Large Space Shuttle Flight Experiment

It appears practical to challenge the Orbiter DAP with a large, attached structure. The definition of this capability is a fundamental step in the development of nearly all large space systems currently under consideration. Experiment features may be incorporated that apply to control systems for large space systems such as modal damping devices. In a relatively simple deployable structure, the correlation of flight test results with ground test and analysis should provide a basis for extrapolation to more complex structures. Initial experiment concepts will provide a starting point for the examination of antenna feed mast requirements with the objective changing the design to produce a representative test article. Correlation of construction operations with ground simulations will provide for better task and time-line definition. EVA needs to be a direct benefit to the conduct of the experiment. Early consideration of safety issues is a precaution against defining an unacceptable experiment concept. Integration of many objectives seems feasible and is generally perceived as the only way to justify a relatively expensive experiment.

Jenkins, L. M.↗

Small payloads for the Shuttle

The Goddard Space Flight Center, Special Payloads Division (sounding rockets) experience in applying rocket mechanical experience and technology to the Shuttle is presented. While the mechanical design loads are similar, new considerations for thermal extremes, material control and attachment structures must be included. These additional requirements have been successfully introduced in the free flyer class of payloads, Shuttle Pointed Automonous Research Tool for Astronomy (SPARTAN), and a motorized door for the Get Away Special (GAS) payloads.

Nygaard, M. A.↗

The Space Shuttle orbiter payload retention systems

Payloads are secured in the orbiter payload bay by the payload retention system or are equipped with their own unique retention systems. The orbiter payload retention mechanisms provide structural attachments for each payload by using four or five attachment points to secure the payload within the orbiter payload bay during all phases of the orbiter mission. The payload retention system (PRS) is an electromechanical system that provides standarized payload carrier attachment fittings to accommodate up to five payloads for each orbiter flight. The mechanisms are able to function under either l-g or zero-g conditions. Payload berthing or deberthing on orbit is accomplished by utilizing the remote manipulator system (RMS). The retention mechanisms provide the capability for either vertical or horizontal payload installation or removal. The payload support points are selected to minimize point torsional, bending, and radial loads imparted to the payloads. In addition to the remotely controlled latching system, the passive system used for nondeployable payloads performs the same function as the RMS except it provides fixed attachments to the orbiter.

Hardee, J. H.↗

A mobile work station concept for mechanically aided astronaut assembly of large space trusses

This report presents results of a series of truss assembly tests conducted to evaluate a mobile work station concept intended to mechanically assist astronaut manual assembly of erectable space trusses. The tests involved assembly of a tetrahedral truss beam by a pair of test subjects with and without pressure (space) suits, both in Earth gravity and in simulated zero gravity (neutral buoyancy in water). The beam was assembled from 38 identical graphite-epoxy nestable struts, 5.4 m in length with aluminum quick-attachment structural joints. Struts and joints were designed to closely simulate flight hardware. The assembled beam was approximately 16.5 m long and 4.5 m on each of the four sides of its diamond-shaped cross section. The results show that average in-space assembly rates of approximately 38 seconds per strut can be expected for struts of comparable size. This result is virtually independent of the overall size of the structure being assembled. The mobile work station concept would improve astronaut efficiency for on-orbit manual assembly of truss structures, and also this assembly-line method is highly competitive with other construction methods being considered for large space structures.

Heard, W. L., Jr.↗

Spacelab - Beyond development

Spacelab is a series of multiple configuration payload carriers that fit in the Orbiter cargo bay. The carriers, ranging from pressurized modules to simple support structures that span across the cargo bay, provide a variety of payload support services, such as cooling, power distribution, data management, pointing, and structural attachment. Previously published papers have addressed the joint development of the initial Spacelab system by the European Space Agency (ESA) and the National Aeronautics and Space Administration (NASA). Herein, the emphasis will be on the NASA utilization and evaluation of the system into the operational era of the Space Transportation System (STS), system enhancement, additional carrier configuration, the effects of time on system hardware, and subsequent replacements and improvement. All configurations added were intended to fulfill payload requirements not originally foreseen. Subsystem replacements thus far have resulted from life limits or unreliable performance while assessments and plans are underway to look also for increased performance and new payload requirements, to the transition from Spacelab to the Space Station Freedom.

Johnson, Charles W.↗

Cryogenic propellant management system requirements for Space Station Freedom

Specific propellant management system requirements have been identified for each facility category of SSF. Distributed systems have been analyzed to indentify momentum management, guidance, and traffic management requirements associated with the guidance, navigation, and control system; space-to-space communications and enhanced tracking requirements associated with the communications and tracking system; and propellant management system utility requirements associated with the electrical power system. Flight element analyses determined attach structure, utility distribution, and structural integrity requirements for the pre-integrated truss and high mass manipulation and translation requirements for the mobile base system.

Saucillo, R. J.↗

ISS External Payload Accommodations (EXPRESS pallet)

The 'expedite the process of experiments to Space Station' (EXPRESS) pallet which is attached to the DS3 truss segment of the International Space Station (ISS) via the payload attach structure is illustrated. The EXPRESS pallet constitutes the primary ISS external payload carrier. Each pallet carries six robotically replaceable payload adapters which are capable of containing one or more payloads. The following aspects of the EXPRESS program and pallet are illustrated: the concept drivers; the physical integration; the installation and in-orbit replacement; and the experiments to be implemented. The program status is summarized.

Harvey L. Shelton↗

Mechanotransduction: all signals point to cytoskeleton, matrix, and integrins

Mechanical stresses modulate cell function by either activating or tuning signal transduction pathways. Mechanotransduction, the process by which cells convert mechanical stimuli into a chemical response, occurs both in cells specialized for sensing mechanical cues and in parenchymal cells whose primary function is not mechanosensory. However, common among the various responses to mechanical stress is the importance of direct or indirect connections between the internal cytoskeleton, the extracellular matrix (ECM), and traditional signal transducing molecules. In many instances, these elements converge at focal adhesions, sites of structural attachment between the cytoskeleton and ECM that are anchored by cell surface integrin receptors. Alenghat and Ingber discuss the accumulating evidence for the central role of cytoskeleton, ECM, and integrin-anchored focal adhesions in several mechanotransduction pathways.

Review, Tutorial↗

Predatory prokaryotes: predation and primary consumption evolved in bacteria

Two kinds of predatory bacteria have been observed and characterized by light and electron microscopy in samples from freshwater sulfurous lakes in northeastern Spain. The first bacterium, named Vampirococcus, is Gram-negative and ovoidal (0.6 micrometer wide). An anaerobic epibiont, it adheres to the surface of phototrophic bacteria (Chromatium spp.) by specific attachment structures and, as it grows and divides by fission, destroys its prey. An important in situ predatory role can be inferred for Vampirococcus from direct counts in natural samples. The second bacterium, named Daptobacter, is a Gram-negative, facultatively anaerobic straight rod (0.5 x 1.5 micrometers) with a single polar flagellum, which collides, penetrates, and grows inside the cytoplasm of its prey (several genera of Chromatiaceae). Considering also the well-known case of Bdellovibrio, a Gram-negative, aerobic curved rod that penetrates and divides in the periplasmic space of many chemotrophic Gram-negative bacteria, there are three types of predatory prokaryotes presently known (epibiotic, cytoplasmic, and periplasmic). Thus, we conclude that antagonistic relationships such as primary consumption, predation, and scavenging had already evolved in microbial ecosystems prior to the appearance of eukaryotes. Furthermore, because they represent methods by which prokaryotes can penetrate other prokaryotes in the absence of phagocytosis, these associations can be considered preadaptation for the origin of intracellular organelles.

Non-NASA Center↗

Development of Advanced Stirling Radioisotope Generator for Space Exploration

Under the joint sponsorship of the Department of Energy and NASA, a radioisotope power system utilizing Stirling power conversion technology is being developed for potential future space missions. The higher conversion efficiency of the Stirling cycle compared with that of Radioisotope Thermoelectric Generators (RTGs) used in previous missions (Viking, Pioneer, Voyager, Galileo, Ulysses, Cassini, and New Horizons) offers the advantage of a four-fold reduction in PuO2 fuel, thereby saving cost and reducing radiation exposure to support personnel. With the advancement of state-of-the-art Stirling technology development under the NASA Research Announcement (NRA) project, the Stirling Radioisotope Generator program has evolved to incorporate the advanced Stirling convertor (ASC), provided by Sunpower, into an engineering unit. Due to the reduced envelope and lighter mass of the ASC compared to the previous Stirling convertor, the specific power of the flight generator is projected to increase from 3.5 to 7 We/kg, along with a 25 percent reduction in generator length. Modifications are being made to the ASC design to incorporate features for thermal, mechanical, and electrical integration with the engineering unit. These include the heat collector for hot end interface, cold-side flange for waste heat removal and structural attachment, and piston position sensor for ASC control and power factor correction. A single-fault tolerant, active power factor correction controller is used to synchronize the Stirling convertors, condition the electrical power from AC to DC, and to control the ASCs to maintain operation within temperature and piston stroke limits. Development activities at Sunpower and NASA Glenn Research Center (GRC) are also being conducted on the ASC to demonstrate the capability for long life, high reliability, and flight qualification needed for use in future missions.

Chan, Jack↗

Composite fastener for use in high temperature environments

A fastener includes a composite body and a metal coupling attached to the body. The metal coupling includes an attachment structure to connect the fastener to an external structure. An assembly of components includes a first metallic component having a first coefficient of thermal expansion, a second non-metallic component having a second coefficient of thermal expansion different from the first thermal expansion and having a groove that receives a fastener that extends between the groove and the second component, the fastener slidably engaging the groove to accommodate relative expansion between the components.

Miller, Robert J.↗

Two Dimensional Heat Transfer around Penetrations in Multilayer Insulation

The objective of this task was to quantify thermal losses involving integrating MLI into real life situations. Testing specifically focused on the effects of penetrations (including structural attachments, electrical conduit/feedthroughs, and fluid lines) through MLI. While there have been attempts at quantifying these losses both analytically and experimentally, none have included a thorough investigation of the methods and materials that could be used in such applications. To attempt to quantify the excess heat load coming into the system due to the integration losses, a calorimeter was designed to study two dimensional heat transfer through penetrated MLI. The test matrix was designed to take as many variables into account as was possible with the limited test duration and system size. The parameters varied were the attachment mechanism, the buffer material (for buffer attachment mechanisms only), the thickness of the buffer, and the penetration material. The work done under this task is an attempt to measure the parasitic heat loads and affected insulation areas produced by system integration, to model the parasitic loads, and from the model produce engineering equations to allow for the determination of parasitic heat loads in future applications. The methods of integration investigated were no integration, using a buffer to thermally isolate the strut from the MLI, and temperature matching the MLI on the strut. Several materials were investigated as a buffer material including aerogel blankets, aerogel bead packages, cryolite, and even an evacuated vacuum space (in essence a no buffer condition).

Johnson, Wesley L.↗

Modified ACES Portable Life Support Integration, Design, and Testing for Exploration Missions

NASA's next generation of exploration missions provide a unique challenge to designers of EVA life support equipment, especially in a fiscally-constrained environment. In order to take the next steps of manned space exploration, NASA is currently evaluating the use of the Modified ACES (MACES) suit in conjunction with the Advanced Portable Life Support System (PLSS) currently under development. This paper will detail the analysis and integration of the PLSS thermal and ventilation subsystems into the MACES pressure garment, design of prototype hardware, and hardware-in-the-loop testing during the spring 2014 timeframe. Prototype hardware was designed with a minimal impact philosophy in order to mitigate design constraints becoming levied on either the advanced PLSS or MACES subsystems. Among challenges faced by engineers were incorporation of life support thermal water systems into the pressure garment cavity, operational concept definition between vehicle/portable life support system hardware, and structural attachment mechanisms while still enabling maximum EVA efficiency from a crew member's perspective. Analysis was completed in late summer 2013 to 'bound' hardware development, with iterative analysis cycles throughout the hardware development process. The design effort will cumulate in the first ever manned integration of NASA's advanced PLSS system with a pressure garment originally intended primarily for use in a contingency survival scenario.

Kelly, Cody↗

Orion Crew Module / Service Module Structural Weight and Center of Gravity Simulator and Vehicle Motion Simulator Hoist Structure for Orion Service Module Umbilical Testing

An Orion Crew Module Service Module Structural Weight and Center of Gravity Simulator and a Vehicle Motion Simulator Hoist Structure for Orion Service Module Umbilical Testing were designed during a summer 2014 internship in Kennedy Space Centers Structures and Mechanisms Design Branch. The simulator is a structure that supports ballast, which will be integrated into an existing Orion mock-up to simulate the mass properties of the Exploration Mission-1 flight vehicle in both fueled and unfueled states. The simulator mimics these configurations through the use of approximately 40,000 lbf of steel and water ballast, and a steel support structure. Draining four water tanks, which house the water ballast, transitions the simulator from the fueled to unfueled mass properties. The Ground Systems Development and Operations organization will utilize the simulator to verify and validate equipment used to maneuver and transport the Orion spacecraft in its fueled and unfueled configurations. The second design comprises a cantilevered tripod hoist structure that provides the capability to position a large Orion Service Module Umbilical in proximity to the Vehicle Motion Simulator. The Ground Systems Development and Operations organization will utilize the Vehicle Motion Simulator, with the hoist structure attached, to test the Orion Service Module Umbilical for proper operation prior to installation on the Mobile Launcher. Overall, these two designs provide NASA engineers viable concepts worthy of fabricating and placing into service to prepare for the launch of Orion in 2017.

VMS↗

Aircraft Engine Exhaust Nozzle System for Jet Noise Reduction

The aircraft exhaust engine nozzle system includes a fan nozzle to receive a fan flow from a fan disposed adjacent to an engine disposed above an airframe surface of the aircraft, a core nozzle disposed within the fan nozzle and receiving an engine core flow, and a pylon structure connected to the core nozzle and structurally attached with the airframe surface to secure the engine to the aircraft.

Thomas, Russell H.↗

Robonaut 2 - Building a Robot on the International Space Station

In 2010, the Robonaut Project embarked on a multi‐phase mission to perform technology demonstrations on‐board the International Space Station (ISS), showcasing state of the art robotics technologies through the use of Robonaut 2 (R2). This phased approach implements a strategy that allows for the use of ISS as a test bed during early development to both demonstrate capability and test technology while still making advancements in the earth based laboratories for future testing and operations in space. While R2 was performing experimental trials onboard the ISS during the first phase, engineers were actively designing for Phase 2, Intra‐Vehicular Activity (IVA) Mobility, that utilizes a set of zero‐g climbing legs outfitted with grippers to grasp handrails and seat tracks. In addition to affixing the new climbing legs to the existing R2 torso, it became clear that upgrades to the torso to both physically accommodate the climbing legs and to expand processing power and capabilities of the robot were required. In addition to these upgrades, a new safety architecture was also implemented in order to account for the expanded capabilities of the robot. The IVA climbing legs not only needed to attach structurally to the R2 torso on ISS, but also required power and data connections that did not exist in the upper body. The climbing legs were outfitted with a blind mate adapter and coarse alignment guides for easy installation, but the upper body required extensive rewiring to accommodate the power and data connections. This was achieved by mounting a custom adapter plate to the torso and routing the additional wiring through the waist joint to connect to the new set of processors. In addition to the power and data channels, the integrated unit also required updated electronics boards, additional sensors and updated processors to accommodate a new operating system, software platform, and custom control system. In order to perform the unprecedented task of building a robot in space, extensive practice sessions and meticulous procedures were required. Since crew training time is at a premium, the R2 team took a skills‐based training approach to ensure the astronauts were proficient with a basic skill set while refining the detailed procedures over several practice sessions and simulations. In addition to the crew activities, meticulous ground procedures were required in order to upgrade firmware on the upper body motor drivers. The new firmware for the IVA mobility unit needed to be deployed using the old software system. This also provided an opportunity to upgrade the upper body joints with new software and allowed for limited insight into the success of the updates. Complete verification that the updated firmware was successfully loaded was not confirmed until the rewiring of the upper body torso was complete.

Diftler, Myron↗

Vented Launch Vehicle Adaptor for a Manned Spacecraft with "Pusher" Launch Abort System

A system, method, and apparatus for a vented launch vehicle adaptor (LVA) for a manned spacecraft with a "pusher" launch abort system are disclosed. The disclosed LVA provides a structural interface between a commercial crew vehicle (CCV) crew module/service module (CM/SM) spacecraft and an expendable launch vehicle. The LVA provides structural attachment of the module to the launch vehicle. It also provides a means to control the exhaust plume from a pusher-type launch abort system that is integrated into the module. In case of an on-pad or ascent abort, which requires the module to jettison away from the launch vehicle, the launch abort system exhaust plume must be safely directed away from critical and dangerous portions of the launch vehicle in order to achieve a safe and successful jettison.

Vandervort, Robert E.↗

NASA Docking System Block 1: NASA's New Direct Electric Docking System Supporting ISS and Future Human Space Exploration

The NASA Docking System (NDS) Block 1 is a key component of NASA's vision for space exploration. It is designed to provide capability for visiting vehicles to dock to the International Space Station's recently-installed International Docking Adapter ports. It is the first docking system to be developed by NASA since the Apollo-Soyuz Test Project of the 1970's. The NDS Block 1 includes provisions for capture, structural attachment, power/data transfer, and undocking. It uses a direct-drive electromechanical Stewart Platform capture system architecture, along with an innovative automated control scheme, to achieve an unprecedented level of performance and simplicity. Its design implements the new International Docking System Standard, which will be a key enabler of diverse and flexible exploration missions in future iterations. NDS qualification was completed in 2017 to support a planned first flight in 2018 on the Boeing CST-100 Starliner.