Search NASA⌕ Search

SEARCH · Search NASA

Results for “Site Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Making a Reliable Actuator Faster and More Affordable

Before any rocket is allowed to fly and be used for a manned mission, it is first test-fired on a static test stand to verify its flight readiness. NASA s Stennis Space Center provides testing of Space Shuttle Main Engines, rocket propulsion systems, and related components with several test facilities. It has been NASA s test-launch site since 1961. The testing stations age with time and repeated use; and with aging comes maintenance; and with maintenance comes expense. NASA has been seeking ways to lower the cost of maintaining the stations, and has aided in the development of an improved reliable linear actuator that arrives onsite quickly and costs less money than other actuators. In general terms, a linear actuator is a servomechanism that supplies a measured amount of energy for the operation of another mechanical system. Accuracy, reliability, and speed of the actuator are critical to performance of the entire system, and these actuators are critical components of the engine test stands. Partnership An actuator was developed as part of a Dual-Use Cooperative Agreement between BAFCO, Inc., of Warminister, Pennsylvania, and Stennis. BAFCO identified four suppliers that manufactured actuator components that met the rigorous testing standards imposed by the Space Agency and then modified these components for application on the rocket test stands. In partnership with BAFCO, the existing commercial products size and weight were reworked, reducing cost and delivery time. Previously, these parts would cost between $20,000 and $22,000, but with the new process, they now run between $11,000 and $13,000, a substantial savings, considering NASA has already purchased over 120 of the units. Delivery time of the cost-saving actuators has also been cut from over 20 to 22 weeks to within 8 to 10 weeks. The redesigned actuator is commercially available, and the company is successfully supplying them to customers other than NASA.

Source record↗

STS-114: Discovery Day 13 Mission Status Briefing

LeRoy Cain, STS-114 Ascent/Entry Flight Director, takes a solo stand with the Press in this briefing. He reports that the vehicle is in good shape, consumable status is excellent, and the shuttle crew is in high spirits and preparing for de-orbit and landing. LeRoy and his team have completed the entry system check up, flight control check up, reactor control system check up, and noted that all are at nominal performance; weather forecast is very good, the Entry team is ready and looking forward to de-orbit and landing at the Kennedy Space Center on Monday, August 8th. Re-entry, personal feelings, Columbia accident, data gathering, consumable situation, back up sites, weather, communication block out, night and day landing, and Commander Collin's piloting skills during night flight are some of the topics covered with the News media.

Source record↗

EVA Suit Studies: Human Forward Contamination Project

Background: NASA Strategic Knowledge Gap B5: Forward Contamination for Mars. Issue: we have knowledge gaps!: Whether / how microbes are released from crewed pressure systems. Why do we care?: Informs Mars operational concepts - How to protect the science; Informs architecture decisions - How “open” Environmental Control and Life Support (ECLS) systems are; Informs landing site selection decisions - How close we can land / operate to where life may be present. Project goal: get some data to fill in these gaps: Data will help determine whether we’re ready to go to Mars, or if we need to change our systems or operational designs.

Rucker, Michelle↗

An Examination of Materials in Launch Vehicle Propulsion

The primary activities carried out for this effort used Mr. Glasgow's communication skills and materials expertise. He worked closely with both the Space Transportation Project Office and the Materials Division, preparing summaries of the weekly Space Transportation Project Office activities for use by the Materials and the Structures Divisions and for distribution to other portions of the GRC. Mr. Glasgow participated in systems analysis and planning sessions of the Program Office, serving as both a representative of the microtechnologists and as a reviewer of the macrotechnologies involved in proposed new launch vehicles. He helped define the technology readiness level of those new vehicle concepts and provided especially critical expertise to provide realistic technical assessments to various vehicle proponents. While a major portion of his work was performed at the GRC site, travel was required to Langley and to Nashville. In addition to the written contributions mentioned above, he presented summaries of Materials Division activities and interests in industry briefings. Mr. Glasgow continued his interest in the copper-chromium-niobium alloy system, a system originally identified by him as a potential rocket engine material and now chosen as baseline for two new rocket engine designs by the leading US builder of rocket engines.

Source record↗

KSC ground operations planning for Space Station

At the Kennedy Space Center (KSC) in Florida, processing facilities are being built and activated to support the processing, checkout, and launch of Space Station elements. The generic capability of these facilities will be utilized to support resupply missions for payloads, life support services, and propellants for the 30-year life of the program. Special Ground Support Equipment (GSE) is being designed for Space Station hardware special handling requirements, and a Test, Checkout, and Monitoring System (TCMS) is under development to verify that the flight elements are ready for launch. The facilities and equipment used at KSC, along with the testing required to accomplish the mission, are described in detail to provide an understanding of the complexity of operations at the launch site. Assessments of hardware processing flows through KSC are being conducted to minimize the processing flow times for each hardware element. Baseline operations plans and the changes made to improve operations and reduce costs are described, recognizing that efficient ground operations are a major key to success of the Space Station.

Lyon, J. R.↗

SNOOPI: Demonstrating P-Band Reflectometry from Orbit

SigNals Of Opportunity: P-band Investigation (SNOOPI)will be the first on-orbit demonstration of remote sensing using Signals of Opportunity (SoOp) in P-band (240-380 MHz). P-band is needed to penetrate through dense vegetation and into the root zone. The longer wavelength of P-band also increases the unwrapping interval for phase observations. These observations hold the potential for spaceborne remote sensing of root-zone soil moisture (RZSM) and snow water equivalent(SWE), two variables identified as priorities in the 2017-2027 Decadal Survey for Earth Science and Applications from Space. SNOOPI will provide in-space validation of both the P-band SoOp technique and a science instrument prototype. SNOOPI technology validation goals will be met by targeting observations within 9 km of the SMAP calibration/validation sites in the continental United States. A secondary priority is collection of continuous phase data over snow-covered regions. These goals are evaluated under constraints of a limited data budget and mission lifetime, with a launch readiness in early2022. Updates on the development of measurement models and mission planning to support SNOOPI are provided. Aground-based station will be deployed to monitor the non-cooperative sources, in order to reduce risk due to uncertainty in knowledge of the broadcast power, spectrum shape, and orbital position.

J L Garrison↗

Instrument Science Experiments on the SNOOPI P-Band Reflectometry Mission

SigNals Of Opportunity: P-band Investigation (SNOOPI) will be the first in-space validation of P-band (240–380 MHz) SoOp techniques and a prototype science instrument. These techniques have the potential to enable remote sensing of root-zone soil moisture (RZSM) and snow water equivalent (SWE). SNOOPI technology validation goals will be met by targeting observations within 9 km of the SMAP calibration/validation sites in the continental United States. A second priority is collection of continuous phase data over snow-covered regions. These goals are evaluated under constraints of a limited data budget and mission lifetime, with a launch readiness in August 2022. This presentation will review the instrument science plans aimed at achieving the validation objectives defined for the mission. Mission planning and data processing approaches are described.

Soil Moisture↗

Preparing the Mars Relay Network for the Arrival of the Perseverance Rover at Mars

The Perseverance rover represents NASA’s latest achievement in Mars exploration. Landing successfully on 18 Feb 2021, the rover’s transmitted data during its entry, descent, and landing (EDL) were captured by the Mars Reconnaissance Orbiter (MRO) and the Mars Atmosphere and Volatile Evolution (MAVEN) orbiter. This data, broadcast in near-realtime to the world, allowed everyone to share in the excitement (and “terror”) of the day. The images returned thereafter included the first images of the new landing site, video of the landing itself taken from a variety of vantage points, and eventually the historic images of the first powered flight on another planet. Behind the scenes, the return of that data to Earth was accomplished via Mars orbiters operated by NASA and ESA, using three different ground tracking networks. Considered together, this Mars Relay Network (MRN) enabled the successful, timely, and unobtrusive return of the rover’s data. This paper describes the preparations taken by the participants of the MRN in anticipation of the arrival of Perseverance at Mars. These were not only focused on successfully acquiring the rover’s critical event telemetry during its EDL, but also on readying the network to return the rover’s data on an ongoing basis as it pursued its mission objectives. Included is a brief description of the MRN, which represents a highly successful international collaboration and continues as critical infrastructure for NASA’s and ESA’s ongoing Mars exploration. Also summarized are the activities performed prior to EDL, including landing site reconnaissance and mission test and training activities; those activities performed on EDL day, especially the recording, return, and processing of the rover’s critical event telemetry; and those activities that are now being performed on an ongoing basis during the rover’s surface operations, including an outline of the planning processes that enable relay services. Finally, a description of the performance of the network to-date on behalf of the Perseverance rover is given, summarizing the success of the network to provide support to both it and other spacecraft on the surface of Mars.

Srnka, Evan↗

RESOLVE Projects: Lunar Water Resource Demonstration and Regolith Volatile Characterization

To sustain affordable human and robotic space exploration, the ability to live off the land at the exploration site will be essential. NASA calls this ability in situ resource utilization (ISRU) and is focusing on finding ways to sustain missions first on the Moon and then on Mars. The ISRU project aims to develop capabilities to technology readiness level 6 for the Robotic Lunar Exploration Program and early human missions returning to the Moon. NASA is concentrating on three primary areas of ISRU: (1) excavating, handling, and moving lunar regolith, (2) extracting oxygen from lunar regolith, and (3) finding, characterizing, extracting, separating, and storing volatile lunar resources, especially in the permanently shadowed polar craters. To meet the challenges related to technology development for these three primary focus areas, the Regolith and Environment Science and Oxygen and Lunar Volatile Extraction (RESOLVE) project was initiated in February 2005, through funding by the Exploration Systems Mission Directorate. RESOLVE's objectives are to develop requirements and conceptual designs and to perform breadboard concept verification testing of each experiment module. The final goal is to deliver a flight prototype unit that has been tested in a relevant lunar polar environment. Here we report progress toward the third primary area creating ways to find, characterize, extract, separate, and store volatile lunar resources. The tasks include studying thermal, chemical, and electrical ways to collect such volatile resources as hydrogen, water, nitrogen, methane, and ammonia. We approached this effort through two subtasks: lunar water resource demonstration (LWRD) and regolith volatile characterization (RVC).

Source record↗

Research on Spectroscopy, Opacity, and Atmospheres

To make my calculations more readily accessible I have set up a web site cfaku5.harvard.edu that can also be accessed by FTP. it has 5 9GB disks that hold all of my atomic and diatomic molecular data, my tables of distribution function opacities, my grids of model atmospheres, colors, fluxes, etc, my program that are ready for distribution, most of my recent papers. Atlases and computed spectra will be added as they are completed. New atomic and molecular calculations will be added as they are completed. I got my atomic programs that had been running on a Cray at the San Diego Supercomputer Center to run on my Vaxes and Alpha. I started with Ni and Co because there were new laboratory analyses that included isotopic and hyperfine splitting. Those calculations are described in the appended abstract for the 6th Atomic Spectroscopy and oscillator Strengths meeting in Victoria last summer. A surprising finding is that quadrupole transitions have been grossly in error because mixing with higher levels has not been included. I now have enough memory in my Alpha to treat 3000 x 3000 matrices. I now include all levels up through n=9 for Fe I and 11, the spectra for which the most information is available. I am finishing those calculations right now. After Fe I and Fe 11, all other spectra are "easy", and I will be in mass production. ATL;LS12, my opacity sampling program for computing models with arbitrary abundances, has been put on the web server. I wrote a new distribution function opacity program for workstations that replaces the one I used on the Cray at the San Diego Supercomputer Center. Each set of abundances would take 100 Cray hours costing $100,000. 1 ran 25 cases. Each of my opacity CDs contains three abundances. I have a new program -iinning on the Alpha that takes about a week. I am going to have to get a faster processor or I will have to dedicate a whole workstation just to opacities.

Kurucz, Robert L.↗

Research on Spectroscopy, Opacity, and Atmospheres

With this funding I produced a web site kurucz.harvard.edu that can also be accessed by FTP. it has a 73GB disk that holds all of my atomic and diatomic molecular data, my tables of distribution function opacities, my grids of model atmospheres, colors, fluxes, etc., my programs that are ready for distribution, and most of my recent papers. Atlases and computed spectra will be added as they are completed. New atomic and molecular calculations will be added as they are completed.

Kurucz, Robert L.↗

Research on Spectroscopy, Opacity, and Atmospheres

A web site has been set up to make the calculations accessible; (i.e., cfakus.harvard.edu) This data can also be accessed by FTP. It has all of the atomic and diatomic molecular data, tables of distribution function opacities, grids of model atmospheres, colors, fluxes, etc, programs that are ready for distribution, and most of recent papers developed during this grant. Atlases and computed spectra will be added as they are completed. New atomic and molecular calculations will be added as they are completed. The atomic programs that had been running on a Cray at the San Diego Supercomputer Center can now run on the Vaxes and Alpha. The work started with Ni and Co because there were new laboratory analyses that included isotopic and hyperfine splitting. Those calculations are described in the appended abstract for the 6th Atomic Spectroscopy and oscillator Strengths meeting in Victoria last summer. A surprising finding is that quadrupole transitions have been grossly in error because mixing with higher levels has not been included. All levels up through n=9 for Fe I and II, the spectra for which the most information is available, are now included. After Fe I and Fe II, all other spectra are "easy". ATLAS12, the opacity sampling program for computing models with arbitrary abundances, has been put on the web server. A new distribution function opacity program for workstations that replaces the one used on the Cray at the San Diego Supercomputer Center has been written. Each set of abundances would take 100 Cray hours costing $100,000.

Kurucz, Robert L.↗

Project Hyreus: Mars sample return mission utilizing in situ propellant production

Project Hyreus is an unmanned Mars sample return mission that utilizes propellants manufactured in situ from the Martian atmosphere for the return voyage. A key goal of the mission is to demonstrate the considerable benefits of using indigenous resources and to test the viability of this approach as a precursor to manned Mars missions. The techniques, materials, and equipment used in Project Hyreus represent those that are currently available or that could be developed and readied in time for the proposed launch date in 2003. Project Hyreus includes such features as a Mars-orbiting satellite equipped with ground-penetrating radar, a large rover capable of sample gathering and detailed surface investigations, and a planetary science array to perform on-site research before samples are returned to Earth. Project Hyreus calls for the Mars Landing Vehicle to land in the Mangala Valles region of Mars, where it will remain for approximately 1.5 years. Methane and oxygen propellant for the Earth return voyage will be produced using carbon dioxide from the Martian atmosphere and a small supply of hydrogen brought from Earth. This process is key to returning a large Martian sample to Earth with a single Earth launch.

Abrego, Anita↗

Project Hyreus: Mars Sample Return Mission Utilizing in Situ Propellant Production

Project Hyreus is an unmanned Mars sample return mission that utilizes propellants manufactured in situ from the Martian atmosphere for the return voyage. A key goal of the mission is to demonstrate the considerable benefits of using indigenous resources and to test the viability of this approach as a precursor to manned Mars missions. The techniques, materials, and equipment used in Project Hyreus represent those that are currently available or that could be developed and readied in time for the proposed launch date in 2003. Project Hyreus includes such features as a Mars-orbiting satellite equipped with ground-penetrating radar, a large rover capable of sample gathering and detailed surface investigations, and a planetary science array to perform on-site research before samples are returned to Earth. Project Hyreus calls for the Mars Landing Vehicle to land in the Mangala Valles region of Mars, where it will remain for approximately 1.5 years. Methane and oxygen propellant for the Earth return voyage will be produced using carbon dioxide from the Martian atmosphere and a small supply of hydrogen brought from Earth. This process is key to returning a large Martian sample to Earth with a single Earth launch.

Bruckner, A. P.↗

FASTSAT a Mini-Satellite Mission...A Way Ahead

The Fast Affordable Science and Technology Spacecraft (FASTSAT) is a mini-satellite weighing less than 150 kg. FASTSAT was developed as government-industry collaborative research and development flight project targeting rapid access to space to provide an alternative, low cost platform for a variety of scientific, research, and technology payloads. The initial spacecraft was designed to carry six instruments and launch as a secondary rideshare payload. This design approach greatly reduced overall mission costs while maximizing the on-board payload accommodations. FASTSAT was designed from the ground up to meet a challenging short schedule using modular components with a flexible, configurable layout to enable a broad range of payloads at a lower cost and shorter timeline than scaling down a more complex spacecraft. The integrated spacecraft along with its payloads were readied for launch 15 months from authority to proceed. As an ESPA-class spacecraft, FASTSAT is compatible with many different launch vehicles, including Minotaur I, Minotaur IV, Delta IV, Atlas V, Pegasus, Falcon 1/1e, and Falcon 9. These vehicles offer an array of options for launch sites and provide for a variety of rideshare possibilities.

Boudreaux, Mark↗

Nutrient Stress Detection in Corn, Using Neural Networks and AVIRIS Hyperspectral Imagery

The US Department of Agriculture (USDA) Agricultural Research Service (ARS) Variable Rate (VRAT) Nitrogen Application site in Shelton, Nebraska, represents a well-documented, corn-growing quarter section. The USDA VRAT site is used to systematically study nutrient stress in corn by varying sub-plot application of fertilizer. The field has four replicates of five blocks that vary by nitrogen treatment from 0-kg/ha to 200-kg/ha in 50-kg/ha increments. The treatment blocks are set out in a randomized, complete block design. Typically, the VRAT is planted in a ridge till, monoculture corn and is watered by a central pivot irrigation system on a three-day period. Since water stress can increase spectral reflectance from corn leaves, it is important that the N-application plots be adequately watered so that only nutrient-related stress will predominate. A figure shows imagery of the USDA VRAT site with the fertilizer amounts for each block shown. Low-altitude Airborne Visible/Infrared Imaging Spectrometer (AVIRIS) hyperspectral imagery was acquired over the Shelton, Nebraska, VRAT site on July 22, 1999. The overflight produced 3-meter pixels with 224 spectral bands. Ground personnel supported the mission with measurements at the time of the overflight. The image data was pre-processed at JPL before being sent out to an investigator. The data arrived radiometrically corrected, allowing ready application of an atmospheric correction procedure. The Atmosphere Removal Program (ATREM) was used to perform an atmospheric correction. The AVIRIS imagery after ATREM correction was output as relative reflectance. This relative reflectance file was scaled by an empirical line procedure to provide reflectances that matched closely those measured in the field.

Estep, Lee↗

Surface Operations: Two Case Studies of Simulated Lunar Operations

In September 2007, a team of scientists and engineers from several NASA centers participated in a field exercise at Meteor Crater, Arizona. The tests in this field exercise utilized recently developed robots of varying scales and capabilities and humans in pressurized space suits. Two examples of operations performed in the field are presented: a surface operations scenario involving suited crew supported by a number of mobile robots and setup operations for accessing a crater. The surface operations scenario simulated the end of a crew sortie and involved the following agents: 1) Suit subjects from Johnson Space Center s (JSC) advanced spacesuit laboratory 2) JSC's unpressurized crewed rover testbed, SCOUT 3) The Jet Propulsion Laboratory s (JPL) rough terrain, payload carrying robot, ATHLETE 4) JSC's Astronaut assist robot, Robonaut 5) Ames Research Center's (ARC) inspection robot, K-10. Operations began with ATHLETE positioning a pressurized rover compartment (PRC) as two crew members drove the SCOUT unpressurized rover from the field. The crew dismounted SCOUT, walked to the PRC for recharging. Robonaut then removed a sample box from the SCOUT equipment tray. K-10 then performed a drive around inspection of SCOUT, assembling a mosaic image. Lastly, the SCOUT vehicle was remotely driven to the next site. The setup operations for crater access scenario involved ATHLETE and Robonaut. This scenario began with Robonaut approaching ATHLETE and extracting a tether line. ATHLETE then extracted a drill and drilled an anchor into the surface. Robonaut then reconnected the tether to the anchor and backed away. ATHLETE is then ready to descend into the crater. This descending into the crater step is currently in the planning phase.

Bluethmann, William J.↗

Proceedings of the 16th Project Integration Meeting

The principal achievement of the Low Cost Solar Array Project in 1980 was the attainment of $2.80/Wp Technical Readiness, and that processes and equipment now commercially available can make possible a deliverable product in 1982. A prototype array for intermediate load applications was demonstrated using frameless modules. It was proof tested to 40 lb/sq ft loading, and priced at $24/sq m, including array fabrication, module installation, shipping to the site and site installation for quantities of 20 MW.

Mcdonald, R. R.↗