Space Station power system autonomy demonstration

The Systems Autonomy Demonstration Program (SADP) represents NASA's major effort to demonstrate, through a series of complex ground experiments, the application and benefits of applying advanced automation technologies to the Space Station project. Lewis Research Center (LeRC) and Marshall Space Flight Center (MSFC) will first jointly develop an autonomous power system using existing Space Station testbed facilities at each center. The subsequent 1990 power-thermal demonstration will then involve the cooperative operation of the LeRC/MSFC power system with the Johnson Space Center (JSC's) thermal control and DMS/OMS testbed facilities. The testbeds and expert systems at each of the NASA centers will be interconnected via communication links. The appropriate knowledge-based technology will be developed for each testbed and applied to problems requiring intersystem cooperation. Primary emphasis will be focused on failure detection and classification, system reconfiguration, planning and scheduling of electrical power resources, and integration of knowledge-based and conventional control system software into the design and operation of Space Station testbeds.

Kish, James A.↗

Space Station Power Generation in Support of the Beta Gimbal Anomaly Resolution

The International Space Station (ISS) is the largest and most complex spacecraft ever assembled and operated in orbit. The first U.S. photovoltaic (PV) module, containing two solar arrays, was launched, installed, and activated in early December 2000. After the first week of continuously rotating the U.S. solar arrays, engineering personnel in the ISS Mission Evaluation Room (MER) observed higher than expected electrical currents on the drive motor in one of the Beta Gimbal Assemblies (BGA), the mechanism used to maneuver a U.S. solar array. The magnitude of the motor currents continued to increase over time on both BGA's, creating concerns about the ability of the gimbals to continue pointing the solar arrays towards the sun, a function critical for continued assembly of the ISS. A number of engineering disciplines convened in May 2001 to address this on-orbit hardware anomaly. This paper reviews the ISS electrical power system (EPS) analyses performed to develop viable operational workarounds that would minimize BGA use while maintaining sufficient solar array power to continue assembly of the ISS. Additionally, EPS analyses performed in support of on-orbit BGA troubleshooting exercises is reviewed. EPS capability analyses were performed using SPACE, a computer code developed by NASA Glenn Research Center (GRC) for the ISS program office.

Delleur, Ann M.↗

Space Station Power Generation Investigated in Support of the Beta Gimbal Anomaly Resolution

The International Space Station (ISS) is the largest and most complex spacecraft ever assembled and operated in orbit. The first U.S. photovoltaic module, containing two solar arrays, was launched, installed, and activated in early December 2000. After the first week of continuously rotating the U.S. solar arrays, engineering personnel in the ISS Mission Evaluation Room observed higher than expected electrical currents on the drive motor in one of the Beta Gimbal Assemblies (BGA), the mechanism used to maneuver a U.S. solar array (see the on-orbit photograph). The magnitude of the motor currents continued to increase over time on both BGAs, creating concerns about the ability of the gimbals to continue pointing the solar arrays towards the Sun, a function critical for continued assembly of the ISS. The BGA provides two critical capabilities to the ISS: (1) transfer of electrical power across a rotating joint and (2) positioning of the solar arrays. A number of engineering disciplines convened in May 2001 to address this on-orbit hardware anomaly. Over the course of a year, many scenarios were developed and used. Only two are discussed here: parked arrays and dual-angle mode.

Delleur, Ann M.↗

Performance estimates for the Space Station power system Brayton Cycle compressor and turbine

The methods which have been used by the NASA Lewis Research Center for predicting Brayton Cycle compressor and turbine performance for different gases and flow rates are described. These methods were developed by NASA Lewis during the early days of Brayton cycle component development and they can now be applied to the task of predicting the performance of the Closed Brayton Cycle (CBC) Space Station Freedom power system. Computer programs are given for performing these calculations and data from previous NASA Lewis Brayton Compressor and Turbine tests is used to make accurate estimates of the compressor and turbine performance for the CBC power system. Results of these calculations are also given. In general, calculations confirm that the CBC Brayton Cycle contractor has made realistic compressor and turbine performance estimates.

Cummings, Robert L.↗

International Space Station Powered Bolt Nut Anomaly and Failure Analysis Summary

A key mechanism used in the on-orbit assembly of the International Space Station (ISS) pressurized elements is the Common Berthing Mechanism (CBM). The mechanism that effects the structural connection of the CBM halves is the Powered Bolt Assembly. There are sixteen Powered Bolt Assemblies per CBM. The CBM has a bolt which engages a self aligning Powered Bolt Nut (PBN) on the mating interface; see Figure 1. The Powered Bolt Assemblies are preloaded to approximately 19 kilo pounds (KIPs) prior to pressurization of the CBM. The PBNs mentioned below, manufactured in 2009, will be used on ISS future missions. An on orbit functional failure of this hardware would be unacceptable and in some instances catastrophic due to the failure of modules to mate and seal the atmosphere, risking loss of crew and ISS functions. The manufacturing processes which create the PBNs need to be strictly controlled. Functional (torque vs. tension) acceptance test failures will be the result of processes not being strictly followed. Without the proper knowledge of thread tolerances, fabrication techniques, and dry film lubricant application processes, PBNs will be, and have been manufactured improperly. The knowledge gained from acceptance test failures and the resolution of those failures, thread fabrication techniques and thread dry film lubrication processes can be applied to many aerospace mechanisms to enhance their performance. Test data and manufactured PBN thread geometry will be discussed for both failed and successfully accepted PBNs.

Sievers, Daniel E.↗

International Space Station Powered Bolt Nut Anomaly and Failure Analysis Summary

A key mechanism used in the on-orbit assembly of the International Space Station (ISS) pressurized elements is the Common Berthing Mechanism. The mechanism that effects the structural connection of the Common Berthing Mechanism halves is the Powered Bolt Assembly. There are sixteen Powered Bolt Assemblies per Common Berthing Mechanism. The Common Berthing Mechanism has a bolt which engages a self aligning Powered Bolt Nut (PBN) on the mating interface (Figure 1). The Powered Bolt Assemblies are preloaded to approximately 84.5 kN (19000 lb) prior to pressurization of the CBM. The PBNs mentioned below, manufactured in 2009, will be used on ISS future missions. An on orbit functional failure of this hardware would be unacceptable and in some instances catastrophic due to the failure of modules to mate and seal the atmosphere, risking loss of crew and ISS functions. The manufacturing processes that create the PBNs need to be strictly controlled. Functional (torque vs. tension) acceptance test failures will be the result of processes not being strictly followed. Without the proper knowledge of thread tolerances, fabrication techniques, and dry film lubricant application processes, PBNs will be, and have been manufactured improperly. The knowledge gained from acceptance test failures and the resolution of those failures, thread fabrication techniques and thread dry film lubrication processes can be applied to many aerospace mechanisms to enhance their performance. Test data and manufactured PBN thread geometry will be discussed for both failed and successfully accepted PBNs.

Sievers, Daniel E.↗

International Space Station Power System Telemetry Compared With Analytically Derived Data for Shadowed Cases

This article highlights fiscal year 2002 work performed by NASA Glenn Research Center personnel to validate algorithms and data developed in-house to predict shadowing effects on the International Space Station (ISS) solar arrays power generation. The validation effort utilized video footage and on-orbit telemetry for cases spanning a 1-yr period. Validation was required because of the uncertainty of various aspects involved in shadowing analysis. Results show that a good comparison exists between actual and predicted shadowed power system performance for solar array front and backside shadowing.

Fincannon, H. James↗

Performance testing of a high frequency link converter for Space Station power distribution system

The testing of a brassboard version of a 20-kHz high-frequency ac voltage link prototype converter dynamics for Space Station application is presented. The converter is based on a three-phase six-pulse bridge concept. The testing includes details of the operation of the converter when it is driving an induction machine source/load. By adapting a field orientation controller (FOC) to the converter, four-quadrant operation of the induction machine from the converter has been achieved. Circuit modifications carried out to improve the performance of the converter are described. The performance of two 400-Hz induction machines powered by the converter with simple V/f regulation mode is reported. The testing and performance results for the converter utilizing the FOC, which provides the capability for rapid torque changes, speed reversal, and four-quadrant operation, are reported.

Sul, S. K.↗

Long term integrity for space station power systems

A study was made of the High Temperature Design Codes ASME N47, British R5, and the French RCC-MR Rules. It is concluded that all these codes provide a good basis of design for space application. The new British R5 is the most complete since it deals with the problem of defects. The ASME N47 was subjected longer to practical application and scrutiny. A draft code is introduced, and a proposed draft for high temperature design in which attempts were made to identify gaps and improvements is suggested. The design is limited by creep characteristics. In these circumstances, life is strongly affected by the selected value of the factor of safety. The factor of safety of primary loads adopted in the codes is 1.5. Maybe a lower value of 1.25 is permissible for use in space. Long term creep rupture data for HAYNES 188 is deficient and it is suggested that extrapolation methods be investigated.

Leckie, F. A.↗

Space station power management and distribution

The power system architecture is presented by a series of schematics which illustrate the power management and distribution (PMAD) system at the component level, including converters, controllers, switchgear, rotary power transfer devices, power and data cables, remote power controllers, and load converters. Power distribution options, reference power management, and control strategy are also outlined. A summary of advanced development status and plans and an overview of system test plans are presented.

Teren, F.↗

Space Station Freedom power - A reliability, availability, and maintainability assessment of the proposed Space Station Freedom electric power system

A preliminary reliability, availability, and maintainability (RAM) analysis of the proposed Space Station Freedom electric power system (EPS) was performed using the unit reliability, availability, and maintainability (UNIRAM) analysis methodology. Orbital replacement units (ORUs) having the most significant impact on EPS availability measures were identified. Also, the sensitivity of the EPS to variations in ORU RAM data was evaluated for each ORU. Estimates were made of average EPS power output levels and availability of power to the core area of the space station. The results of assessments of the availability of EPS power and power to load distribution points in the space stations are given. Some highlights of continuing studies being performed to understand EPS availability considerations are presented.

Turnquist, S. R.↗

Power considerations for an early manned Mars mission utilizing the space station

Power requirements and candidate electrical power sources were examined for the supporting space infrastructure for an early (2004) manned Mars mission. This two-year mission (60-day stay time) assumed a single six crew piloted vehicle with a Mars lander for four of the crew. The transportation vehicle was assumed to be a hydrogen/oxygen propulsion design with or without large aerobrakes and assembled and checked out on the LEO Space Station. The long transit time necessitated artificial gravity of the crew by rotating the crew compartments. This rotation complicates power source selection. Candidate power sources were examined for the Lander, Mars Orbiter, supporting Space Station, co-orbiting Propellant Storage Depot, and alternatively, a co-orbiting Propellant Generation (water electrolysis) Depot. Candidates considered were photovoltaics with regenerative fuel cells or batteries, solar dynamics, isotope dynamics, and nuclear power.

Valgora, Martin E.↗

Power considerations for an early manned Mars mission utilizing the Space Station

Power requirements and candidate electrical power sources were examined for the supporting space infrastructure for an early (2004) manned Mars mission. This two-year mission (60-day stay time) assumed a single six crew piloted vehicle with a Mars lander for four of the crew. The transportation vehicle was assumed to be a hydrogen/oxygen propulsion design with or without large aerobrakes and assembled and checked out on the LEO Space Station. The long transit time necessitated artificial gravity of the crew by rotating the crew compartments. This rotation complicates power source selection. Candidate power sources were examined for the Lander, Mars Orbiter, supporting Space Station, co-orbiting Propellant Storage Depot, and, alternatively, a co-orbiting Propellant Generation (water electrolysis) Depot. Candidates considered were photovoltaics with regenerative fuel cells or batteries, solar dynamics, isotope dynamics, and nuclear power.

Valgora, Martin E.↗

Automation in the Space Station module power management and distribution Breadboard

The Space Station Module Power Management and Distribution (SSM/PMAD) Breadboard, located at NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama, models the power distribution within a Space Station Freedom Habitation or Laboratory module. Originally designed for 20 kHz ac power, the system is now being converted to high voltage dc power with power levels on a par with those expected for a space station module. In addition to the power distribution hardware, the system includes computer control through a hierarchy of processes. The lowest level process consists of fast, simple (from a computing standpoint) switchgear, capable of quickly safing the system. The next level consists of local load center processors called Lowest Level Processors (LLP's). These LLP's execute load scheduling, perform redundant switching, and shed loads which use more than scheduled power. The level above the LLP's contains a Communication and Algorithmic Controller (CAC) which coordinates communications with the highest level. Finally, at this highest level, three cooperating Artificial Intelligence (AI) systems manage load prioritization, load scheduling, load shedding, and fault recovery and management. The system provides an excellent venue for developing and examining advanced automation techniques. The current system and the plans for its future are examined.

Walls, Bryan↗

Augmentation of the space station module power management and distribution breadboard

The space station module power management and distribution (SSM/PMAD) breadboard models power distribution and management, including scheduling, load prioritization, and a fault detection, identification, and recovery (FDIR) system within a Space Station Freedom habitation or laboratory module. This 120 VDC system is capable of distributing up to 30 kW of power among more than 25 loads. In addition to the power distribution hardware, the system includes computer control through a hierarchy of processes. The lowest level consists of fast, simple (from a computing standpoint) switchgear that is capable of quickly safing the system. At the next level are local load center processors, (LLP's) which execute load scheduling, perform redundant switching, and shed loads which use more than scheduled power. Above the LLP's are three cooperating artificial intelligence (AI) systems which manage load prioritizations, load scheduling, load shedding, and fault recovery and management. Recent upgrades to hardware and modifications to software at both the LLP and AI system levels promise a drastic increase in speed, a significant increase in functionality and reliability, and potential for further examination of advanced automation techniques. The background, SSM/PMAD, interface to the Lewis Research Center test bed, the large autonomous spacecraft electrical power system, and future plans are discussed.

Walls, Bryan↗

Design of the Space Station Freedom power system

The design of Space Station Freedom's electric power system (EPS) is reviewed, highlighting the key design goals of performance, low cost, reliability and safety. Tradeoff study results that illustrate the competing factors responsible for many of the more important design decisions are discussed. When Freedom's EPS is compared with previous space power designs, two major differences stand out. The first is the size of the EPS, which is larger than any prior system. The second major difference between the EPS and other space power designs is the indefinite expected life of Freedom; 30 years has been used for life-cycle-cost calculations.

Thomas, Ronald L.↗

Dynamic characteristics of power-tower space stations with 15-foot truss bays

A power tower space station concept which generates power with photovoltaic arrays and where the truss structure has a bay size of 15 ft is described. Rigid body and flexible body dynamic characteristics are presented for a 75-kW Initial Operating Capability (IOC) and 150-kW and 300-kW growth stations. The transient response of the IOC and 300-kW growth stations to shuttle dock, orbit reboost, and mobile remote manipulator system translation loads are studied. Displacements, accelerations, and bending moments at various locations on the IOC and 300-kW growth stations are presented.

Dorsey, J. T.↗