Search NASA⌕ Search

SEARCH · Search NASA

Results for “Space FOM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

52 records · Page 3

Pterodactyl: Trade Study for an Integrated Control System Design of a Mechanically Deployed Entry Vehicle

This paper presents a trade study method used to evaluate and down-select from a set of guidance and control (G&C) system designs for a mechanically deployable entry vehicle (DEV). The Pterodactyl project, funded by NASA's Space Technology Mission Directorate (STMD), was prompted by the challenge to develop an effective G&C system for a vehicle without a backshell, which is the case for DEVs. For the DEV, the project assumed a specific aeroshell geometry pertaining to an Adaptable, Deployable, Entry Placement Technology (ADEPT) vehicle, which was successfully developed by STMD prior to this study. The Pterodactyl project designed three different G&C systems for the vehicle's precise entry, which this paper briefly discusses. This paper details the Figures of Merit (FOMs) and metrics used during the course of the project's G&C system assessment. Each G&C configuration was traded against the three FOMs categories: G&C system performance, affordability and life cycle costs, and safety and mission success. The relative importance of the FOMs was determined from the Analytical Hierarchy Process (AHP), which was used to develop weights that were combined with quantitative design metrics and engineering judgement to rank the G&C systems against one another. This systematic method takes into consideration the project's input while simultaneously reducing unintentional judgement bias and ultimately was used to select a single G&C design for the project to continue pursuing in the next prototyping and testing phase.

Alunni, Antonella I.↗

Lunar Regolith Characterization for Simulant Design and Evaluation using Figure of Merit Algorithms

NASA's Marshall Space Flight Center (MSFC), in conjunction with the United States Geological Survey (USGS) and aided by personnel from the Astromaterials Research and Exploration Science group at Johnson Space Center (ARES-JSC), is implementing a new data acquisition strategy to support the development and evaluation of lunar regolith simulants. The first analyses of lunar regolith samples by the simulant group were carried out in early 2008 on samples from Apollo 16 core 64001/64002. The results of these analyses are combined with data compiled from the literature to generate a reference composition and particle size distribution (PSD)) for lunar highlands regolith. In this paper we present the specifics of particle type composition and PSD for this reference composition. Furthermore. we use Figure-of-Merit (FoM) routines to measure the characteristics of a number of lunar regolith simulants against this reference composition. The lunar highlands regolith reference composition and the FoM results are presented to guide simulant producers and simulant users in their research and development processes.

Schrader, Christian M.↗

Application of Analytical Hierarchy Process for Narrowing Down Nep Candidate Reactor Designs

NASA is currently studying the possibility of human exploration of Mars in the late 2030s timeframe using a hybrid nuclear electric propulsion (NEP)/chemical propulsion system. Present analyses indicate such a mission could require a reactor power system in the range of 2 to 6 MWe operating for approximately 3 years. At present, the Technology Readiness Levels (TRL) of key NEP technologies are still low, implying that significant technology development activities must be undertaken prior to making informed design selections for an integrated propulsion system. NASA’s Space Nuclear Propulsion (SNP) project has recently undertaken an in-depth effort to identify NEP candidate technologies and determine the required developmental work to mature these technologies to the point where they could realistically support the design and assembly of a full NEP system. A version of the Analytical Hierarchy Process is being employed to narrow the technology candidates for SNP investment planning. This multi-attribute decision-making process relies on quantified technical inputs and the judgement of Subject Matter Experts (SMEs) to evaluate technology options against key technical and programmatic Figures-of-Merit (FOM) at the subsystem and optimized system level. The process and an example evaluation of nuclear fuel/moderator combinations in a sodium heat pipe honeycomb-geometry reactor concept are described. The evaluation and analysis methodology described in this paper can be employed for pairwise comparisons between reactor concepts and technology choices as new data become available.

Dasari V Rao↗

2007 Lunar Regolith Simulant Workshop Overview

The National Aeronautics and Space Administration (NASA) vision has as a cornerstone, the establishment of an Outpost on the Moon. This Lunar Outpost will eventually provide the necessary planning, technology development, and training for a manned mission to Mars in the future. As part of the overall activity, NASA is conducting Earth-based research and advancing technologies to a Technology Readiness Level (TRL) 6 maturity under the Exploration Technology Development Program that will be incorporated into the Constellation Project as well as other projects. All aspects of the Lunar environment, including the Lunar regolith and its properties, are important in understanding the long-term impacts to hardware, scientific instruments, and humans prior to returning to the Moon and living on the Moon. With the goal of reducing risk to humans and hardware and increasing mission success on the Lunar surface, it is vital that terrestrial investigations including both development and verification testing have access to Lunar-like environments. The Marshall Space Flight Center (MSFC) is supporting this endeavor by developing, characterizing, and producing Lunar simulants in addition to analyzing existing simulants for appropriate applications. A Lunar Regolith Simulant Workshop was conducted by MSFC in Huntsville, Alabama, in October 2007. The purpose of the Workshop was to bring together simulant developers, simulant users, and program and project managers from ETDP and Constellation with the goals of understanding users' simulant needs and their applications. A status of current simulant developments such as the JSC-1A (Mare Type Simulant) and the NASA/U.S. Geological Survey Lunar Highlands-Type Pilot Simulant (NU-LHT-1M) was provided. The method for evaluating simulants, performed via Figures of Merit (FoMs) algorithms, was presented and a demonstration was provided. The four FoM properties currently being assessed are: size, shape, density, and composition. Some of the Workshop findings include: simulant developers must understand simulant users' needs and applications; higher fidelity simulants are needed and needed in larger quantities now; simulants must be characterized to allow "apples-to-apples" comparison of test results; simulant users should confer with simulant experts to assist them in the selection of simulants; safety precautions should be taken in the handling and use of simulants; shipping, storing, and preparation of simulants have important implications; and most importantly, close communications among the simulant community must be maintained and will be continued via telecoms, meetings, and an annual Lunar Regolith Simulant Workshop.

McLemore, Carole A.↗

2007 Lunar Regolith Simulant Workshop Overview

The National Aeronautics and Space Administration (NASA) vision has as a cornerstone, the establishment of an Outpost on the Moon. This Lunar Outpost will eventually provide the necessary planning, technology development, and training for a manned mission to Mars in the future. As part of the overall activity, NASA is conducting Earth-based research and advancing technologies to a Technology Readiness Level (TRL) 6 maturity under the Exploration Technology Development Program that will be incorporated into the Constellation Project as well as other projects. All aspects of the Lunar environment, including the Lunar regolith and its properties, are important in understanding the long-term impacts to hardware, scientific instruments, and humans prior to returning to the Moon and living on the Moon. With the goal of reducing risk to humans and hardware and increasing mission success on the Lunar surface, it is vital that terrestrial investigations including both development and verification testing have access to Lunar-like environments. The Marshall Space Flight Center (MSFC) is supporting this endeavor by developing, characterizing, and producing Lunar simulants in addition to analyzing existing simulants for appropriate applications. A Lunar Regolith Simulant Workshop was conducted by MSFC in Huntsville, Alabama, in October 2007. The purpose of the Workshop was to bring together simulant developers, simulant users, and program and project managers from ETDP and Constellation with the goals of understanding users' simulant needs and their applications. A status of current simulant developments such as the JSC-1A (Mare Type Simulant) and the NASA/U.S. Geological Survey Lunar Highlands-Type Pilot Simulant (NU-LHT-1 M) was provided. The method for evaluating simulants, performed via Figures of Merit (FoMs) algorithms, was presented and a demonstration was provided. The four FoM properties currently being assessed are: size, shape, density, and composition. Some of the Workshop findings include: simulant developers must understand simulant users' needs and applications; higher fidelity simulants are needed and needed in larger quantities now; simulants must be characterized to allow "apples-to-apples" comparison of test results; simulant users should confer with simulant experts to assist them in the selection of simulants; safety precautions should be taken in the handling and use of simulants; shipping, storing, and preparation of simulants have important implications; and most importantly, close communications among the simulant community must be maintained and will be continued via telecoms, meetings, and an annual Lunar Regolith Simulant Workshop.

McLemore, Carole A.↗

Composite Payload Fairing Structural Architecture Assessment and Selection

This paper provides a summary of the structural architecture assessments conducted and a recommendation for an affordable high performance composite structural concept to use on the next generation heavy-lift launch vehicle, the Space Launch System (SLS). The Structural Concepts Element of the Advanced Composites Technology (ACT) project and its follow on the Lightweight Spacecraft Structures and Materials (LSSM) project was tasked with evaluating a number of composite construction technologies for specific Ares V components: the Payload Shroud, the Interstage, and the Core Stage Intertank. Team studies strived to address the structural challenges, risks and needs for each of these vehicle components. Leveraging off of this work, the subsequent Composites for Exploration (CoEx) effort is focused on providing a composite structural concept to support the Payload Fairing for SLS. This paper documents the evaluation and down selection of composite construction technologies and evolution to the SLS Payload Fairing. Development of the evaluation criteria (also referred to as Figures of Merit or FOMs), their relative importance, and association to vehicle requirements are presented. A summary of the evaluation results, and a recommendation of the composite concept to baseline in the Composites for Exploration (CoEx) project is presented. The recommendation for the SLS Fairing is a Honeycomb Sandwich architecture based primarily on affordability and performance with two promising alternatives, Hat stiffened and Fiber Reinforced Foam (FRF) identified for eventual program block upgrade.

Krivanek, Thomas M.↗

Evidence for eddy formation in the eastern Arabian Sea during the northeast monsoon

The seasonal formation of a large (500-800 km diameter) anticyclonic eddy in the upper 300-400 m of the eastern Arabian Sea during the northest monsoon period (December-April) is indicated fom hydrographic and satellite altimetry sea level observations, as well as from numerical model experiments. The center of the eddy circulation is approximately 10 deg N, 70 deg E, just to the west of the north-south Laccadive Island chain. In this paper the eddy is called the Laccadive High (LH). In some ways it is like a mirrorlike counterpart to the Great Whirl that develops during the southwest monsoon of the Somali coast (western Arabian Sea). The LH occurs at the same latitude but on the opposite side of the basin during the reversed monsoon. It is different from the Great Whirl, however, in its formation process, its intensity, and its decay. The hydrographic data obtained from surveys all during a single season give sufficiently close station spacing to allow reasonable contouring of the geopotential surfaces and of the properties within and around the LH region with minimum time aliasing. The Geostat altimeter record extends over 4 years, during which the seasonal variability of the LH indicates a dynamic relief of approximately 15-20 cm, which is in good agreement with the hydrographics observations. The altimetry time series also suggests a westward translation of the LH by January with a subsequent dissipation in midbasin. The model used is a wind-forced three-layer primitive equation model which depicts a LH agreement with the timing, position, and amplitude of both the hydrographic and altimetric measurements. The numerical simulation includes a passive tracer located in the Western Bay of Bengal; the western advection of the tracer around the south coasts of Sri Lanka and India in December and January is consistent with the appearance of low-salinity water observed to extend into the Arabian Sea during this period. The modeling studies suggest that both local and remote forcing are important in formation of the LH.

Bruce, John G.↗

Using Open Standards and NASA Open Source Simulation Tools to Model Artemis Base Camp Mission Timelines

The United States’ National Aeronautics and Space Administration (NASA) has announced that the Artemis Program will return humans to the Moon, establishing a persistent presence with the Artemis Base Camp (ABC), and extend human exploration to Mars. The NASA Exploration Systems Simulations (NExSyS) team at NASA’s Johnson Space Center is using internationally developed simulation interoperability standards and NASA open source simulation tools to support Artemis concept, analysis, designs, development, training, and ultimately operations. The NExSyS team has been tasked to support early ABC architecture and mission analysis using mission time lines developed by the crew operations mission planning team. The NExSyS team is developing a distributed simulation framework with initial Artemis element implementations to model the ABC mission timelines using the international simulation interoperability standard High Level Architecture (HLA), the Simulation Interoperability Standards Organization’s Space Reference Federation Object Model (SpaceFOM), the NASA open source Trick Simulation Environment, and another NASA open source interface package called TrickHLA. The ABC architecture is composed of a number of key surface elements and resources. Some examples of modeled elements (also known as entities) are landers, habitats, rovers, logistics carriers, and astronauts. Some examples of modeled transferable and consumable resources are power, water, oxygen, nitrogen, scientific samples, and food. These entities and resources are modeled in a collection of individual simulations called Federates. A coordinated collection of interoperable federates is called a Federation and when these federates are tied together in a coordinated simulation run, it is referred to as a Federation Execution. The federates communicate through HLA using data exchange formats defined by a collection of machine readable files called Federation Object Models (FOMs). These FOM files are based on extensions to the SpaceFOM. This enables the instantiation and sharing of objects and interactions between federates in the federation. These provide for entity and resource tracking, object transfer, and data collection. Federate interactions are used to trigger events and notify federates of entity or resource transfers. For the initial implementation, the constituent federates are Trick-based simulations that use TrickHLA to provide the required HLA-base interoperability. These Trick-based simulations provide the required modeling for the individual Artemis elements along with the associated element resources. These federates provide a means to explore traverses between surface elements and exploration sites as scheduled in a mission timeline and explore the affects traverse times have on the overall mission timeline. The mission time lines are modeled using a Trick input file event handling capabilities. Each timeline operation is handled as individual simulation events, and triggered based on previous event status, time of operation, and simulated task completions. In addition, the ABC Federation can be used to perform Monte Carlo analysis. The Monte Carlo tool can vary the inputs, timings, and malfunctions to show how various contingencies in the mission can affect the mission timeline.

Keaton Craig Dodd↗

Complex Decision-Making Applications for the NASA Space Launch System

The Space Shuttle program is ending and elements of the Constellation Program are either being cancelled or transitioned to new NASA exploration endeavors. NASA is working diligently to select an optimum configuration for the Space Launch System (SLS), a heavy lift vehicle that will provide the foundation for future beyond LEO large ]scale missions for the next several decades. Thus, multiple questions must be addressed: Which heavy lift vehicle will best allow the agency to achieve mission objectives in the most affordable and reliable manner? Which heavy lift vehicle will allow for a sufficiently flexible exploration campaign of the solar system? Which heavy lift vehicle configuration will allow for minimizing risk in design, test, build and operations? Which heavy lift vehicle configuration will be sustainable in changing political environments? Seeking to address these questions drove the development of an SLS decisionmaking framework. From Fall 2010 until Spring 2011, this framework was formulated, tested, fully documented, and applied to multiple SLS vehicle concepts at NASA from previous exploration architecture studies. This was a multistep process that involved performing FOM-based assessments, creating Pass/Fail gates based on draft threshold requirements, performing a margin-based assessment with supporting statistical analyses, and performing sensitivity analysis on each. This paper discusses the various methods of this process that allowed for competing concepts to be compared across a variety of launch vehicle metrics. The end result was the identification of SLS launch vehicle candidates that could successfully meet the threshold requirements in support of the SLS Mission Concept Review (MCR) milestone.

Lyles, Garry↗

Complex Decision-Making Applications for the NASA Space Launch System

The Space Shuttle program is ending and elements of the Constellation Program are either being cancelled or transitioned to new NASA exploration endeavors. The National Aeronautics and Space Administration (NASA) has worked diligently to select an optimum configuration for the Space Launch System (SLS), a heavy lift vehicle that will provide the foundation for future beyond low earth orbit (LEO) large-scale missions for the next several decades. Thus, multiple questions must be addressed: Which heavy lift vehicle will best allow the agency to achieve mission objectives in the most affordable and reliable manner? Which heavy lift vehicle will allow for a sufficiently flexible exploration campaign of the solar system? Which heavy lift vehicle configuration will allow for minimizing risk in design, test, build and operations? Which heavy lift vehicle configuration will be sustainable in changing political environments? Seeking to address these questions drove the development of an SLS decision-making framework. From Fall 2010 until Spring 2011, this framework was formulated, tested, fully documented, and applied to multiple SLS vehicle concepts at NASA from previous exploration architecture studies. This was a multistep process that involved performing figure of merit (FOM)-based assessments, creating Pass/Fail gates based on draft threshold requirements, performing a margin-based assessment with supporting statistical analyses, and performing sensitivity analysis on each. This paper discusses the various methods of this process that allowed for competing concepts to be compared across a variety of launch vehicle metrics. The end result was the identification of SLS launch vehicle candidates that could successfully meet the threshold requirements in support of the SLS Mission Concept Review (MCR) milestone.

Lyles, Garry↗

High-Power, High-Speed Electro-Optic Pockels Cell Modulator

Electro-optic modulators rely on a change in the index of refraction for the optical wave as a function of an applied voltage. The corresponding change in index acts to delay the wavefront in the waveguide. The goal of this work was to develop a high-speed, high-power waveguide- based modulator (phase and amplitude) and investigate its use as a pulse slicer. The key innovation in this effort is the use of potassium titanyl phosphate (KTP) waveguides, making the highpower, polarization-based waveguide amplitude modulator possible. Furthermore, because it is fabricated in KTP, the waveguide component will withstand high optical power and have a significantly higher RF modulation figure of merit (FOM) relative to lithium niobate. KTP waveguides support high-power TE and TM modes - a necessary requirement for polarization-based modulation as with a Pockels cell. High-power fiber laser development has greatly outpaced fiber-based modulators in terms of its maturity and specifications. The demand for high-performance nonlinear optical (NLO) devices in terms of power handling, efficiency, bandwidth, and useful wavelength range has driven the development of bulk NLO options, which are limited in their bandwidth, as well as waveguide based LN modulators, which are limited by their low optical damage threshold. Today, commercially available lithium niobate (LN) modulators are used for laser formatting; however, because of photorefractive damage that can reduce transmission and increase requirements on bias control, LN modulators cannot be used with powers over several mW, dependent on wavelength. The high-power, high-speed modulators proposed for development under this effort will enable advancements in several exciting fields including lidarbased remote sensing, atomic interferometry, free-space laser communications, and others.

Hawthorne, Justin↗

ESAS-Derived Earth Departure Stage Design for Human Mars Exploration

The Vision for Space Exploration has set the nation on a course to have humans on Mars as early as 2030. To reduce the cost and risk associated with human Mars exploration, NASA is planning for the Mars architecture to leverage the lunar architecture as fully as possible. This study takes the defined launch vehicles and system capabilities from ESAS and extends their application to DRM 3.0 to design an Earth Departure Stage suitable for the cargo and crew missions to Mars. The impact of a propellant depot in LEO was assessed and sLzed for use with the EDS. To quantitatively assess and compare the effectiveness of alternative designs, an initial baseline architecture was defined using the ESAS launch vehicles and DRM 3.0. The baseline architecture uses three NTR engines, LH2 propellant, no propellant depot in LEO, and launches on the Ares I and Ares V. The Mars transfer and surface elements from DRM 3.0 were considered to be fixed payloads in the design of the EDS. Feasible architecture alternatives were identified from previous architecture studies and anticipated capabilities and compiled in a morphological matrix. ESAS FOMs were used to determine the most critical design attributes for the effectiveness of the EDS. The ESAS-derived FOMs used in this study to assess alternative designs are effectiveness and performance, affordability, reliability, and risk. The individual FOMs were prioritized using the AHP, a method for pairwise comparison. All trades performed were evaluated with respect to the weighted FOMs, creating a Pareto frontier of equivalently ideal solutions. Additionally, each design on the frontier was evaluated based on its fulfillment of the weighted FOMs using TOPSIS, a quantitative method for ordinal ranking of the alternatives. The designs were assessed in an integrated environment using physics-based models for subsystem analysis where possible. However, for certain attributes such as engine type, historical, performance-based mass estimating relations were more easily employed. The elements from the design process were integrated into a single loop, allowing for rapid iteration of subsystem analyses and compilation of resulting designs.

Flaherty, Kevin↗

High Efficiency Thermoelectric Radioisotope Power Systems

The work performed and whose results presented in this report is a joint effort between the University of New Mexico s Institute for Space and Nuclear Power Studies (ISNPS) and the Jet Propulsion Laboratory (JPL), California Institute of Technology. In addition to the development, design, and fabrication of skutterudites and skutterudites-based segmented unicouples this effort included conducting performance tests of these unicouples for hundreds of hours to verify theoretical predictions of the conversion efficiency. The performance predictions of these unicouples are obtained using 1-D and 3-D models developed for that purpose and for estimating the actual performance and side heat losses in the tests conducted at ISNPS. In addition to the performance tests, the development of the 1-D and 3-D models and the development of Advanced Radioisotope Power systems for Beginning-Of-Life (BOM) power of 108 We are carried out at ISNPS. The materials synthesis and fabrication of the unicouples are carried out at JPL. The research conducted at ISNPS is documented in chapters 2-5 and that conducted at JP, in documented in chapter 5. An important consideration in the design and optimization of segmented thermoelectric unicouples (STUs) is determining the relative lengths, cross-section areas, and the interfacial temperatures of the segments of the different materials in the n- and p-legs. These variables are determined using a genetic algorithm (GA) in conjunction with one-dimensional analytical model of STUs that is developed in chapter 2. Results indicated that when optimized for maximum conversion efficiency, the interfacial temperatures between various segments in a STU are close to those at the intersections of the Figure-Of-Merit (FOM), ZT, curves of the thermoelectric materials of the adjacent segments. When optimizing the STUs for maximum electrical power density, however, the interfacial temperatures are different from those at the intersections of the ZT curves, but close to those at the intersections the characteristic power, CP, curves of the thermoelectric materials of the adjacent segments (CP = T(sup 2)Zk and has a unit of W/m). Results also showed that the number of the segments in the n- and p-legs of the STUs optimized for maximum power density are generally fewer than when the same unicouples are optimized for maximum efficiency. These results are obtained using the 1-D optimization model of STUs that is detailed in chapter 2. A three-dimensional model of STUs is developed and incorporated into the ANSYS commercial software (chapter 3). The governing equations are solved, subject to the prescribed

El-Genk, Mohamed↗

Evolving the SpaceFOM: Lessons Learned and Future Development

For over fifty years, simulation has been a cornerstone technology for space missions. In many cases, one single simulator, developed by one team, is not enough to meet the simulation objectives. Astronaut crew training, docking, vehicle testing and complex mission planning all require several simulations to be connected and to interoperate, in order to achieve the goal of the simulation. To facilitate the development of interoperable simulations, an open standard, the SISO SpaceFOM was developed in collaboration between government, industry and academia. The standard was released in 2020. The initial release of SpaceFOM focuses on the core interoperability topics for space simulation: (i) specifying spatial data using several, well defined reference frames, (ii) managing time (including real-time, hard real-time, and as-fast-as-possible execution), (iii) composition of systems with subsystems such as space vehicles, and (iv) execution control, such as initializing, running, pausing, and terminating simulations. A number of requirements for the next version of SpaceFOM have been identified and proposed solutions are already under development. One key area is the object classes used for data exchange, where a richer set of classes have been proposed, based on practical use cases. For time management, the use of variable time resolutions and variable time steps is also proposed. For execution control, save and restore of simulations is considered as well as improved robustness, to handle failing components. A number of clarifications are also under consideration. This paper provides both a forward-looking view of the technical developments underway and a retrospective on the standard's evolution. The authors emphasize that prioritizing core challenges and delivering a practical first version were crucial steps. While not every idea was implemented in the initial release, the timely delivery of a functional standard enabled real-world applications, the growth of a user community, and the collection of valuable insights to shape future versions. The authors look forward to working with the next version of SpaceFOM together with the growing user community.

FOMs↗

Evolving the SpaceFOM: Lessons Learned and Future Development

For over fifty years, simulation has been a cornerstone technology for space missions. In many cases, one single simulator, developed by one team, is not enough to meet the simulation objectives. Astronaut crew training, docking, vehicle testing and complex mission planning all require several simulations to be connected and to interoperate, in order to achieve the goal of the simulation. To facilitate the development of interoperable simulations, an open standard, the SISO SpaceFOM was developed in collaboration between government, industry and academia. The standard was released in 2020. The initial release of SpaceFOM focuses on the core interoperability topics for space simulation: (i) specifying spatial data using several, well defined reference frames, (ii) managing time (including real-time, hard real-time, and as-fast-as-possible execution), (iii) composition of systems with subsystems such as space vehicles, and (iv) execution control, such as initializing, running, pausing, and terminating simulations. The initial release of SpaceFOM focuses on the core interoperability topics for space simulation: (i) specifying spatial data using several, well defined reference frames, (ii) managing time (including real-time, hard real-time, and as-fast-as-possible execution), (iii) composition of systems with subsystems such as space vehicles, and (iv) execution control, such as initializing, running, pausing, and terminating simulations. A number of requirements for the next version of SpaceFOM have been identified and proposed solutions are already under development. One key area is the object classes used for data exchange, where a richer set of classes have been proposed, based on practical use cases. For time management, the use of variable time resolutions and variable time steps is also proposed. For execution control, save and restore of simulations is considered as well as improved robustness, to handle failing components. A number of clarifications are also under consideration. This paper provides both a forward-looking view of the technical developments underway and a retrospective on the standard's evolution. The authors emphasize that prioritizing core challenges and delivering a practical first version were crucial steps. While not every idea was implemented in the initial release, the timely delivery of a functional standard enabled real-world applications, the growth of a user community, and the collection of valuable insights to shape future versions. The authors look forward to working with the next version of SpaceFOM together with the growing user community.

Simulation Interoperability↗

NASA LSII Lunar Simulant Project

Introduction: America has entered a new era of exploration. NASA’s Artemis program will lead humanity forward to the Moon and prepare us for the next giant leap, the exploration of Mars [1]. To champion technologies needed to live on and explore the Moon, NASA’s Space Technology Mission Directorate (STMD) established the Lunar Surface Innovation Initiative (LSII)[2].LSII's technology development portfolio includes: Utilizing the Moon’s resources; Establishing sustainable surface power; Building machinery and electronics that work in extreme environments, like super-chilly permanently shadowed craters; Mitigating lunar dust; Carrying out surface excavation, manufacturing and construction duties; and Extreme access which includes navigating and exploring the surface/subsurface. To support the development and testing of these technologies, LSII created the lunar simulant project, to create and/or acquire low-, medium-and high-fidelity lunar simulants to match the needs of STMD projects at all levels of technology readiness levels (TRL), as well as other NASA programs. There is not one bulk lunar simulant that will satisfy the needs of all projects. NASA's Approach to Simulants: Just as LSII's activities are being implemented through a combination of unique NASA work and public-private partnerships, NASA will work with commercial simulant providers to acquire simulants that meet NASA's needs. If warranted, NASA will develop simulants using government agencies, as was done with the NASA/USGS Lunar Highlands Type (NU-LHT)series of lunar simulants [3].NASA is also collaborating with the Johns Hopkins University Applied Physics Laboratory(JHUAPL) Lunar Surface Innovation Consortium (LSIC) in the development and characterization of lunar simulants [4]. Within NASA, a small team (< 10 people) is coordinating simulant activities across the agency, with team members located at several NASA centers. The overall objective of the project is to procure lunar simulants in sufficient amounts for earth-based testing of subsystems and systems in a variety of environments (i.e., laboratory, high-bay, thermal-vacuum chambers), required for Artemis missions to the Moon, as well as other missions carrying NASA lunar payloads, such as the Commercial Lunar Payload Services (CLPS)program [5]. Lunar Highlands Simulant: NASA's Artemis Program is targeting the lunar south pole region for initial human missions and the Artemis Base Camp. Hence, the LSII lunar simulant project is currently focusing on the mineralogy and properties of lunar highlands regolith [6 and 7]. Plagioclase-rich rocks (e.g., anorthosite, norite) are the dominant constituent in highlands simulants, with Shawmere, Stillwater, and White Mountain anorthosites being used in commercially available simulants. However, because these feedstocks are terrestrial in nature, they include hydrated minerals, carbon-bearing minerals, and other chemical signatures that are not present on the Moon, and these minor mineral assemblages need to be taken into account when trying to understand test procedures and results. Glass Component: While much attention has been placed on the rock/mineral component of lunar simulants, glass is just as important when creating simulants. The glass component in lunar regoliths is often greater than 50% by volume [8]. This component includes impact melt glass, dark matrix breccias, and agglutinates. However, this component is difficult, time-consuming and expensive to make. Most lunar simulants, past and current, have relied on basaltic cinder as a feedstock for glass. Getting better glass components at a lower cost, particularly agglutinates and glass with an anorthositic composition is a near-term objective that the NASA simulant project is trying to address . Characterization: It is extremely important for lunar simulants to be characterized by several analytical methods. Gruener et al. [9] and JHUAPL LSIC [10] conducted initial assessments of some of the commercially available simulants in 2019 and early 2020, before the global pandemic. Further analyses are needed to better quantify important parameters such as, modal mineralogy and glass content, particle shape, and particle size distribution. These quantified results can then be used in determining figures of merit (FOM) that show how well simulants compare to lunar regolith [11 and 12].

J E Gruener↗