Search NASA⌕ Search

SEARCH · Search NASA

Results for “Total suspended solids”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

39 records · Page 3

Modified Isotherm Modeling to Predict Cs Exchange with Crystalline Silicotitanate in Tank Waste Simulants

The U.S. Department of Energy is working to expedite processing of Hanford tank waste supernate at the Hanford Waste Treatment and Immobilization Plant. To support this goal, Washington River Protection Solutions is designing a Tank Side Cesium Removal (TSCR) system for suspended solids and cesium (Cs/ 137 Cs) removal from Hanford tank waste supernate. The ion exchange media selected for Cs removal at TSCR is crystalline silicotitanate (CST) that is manufactured in a nearly spherical form by Honeywell UOP LLC (UOP; Des Plaines, IL) as product IONSIV® R9140-B (Na form). The Zheng Anthony Miller (ZAM) isotherm model (Zheng et al. 1997) is a multicomponent ion exchange model used to predict the exchange of Group I metals onto CST. The ZAM isotherm has historically been used to predict Cs distribution values from Hanford and Savannah River Site (SRS) tank waste simulants. Figure S.1 summarizes model predictions from the ZAM isotherm that indicate poor prediction of Cs distribution values for simple and complex simulants with the engineered form of CST, IONSIV® R9140-B, and IONSIV® R9120-B where the solid line indicates a perfect fit by the model. The dotted lines indicate ±20% error. Batch contact testing with Hanford tank waste complex and simple simulants was used in conjunction with SRS simulants to experimentally determine Cs distribution values using a modification to the original isotherm model. The experimentally determined maximum Cs capacity for IONSIV® R9140-B CST in both the simple and complex matrices was found to be 0.53±0.3 mmoles Cs/g of CST. This value is not drastically different from the maximum Cs capacity of 0.58 mmoles Cs/g TAM-5 reported by Zheng et al. (1997). However, it is important to note that TAM-5 (commercially IONSIV® IE-910) is a powder. Hamm et al. (2002) determined that a dilution factor was needed to account for the Zr(OH)2 binder in the engineered form of CST. Hamm et al. determined that a dilution factor of 0.68 was appropriate to account for binder contribution and correct overprediction of Cs exchange on the engineered form of CST in ZAM calculations. This reduced the total capacity from 0.58 mmol/g with TAM-5 to 0.39 mmol/g for the engineered form of CST (Hamm et al. 2002). Despite substituting the experimentally determined maximum Cs capacity of 0.55 mmoles Cs/g for the literature-reported capacity of 0.39 mmoles Cs/g, it was determined that additional modifications to the model’s equilibrium rate constants were necessary in refining the isotherm model. The modified model overpredicted K+ uptake by the CST when compared to digested CST results described by Campbell et al. (2019). The modified model was further revised to omit three of the five K+ exchange equilibrium reactions described by ZAM to reduce the additional K+ loading seen by the model. Figure S.2 summarizes the revised model isotherm predictions plotted against measured Kd values.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cesium Ion Exchange Testing Using Crystalline Silicotitanate with Hanford Tank Waste 241-AP-107

At the time of this testing, the Low-Activity Waste Pretreatment System (LAWPS) was to provide for the initial production of immobilized low-activity waste by feeding Hanford tank supernate from tank farms to the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Facility for immobilization. Washington River Protection Solutions requested that Hanford tank waste collected from tank 241-AP-107 (hereafter called AP-107) be processed using conceived pretreatment steps (suspended solids removal by filtration, Cs removal by ion exchange) then vitrified. A small-scale test platform to demonstrate the solids filtration, Cs removal, and LAW vitrification was constructed and installed at Pacific Northwest National Laboratory. Bench-scale ion exchange testing with approximately 9 L of AP-107 supernate was conducted using crystalline silicotitanate (CST) ion exchange media. The IONSIV R9140-B CST was provided by Honeywell UOP, LLC in 2018 (Batch 2081000057). The ion exchange media was first tested with simulant and was previously described. This report describes the Cs ion exchange batch contact and column test results with the AP-107 tank waste. Batch contact testing helps to evaluate CST performance on tank waste supernate prior to processing it in the ion exchange columns. Batch contacts were performed with the waste at four Cs concentrations at a phase ratio of 200 (liquid volume to exchanger mass) with AP-107. The distribution coefficient (K d ) at the equilibrium condition of 8.57 µg Cs/mL (AP-107 feed condition) was determined to be 669 mL AP-107/g CST. With a CST bed density of 1.00 g/mL, this K d corresponded to a predicted 50% Cs breakthrough of 669 bed volumes (BVs). The Cs load capacity at the equilibrium feed condition was determined to be 7.5 mg Cs/g dry CST. The column testing was prototypic to the intended LAWPS operations in a lead-lag column format, although on a small-scale basis with 10-mL CST beds. The feed was processed downflow through the lead column and then through the lag column at ~2.2 BV/h. Loading continued until the lag column reached the WTP waste acceptance criteria (WAC) for receiving supernatant waste for vitrification (a function of the Na and 137 Cs concentrations). For AP-107, the WAC is 0.114% of the influent 137 Cs concentration; this required a Cs decontamination factor of 876. The Cs effluent from the lag column reached the WAC after processing ~410 BVs. To keep the subsequent product effluent below the WAC, a replacement lag column was prepared, the lead column was removed from service (after processing a total of 471 BVs), the lag column was put into the lead column position, and the replacement lag column was installed. Feed processing continued and after another ~290 BVs the Cs effluent from the lag column again exceeded the WAC. In both cases, the lead columns only reached 25% Cs breakthrough before removal. Although 50% Cs breakthrough was not reached, this value was estimated and averaged based on extrapolation of the loading curves (640 BVs) and agreed within 4% of the predicted 50% Cs breakthrough from batch contact test results (669 BVs). Table ES.1 summarizes the observed column performance and relevant Cs loading characteristics.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Blue Rock CropSpanPV - Low Cost Racking for Agricultural Solar Photovoltaics

In this work, a total of four solar panel layouts, applied to Agrivoltaics, are investigated. This study presents two hypotheses: 1. Prefabrication - Lower total cost can be achieved by constructing a pre-assembled, pre-wired solar array in a factory, with automation, then rapidly deploying it in the field. 2. Tension Structures - Using tension structures in a way to suspend an overhead solar array also reduces costs when compared to conventional support methods. Designs are presented for frames to hold the panels. Configurations are advanced to connect the frames into arrays. Supports and foundations to hold the arrays in the desired layout are calculated, selected and presented. Cost models are prepared for the four layouts, which include definition of the business enterprise, the manufacturing operation, and the required facility for production at scale. Cost models include, detail material and task/labor take-offs for both manufacturing and installation. Comparisons with conventional system adapted to Agrivoltaics reveal that the two hypotheses do not hold true. A prefabricated array requires additional material that is not needed in the base system and the cost of this additional material is not outweighed by the cost savings of reduced field installation. The cost of wire rope for a tension structure does result in an economy of material, however, the cost of end connections and tensioning devices adds significantly to the cost of the overall tension structure. Foundation loads with tension structures, especially the large wind uplift seen with a fixed tilt solar array, impose significant constraints and high costs. The following conclusions are recommended for further consideration: 1. Best Case Agrivoltaic Configuration - The best value/lowest cost configuration for agrivoltaics is the installation of solar panels mounted on a single axis tracker in either a 2-in-portrait or 2-in landscape arrangement. This is useful for grazing lands and for staple crops which require high light levels. These applications represent the vast majority of the potential agrivoltaic market. Important elements in this configuration are the specific geometric layout coordinated with the various field operations and a control system linked between the farm equipment and single axis tracker. The control system is to monitor location and orientation, then actively tilt the solar panels or brake the field equipment to provide clearance and avoid collisions. 2. Long Span Applications - The use of tension structures for an overhead fixed tilt array is beneficial where long spans are a necessity, especially where the base support in the project location has consolidated rock near the surface or some other solid structure. One application is spanning wide irrigation canals. Another may be as an installation at the top deck of parking structures. 3. Direct Ground Mount Configuration – Having skids at the base of a pre-fabricated array that extend when the array is deployed, could be a successful design. This could be a useful strategy for dense, flat, ground-mount configurations like that employed by a couple of successful commercial operations (5G Maverick and Erthos). Arrays would be orientated north and south, deployed very low on prepared grade. Arrays would be aligned closely next to each other and anchored with small ground screws or simply with ballast. This same product arrangement could be very useful for rapid deployment and set-up of solar arrays for temporary deployments, disaster response and the military operations

14 SOLAR ENERGY↗