Search NASA⌕ Search

SEARCH · Search NASA

Results for “Spallation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Dynamic compression and spallation behavior of NbTaTiVZr high-entropy alloy

High-entropy alloys are a new class of materials with promising properties for aerospace and defense applications. The unique behavior of these materials is driven by the complex interactions between dissimilar atoms in a crystal and requires combined theoretical and experimental efforts to unlock their full potential. Here, we evaluate the relationship between the microstructure and the dynamic response of the equiatomic NbTaTiVZr alloy. Specifically, the shock Hugoniot, or equation of state, was measured up to a particle velocity of 0.5 mm μs −1 using gas gun plate impacts. Shock wave profile and incipient spallation experiments were used to characterize wave propagation and damage formation with post-mortem recovery experiments. Molecular dynamics simulations confirm the experimental findings and extend them up to 2.1 mm μs −1 particle velocity. Computational thermodynamic calculation of phase diagram simulations explain details of the material microstructure, which explains the measured strength and experimental damage patterns. Overall, this work provides detailed high-strain-rate characterization of a refractory high-entropy alloy, and more importantly, a framework and demonstration of the utility and necessity of a combined theoretical and experimental approach, outlining the importance of considering processing and manufacturing conditions when evaluating the performance of new materials.

36 MATERIALS SCIENCE↗

A compact in situ polarized 3He neutron spin filter for the diffractometer VULCAN at the Spallation Neutron Source

We have built and commissioned a compact in situ 3He polarizer based on spin-exchange optical pumping for the engineering materials diffractometer, named VULCAN, at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory. The system achieved 78% 3He polarization with a short pump-up time constant of 2.2 h. Its first deployment in an in situ half-polarized neutron diffraction experiment on a magnetic shape memory alloy, Ni–Mn–Ga, revealed changes in magnetization coupled to deformation twinning under compression. With this new capability, VULCAN has become the first diffractometer at SNS capable of performing polarized neutron experiments, opening new opportunities to study a wider range of magnetism-related material behaviors under varied thermal, mechanical, electrical, and/or magnetic fields.

Fu, Sichao [ORNL] (ORCID:0009000846771640)↗

H - Ion Source RF Plasma Testing with 13 MHz and 27 MHz at the Spallation Neutron Source (SNS)

The baseline RF-driven H⁻ ion source configuration at the Spallation Neutron Source (SNS) facility uses a continuous wave (CW) 600 W 13 MHz RF system to ignite and maintain a low-density plasma inside the ion source vacuum chamber. After the continuous low-density 13 MHz plasma has been established, a pulsed (typical 1 ms pulse width and 60 Hz pulse repetition rate) 80 kW 2 MHz RF system is used to increase the plasma density to produce the pulsed H⁻ ion beam. Incremental upgrades and improvements to the SNS ion source systems have resulted in the ability to reliably operate an H⁻ ion source for SNS neutron production run cycles that can last up to four months. Conditions inside the SNS H⁻ ion source evolve throughout a four-month run cycle due to changes in impurity levels, sputtering, and erosion. As the internal ion source conditions change during the run cycle, there can also be changes in plasma stability and the 13 MHz RF power level required to ignite the plasma. This paper presents the preliminary results of testing performed on the SNS Ion Source Test Stand (ISTS) system where we looked at plasma ignition and plasma stability using 27 MHz RF in place of the baseline 13 MHz RF system.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Conceptual design of a replacement 2.1 K cold box for the Spallation Neutron Source Central Helium Liquefier

Abstract After more than 20 years of operation, the cold compressor technology in use at the Spallation Neutron Source (SNS) is obsolete, and replacement parts and service are no longer available. SNS has partnered with Jefferson Lab to design and construct a replacement sub-atmospheric cold box outfitted with modern cold compressor technology. The general design follows from Jefferson Lab’s experience on other recent sub-atmospheric cold box projects. Design decisions are backed by thorough engineering analysis to ensure technical requirements are met in a cost-effective manner. Conceptual design of the replacement cold box has been completed, and will be summarized in this paper. It features five cold compressors with an operating flow range of 80-140 g/s, and includes piping and valving to support cold compressor maintenance without interrupting flow circulation to the load. The approach to thermal shielding, insulation, and integration of the upgraded cold compressor hardware into the existing SNS control system will also be addressed.

Mastracci, B [Thomas Jefferson National Accelerato↗

Performance of Oak Ridge National Laboratory spallation neutron source proton power upgrade cavities and cryomodule production

The Proton Power Upgrade initiative at Oak Ridge National Lab’s Spallation Neutron Source aims to greatly boost the capability of proton beam power. This upgrade involves the integration of seven additional cryomodules, each housing four six-cell high-beta ( β = 0.81 ) superconducting radio frequency cavities. These cavities, manufactured and processed by Research Instruments in Germany, underwent meticulous treatment, including electropolishing as the bulk and final vital step. Upon delivery to Jefferson Lab, a total of 28 cavities for seven cryomodules, along with an additional four cavities for a spare cryomodule, underwent thorough vertical qualification tests, meeting the required specifications. Following cavity tanking and subsequent rf testing, the assembly of eight cryomodules was successfully executed, with all 32 cavities demonstrating compliance with acceptance criteria. The transportation of the cryomodule to SNS for high-power testing in the tunnel yielded exceptional results. Notably, the performance surpassed specifications, in terms of quality factor and accelerating gradient. Published by the American Physical Society 2024

43 PARTICLE ACCELERATORS↗

Improved limits on n → n ' transformation from the Spallation Neutron Source

Conversions between neutrons n and dark matter candidate sterile neutrons n' have been proposed as a mechanism for baryon number $\mathscr{B}$ violation. In the case that there is a small mass difference Δ⁢m between the n and the n' states, oscillations can be induced by compensating for Δ⁢m with a magnetic field. A search for such neutron oscillations was performed at the Spallation Neutron Source by looking for anomalous neutron transmission through a strongly absorbing cadmium wafer inside of a 6.6 T magnet. The approach described here saw no regenerated neutrons above background, which provides an improved limit for neutron–sterile neutron transformations for a range of Δ⁢m between 0.1 and 1000 neV.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Transient Optimization of the Cryogenic Moderator System Controller at the Spallation Neutron Source for Improved Performance

The high-energy neutron beam generated at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory is moderated to use cold (slow) neutrons for scientific discoveries. The Cryogenic Moderator System (CMS) removes heat from the neutron beam using cryogenic hydrogen (H 2 ) moderators connected via heat exchangers to a helium (He) refrigeration loop that dissipates heat using a compressor-brake system. However, the CMS is affected by sporadic losses in beam power, referred to as "beam trips," as these events generate significant disturbances in cooling requirements. To accommodate the heat load transients during beam trips, the CMS uses a decentralized control strategy consisting of four flow valves and one electric heater adjusted by independent proportional-integral (PI) controllers. During the CMS’s initial commissioning, the PI gains were calibrated based only on tracking performance, overlooking their effectiveness in disturbance rejection. A data-driven, control-oriented closed-loop model was developed to recalibrate the PI gains and minimize the transient disturbances caused by beam trips. The model consists of three main components: (1) a physics-based model of the He refrigeration loop, (2) a machine-learning model of the cryogenic H 2 cooling trains, and (3) the control logic used for feedback set-point tracking. Experimental results showed that the recalibrated gains obtained in this study improved the CMS’s transient response during beam trips.

Maldonado Puente, Bryan↗

Operating Klystrons at the Spallation Neutron Source – Two Decades of Perspective

Klystron amplifiers have been operated at the Spallation Neutron Source (SNS) in support of the user program since 2006. SNS tubes have amassed over 100,000 hours of high-voltage and filament-on time providing a significant source of operational statistics for high power, high-duty klystrons. Additionally, the SNS Radiofrequency (RF) Systems Group has developed operational methods to mitigate specific reliability challenges, such as cathode arcing and output power instability. Despite much progress, many of these challenges persist, prompting the SNS to update the procedures used for klystron processing as well as develop a higher throughput test stand.

Moss, John [ORNL] (ORCID:0009000085988916)↗

New machine protection system at the Spallation Neutron Source – design process and performance analysis

A New Machine Protection System (MPS) at the Spallation Neutron Source (SNS) was developed and implemented on µTCA-based hardware platforms. The system monitors more than 2500 field inputs and shuts off the beam within 10 µs if adverse events occur. We will present system level design process of various firmware and software components as well as the system integration into EPICS environment. The performance analysis of the MPS after two SNS run cycles will also be presented.

Bobrek, Miljko [ORNL] (ORCID:0000000332763451)↗

Architecture of the personnel protection systems for Spallation Neutron Source Second Target Station

The Oak Ridge National Laboratory (ORNL) is implementing a major upgrade to the Spallation Neutron Source (SNS) facility, encompassing the addition of the Second Target Station (STS). Preliminary design reviews have been conducted on several STS Personnel Protection Systems (PPS). The reviews focused primarily on the integration with the existing SNS PPS, the new proton transport tunnel, and the target areas. Development of the PPS is ongoing, to ensure a coherent safety system with the mission of protecting users and workers from prompt radiation hazards while providing high beam availability to operations. The STS PPS element in the Integrated Control System (ICS) is a facility-wide system composed of multiple safety subsystems, including the Ring to Second Target (RTST) beam transport tunnel, Target, Bunker and Instruments. Personnel working in all these geographic areas are protected by modular reliable PPS solutions. The safety system enforces access controls, radiation monitoring, beam destination control, and application of critical device inhibit upon detection of abnormal condition. It uses well-documented processes, Common Industrial Protocol (CIP) safety, pulsed test, and redundancy to achieve the desired Safety Integrity Level (SIL). This paper gives an architectural overview of the STS PPS and a detailed safety plan for the SNS facility, addressing safety solutions and human factors.

Michaelides, Tommy [ORNL] (ORCID:0000000190499869)↗

Proton pulse charge calculation algorithm in Beam Power Limiting System at Spallation Neutron Source

A proton pulse charge calculation algorithm in the Beam Power Limiting System (BPLS) at the Spallation Neutron Source (SNS) was developed and implemented in an FPGA. The algorithm calculates one-minute running average of the pulse charges and issues a fault to the Personal Protection System (PPS) and the Machine Protection System (MPS) when a limit is reached. A bit-accurate model of the algorithm was first developed and tested in Matlab® and then implemented and simulated in VHDL using Vivado® design environment. Finally, the algorithm was verified on a µTCA-based hardware platform.

Bobrek, Miljko [ORNL] (ORCID:0000000332763451)↗

Measurement and modeling of beam transport in the FODO line of the Spallation Neutron Source Beam Test Facility

Ongoing studies at the Spallation Neutron Source (SNS) Beam Test Facility (BTF) seek to understand and model bunch dynamics in a high-power LINAC front-end. The BTF has recently been upgraded with a reconfiguration from a U-shaped line to a Straight line. We report the current state of model benchmarking, with a focus on RMS beam sizes within the FODO line. The beam measurement is obtained via three camera/screen pairs in the FODO line. This presentation discusses the methodology and results of this measurement.

Thompson, Trent↗

Python-EPICS RF Conditioning Automatic Control System at the Spallation Neutron Source

The RF Test Facility (RFTF) at the Spallation Neutron Source (SNS) is used for the conditioning of RF compo-nents such as ceramic vacuum windows and power cou-plers prior to their installation in the H- ion linear accel-erator. This process exposes components to high-power RF fields and thermal cycling to improve performance and remove surface impurities. To automate and optimize this process, a Python-based EPICS control system was developed alongside targeted hardware upgrades. The system enables real-time monitoring and control of RF power levels, temperature, and vacuum pressure. A user-friendly graphical interface was implemented using CS-Studio (Phoebus), allowing operators to adjust parameters and collect data efficiently. The system integrates a High-Power Protection Module (HPM) for interlocks based on vacuum and arc detection, ensuring safe operation. These upgrades have significantly improved the efficiency, accuracy, and safety of RF conditioning at the SNS RFTF. This paper describes the updated RF conditioning sys-tem, highlighting the software and hardware develop-ments and their application in support of the Proton Pow-er Upgrade (PPU) project.

Lee, Sung-Woo [ORNL] (ORCID:000000030915835X)↗

Physics Considerations for a Harp System Design at the Second Target Station of the Spallation Neutron Source

A harp system is being developed for monitoring proton beam profile direct upstream of the proton beam window at the Second Target Station of the Spallation Neutron Source, Oak Ridge National Laboratory. It consists of two sensor planes which have arrays of thin conducting wires aligned vertically and horizontally, respectively. It monitors beam profiles in two transverse directions to the beam axis by measuring the net-charge depositions in the sensor wires, which are caused by ejection of secondary electrons and delta rays driven by electromagnetic interactions with high energy protons. The net charge deposition in a sensing wire linearly correlates with the number of incident protons on it. This correlation is perturbed when the wire interacts with secondary electrons and delta rays originating from beam matter interactions in neighboring wires, PBW and residual gases. In this paper, we analyze the physical phenomena that affects the measurement uncertainties of the harp using particle transport simulations.

Lee, Yong Joong [ORNL] (ORCID:0000000298381723)↗

Radioisotope production at the Spallation Neutron Source: Design concept of experimental target station

Completion of the Proton Power Upgrade Project for the Spallation Neutron Source (SNS) accelerator at Oak Ridge National Laboratory opens an opportunity to utilize reserve beam power of more than 100 kW for applications beyond neutron production. One of these applications is the production of critical radionuclides. To demonstrate the feasibility of using the reserve beam power to produce radioisotope at SNS, a design concept of a small-scale experimental target station in the Linac Dump area has been developed. This experimental facility will provide isotope yield benchmarking data using protons in the GeV range. It will also enable additional research and development in isotope handling and radiochemical separation. The target station consists of a target module enclosed in a vessel and concrete shielding. Particle transport calculations and thermo-mechanical simulations are used to determine beam parameters, decay time, isotope yield, shielding dimensions, and target design parameters. Calculations verified that the irradiated capsule can be handled manually using hands-off tools and transported to a hot cell in a shielded container for post-irradiation characterizations.

Lee, Yong Joong [ORNL] (ORCID:0000000298381723)↗

Radioisotope production at the Spallation Neutron Source: Design concept of isotope production target

Upon completion of the Second Target Station (STS) Project in the mid 2030s, the Spallation Neutron Source accelerator at Oak Ridge National Laboratory will deliver a 2.7 MW proton beam to the neutron production targets. In the post-STS phase, the accelerator will have a reserve beam power capacity of at least 100 kW beyond what the two neutron production targets will receive, which could potentially be ramped up to 300 kW. In this paper, a design concept for a radioisotope production target that could utilize 250 kW of the reserve beam power capacity is presented. The target consists of thorium discs encapsulated in 316L austenitic steel shells that are cooled by water. The estimated post-irradiation activity of Ac-225 and Ra-225, critical medical radioisotopes used in targeted alpha therapy cancer treatment, is calculated at the end of bombardment after a 14 day long irradiation time. Thermal and structural analyses are performed on the basis of calculated nuclear heating data. The technical feasibility of a high-power target under a 250-kW beam load with an extremely low duty factor of $3.5\cdot 10^{-6}$ is presented from thermal, structural and fatigue lifetime perspectives.

Lee, Yong Joong [ORNL] (ORCID:0000000298381723)↗

Spallation Neutron Source Second Target Station Construction Project: Biological Assessment

The Endangered Species Act of 1973 (16 U.S.C. 153 et seq.), as amended (ESA or Act) in section 7(a)(1) directs Federal agencies to conserve and recover listed species and use their authorities in the furtherance of the purposes of the Act by carrying out programs for the conservation of endangered and threatened species so that listing is no longer necessary (50 CFR §402). Furthermore, the Act in section 7(a)(2) directs Federal agencies to consult (referred to as section 7 consultation) with the U.S. Fish and Wildlife Service (USFWS) when their activities “may affect” a listed species or designated critical habitat. This biological assessment (BA) analyzes the potential effects of the proposed Spallation Neutron Source Second Target Station STS construction project on the U. S. Department of Energy Oak Ridge Reservation (ORR) on Federal listed threatened, endangered, proposed, and under consideration for Federal listing bat species, pursuant to section 7(a)(2) of the ESA.

54 ENVIRONMENTAL SCIENCES↗

Analyses of Dose Rates for Second Inner Reflector Plug Replacement at Spallation Neutron Source

The Inner Reflector Plug (IRP) is a central component of the Spallation Neutron Source (SNS) target monolith, which houses the liquid mercury target and four liter-sized neutron moderator units. It is exposed to high-level radiation fields during routine operation and builds up significant activity. The IRP needs to be replaced due to moderator neutron poison and decoupler burn-out, which is used for shaping neutron pulses. The first IRP exchange took place in March 2018 and next one, which is IRP2, is planned to be replaced during the facility maintenance period in the end of December 2025, beginning of January 2026 calendar year. The replacement of IRP is a complex task due to its location in the area receiving high irradiation, being under significant amount of shielding, and size, which requires removal in segments. For planning the replacement workflow to help to reduce radiation exposure to workers dose rates for each stage of extraction/replacement operation are predicted.

42 ENGINEERING↗