dynamic simulations of the coupled tertiary thermal and electric loads as well as coordinated activities with NPP operators, tertiary load operators and grid power coordinators. The report summarizes progress in developing and testing full-scope NPP simulators at the HSSL, including a generic BWR simulator from GSE Systems, Inc. and generic PWR simulator from Westinghouse. In the case of the TPD-GBWR Simulator from GSE Systems, Inc., a BWR is thermally coupled to a high temperature electrolysis (HTE) plant that produces hydrogen and oxygen from de-ionized water. The hydrogen plant is not explicitly simulated but only included as a transient heat sink. A thermal power dispatch (TPD) system transfers heat between the steam systems at the BWR and the hydrogen plant. Operational results from two versions of the modified simulator are presented. The first version uses synthetic oil as a heat transfer fluid in a closed delivery heat loop (DHL) that generates steam at the hydrogen plant. The second version uses steam as the heat transfer fluid in a delivery steam line (DSL) to provide steam to the hydrogen plant. For both versions, the estimated thermal power delivery distance is approximately one kilometer. The amount of thermal power dispatched in the simulators is 15% of the total reactor thermal power such that the simulators provide a tool to study the feasibility of coupling a BWR to industrial processes that benefit from a combination electrical and thermal power dispatch. Ongoing work within a CRADA is also developing a full-scope PWR simulator provided by Westinghouse for both thermal and electric power coupling. This simulator is based on a PWR plant with two three-loop Westinghouse reactors. Westinghouse PWRs are sufficiently similar that a simulator of a three-loop reactor is an appropriate representation for two-loop and four-loop PWR reactors. The three-loop simulator will initially be modified for close-coupling to a 100 MW HTE hydrogen production plant that will require approximately 25 MW of thermal power while operating at its maximum rated capacity. The simulator testing will include full coupling to dynamic simulations of a hydrogen production plant and a representative bulk electric grid. The simulator provided by Westinghouse is similar to the GPWR simulator that INL has already obtained from GSE Systems but has a few important added benefits. First, the Westinghouse simulator is based on digital controls and has additional screens that can be called up to show parameter trends to assist operators in decision-making. The Westinghouse simulator also has upgrades to the controls and hardware representations, such as valve actuators, that make it more realistic and flexible in terms of accurately sim

99 GENERAL AND MISCELLANEOUS↗