Search NASASearch

SEARCH · Search NASA

Results for “Space Shuttle Missions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

725 records · Page 3

Core-Centering of Compound Drops in Capillary Oscillations: Observations on USML-1 Experiments in Space

Using the existing inviscid theories, an attempt is made to explain the centering of the oscillating liquid shell. Experiments on liquid shells and liquid-core compound drops were conducted using acoustic levitation, in a low-gravity environment during a Space Shuttle flight. It was observed that their inner and outer interfaces became concentric when excited into capillary oscillations. Using the existing inviscid theories, and attempt is made to explain the centering of the oscillating liquid shell. It is concluded that viscosity needs to be considered in order to provide a realistic description of the centering process.

T G Wang

Advanced Solid Rocket Motor Project Status

The objectives of the project are the following: (1) to improve system safety and reliability; (2) to improve Space Shuttle Payload performance - 12,000 lb; (3) to optimize program cost; and (4) to promote a competitive solid rocket motor industry. The topics are presented in viewgraph form and include the Advanced Solid Rocket Motor (ASRM) project team, ASRM design, design schedules, and technical issues.

Keith Coates

Marshall Space Flight Center CFD Overview

Computational Fluid Dynamics (CFD) activities at Marshall Space Flight Center (MSFC) have been focused on hardware specific and research applications with strong emphasis upon benchmark validation. The purpose here is to provide insight into the MSFC CFD related goals, objectives, current hardware related CFD activities, propulsion CFD research efforts and validation program, future near-term CFD hardware related programs, and CFD expectations. The current hardware programs where CFD has been successfully applied are the Space Shuttle Main Engines (SSME), Alternate Turbopump Development (ATD), and Aeroassist Flight Experiment (AFE). For the future near-term CFD hardware related activities, plans are being developed that address the implementation of CFD into the early design stages of the Space Transportation Main Engine (STME), Space Transportation Booster Engine (STBE), and the Environmental Control and Life Support System (ECLSS) for the Space Station. Finally, CFD expectations in the design environment will be delineated.

L A Schutzenhofer

Development of a battery status monitor

A prototype battery status monitor system has been developed. The functions of the system are: (1) to provide the energy status of the battery, (2) to measure and transmit basic battery parameters, (3) to process these measurements required to determine abnormal functioning of the battery, and (4) to transmit warning signals of the abnormal condition along with a go/no go signal. The system was developed for use with the space shuttle.

Zimmerman, R. I.

GeoStorm Beacon Design Reference Mission (DRM) and Technology Drivers

A Design Reference Mission (DRM) for a NOAA Space Weather monitoring platform that provides warning times greater than 20 minutes with a 10-year operational timeline is presented. The summary of the DRM includes technology drivers for a subscale flight demonstration to reduce risk for the operational mission.

Solar Sails

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce Askins

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce R Askins

NASA's Innovative Entry Systems and TPS Technologies Enabling Commercial Space Missions

For over six decades, the NASA Ames Entry Systems and Technology Division has been a cornerstone of U.S. space exploration, delivering critical atmospheric entry solutions since Project Mercury and now increasingly supporting the commercial space sector. The Division provides reliable entry system solutions through a unique blend of expertise, national facilities, and systems integration knowledge, a combination that is difficult to replicate outside a dedicated government entity. Consistently successful, the TS Division remains central to NASA’s exploration objectives and significantly contributes to the transfer of technology to the commercial space sector, supporting more than ten commercial space companies and supplying flight heatshields to three of them in the past five years. Its strengths in Thermal Protection System (TPS) materials, aerothermodynamics, ground test facilities, and Entry, Descent, and Landing (EDL) systems engineering drive rapid development and sustained U.S. competitiveness in space. The Division's expertise in reusable and ablative thermal protection systems, as well as mechanically deployable entry systems primarily developed for NASA missions, now benefits commercial space missions. This presentation will highlight the vision and needs of these commercial space companies, how NASA-invented technologies meet mission requirements, and how these technologies enable and distinguish their efforts.

Ethiraj Venkatapathy

Electric Propulsion Orbital Platform

This paper describes the Electric Propulsion Orbital Platform (EPOP), of which the primary objective is to provide an instrumented platform for testing electric propulsion devices in space. It is anticipated that the first flight, EPOP-1, will take place on the Shuttle-deployed Wake Shield Facility in 1996, and will be designed around a commercial 1.8 kW arcjet system which will be operated on gaseous hydrogen propellant. Specific subsystems are described, including the arcjet system, the propellant and power systems, and the diagnostics systems.

V. J. Friedly

Space Nuclear Propulsion for Space Applications: Multi-Mission Nuclear Thermal Propulsion Vehicle Design

This NASA Technical Memorandum (TM) is intended to capture design work that the Advanced Concepts Office (ACO) at NASA’s Marshall Space Flight Center (MSFC) performed on behalf of the Space Nuclear Propulsion (SNP) Project during an SNP-driven design and mission analysis initiative in FY2025. Specifically, this TM focuses on several spacecraft design concepts intended to explore the feasibility of nuclear thermal propulsion (NTP) for use in a selection of notional, unmanned space missions. While references to the missions will be made in this TM, the primary focus will be on the spacecraft design concepts themselves, the ground rules and assumptions used for designing the spacecraft, a description of the various subsystems and their performance parameters, and the methodologies used to design them. The TM will also highlight areas of future work and additional considerations that may need to be taken into account when evaluating the feasibility of NTP space systems for other applications. The report will discuss the results from ACO’s analysis as they pertain to the different vehicle concepts that were evaluated. Each discipline section in this report will discuss the discipline-specific ground rules and assumptions, the methodology and design approaches employed, and present the results along with any relevant discussion, and highlight areas of future work where applicable.

Mitchell A Rodriguez

The HEROIX Broadband X-Ray Space Telescope Mission Concept

The High EneRgy Observatory for Imaging X-rays (HEROIX) Medium-Class Mission concept envisions a next-generation broadband X-ray observatory designed to meet the astrophysics community’s need for high-angular-resolution studies of the Cosmic X-ray Background. Building on the science legacy of NASA’s NuSTAR mission and more than 30 years of advances in replicated NiCo shell technology at NASA Marshall, HEROIX proposes a space observatory comprising four co-aligned telescopes achieving 5 arcsecond half-power diameter (HPD) angular resolution. This capability, approached by the resolution demonstrated in the FOXSI-4 sounding rocket mission and under development through the SuperHERO balloon mission, will be extended to energies up to 80 keV through multilayer coatings. Marshall’s inhouse precision optics manufacturing enables an integrated effective area of 380 cm² at 30 keV, which, combined with high-resolution optics, opens new windows into extreme astrophysical non-thermal processes.

Nick Thomas

Physical Parameters of Space Mission Asteroid Targets

Ground-based characterization of asteroids that are planned or potential targets of space missions provides important data on their physical parameters and properties. Knowledge of the properties of mission targets is important especially during mission preparation and planning, as it serves to select best or suitable targets for specific purpose of a given mission, to prepare mission plans, to constrain possible mission scenarios, and to design mission experiments. Such characterization efforts may be particularly critical for flyby missions that take only limited data during the high-speed flybys of their target asteroids, but they also provide very crucial data for targets of rendezvous missions. Moreover, long-term observations taken from Earth also allows the modelling of, or constraining, processes acting on the asteroids over extended time scales. Over the past years and decades we have obtained rich data on physical parameters of 82 asteroids that are planned or potential targets of space missions. Our primary observing technique is time-resolved (lightcurve) photometry, but we use also data obtained with other techniques, such as spectroscopy, thermal or radar observations. 15 of the 82 characterized asteroids are planned or possible targets of several space missions that are in flight or preparation, such as ESA’s Hera, RAMSES and PRIAMOS, NASA’s OSIRIS-APEX, JAXA’s Hayabusa2#, DESTINY+ and Next Generation Sample Return (NGSR), the Emirates Mission to Asteroids (EMA), and Karman+’s High Frontier, but we have also characterized 67 asteroids that are potential targets of space missions for their low delta-V’s and were announced as being “of interest to NASA” in the Small-Bodies-Observations- NASA mailing list or listed on the NHATS page of “Accessible NEAs”. The sample of asteroid targets span 3 orders of magnitude in size, with absolute magnitudes H from 12.57 to 26.8, corresponding to diameters from about 10 m to about 10 km. The sample contains a variety of taxonomic types and physically or dynamically interesting objects. Among them, we have identified 5 binary asteroids and 20 tumblers (i.e., asteroids in excited, non-principal axis rotation states). Rotation periods of the characterized asteroids range from 1.45 min to 280 h, reflecting diversity of their properties and formation/evolution paths. We will present an overview of the data set and highlight several representative cases.

Petr Pravec

Space Mission Options for Reconnaissance and Mitigation of Asteroid 2024 YR4

Near-Earth asteroid 2024 YR 4 was discovered on 2024-12-27 and its probability of Earth impact in December 2032 peaked at about 3% on 2025-02-18. Additional observations ruled out Earth impact by 2025-02-23. However, the probability of lunar impact in December 2032 then rose, reaching about 4% by the end of the apparition in May 2025. James Webb Space Telescope (JWST) observations on 2025-03-26 estimated the asteroid's diameter at 60 +/- 7 m. Studies of 2024 YR 4 's potential lunar impact effects suggest lunar ejecta could increase micrometeoroid debris flux in low Earth orbit up to 1000 times above background levels over just a few days, possibly threatening astronauts and spacecraft. In this work, we present options for space missions to 2024 YR 4 that could be utilized if lunar impact is confirmed. We cover flyby & rendezvous reconnaissance, deflection, and robust disruption of the asteroid. We examine both rapid-response and delayed launch options through 2032. We evaluate chemical and solar electric propulsion, various launch vehicles, optimized deep space maneuvers, and gravity assists. Re-tasking extant spacecraft and using built spacecraft not yet launched are also considered. The best reconnaissance mission options launch in late 2028, leaving only approximately three years for development at the time of this writing in August 2025. Deflection missions were assessed and appear impractical. However, kinetic robust disruption missions are available with launches between April 2030 and April 2032. Nuclear robust disruption missions are also available with launches between late 2029 and late 2031. Finally, even if lunar impact is ruled out there is significant potential utility in deploying a reconnaissance mission to characterize the asteroid.

Asteroid Disruption

Predicting Team Functioning in Long Term Space Missions Using Acoustic and Linguistic Measures

Maintaining optimal team functioning is critical for long-duration space exploration missions, yet traditional monitoring methods, such as self-reports and wearable sensors, often impose operational burdens or suffer from bias. This paper investigates a non-intrusive speech-based artificial intelligence (AI) framework to predict degradations in team functioning using data from the Human Exploration Research Analog (HERA) of the U.S. National Aeronautics and Space Administration (NASA). Using acoustic features, linguistic descriptors, and semantic embeddings, we evaluate static non-linear and temporal machine learning models to predict both objective (task accuracy) and subjective (self-reported efficacy and cohesion) team functioning outcomes. Results indicate that temporal models outperform static approaches, with prediction of objective task accuracy in Team Interaction Battery (TIB) improving from near chance to 71%. Self-reported outcomes, including team efficacy and cohesion, are predicted more reliably than task performance, achieving balanced accuracies of up to 85.56% and 78.12%, respectively, and are found to be most strongly associated with acoustic features. In a second interdependent task, the MMSEV–EVA, accuracies of up to 78% are achieved using temporal models with acoustic features. Furthermore, incorporating just 1–2 days of team-specific historical data systematically improved performance, and acoustic markers from informal pre-task interactions provided modest predictive gains. Finally, while automated preprocessing yielded viable accuracy, humancorrected data provided moderate performance gains, though transcription error rates did not significantly correlate with model performance. These findings highlight the potential of speech as a passive, high-fidelity monitoring tool for autonomous habitats.

Temporal modeling

Legacy of the Asteroid Redirect Robotic Mission (ARRM)

NASA’s proposed Asteroid Redirect Robotic Mission (ARRM) began with the recognition in a 2010 NASA study that emerging high-power solar electric propulsion technology could be used to rendezvous with, capture, and return an entire, very small (~10,000 kg), near Earth asteroids to the International Space Station. A 2011 workshop by the Keck Institute for Space Studies (KISS) extended the earlier NASA study to asteroid masses of order 500,000 kg by returning them to cislunar space. Subsequent detailed NASA studies in 2013-2014 confirmed the feasibility of this concept. This led to the establishment of the Asteroid Redirect Mission program that consisted of a robotic mission to return multiple tons of asteroid material to cislunar space and a crewed mission to rendezvous with the robotic vehicle, perform two extra vehicular activities (EVAs), collect samples of the asteroid material, and return this material to Earth. Implementation of ARRM got midway through Phase B before being cancelled in April 2017. Although ARRM was cancelled, it has left a near-term legacy of positive impacts to the human spaceflight community, the planetary defense community, the deep space science community, and asteroid mining interests.

John R Brophy

Thermal Considerations for 2039 Opposition Class Nuclear Electric Propulsion/Chemical Propulsion Crewed Mars Mission

The high specific impulse (Isp) of Nuclear Electric Propulsion (NEP) technology offers the potential for advanced space mission capabilities. However, the five critical technology elements of NEP vehicles have yet to prove technical maturity levels for consideration into mission design. In response to the critical reviews by the NASA Engineering and Safety Center (NESC) and the National Academies of Sciences, Engineering, and Medicine (NASEM), NASA’s Space Nuclear Propulsion (SNP) project created an NEP Technology Maturation Plan (TMP) for focused development of NEP technology. The TMP called for a coordinated set of technology development efforts to meet this objective. The Modular Assembled Radiators for NEP VehicLes (MARVL) Early Career Initiative (ECI) project was initiated to develop a portion of the fifth Critical Technology Element (CTE) of the NEP vehicle: the Primary Heat Rejection Subsystem (PHRS). A target application of a 2039 human-rated Mars mission was outlined in the TMP. For the outlined mission, a NEP vehicle will experience several thermal environments which will impact the design and operation of the PHRS. To maintain radiator temperatures within the required effective temperature range, the effect of natural, induced, and NEP internally generated heat loads on the radiator panel must be well understood. Furthermore, this analysis is critical for analyzing the influence of various orientations and positions of the NEP vehicle relative to nearby celestial bodies throughout the mission. This study conducted a complete enveloping analysis of the thermal environments influencing the NEP vehicle throughout the mission. Thermal analysis was conducted for the radiator panels based on the defined mission environments. This thermal analysis concludes with the selection of ideal radiator orientations for the NEP vehicle, and the identification of worst case hot and cold environmental sink temperatures throughout the mission. For the target application, the environmental sink temperature while the reactor is powered OFF or powered ON ranges from 30 K to 353 K and 2.7 K to 243 K respectively. When considering interplanetary space, the minimum environmental sink temperature when the reactor is powered OFF and the radiators are oriented “edge to Sun” is 2.7 K. The environmental thermal models generated in this study will be used for future studies with the full vehicle system model. The environmental sink temperature curves generated will be used for future radiator and component analysis to predict transient performance in the space environment. The environmental sink temperature and heat rejection capability curves will inform the trade between commissioning orbits that are in consideration. The model may also serve as a useful tool as reference for future crewed space missions, missions involving radiators or temperature sensitive equipment, or other missions requiring analysis of natural orbital thermal environments.

Nuclear Electric Propulsion