Search NASA⌕ Search

SEARCH · Search NASA

Results for “Study”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Outer planet entry probe system study. Volume 4: Common Saturn/Uranus probe studies

Results are summarized of a common scientific probe study to explore the atmospheres of Saturn and Uranus. This was a three-month follow-on effort to the Outer Planet Entry Probe System study. The report presents: (1) a summary, conclusions and recommendations of this study, (2) parametric analysis conducted to support the two system definitions, (3) common Saturn/Uranus probe system definition using the Science Advisory Group's exploratory payload and, (4) common Saturn/Uranus probe system definition using an expanded science complement. Each of the probe system definitions consists of detailed discussions of the mission, science, system and subsystems including telecommunications, data handling, power, pyrotechnics, attitude control, structures, propulsion, thermal control and probe-to-spacecraft integration. References are made to the contents of the first three volumes where it is feasible to do so.

Source record↗

Life sciences payload definition and integration study, task C and D. Volume 2: Payload definition, integration, and planning studies

The Life Sciences Payload Definition and Integration Study was composed of four major tasks. Tasks A and B, the laboratory definition phase, were the subject of prior NASA study. The laboratory definition phase included the establishment of research functions, equipment definitions, and conceptual baseline laboratory designs. These baseline laboratories were designated as Maxi-Nom, Mini-30, and Mini-7. The outputs of Tasks A and B were used by the NASA Life Sciences Payload Integration Team to establish guidelines for Tasks C and D, the laboratory integration phase of the study. A brief review of Tasks A and B is presented provide background continuity. The tasks C and D effort is the subject of this report. The Task C effort stressed the integration of the NASA selected laboratory designs with the shuttle sortie module. The Task D effort updated and developed costs that could be used by NASA for preliminary program planning.

Source record↗

Shuttle filter study. Volume 2: Contaminant generation and sensitivity studies

Contaminant generation studies were conducted at the component level using two different methods, radioactive tracer technique and gravimetric analysis test procedure. Both of these were reduced to practice during this program. In the first of these methods, radioactively tagged components typical of those used in spacecraft were studied to determine their contaminant generation characteristics under simulated operating conditions. Because the purpose of the work was: (1) to determine the types and quantities of contaminants generated; and (2) to evaluate improved monitoring and detection schemes, no attempt was made to evaluate or qualify specific components. The components used in this test program were therefore not flight hardware items. Some of them had been used in previous tests; some were obsolete; one was an experimental device. In addition to the component tests, various materials of interest to contaminant and filtration studies were irradiated and evaluated for use as autotracer materials. These included test dusts, plastics, valve seat materials, and bearing cage materials.

Source record↗

Spacelab user implementation assessment study (software requirements analysis). Volume 1: Executive study

The primary objective of this study was to develop an integrated approach for the development, implementation, and utilization of all software that is required to efficiently and cost-effectively support advanced technology laboratory flight and ground operations. It was recognized that certain aspects of the operations would be mandatory computerized services; computerization of other aspects would be optional. Thus, the analyses encompassed not only alternate computer utilization and implementations but trade studies of the programmatic effects of non-computerized versus computerized approaches to the operations. A general overview of the study is presented.

Source record↗

Orbit Transfer Vehicle Engine Study. Phase A, extension 1: Study plan update

The updated study plan for the Space Transportation System orbit transfer vehicle (OTV) engine study is presented. The study program consists of engine system, programmatic, cost, and risk analyses of OTV engine concepts. Detailed task descriptions for the advanced expander cycle engine optimization, alternate low thrust capability, and safety, reliability, and cost comparisons are given.

Mellish, J. A.↗

Extravehicular Crewman Work System (ECWS) study program: Prebreathe elimination study

The study examined impacts of changing Orbiter cabin pressure and EMU EVA pressure to eliminate pure O2 prebreathing prior to EVA. The investigation defines circumscribing physiological boundaries and identifies changes required within Orbiter to reduce cabin pressure. The study also identifies payload impacts, payload flight assignment constraints, and impacts upon EMU resulting from raising EVA pressure. The study presents the trade-off which optimizes the choice of reduced cabin pressure and increased EVA pressure.

Wilde, R. L.↗

Research study: Studies in atmospheric processes from Space Platforms

Activities of the project for studies in atmospheric processes from space platforms are described. Topics include feasibility studies for a Low Altitude Research Satellite system, a satellite borne Doppler lidar wind monitoring system, the relationship between solar variability and weather, atmospheric modeling, cloud physics, and aerosol studies.

Source record↗

Shuttle-tethered satellite system definition study. Volume 1: Executive study

The Tethered Satellite System has great prospects for extending orbital operations capability of the Space Transportation System to science, applications, and technology projects not otherwise attainable. The system will installed in the Shuttle Orbiter and will have the capability to deploy a captive satellite up to 100 km away from the Orbiter. Control and retrieval of the satellite are accomplished by means of a tether line connecting the satellite and the cargo bay mounted equipment in the Orbiter. At low satellite altitudes, the system will permit investigations of a duration that could not be pursued with sounding rockets of free-flying spacecraft. The propose of the Shuttle/Tethered Satellite System Definition Study was to produce the preliminary design, preliminary specifications, gross program plans, and program cost estimate for a 1982 operational verification flight. This was accomplished during a fifteen month effort under by the NASA George C. Marshall Space Flight Center (MSFC). The MSFC Phase 1 and related studies demonstrated the feasibility of the system and served as a starting point for the Phase 2 definition study.

Source record↗

Space station data system analysis/architecture study. Task 3: Trade studies, DR-5, volume 1

The primary objective of Task 3 is to provide additional analysis and insight necessary to support key design/programmatic decision for options quantification and selection for system definition. This includes: (1) the identification of key trade study topics; (2) the definition of a trade study procedure for each topic (issues to be resolved, key inputs, criteria/weighting, methodology); (3) conduct tradeoff and sensitivity analysis; and (4) the review/verification of results within the context of evolving system design and definition. The trade study topics addressed in this volume include space autonomy and function automation, software transportability, system network topology, communications standardization, onboard local area networking, distributed operating system, software configuration management, and the software development environment facility.

Source record↗

SRB/SLEEC (Solid Rocket Booster/Shingle Lap Extendible Exit Cone) feasibility study, volume 2. Appendix A: Design study for a SLEEC actuation system

The results are presented of a design feasibility study of a self-contained (powered) actuation system for a Shingle Lap Extendible Exit Cone (SLEEC) for Transportation System (STS). The evolution of the SLEEC actuation system design is reviewed, the final design concept is summarized, and the results of the detailed study of the final concept of the actuation system are treated. A conservative design using proven mechanical components was established as a major program priority. The final mechanical design has a very low development risk since the components, which consist of ballscrews, gearing, flexible shaft drives, and aircraft cables, have extensive aerospace applications and a history of proven reliability. The mathematical model studies have shown that little or no power is required to deploy the SLEEC actuation system because acceleration forces and internal pressure from the rocket plume provide the required energies. A speed control brake is incorporated in the design in order to control the rate of deployment.

Thompson, D. S.↗

Orbital transfer vehicle concept definition and system analysis study, 1986. Volume 9: Study extension results

The purpose of this extension to the OTV Concept Definition and Systems Analysis Study was to improve the definition of the OTV Program that will be most beneficial to the nation in the 1995 to 2010 timeframe. The implications of the defined mission and defined launch vehicle are investigated. The key mission requirements identified for the Space Transportation Architecture Study (STAS) were established and reflect a need for early capability and more ambitious capability growth. The key technical objectives and related issues addressed are summarized. The analyses of selected areas including aerobrake design, proximity operations, and the balance of EVA and IVA operations used in the support of the OTV at the space-base were enhanced. Sensitivity studies were conducted to establish how the OTV program should be tailored to meet changing circumstances.

Kofal, Allen E.↗

Electrodynamic tether system study: Extended study

This document is the final report of a study performed by Ball Space Systems Division (BSSD) for the NASA Johnson Space Center under an extension to contract NAS9-17666. The tasks for the extended study were as follows: (1) Define an interface between the Electrodynamic Tether System (ETS) and the Space Station (SS); (2) Identify growth paths for the 100 kW ETS defined in the original study to a 200 kW level of performance; (3) Quantify orbit perturbations caused by cyclic day/night operations of a Plasma Motor/Generator (PMG) on the SS and explore methods of minimizing these effects; (4) Define the analyses, precursor technology, ground tests, and precursor demonstrations leading up to a demonstration mission for an electrodynamic tether system that would be capable of producing maneuvering thrust levels of 25 newtons; and (5) Propose a development schedule for the demonstration mission and preliminary cost estimates.

Source record↗

Geostationary platform study: Advanced ESGP/evolutionary SSF accommodation study

The implications on the evolutionary space station of accommodating geosynchronous Earth Orbit (GEO) facilities are assessed. These facilities include unmanned satellites and platforms, manned elements, and transportation and servicing vehicles/elements. The latest existing definitions of typical unmanned GEO facilities and transportation and servicing vehicles/elements are utilized. The physical design, functional design, and operations implications at the space station are determined. Various concepts of the space station from past studies are utilized ranging from the IOC Multifunction Space Station to a branched transportation node space station and the implications of accommodating the GEO infrastructure at each type are assessed. Where possible, parametric data is provided to show the implications of variations in sizes and quantities of elements, launch rates, crew sizes, etc. The use of advanced automation, robotics equipment, and an efficient mix of manned/automated support for accomplishing necessary activities at the space station are identified and assessed. The products of this study are configuration sketches, resource requirements, trade studies, and parametric data.

Source record↗

Geostationary platform study: Advanced ESGP/evolutionary SSF accommodation study

The implications on the evolutionary space station of accommodating geosynchronous Earth Orbit (GEO) facilities including unmanned satellites and platforms, manned elements, and transportation and servicing vehicles/elements. The latest existing definitions of typical unmanned GEO facilities and transportation and servicing vehicles/elements are utilized. The physical design, functional design, and operations implications at the space station are determined. Various concepts of the space station from past studies are utilized ranging from the IOC Multifunction Space Station to a branched transportation node space station, and the implications of the accommodation the GEO infrastructure of each type are assessed. Where possible, parametric data are provided to show the implications of variations in sizes and quantities of elements, launch rates, crew sizes, etc. The use of advanced automation, robotics equipment, and an efficient mix of manned/automated support for accomplishing necessary activities at the space station are identified and assessed. The products of this study are configuration sketches, resource requirements, trade studies, and parametric data.

Source record↗

Advanced transportation system studies, technical area 3. Alternate propulsion subsystem concepts: J-2S restart study

The objectives were to assess what design changes would be required to remit late production of the J-2S engine for use as a large high energy upper stage engine. The study assessed design changes required to perform per the J-2S model specification, manufacturing changes required due to obsolescence or improvements in state-of-the-practice, availability issues for supplier provided items, and provided cost and schedule estimates for this configuration. The confidence that J-2S production could be reinitiated within reasonable costs and schedules was provided. No significant technical issues were identified in either the producibility study or in the review of previous technical data. Areas of potential cost reduction were identified which could be quantified to a greater extent with further manufacturing planning. The proposed schedule can be met with no foreseeable impacts. The results of the study provided the necessary foundation for the detailed manufacturing and test plans and non-recurring and recurring cost estimates that are needed to complete the effort to reinitiate production of the J-2S engine system.

Vilja, John↗

Mars power system concept definition study. Volume 1: Study results

A preliminary top level study was completed to define power system concepts applicable to Mars surface applications. This effort included definition of power system requirements and selection of power systems with the potential for high commonality. These power systems included dynamic isotope, Proton Exchange Membrane (PEM) regenerative fuel cell, sodium sulfur battery, photovoltaic, and reactor concepts. Design influencing factors were identified. Characterization studies were then done for each concept to determine system performance, size/volume, and mass. Operations studies were done to determine emplacement/deployment maintenance/servicing, and startup/shutdown requirements. Technology development roadmaps were written for each candidate power system (included in Volume 2). Example power system architectures were defined and compared on a mass basis. The dynamic isotope power system and nuclear reactor power system architectures had significantly lower total masses than the photovoltaic system architectures. Integrated development and deployment time phasing plans were completed for an example DIPS and reactor architecture option to determine the development strategies required to meet the mission scenario requirements.

Littman, Franklin D.↗