Search NASA⌕ Search

SEARCH · Search NASA

Results for “Trans Earth Injection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Launch Order, Launch Separation, and Loiter in the Constellation 1 1/2-Launch Solution

The NASA Constellation Program (CxP) is developing a two-element Earth-to-Orbit launch system to enable human exploration of the Moon. The first element, Ares I, is a human-rated system that consists of a first stage based on the Space Shuttle Program's solid rocket booster (SRB) and an upper stage that consists of a four-crew Orion capsule, a service module, and a Launch Escape System. The second element, Ares V, is a Saturn V-plus category launch system that consists of the core stage with a cluster of six RS-68B engines and augmented with two 5.5-segment SRBs, a Saturn-derived J-2X engine powering an Earth Departure Stage (EDS), and the lunar-lander vehicle payload, Altair. Initial plans called for the Ares V to be launched first, followed the next day by the Ares I. After the EDS performs the final portion of ascent and subsequent orbit circularization, the Orion spacecraft then performs a rendezvous and docks with the EDS and its Altair payload. Following checkout, the integrated stack loiters in low Earth orbit (LEO) until the appropriate Trans-Lunar Injection (TLI) window opportunity opens, at which time the EDS propels the integrated Orion Altair to the Moon. Successful completion of this 1 1/2-launch solution carries risks related to both the orbital lifetime of the assets and the probability of achieving the launch of the second vehicle within the orbital lifetime of the first. These risks, which are significant in terms of overall system design choices and probability of mission success, dictated a thorough reevaluation of the launch strategy, including the order of vehicle launch and the planned time period between launches. The goal of the effort described in this paper was to select a launch strategy that would result in the greatest possible expected system performance, while accounting for launch risks and the cost of increased orbital lifetime. Discrete Event Simulation (DES) model of the launch strategies was created to determine the probability of a second launch not occurring in a timely fashion (i.e., before the assets waiting in LEO expire). An overview of the launch strategy evaluation process is presented, along with results of specific cases that were analyzed. A high-level comparison of options is then presented, along with the conclusion derived from the analysis.

Stromgren, Chel↗

Lunar Base Construction Overview

Previous lunar missions and campaigns have been restricted to using robotic landers and lunar orbiting satellites as well as sortie type of operations using astronaut crews (NASA Apollo program). The next phase of lunar exploration has begun under NASA’s Artemis program and there has been an international response where other nations such as China, Russia, India, Canada, Japan and the European Union of nations, have all expressed interest in either collaborating or competing with NASA on the Moon. This next phase has an over arching goal of achieving a permanent human presence on the Moon via sustainable methods. A lunar base with human occupancy will require infrastructure to provide shelter, utilities, landing/launch pads, roads, communications, power and all the other necessities to sustain human life and protect equipment. Since human biology is not well suited for surviving in the lunar environment, there will be many forms of automated equipment, autonomy and robotic helpers that will minimize the amount of Extra-Vehicular Activity (EVA) required by the crew. This will mean that the radiation dosage received by the crew will stay within acceptable and safe career doses. The required infrastructure must be constructed, but the mass and logistics of bringing all the construction materials from Earth are prohibitive, which makes the necessary construction difficult to achieve. In-Situ Resource Utilization (ISRU) aims to solve this challenge by sourcing construction materials locally or “in-situ”. This means that their transportation can be completely eliminated, resulting in large cost savings by avoiding the launch out of Earth’s deep gravity well and subsequent trans lunar injection, lunar orbit capture and landing. This paper will give an overview of the required construction tasks and related equipment that will be required to robotically build a lunar base using in-situ resources. It will also organize these tasks into logical groupings so that technology development and implementation can be pursued within a framework that can be referenced by all involved.

Construction↗

Lunar Base Construction Overview

Previous lunar missions and campaigns have been restricted to using robotic landers and lunar orbiting satellites as well as sortie type of operations using astronaut crews (NASA Apollo program). Now, the next phase of lunar exploration has begun under NASA’s Artemis program and there has been an international response where other nations such as China, Russia, India, Canada, Japan and the European Union of nations, have all expressed interest in either collaborating or competing with NASA on the Moon. This next phase has an over arching goal of achieving a permanent human presence on the Moon via sustainable methods. A lunar base with human occupancy will require infrastructure to provide shelter, utilities, landing/launch pads, roads, communications, power and all the other necessities to sustain human life and protect equipment. Since human biology is not well suited for surviving in the lunar environment, there will be many forms of automated equipment, autonomy and robotic helpers that will minimize the amount of Extra-Vehicular Activity (EVA) required by the crew. This will mean that the radiation dosage received by the crew will stay within acceptable and safe career doses. Radiation shielding via the use of regolith can also mitigate radiation dangers. The required infrastructure must be constructed, but the mass and logistics of bringing all the construction materials from Earth are prohibitive, which makes the necessary construction difficult to achieve. In-Situ Resource Utilization (ISRU) aims to solve this challenge by sourcing construction materials locally or “in-situ”. This means that their transportation can be completely eliminated, resulting in large cost savings by avoiding the launch out of Earth’s deep gravity well and subsequent trans lunar injection, lunar orbit capture and landing. This paper will give an overview of the required construction tasks and related equipment that will be required to robotically build a lunar base using in-situ resources. It will also organize these tasks into logical groupings so that technology development and implementation can be pursued within a framework that can be referenced by all involved.

Lunar Base↗

Lunar Base Construction Planning

Previous lunar missions and campaigns have been restricted to using robotic landers and lunar orbiting satellites as well as sortie type of operations using astronaut crews(NASA Apollo program).Now, the next phase of lunar exploration has begun under NASA’s Artemis program and there has been an international response where other nations such as China, Russia, India, Canada, Japan and theEuropean Union of nations, have all expressed interest in either collaborating or competing with NASA on theMoon. This next phase has an overarching goal of achieving a permanent human presence on theMoon via sustainable methods. A lunar base with human occupancy will require infrastructure to provide shelter, utilities, landing/launch pads, roads, communications, power and all the other necessities to sustain human life and protect equipment.Since human biology is not well suited for surviving in the lunar environment, there will be many forms of automated equipment, autonomy and robotic helpers that will minimize the amount of Extra-Vehicular Activity(EVA) required by the crew. This will mean that the radiation dosage received by the crew will stay within acceptable and safe career doses. Radiation shielding via the use of regolith can also mitigate radiation dangers.The required infrastructure must be constructed, but the mass and logistics of bringing all the construction materials from Earth are prohibitive, which makes the necessary construction difficult to achieve.In-Situ Resource Utilization (ISRU) aims to solve this challenge by sourcing construction materials locally or “in-situ”. This means that their transportation can be completely eliminated, resulting in large cost savings by avoiding the launch out of Earth’s deep gravity well and subsequent trans lunar injection, lunar orbit capture and landing. This paper will give ahistorical review and current status of lunar construction planning and a high level introduction to the required infrastructure and construction equipment that will be required to robotically build a lunar base using in-situ resources.It will also organize these tasks into logical groupings so that technology development and implementation can be pursued within a framework that can be referenced by all involved.

Lunar↗

Exploration Launch Projects RS-68B Engine Requirements for NASA's Heavy Lift Ares V

NASA's Vision for Exploration requires a safe, efficient, reliable, and versatile launch vehicle capable of placing large payloads into Earth orbit for transfer to the Moon and destinations beyond. The Ares V Cargo Launch Vehicle (CaLV) will provide this heavy lift capability. The Ares V launch concept is shown in Fig. 1. When it stands on the launch pad at Kennedy Space Center late in the next decade, the Ares V stack will be almost 360 feet tall. As currently envisioned, it will lift 133,000 to 144,000 pounds to trans-lunar injection, depending on the length of loiter time on Earth orbit. This presentation will provide an overview of the Constellation architecture, the Ares launch vehicles, and, specifically, the latest developments in the RS-68B engine for the Ares V.

Sumrall, John P.↗

Fast Track NTR Systems Assessment for NASA's First Lunar Outpost Scenario

Integrated systems and mission study results are presented which quantify the rationale and benefits for developing and using nuclear thermal rocket (NTR) technology for returning humans to the moon in the early 2000's. At present, the Exploration Program Office (ExPO) is considering chemical propulsion for its 'First Lunar Outpost' (FLO) mission, and NTR propulsion for the more demanding Mars missions to follow. The use of an NTR-based lunar transfer stage, capable of evolving to Mars mission applications, could result in an accelerated schedule, reduced cost approach to moon/Mars exploration. Lunar mission applications would also provide valuable operational experience and serve as a 'proving ground' for NTR engine and stage technologies. In terms of performance benefits, studies indicate that an expendable NTR stage powered by two 50 klbf engines can deliver approximately 96 metric tons (t) to trans-lunar injection (TLI) conditions for an initial mass in low earth orbit (IMLEO) of approximately 199 t compared to 250 t for a cryogenic chemical TLI stage. The NTR stage liquid hydrogen (LH2) tank has a 10 m diameter, 14.8 m length, and 68 t LH2 capacity. The NTR utilizes a 'graphite' fuel form consisting of coated UC2 particles in a graphite substrate, and has a specific impulse capability of approximately 870 s, and an engine thrust-to-weight ratio of approximately 4.8. The NTR stage and its piloted FLO lander has a total length of approximately 38 m and can be launched by a single Saturn V-derived heavy lift launch vehicle (HLLV) in the 200 to 250 t-class range. The paper summarizes NASA's First Lunar Outpost scenario, describes characteristics for representative engine/stage configurations, and examines the impact on engine selection and vehicle design resulting from a consideration of alternative NTR fuel forms and lunar mission profiles.

Borowski, Stanley K.↗

Fast Track Lunar NTR Systems Assessment for NASA's First Lunar Outpost and Its Evolvability to Mars

Integrated systems and missions studies are presented for an evolutionary lunar-to-Mars space transportation system (STS) based on nuclear thermal rocket (NTR) technology. A 'standardized' set of engine and stage components are identified and used in a 'building block' fashion to configure a variety of piloted and cargo, lunar and Mars vehicles. The reference NTR characteristics include a thrust of 50 thousand pounds force (klbf), specific impulse (I(sub sp)) of 900 seconds, and an engine thrust-to-weight ratio of 4. 3. For the National Aeronautics and Space Administrations (NASA) First Lunar Outpost (FLO) mission, and expendable NTR stage powered by two such engines can deliver approximately 96 metric tonnes (t) to trans-lunar injection (TLI) conditions for an initial mass in low Earth orbit (IMLEO) of approximately 198 t compared to 250 t for a cryogenic chemical system. The stage liquid hydrogen (LH2) tank has a diameter, length, and capacity of 10 m, 14.5 m and 66 t, respectively. By extending the stage length and LH2 capacity to approximately 20 m and 96 t, a single launch Mars cargo vehicle could deliver to an elliptical Mars parking orbit a 63 t Mars excursion vehicle (MEV) with a 45 t surface payload. Three 50 klbf engines and the two standardized LH2 tanks developed for the lunar and Mars cargo vehicles are used to configure the vehicles supporting piloted Mars missions as early as 2010. The 'modular' NTR vehicle approach forms the basis for an efficient STS able to handle the needs of a wide spectrum of lunar and Mars missions.

Borowski, Stanley K.↗

Current Status of NASA's Heavy Lift Plans

Numerous studies since the Apollo Program of the 1960s have highlighted the benefits of - and the need for - a national heavy lift launch capability to support human exploration, science, national security, and commercial development of space. NASA's most recent and most refined effort to develop that heavy lift capability is the Ares V. Ares V is a key element of NASA's Constellation Program. It s overall goal s part of approved national space policy is to retire the Space Shuttle and develop its successor, complete the International Space Station, and resume human exploration beyond low Earth orbit (LEO), beginning with exploration of the Moon as a step to other destinations in the Solar System. Ares V s first role is that of cargo vehicle to carry a lunar lander into Earth orbit, rendezvous with astronauts launched on the smaller Ares I crew launch vehicle, and perform the trans lunar injection (TLI) mission to send the mated crew and lander vehicles to the Moon. The design reference missions (DRMs) envisioned for it also include direct lunar cargo flights and a human Mars mission. Although NASA's priority from the start of the Constellation Program to the present has been development of the Ares I and Orion crew vehicle to replace the retiring Shuttle fleet, the Ares team has made significant progress in understanding the performance, design trades, technology needs, mission scenarios, ground and flight operations, cost, and other factors associated with heavy lift development. The current reference configuration was selected during the Lunar Capabilities Concept Review (LCCR) in fall 2008. That design has served since then as a point of departure for further refinements and trades among five participating NASA field centers. Ares V development to date has benefited from progress on the Ares I due to commonality between the vehicles. The Ares I first stage completed a successful firing of a 5-segment solid rocket motor. The Ares I-X launch Numerous studies since the Apollo Program of the 1960s have highlighted the benefits of and the need for - a national heavy lift launch capability to support human exploration, science, national security, and commercial development of space. NASA s most recent and most refined effort to develop that heavy lift capability is the Ares V. Ares V is a key element of NASA s Constellation Program. It s overall goal s part of approved national space policy is to retire the Space Shuttle and develop its successor, complete the International Space Station, and resume human exploration beyond low Earth orbit (LEO), beginning with exploration of the Moon as a step to other destinations in the Solar System. Ares V s first role is that of cargo vehicle to carry a lunar lander into Earth orbit, rendezvous with astronauts launched on the smaller Ares I crew launch vehicle, and perform the trans lunar injection (TLI) mission to send the mated crew and lander vehicles to the Moon. The design reference missions (DRMs) envisioned for it also include direct lunar cargo flights and a human Mars mission. Although NASA s priority from the start of the Constellation Program to the present has been development of the Ares I and Orion crew vehicle to replace the retiring Shuttle fleet, the Ares team has made significant progress in understanding the performance, design trades, technology needs, mission scenarios, ground and flight operations, cost, and other factors associated with heavy lift development. The current reference configuration was selected during the Lunar Capabilities Concept Review (LCCR) in fall 2008. That design has served since then as a point of departure for further refinements and trades among five participating NASA field centers. Ares V development to date has benefited from progress on the Ares I due to commonality between the vehicles. The Ares I first stage completed a successful firing of a 5-segment solid rocket motor. The Ares I-X launch successfully demonstrated in suborbital flighhe ability to assemble, prepare, launch, control and recover the Ares I configuration and compare performance to computer models. Component tests continue on the J-2X engine, which will put both the Ares I and Ares V upper stages into orbit. In addition, more than 100,000 parts have been manufactured or on the assembly line for the first J-2X powerpack and the first two development engines, with hot fire tests to begin in 2011. This paper will further detail the progress to date on the Ares V and planned activities for the remainder of 2010. In addition, the Ares V team has continued its outreach to potential user communities in science and national security. Through the Constellation Program, NASA has amassed an enormous knowledge base in the design, technologies, and operations of heavy lift launch vehicles that will be a national asset for any future launch vehicle decision. This early phase of the design presents the best opportunity to incorporate where possible the insights and needs of other users.

Creech, Steve↗

NASA's Space Launch System: Deep-Space Opportunities for Smallsats

Designed to provide the significant capability required for human deep-space exploration, NASA's Space Launch System (SLS) also provides a unique opportunity for lower-cost deep-space science in the form of small-satellite secondary payloads. This opportunity will be leveraged beginning with the rocket's first flight; a launch of the vehicle's Block 1 configuration, capable of delivering at least 26 metric tons (t) to trans-lunar injection (TLI), which will see the Orion crew vehicle travel around the moon and return to Earth. On that flight, SLS will also deploy 13 6U CubeSat-class payloads to multiple destinations in deep space. These secondary payloads will include not only NASA research but also spacecraft from international partners, industry and academia. The payloads represent a variety of disciplines including, but not limited to, studies of the moon, Earth, sun and asteroids, along with technology demonstrations that could pave the way for even more ambitious smallsat missions in the future.

Robinson, Kimberly F.↗

NASA's Space Launch System and Deep-Space Opportunities for SmallSats

Designed to provide the significant capability required for human deep-space exploration, NASA's Space Launch System (SLS) also provides a unique opportunity for lower-cost deepspace science in the form of small-satellite secondary payloads. This opportunity will be leveraged beginning with the rocket's first flight; a launch of the SLS's Block 1 configuration, capable of delivering >26 metric tons (t) to Trans-Lunar Injection (TLI), which will see the Orion crew vehicle travel around the Moon and return to Earth. On that flight, SLS will also deploy 13 6U CubeSat-class payloads to multiple destinations including deep space. These secondary payloads will include not only NASA research, but also spacecraft from international partners, industry and academia. The payloads represent a variety of disciplines including, but not limited to, studies of the Moon, Earth, Sun, and asteroids, along with technology demonstrations that could pave the way for even more ambitious smallsat missions in the future. As the SLS Program is making significant progress toward that first launch, preparations are already under way for future missions, which will see the booster evolve to its more-capable Block 1 B configuration, able to deliver 40 metric tons to TLI. That configuration will have the capability to carry large payloads co-manifested with the Orion spacecraft, or to utilize an 8.4- meter (m) fairing to carry payloads several times larger than are currently possible. SLS will evolve to its full Block 2 configuration, with a TLI capability of >45 metric tons. Both the Block lB and Block 2 versions of SLS will be able to carry larger secondary payloads than the Block 1 configuration, creating even more opportunities for affordable scientific exploration of deep space. This lecture will provide a status of the SLS development and outline the progress being made toward flying smallsats on the first flight of SLS, and discuss future opportunities for smallsats on subsequent flights.

Bookout, Paul S.↗

NASA's Space Launch System and Deep Space Opportunities for Smallsats

Designed to provide the significant capability required for human deep-space exploration, the National Aeronautics and Space Administration's Space Launch System (SLS) also provides an exceptional opportunity for lower-cost deep-space science in the form of small-satellite (smallsat) secondary payloads. This opportunity will be leveraged beginning with the rocket's first flight; a launch of the SLS's Block 1 configuration, capable of delivering greater than 26 metric tons (t) to Trans-Lunar Injection (TLI), which will see the Orion crew vehicle travel around the Moon and return to Earth. On that flight, SLS will also deploy 13 6U-class CubeSat secondary payloads to multiple destinations including deep space. Preparations are already under way for future vehicle configurations, with the more capable Block 1B, able to deliver 40 metric tons to TLI. That configuration will have the capability to carry large payloads co-manifested with the Orion spacecraft, or to utilize an 8.4-meter (m) fairing to carry payloads several times larger than are currently possible. SLS will evolve to its full Block 2 configuration, with a TLI capability of greater than 45 metric tons. This paper will provide a status of the SLS development and outline the progress being made toward flying smallsats on SLS, and discuss future opportunities for smallsats.

Bookout, Paul S.↗

Trajectory Design and Orbit Determination for the Lunar CRater Observation and Sensing Satellite (LCROSS)

The Lunar CRater Observation and Sensing Satellite (LCROSS) was competitively selected by the National Aeronautical and Space Administration (NASA) Exploration Systems Mission Directorate (ESMD) as a low-cost (< $80M) 1000 kg secondary payload to be launched with the Lunar Reconnaissance Orbiter (LRO) in October of 2008. LCROSS is a lunar impactor mission that will investigate the presence or absence of water in a permanently shadowed crater. Following launch, trans-lunar injection (TLI) and separation from LRO, LCROSS will remain attached to the launch vehicle's approximately 2300 kg spent Earth Departure Upper Stage (EDUS) and will guide it toward an impact of a permanently shadowed crater at the lunar South Pole. Hours prior to impact, LCROSS will separate from the EDUS and perform a braking maneuver that will allow the spacecraft to take measurements of the resulting EDUS impact ejecta cloud for several minutes, before impacting the crater as well. As a cost-capped secondary mission that must accommodate specific LRO launch dates, LCROSS faces unique challenges and constraints that must be carefully reconciled in order to satisfy an ambitious set of science observation requirements. This paper examines driving mission requirements and constraints and describes the trajectory design and navigation strategy that shape the LCROSS mission.

Galal, Ken↗

Synchronized Lunar Pole Impact Plume Sample Return Trajectory Design

The presented trajectory design enables two maneuverable spacecraft launched onto the same trans-lunar injection trajectory to coordinate a steep impact of a lunar pole and subsequent sample return of the ejecta plume to Earth. To demonstrate this concept, the impactor is assumed to use the LCROSS missions trajectory and spacecraft architecture, thus the permanently-shadowed Cabeus crater on the lunar south pole is assumed as the impact site. The sample-return spacecraft is assumed to be a CubeSat that requires a complimentary trajectory design that avoids lunar impact after passing through the ejecta plume to enable sample-return to Earth via atmospheric entry.

impact plume↗

Project Minerva: A low cost manned Mars mission based on indigenous propellant production

Project Minerva is a low-cost manned Mars mission designed to deliver a crew of four to the Martian surface using only two sets of two launches from the Kennedy Space Center. Key concepts which make this mission realizable are the use of near-term technologies and in-situ propellant production, following the scenario originally proposed by R. Zubrin. The first set of launches delivers two unmanned payloads into low Earth orbit (LEO): the first payload consists of an Earth Return Vehicle (ERV), a propellant production plant, and a set of robotic vehicles; the second payload consists of the trans-Mars injection (TMI) upper stage. In LEO, the two payloads are docked and the configuration is injected into a Mars transfer orbit. The landing on Mars is performed with the aid of multiple aerobraking maneuvers. On the Martian surface, the propellant production plant uses a Sabatier/electrolysis type process to combine nine tons of hydrogen with carbon dioxide from the Martian atmosphere to produce over a hundred tons of liquid oxygen and liquid methane, which are later used as the propellants for the rover expeditions and the manned return journey of the ERV. The systems necessary for the flights to and from Mars, as well as those needed for the stay on Mars, are discussed. These systems include the transfer vehicle design, life support, guidance and communications, rovers and telepresence, power generation, and propellant manufacturing. Also included are the orbital mechanics, the scientific goals, and the estimated mission costs.

Beder, David↗

Flight Dynamics and Navigation Performance of the BioSentinel Mission

BioSentinel was one of the ten 6U CubeSats launched by the Space Launch System (SLS) as part of the Artemis-I mission on November 16th, 2022. The spacecraft was deployed after the trans-lunar injection imparted by the upper stage of SLS, and performed a lunar flyby that provided the necessary energy to escape the Earth-Moon system into heliocentric space. The BioSentinel mission required flight dynamics support prior to flight to assess the deployment conditions and the trajectory design, as well as navigation support during flight, to provide orbit determination solutions for the mission and the Deep Space Network (DSN). This paper discusses the BioSentinel mission flight dynamics campaign, from mission design to the challenges and lessons learned encountered during flight.

Astrodynamics↗

Artemis I Off-Nominal-Trajectory Design and Optimization

In order to achieve the Artemis I mission objectives to human-rate the Orion spacecraft even under off-nominal conditions, trajectories were developed to handle contingency scenarios: alternate missions for contingencies before or during the Trans-Lunar Injection burn, recoveries to return Orion to the nominal trajectory after a delayed or partial burn, and abort trajectories to return the spacecraft to Earth after a critical failure. In addition, disposal trajectories were generated for situations where recovery was not an option. Details are given on the trajectory characteristics, solution families, the generation of the trajectories, and operations considerations.

Artemis I↗

A GNM mission and system design proposal

Here, the author takes an advocacy position for the proposed Mars Global Network Mission (GNM); it is not intended to be an objective review, although both pros and cons are presented in summary. The mission consists of launches from earth in the '96, '98, and '01 opportunities on Delta-class launch vehicles (approx. 1000 kg injected to Mars in 8 to 10 ft diameter shroud). The trans Mars boost stage injects a stack of small independent, aeroshelled spacecraft. The stack separates from the boost stage and each rigid (as opposed to deployable) aeroshell flies to Mars on its own, performing midcourse maneuvers as necessary. Each spacecraft flies a unique trajectory which is targeted to achieve approach atmospheric interface at the desired latitude and lighting conditions; arrival times may vary by a month or more. A direct entry is performed, there is no propulsive orbit capture. The aeroshelled rough-landers are targeted to achieve a desired attitude and entry flight path angle, and then follow a passive ballistic trajectory until terminal descent. Based on sensed acceleration (integrated to deduce altitude), the aft aeroshell skirt is jettisoned; a short later a supersonic parachute is deployed. The ballistic coefficient of the parachute is sized to achieve terminal velocity at about 8 km. However the parachute is not deployed until a few Km above the surface to minimize wind-induced drift. The nose cap descent imaging begins, a laser altimeter also measures true altitude. Based on range and range rate to the surface, the parachute is jettisoned and the lander uses descent engines to achieve touchdown velocity. A contact sensor shuts down the motors to avoid cratering, and the lander rough-lands at less than 5 m/sec. The remaining aeroshell and a deployable bladder attenuate landing loads and minimize the possibility of tip over. Science instruments are deployed and activated, and the network is established.

Bailey, Stephen↗

NASA's Space Launch System Moves into Testing and Integration

NASA's Space Launch System (SLS) has moved from design and manufacturing into testing and integration for its first flight as early as December 2019. In 2017, the NASA/industry team completed manufacturing of all major structural elements for the launch vehicle for Exploration Mission-I (EM-1 ). That work included shipping the first major flight hardware element to the launch site. The team processed all four RS-25 engines for stage integration, cast all 10 booster flight motor segments, and manufactured all five major sections of the core stage. The program also completed major structural work on the B-2 test stand at Stennis Space Center, which will be used for the core stage "green run" test; delivered the core stage and engine simulators used for training; and much of the transportation equipment for the core stage. Engineers completed structural testing on the upper stage/payload section of the vehicle as well as the engine section test article. In 2018, the program will deliver the Orion Stage Adapter (OSA) to Exploration Ground Systems (EGS) at KSC and send the test articles for the core stage liquid hydrogen tank, liquid oxygen tank, and intertank to NASA's Marshall Space Flight center for structural testing. Additionally, workers will begin the challenging process of integrating the major sections of the 212-foot EM-1 core stage. This work is focused on the initial Block 1 variant of SLS, capable of launching more than 70 metric tons (t) to low Earth orbit (LEO). However, work concurrently is underway on the Block lB variant, which will enable 105 t to LEO and more than 37t to trans-lunar injection (TLI). Block lB will be the workhorse vehicle of NASA's lunar exploration plans. As the needs of the nation's deep space exploration program grow, SLS performance is designed to evolve to a payload mass of 130 t to LEO and up to 45t to TLI. The advantages of this mass - as well as volume- are critical to the entire exploration architecture for deep space exploration. They translate to greater capability, greater infrastructure and operational simplicity, less overall mission risk, and opportunities to accomplish unprecedented exploration and discovery. This paper will discuss SLS progress to date and planned future work.

Honeycutt, John↗